myhotel as existing drawings

Post on 16-Mar-2016

223 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

MyHotel As Existing Drawings, accompanying the planning application for the most recent proposals for extension.

TRANSCRIPT

Site Location PlanScale: 1:125001

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

0.SCALE (m):

20. 40. 100.

Can

opy/

Pla

nter

ove

r

Smok

ing

terr

ace

Smal

l bat

ch t

erra

ce

my

hote

l

Add

ition

al

dow

nlig

hts

rece

ssed

int

o un

ders

ide

of

cano

py

Add

ition

al

dow

nlig

hts

rece

ssed

int

o un

ders

ide

of

cano

py

Go

bo p

roje

ctio

n on

to

pave

men

t

FFL

0.00

0

FFL

-0.4

00

FFL

-0.8

70

BIN

STO

RE

TIC

KET

S A

ND

CLO

AK

S

SMA

LL B

ATC

HEX

IST

ING

100

M2

PRO

POSE

D 1

40M

2

KIT

CH

EN E

XT

RA

CT

FRO

M

BASE

MEN

T

outline of ext. wall above

D.G19-2

87

54 3

21

6

D.G

14

12 13 14 15 16 17 18 19 20 21

109811

7

2000

Stor

es

Offi

ce

Cup

'd

30M

228

cov

ers

130M

2

Plan

ting

Planting

10 c

over

s Che

fs T

able

Block PlanScale: 1:500

02

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

11513

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

0. 5. 10.SCALE (m):

20. 40.

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW AUGUST 20121:500 & 1:1250 @ A1

1138 A.01 -

SITE AND BLOCK PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

N

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.03 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

1 2 3

4 5

6

1

2

3

4

5

6

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

N

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.04 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

5

4

3

2

1

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.05 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

5

3

2

1

4

CAR PARKL625M2

MECHNICAL & PLANT

UNIFORMS & DIRTY LINEN

UNIFORMS & CLEAN LINEN

CORRIDOR

SERVICE LIFT

CORRIDOR

ACCESSIBLE WC & SHOWER

STAFF CHANGING - MALE STAFF CHANGING - FEMALE

STAFF DINING

COMMUNICATIONSDisabled refuge

STAIR

ADMINISTRATION

WORKSHOP

KITCHEN

Disabled refuge

STAIR

HOUSE KEEPING

REFUSE

RAMP UP

BOTTLE STORE

CHEFS OFFICE

FOOD STORE

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.05 -

AS EXISTING BASEMENT PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Basement Plan 1:200 @ A3

0 1 2 3 4 5 10

metres

outli

ne o

f ext

. wal

l abo

ve

D.G

19-2

87 5

43

21

6

my my

D.G14

1213

1415

1617

1819

2021

109

811

7

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.07 -

AS EXISTING GROUND FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Ground Floor Plan 1:200 @ A3

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:100 @ A31:100 @ A1

1138 A.08 -

AS EXISTING 1ST FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing First Floor 1:200 @ A3

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:100 @ A31:100 @ A1

1138 A.09 -

AS EXISTING 2ND FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Second Floor Plan 1:200 @ A3

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

JG OCTOBER 20121:200 @ A31:100 @ A1

1138 A.10 -

AS EXISTING 3RD FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Third Floor Plan 1:200 @ A3

0 1 2 3 4 5 10

metres

2050

010

900

2400

9050

5000

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

JG OCTOBER 20121:200 @ A31:100 @ A1

1138 A.11 -

AS EXISTING ROOF PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Roof Plan 1:200 @ A3

8

JUBILEE STREETSWIMMING POOL

6

1

6

01234510

metres

my

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.15 -

AS EXISTING ELEVATIONS

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing North Elevation

01

-As Existing East Elevation

01234510

metres

THE TWITTEN

ramp beyond

JUBILEE STREET

8

SWIMMING POOL

01

-As Existing South Elevation

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 info@chalkarchitecture.com www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.16 -

AS EXISTING ELEVATIONS

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing West Elevation

top related