mardigu wowiek prasantyo rembang pati kudus cepu surabaya semanggi gas field 1-5 mmscfd 82 km from...

Post on 14-Mar-2019

214 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

1

MARDIGU WOWIEK PRASANTYO

PROFILE

2

FORMAL EDUCATION• BachelordegreeSFSUSanFransiscoStateUniversity,

MasterAppliedPsychologyinCriminalmind&ForensicInvestigators

PROFESIONAL WORKING EXPERIENCE• PaninBank,TreasuryManager1990-1993

• PTMegasinoInvestama,Director1993-1999

• Interogatordaninvestigatorforextraordinarycrime(esp:teroris)2006-2011

• MengajardisekolahtinggiIntelegenNasional,Sandha,,BIN,BAIS–Present

• KEINPokjaenergy2015-Present

• StafahliAnstraKemenhan–2015-Present

BUSINESS EXPERIENCE• Owner&founderPTTitisSampurnaOil&Gascompany(sold)

• Owner&FounderPTLakselcompany

• Owner&FounderPTCiptalintangInvestmentcompany

• Owner&FounderPTNarapatihInspiratamaBusiness

• ConsultantCompany

MARDIGU WOWIEK PRASANTYO

3

COMPANY OvERvIEW

4

MAjOR ExPERIENCES IN GAS PIPELINESEast Java Gas Transmission System O&M (1997 – 2007)

• ActingasanOperationsandMaintenance(“O&M”)contractorforPERTAMINAfora440kmgaspipeline(28”onshore&offshore),fromPagerunganIslandtoGersikwith200MMSCFDGasFlowRate.

• Pipelinecapacity:600mmscfdwithSCADAcontrolsystem

5

Grissik - Duri Gas Transmission System O&M (1997 – 2003)

• InCooperationwithNovaTransCanadaPipelines,TitisSampurnaactingasanO&McontractorforPTPerusahaanGasNegara(PGN)for536km28”gaspipeline,fromGrissiktoDuri(CentralSumatera)with310MMSCFDGasFlowRate.

6

West Natuna to Singapore Gas Transmission System (2000)

Supervision,VerificationandCertificationofEPCandOffshorePipelineInstallationandTestingfor656Km28”,22”,16”and15”gaspipeline.ThePipelineisacross-borderbetweenIndonesiaandSingaporestartfromBlockB-Conoco,BlockA–Premier,BlockKakap–Gulf(Indonesia)toSakraIsland(Singapore).

West Natuna to Malaysia Gas Transmission System (2001)

Supervision,VerificationandCertificationofEPCandOffshorePipelineInstallationandTestingfor135Km

12”,14”,18”gaspipeline.ThePipelineisacross-borderbetweenIndonesiaandMalaysiastartfromKijingField-KeongField–HangtuahPlatform(Conoco-Indonesia)toDuyongCentralProcessingPlatform(Petronas-Malaysia)

7

KM 53 - Bontang Gas Transmission System (Start 2000), Own Investment

• Theproject(BOO)comprisesofa13km20”gaspipelineinBontang,EastKalimantanincludingsupportingfacilitieswith165–300MMSCFDgasflowrate.

• ThegasissuppliedbyPERTAMINAandconsumedbyMitsuiandMitsubishi(AmmoniaPlant).

• EPCweredonebyTitisSampurna

8

Sub-sea Control System Project Pagerungan Block C, ARCO (1995 – 1996)

• EngineeringDesign,Fabrication&InstallationoftheSub-seaControlSystemandassociatedequipmenttotheexistingPagerungan-CFacility,includingtheinterfaceswithexistingFacilities.

• TheWorkincludingtheonshoreandoffshoreequipmentsuchas:Sub-seaControlSystem,ChemicalInjectionSystem,Sub-seaServiceUmbilicals,Sub-seaVenturiMeter

MAjOR ExPERIENCES IN ENGINEERING & CONSTRUCTION

9

Poleng Gas Field Re-activation Project, East Java (1996 - 1999) • AnEPCandturnkeyprojectforre-activating

andenhancingoffiveoffshore’wellsnamePolengFieldofKODECOEnergy.

• ScopeofWork:DetailedEngineer,Fabricate,Install,Hook-upandpre

commissionthenewfacilities

Kamojang Geothermal Power Plant• FrontEndEngineeringDesign(FEED)2004

Lahendong Geothermal Power Plant• FrontEndEngineeringDesign(FEED)2005

• ProjectManagementConsultant2006

10

3 X 1500 HP Gas Compressors & Dehydration Unit

4 X 1500 HP Gas Compressors & Dehydration Unit

AIR SERDANG

LIMAU TIMUR

BERINGIN

Project Location

27.5 km 10” Gas Pipeline14 MMSCFD Flowrate

32.5 km 8” Gas Pipeline22 MMSCFD Flowrate

LPG Plant (200 MTD LPG, 1500BBLD Condensate) & CO2 Removal

PROjECT LOCATION

Prabumulih

11

south sumatera GAS UTILIZATIONGas Transmission System- 60 km

Gas Compressor Stations - 7 x 1500 hp

Gas Extraction Facility (36 MMSCFD Feed Natural Gas)

• CO2Removal

• LPGPlant(200MTDLPG,1500BBLDStabilizedCondensate)

12

LImau tImur LPG ExTRACTION PLANT + CO2 REMOvAL

13

BLORA

REMBANG

PATI

KUDUS

CEPU

SURABAYA

Semanggi Gas Field

1- 5 mmscfd

82 km from Mother Station

97 km from Mother Station

CNG Mother Station

DEMAK

120 km from Mother Station

SEMANGGI BLOCK, cEntRaL javaFlaredGasUtilizationForCNGBusiness

14

CNG FACILITIES, centraL java

15

GAS SUPPLY TO TAMBAK LOROK CCGT POWER PLANT centraL java

Investmentof140km20

gaspipelinewith6,000hp

compressorsfromgundiharea

totambaklorokpowerplant,

centraljava

16

GAS LOCATION

Proposed 20” 130km Gas Pipeline

Gas Compressor Station

Gas Delivery Point

Gas Receiving Station

PROjECT LOCATION

17

arra amanDaru hoteL cePu

18

arra LemBah PInus hoteL cILoto PuncaK

19

nusa PenIDa crYstaL BaY

20

area 247 KetaPanG BanYuWanGI

21

stay cOnnEctEd

fb.com/wowiek

mardiguwp

mardiguwp

23

WWW.cyROnIUM.cOM

top related