myhotel as existing drawings

12
Site Location Plan Scale: 1:1250 01 9 10 Corn Exchange 26 Hall Pavilion 120 Art Gallery and Museum 119 20 19 North 22 25 29 Theatre Church Unitarian 2 BARRACK YARD REGENT STREET 43 57 1 GARDNER STREET 100 5 2 Posts 48 16 5 32 1 to 20 4 JUBILEE STREET 7 8 9 1 3 1 2 El Sub Sta Brighton 1 PH NORTH PLACE 2 40 19 24 3 13 to 16 43 la 1 to 3 1 to 4 5 Jubilee Library 36 1 23 18 9 1 to 15 31 Arena House 21 Arena House 1 to 12 11 12 8 11 to 17 Orange Row 20 21 18a 39 TCBs 28 29 30 27 38 37 3 114 Prince Regent Swimming Complex 109 23 21 115 13 CHURCH STREET 1 4b 116 3 7 8 3d 3c 4 3a 1 to 5 3b LB 118 5 Pavilion Mews 6 6a 1 24 4 5 2 44 to 47 17 Hotel 14 PH 0. SCALE (m): 20. 40. 100. my hotel FFL 0.000 FFL -0.400 FFL -0.870 TICKETS AND CLOAKS SMALL BATCH EXISTING 100M2 PROPOSED 140M2 outline of ext. wall above D.G19-2 D.G14 2000 Stores Office Cup'd 30M2 28 covers 130M2 Planting Planting 10 covers Chefs Table Block Plan Scale: 1:500 02 9 10 Corn Exchange 26 Hall Pavilion 120 Art Gallery and Museum 119 20 19 North 22 25 29 Theatre Church Unitarian 2 BARRACK YARD REGENT STREET 43 57 1 GARDNER STREET 100 5 2 Posts 48 16 5 32 1 to 20 4 JUBILEE STREET 9 1 3 1 2 El Sub Sta Brighton 1 PH NORTH PLACE 2 40 19 24 3 13 to 16 43 la 1 to 3 1 to 4 5 Jubilee Library 36 1 23 18 9 1 to 15 31 Arena House 21 Arena House 1 to 12 11 12 8 11 to 17 Orange Row 20 21 18a 39 TCBs 28 29 30 27 38 37 3 114 Prince Regent Swimming Complex 109 23 21 115 13 CHURCH STREET 1 4b 116 3 7 8 3d 3c 4 3a 1 to 5 3b LB 118 5 Pavilion Mews 6 6a 1 24 4 5 2 44 to 47 17 Hotel 14 PH 0. 5. 10. SCALE (m): 20. 40. Chalk Architecture Ltd The Chalk Store 102a Gloucester Road North Laine Brighton East Sussex BN1 4AL UK 0044 (0) 1273 697262 [email protected] www.chalkarchitecture.com 1. Dimensions and Levels Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled. 2. Existing Building and Services Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works. 3. Copyright Copyright for all designs and drawings in full or part shall remain with the Architect in accordance with the Copyright Act. 4. Scope of Works Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contract unless otherwise agreed in writing 5. Statutory Requirements and Standards All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards. 7. Revisions rev date comment drawn Project Drawing Drawn Scale Date Job No. Drg. No. Rev. MYHOTEL BRIGHTON JUBILEE ST, BRIGHTON GCW AUGUST 2012 1:500 & 1:1250 @ A1 1138 A.01 - SITE AND BLOCK PLAN Drawing status Client MYHOTEL GROUP PLANNING N

Upload: joe-giddings

Post on 16-Mar-2016

222 views

Category:

Documents


0 download

DESCRIPTION

MyHotel As Existing Drawings, accompanying the planning application for the most recent proposals for extension.

TRANSCRIPT

Page 1: MyHotel As Existing Drawings

Site Location PlanScale: 1:125001

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

0.SCALE (m):

20. 40. 100.

Can

opy/

Pla

nter

ove

r

Smok

ing

terr

ace

Smal

l bat

ch t

erra

ce

my

hote

l

Add

ition

al

dow

nlig

hts

rece

ssed

int

o un

ders

ide

of

cano

py

Add

ition

al

dow

nlig

hts

rece

ssed

int

o un

ders

ide

of

cano

py

Go

bo p

roje

ctio

n on

to

pave

men

t

FFL

0.00

0

FFL

-0.4

00

FFL

-0.8

70

BIN

STO

RE

TIC

KET

S A

ND

CLO

AK

S

SMA

LL B

ATC

HEX

IST

ING

100

M2

PRO

POSE

D 1

40M

2

KIT

CH

EN E

XT

RA

CT

FRO

M

BASE

MEN

T

outline of ext. wall above

D.G19-2

87

54 3

21

6

D.G

14

12 13 14 15 16 17 18 19 20 21

109811

7

2000

Stor

es

Offi

ce

Cup

'd

30M

228

cov

ers

130M

2

Plan

ting

Planting

10 c

over

s Che

fs T

able

Block PlanScale: 1:500

02

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

11513

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

0. 5. 10.SCALE (m):

20. 40.

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW AUGUST 20121:500 & 1:1250 @ A1

1138 A.01 -

SITE AND BLOCK PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

N

Page 2: MyHotel As Existing Drawings

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.03 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

1 2 3

4 5

6

1

2

3

4

5

6

Page 3: MyHotel As Existing Drawings

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

N

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.04 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

5

4

3

2

1

Page 4: MyHotel As Existing Drawings

0.SCALE (m):

20. 40. 100.

