Meeting Name. Date. Agenda. Introductions Transportation Funding 101 Program Development Process Program Projects Strategic Funding Tax Rate Implications Public Information. Transportation – The Big Picture. The Texas Transportation Institute found that Texas needs: - PowerPoint PPT Presentation

TRANSCRIPT

Meeting NameDate

Agenda

• Introductions

• Transportation Funding 101

• Program Development Process

• Program Projects

• Strategic Funding

• Tax Rate Implications

• Public Information

Transportation – The Big Picture• The Texas Transportation Institute found that Texas needs: • $6B annually to slow deteriorating pavement conditions and

congestion• $10B annually to keep 2010 conditions stable • Currently there is $2.8B available budget for 2014 and 2015

http://transportationadvocatesoftexas.org

Why Such a Shortfall?• There are many reasons• Population – Increased congestion and maintenance• Increased cost of resources and construction• Vehicle fuel efficiency and Inflation affecting the tax rate

http://transportationadvocatesoftexas.org

Kaufman County • Kaufman County is the 9th fastest growing County in Texas and the

40th fastest growing county in the U.S.

http://research.stlouisfed.org

• NCTCOG Population Projection• Year 2013 = 110,000 people• Year 2030 =277,000 people

Process – Data Collection• Sources for candidate project solicitation• County Judge & Commissioners• All Cities • Texas Department of Transportation (TxDOT)• NCTCOG • ISD Superintendents

• A total of 80 projects were submitted for consideration in the bond program, totaling over $400M

Process – Project Evaluation• Project Considerations• Safety Improvements• Congestion Alleviation• Proximity to Schools & High Traffic Generators• Air Quality Improvement• Economic Development• Significant Alternate Route Creation• External Funding Availability• Fast Start Project / Bond Term Viability

• A Total of 26 projects were included totaling an estimated cost of $56M

All Projects

All Projects

*Project costs are estimates

Precinct 1 Projects

Precinct 1 Projects

*Project costs are estimates

Project # Project Name Total Project Cost Local Funds TxDOT and

Federal Funds2013 County Bond Funds Comments

1 County Roads (Precinct 1) $1,000,000 $0 $1,000,000

2SH 34 (By-Pass) $20,200,000 $14,200,000

$0$6,000,000

Funding gap in Pass Through Project, expect a proportional payback of $4.5M

3 CR 151/ Kings Fort Pkwy $4,000,000 $0 $4,000,000

4SH 243/ FM 2515 Intersection Improvements $200,000 $0

$200,000

5SH 243/ FM 2727 Intersection Improvements $200,000 $0

$200,000

6 Highway 34 Advanced Planning $1,500,000 $0 $1,500,000

7 Regional Transportation Plan $1,000,000 $0 $1,000,000 Total Project

Cost County Cost Pass-Through Payback

$31,100,000 $16,900,000 $4,500,000

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Precinct 1 - Project Facts

Program Project Summary

• $4M - Funding County Road Materials

• $19.2M - Pass Through Projects

• $2.6M – Intersection Safety Improvements

• $6.9M - Advanced Planning (Env. & Schematic Design)

• $2M – Countywide Transportation Studies

• $3M – Strategic Project Funding

• $18.3M – General Roadway Design and Construction

Strategic Funding• Program Funding Sources• County• Local City Participation• TxDOT and Federal Funds

Tax Rate Implications• $0.036 (3.6¢) per $100 taxable value

• Average home value=$122,000 $43.92 per year $3.66 per month

* Important - The amount of taxes on residential homesteads of persons 65 and older will not increase above the amount of taxes when they qualified to receive the freeze exemption.

Public Information• Website• www.KaufmanCountyTransportation.com

Public Information• Bond Program

Educational Presentations• Voters Educational

Brochure• Website

QUESTIONS??Thank You!