Project Zone newsletter | November 2018
For more information visit: nepeanredevelopment.health.nsw.gov.au
email: HI-Nepeanredevelopment@health.nsw.gov.au
NEPEAN REDEVELOPMENT
Designs unveiled for
Stage 1
On Friday 16 November, Member for Penrith,
Stuart Ayres and Member for Mulgoa Tanya
Davies visited the Nepean campus to unveil the
schematic designs for the new 14-storey clinical
tower, which is part of the $576 million Stage 1
Nepean Redevelopment.
A 3D fly-over of the building and several artist’s
impressions of the interiors showcase the
outcomes of an extensive planning and
consultation process with hospital staff and the
community.
The Stage 1 hospital tower will include a new
and expanded Emergency Department, more
than 12 new Operating Theatres, 18 Birthing
Suites, a new Neonatal Intensive Care Unit, more
than 200 overnight beds and a new roof top helipad.
Construction is expected to start in early-2019
following a final detailed design planning and
consultation process. This will determine where all
the furniture, fittings and equipment will be located in
each clinical area and public space of the tower.
Currently, the project team is also conducting a
roadshow to capture community input into the look
and feel of the public spaces of the new tower. This
will feed into the final detailed design phase. Further
details about this roadshow are included on page 4
of this newsletter.
Artist’s impression of the new Emergency Department entry.
Artist’s impression of the Stage 1 hospital tower.
Artist’s impression of the Neonatal Intensive Care Unit.
Project Zone newsletter | November 2018
For more information visit: nepeanredevelopment.health.nsw.gov.au
email: HI-Nepeanredevelopment@health.nsw.gov.au
NEPEAN REDEVELOPMENT
Drivers will still be able to retrieve their cars from this car park at any time.
In mid-January 2019, the Somerset Street car park will be permanently closed to allow for construction to commence on the Stage 1 tower.
Additional, temporary staff parking will be provided close to the hospital campus to minimise any disruption to patients and visitors.
All disabled car spaces within the Somerset car park, will be relocated to convenient areas on the hospital campus to ensure spaces are maintained. Details on the new accessible parking locations will be provided in the coming weeks.
New parking changes at
Nepean Redevelopment
There will be changes to parking over the Christmas and New Year period to prepare for construction of the Stage 1 hospital tower in early 2019.
From Monday 10 December 2018, we will trial valet parking at the Derby Street multi-storey car park.
This will require drivers to leave their keys with parking attendants when the car park is close to capacity, allowing parking attendants to park the cars in a more efficient way and increase capacity within the multi-storey car park.
Thank you for your support and patience as we progress this important project.
For further information or questions regarding the car parking changes please email:
HI-nepeanredevelopment @health.nsw.gov.au
Did you know?
The new Barber
Avenue multi-storey car
park will open in mid-
2019, providing more
than 600 car spaces. It
will also have an
interim roof-top helipad
for emergency
helicopter landings.
Project Zone newsletter | November 2018
For more information visit: nepeanredevelopment.health.nsw.gov.au
email: HI-Nepeanredevelopment@health.nsw.gov.au
NEPEAN REDEVELOPMENT
Nepean Cancer Care Centre
Clinic rooms set to open in the
New Year
The countdown is on for the completion of the new clinic
rooms at the Nepean Cancer Care Centre. Large trucks
recently delivered the modular sections of the unit
(pictured on the right), and staff are preparing to open the
doors to the new rooms in mid-January following a short
commissioning period.
Once the new clinic rooms are open, work can start on the
expansion of the chemotherapy treatment spaces in
parallel with the construction of the third radiation therapy
bunker.
All works are scheduled to be complete in mid-2019,
which is a great outcome for patients and staff.
South Block project wall
Don’t forget to stop by our project wall located in the
main corridor of South Block at Nepean Hospital. All
the latest artist’s impressions of the Stage 1 Nepean
Redevelopment are there.
You can also pick up the latest edition of this
newsletter, facts sheets and construction updates.
This information is also available on our project
website via nepeanredevelopment.health.nsw.gov.au.
You can also follow us on Instagram
@nepeanredevelopment.
Nepean Redevelopment project wall in South Block at Nepean
Hospital.
Modular building being lifted into place by a crane on the
Nepean Cancer Care Centre work site.
Project Zone newsletter | November 2018
For more information visit: nepeanredevelopment.health.nsw.gov.au
email: HI-Nepeanredevelopment@health.nsw.gov.au
NEPEAN REDEVELOPMENT
Achievement/
Milestone
Achievement/
Milestone
Achievement/
Milestone
Achievement/
Milestone
Achiev
ement/
Mo
nth
Ach
ieve
Month
Year
Month
Year
Month
Year
Month
Year
Month
Year
Tweed Val-