910

Corn

Exc

hang

e

26

Hal

l

Pavilion

120

Art Gallery and Museum

119

20

19

North

22

25

29

Theatre

Church

Unitarian

2

BAR

RAC

K YA

RD

REG

ENT

STR

EET

43

57

1

GAR

DN

ER S

TREE

T

100

52

Posts

48

16

5

32

1 to

20

4

JUBI

LEE

STR

EET

78

9

1

3

1

2

El S

ub S

ta

Brighton

1

PH

NO

RTH

PLA

CE

2

40

19

24

3

13 to

16

43

la

1 to

3

1 to

4

5

Jubilee Library

36

1

23

189

1 to 1531

Arena House21

Aren

a H

ouse

1 to

12

1112

8

11 to

17

Ora

nge

Row

20

21

18a

39

TCBs

2829

3027

3837

3

114

Prince Regent Swimming Complex

109

23

21

115

13

CHURCH STREET1

4b

116

3 7

8

3d3c

4

3a1

to 5

3b

LB118

5

Pavi

lion

Mew

s6

6a

1

24

4 5

2

44 to

47

17

Hotel

14

PH

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON

GCW NOVEMBER 20121:2000 @ A31:1000 @ A1

1138 A.05 -

PHOTO SURVEY

Drawing status

Client

MYHOTEL GROUP

PLANNING

5

3

2

1

4

Page 5: MyHotel As Existing Drawings

CAR PARKL625M2

MECHNICAL & PLANT

UNIFORMS & DIRTY LINEN

UNIFORMS & CLEAN LINEN

CORRIDOR

SERVICE LIFT

CORRIDOR

ACCESSIBLE WC & SHOWER

STAFF CHANGING - MALE STAFF CHANGING - FEMALE

STAFF DINING

COMMUNICATIONSDisabled refuge

STAIR

ADMINISTRATION

WORKSHOP

KITCHEN

Disabled refuge

STAIR

HOUSE KEEPING

REFUSE

RAMP UP

BOTTLE STORE

CHEFS OFFICE

FOOD STORE

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.05 -

AS EXISTING BASEMENT PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Basement Plan 1:200 @ A3

Page 6: MyHotel As Existing Drawings

0 1 2 3 4 5 10

metres

outli

ne o

f ext

. wal

l abo

ve

D.G

19-2

87 5

43

21

6

my my

D.G14

1213

1415

1617

1819

2021

109

811

7

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.07 -

AS EXISTING GROUND FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Ground Floor Plan 1:200 @ A3

Page 7: MyHotel As Existing Drawings

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:100 @ A31:100 @ A1

1138 A.08 -

AS EXISTING 1ST FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing First Floor 1:200 @ A3

Page 8: MyHotel As Existing Drawings

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:100 @ A31:100 @ A1

1138 A.09 -

AS EXISTING 2ND FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Second Floor Plan 1:200 @ A3

Page 9: MyHotel As Existing Drawings

0 1 2 3 4 5 10

metres

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

JG OCTOBER 20121:200 @ A31:100 @ A1

1138 A.10 -

AS EXISTING 3RD FLOOR PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Third Floor Plan 1:200 @ A3

Page 10: MyHotel As Existing Drawings

0 1 2 3 4 5 10

metres

2050

010

900

2400

9050

5000

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

JG OCTOBER 20121:200 @ A31:100 @ A1

1138 A.11 -

AS EXISTING ROOF PLAN

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing Roof Plan 1:200 @ A3

Page 11: MyHotel As Existing Drawings

8

JUBILEE STREETSWIMMING POOL

6

1

6

01234510

metres

my

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.15 -

AS EXISTING ELEVATIONS

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing North Elevation

01

-As Existing East Elevation

Page 12: MyHotel As Existing Drawings

01234510

metres

THE TWITTEN

ramp beyond

JUBILEE STREET

8

SWIMMING POOL

01

-As Existing South Elevation

Chalk Architecture Ltd The Chalk Store102a Gloucester RoadNorth LaineBrightonEast SussexBN1 4ALUK

0044 (0) 1273 5697262 [email protected] www.chalkarchitecture.com

1. Dimensions and Levels

Figured dimensions and levels should be verified by the Contractor on site before construction or manufacture and any discrepancies brought to the attention of the Architect. Dimensions should not be scaled.

2. Existing Building and Services

Where shown, existing buildings and services will not indicate condition. The Contractor shall therefore investigate and report to the Architect at the commencement of the works.

3. Copyright

Copyright for all designs and drawings in fullor part shall remain with the Architect in accordance with the Copyright Act.

4. Scope of Works

Drawings are issued in accordance with and on the basis of the RIBA Conditions of Engagement and the JCT Form of Contractunless otherwise agreed in writing

5. Statutory Requirements and Standards

All work is to comply with the current Building Regulations and the requirements of the respective local authority. Workmanship and standards shall also comply with the current Codes of Practice and the relevant British Standards.

7. Revisions

rev date comment drawn

Project

Drawing

Drawn ScaleDate

Job No. Drg. No. Rev.

MYHOTEL BRIGHTON

JUBILEE ST, BRIGHTON.

PN SEPTEMBER 20121:200 @ A31:100 @ A1

1138 A.16 -

AS EXISTING ELEVATIONS

Drawing status

Client

MYHOTEL GROUP

PLANNING

01

-As Existing West Elevation