DESCRIPTION

Mock presentation for Project Management class. Worked as a group to propose solutions for a start-up web designs company. I was Assistant PM. We made little and gigatanic mistakes, but still got a good grade.

TRANSCRIPT

Leuze Web Design Project

Prospective overview by:

Since its creation in 2003, Project Solutions’ key goal has been to provide the best service possible to our client base and to spread that

passion for network design and implementation.

• Certified Staff• High success rate• Prompt Completion• Lasting Relationships

Project Solutions

Perform site survey Design a network that meets/exceeds

requirements Select appropriate network devices Install requested software Test connectivity, troubleshoot Complete promptly Maintain an open line of communication Optional Add-ons

Objectives

Schedule

Microsoft Office Project 2003

Distribution-Cisco WS-C3750-48PS-S Catalyst 3750-48PS Cisco SGE2010 48-port Gigabit SwitchLinksys SRW 2008P 8-port

Access-Cisco Catalyst 3560-48TS 48-PortCisco 2960 48-port switchCisco SLM2048 48-port Gigabit Smart Switch

Network Devices -Switches

Wired – Cisco 2821 Sec/k9Cisco 2811Cisco - 1811 - CISCO1811/K9

Wireless – Linksys WRT160N Ultra RangePlus Wireless N

Router Cisco WRT160NL Wireless-N Broadband Router Linksys WRT610N Wireless N Router

Network Devices- Routers

500ft UTP Cat5e cabling Cables To Go 25-Foot Cat5e Crossover Patch

Cable Cables To Go 100-Foot Cat5e Assembled

Patch Cable

Network Devices- Cabling

A VLAN is a Virtual Local Area Network Configure a network for basic roles Ports cannot communicate with each other VLANs allow us to divide a network without

the use of more equipment To make ports communicate between VLANs

they need to be routed with a router.

What is a VLAN?

VLAN Assignments VLAN 34 Sales VLAN 58 Development VLAN 67 Marketing VLAN 78 Administration VLAN 1-1001 Management (Network)

Logical Topology

Acquire Software◦ Vista OS◦ MS Office Standard 2007◦ Adobe ACS4

Install and Image Laptop◦ Connect to PCs

Daisy Chain 10 PCs then Remaining 75◦ Connect to Laptops

Daisy Chain 10 Laptops then Remaining 40 Test Software

Operating System & Software

50 Blackberry Phones◦ Purchased with service contract◦ Leased with Support Included

Adobe ASC4◦ Support

Additional Training

Optional Services

Hacking & Other Security Breaches Network Failure Faulty Equipment Location of Network Equipment Client Hardware Early Close Out

Risk Analysis

 

WEEK 1 Begin LWD ProjectResearch and obtain OS and software licenses

Arrival and Installation of hardware

WEEK 2 Network Preparation and Configuration Our IT staff will configure network devices based on department

needs

WEEK 3 Diagnostics/Installation of Software Troubleshooting (if needed)

Using a common practiced system to install software on all PC’s and Laptops

WEEK 4 Walkthrough/meet with existent IT staff/Close OutWalkthrough with LWD IT Team, discuss changes if needed, reviseWhen the entire network is working, software is installed properly

Schedule

Monday through Friday 9pm to 5 pm No weekends Equipment fees based on our suggestions

Budget

2550 Langdon AveDetroit, MI 48978Office: 313.867.5309Fax: 313.867.5310