European Union European Structural and Investment Funds
LIST OF OPERATIONS
OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020,
PRIORITY AXIS 1 “WATER”
Beneficiary name Operation name Operation summary
Operation start
date and
operation end
date
Total eligible
expenditure
(BGN)
Union co-
financing
rate
Location of
operation Country
Category of
interventio
n
Date of last
update
Ministry of
regional
development and
public works -
"Water supply
and Sewerage"
Directorate
Effectiveness,
management and
institutional
capacity support
for WSS sector
The project complies with the principles
and needs as defined in the Strategy for
Development and Management of the
Water Supply and Sanitation Sector in the
Republic of Bulgaria 2014 - 2023 and the
Action plan for its implementation and
includes activities, which aim at the
implementation of the measures envisaged
in them. The concept of the project
proposal’s content reflects the consistency
and sustainability in the implementation of
the priorities in conducting the policy in the
WSS sector, the activities already
accomplished and the experience gained
during the last programming period 2007-
2013. Within the project activities there will
be analyses and actions for the
implementation of best international
practices in the management and
development of water supply infrastructure
and provision of services, measures aiming
at enhancing the institutional capacity for
control, management and planning of water
supply and sewerage sector, an increase in
efficiency and sustainability, performance
of the responsibilities of the Ministry of
Regional Development and Public Works
as envisaged in the Water Act and related to
the development of specialized information
systems, support for the definition of
changes in the relevant laws and
16.03.2016 -
30.06.2024
15 378 161.00 85% Bulgaria Republic
of Bulgaria
021 16.03.2016
European Union European Structural and Investment Funds
regulations, creating opportunities for the
financial viability of the sector in the long
run, etc.
It is envisaged that the project activities will
be carried out in parallel with the
implementation of project “Support for the
Regional Investment Planning in the Water
and Sanitation Sector”, financed by the
Operational Programme "Environment
2014-2020" (OPE 2014-2020), following
the common principles of ensuring the
sustainability of the reform in the sector,
effective utilisation of grant funds and
implementation of projects under OPE
2014-2020.
Executive
Environment
Agency
Development and
implementation of
methods for
water, sediment
and biota analysis,
and equipping the
laboratories of the
Executive
Environment
Agency.
In response to the recommendations of the
European Commission (EC) when revising
the First plans for management of the river
pools (FMRP) and in accordance to the
requirements of the National and European
legislation regarding the water policies the
number of mandatory for monitoring
priority and specific pollutants is increased
and new matrices for observation are
introduced.
This imposes the development and
introduction of additional methods of
analysis and the purchase of the necessary
precise analytical equipment.
The retrofit of the laboratories in the
Executive Environmental Agency with
basic and auxiliary equipment for sampling,
sample preparation and sample preservation
will insure higher reliability and
comparability of the data and it will answer
the requirements of the Water Framework
Directive WFD 2000/60/EU, it will also
insure the execution of the Plans for
management of the river pools 2016-2021
and the Transnational Monitoring Network
in the frame of the Convention on the
12.03.2016 –
12.09.2018
5 049 925.00 85% Bulgaria Republic
of Bulgaria
021 14.03.2016
European Union European Structural and Investment Funds
conservation of the Danube and its
tributaries.
Ministry of
Regional
Development and
Public Works
Support for the
Regional
Investment
Planning in the
Water and
Sanitation Sector
The Project is based on the principles
and needs, defined in the Strategy for
the Development and Management of
the Water Supply and Sanitation Sector
in the Republic of Bulgaria for the
period 2014-2023 and the Action plan
for its implementation, the priorities for
investments in the water sector of the
EC and in the context of the on-going
water reform. The application of
regional approach is in compliance
with European and international good
practices for planning, investment and
management of the water supply and
sanitation infrastructure and services.
The implementation of investment
needs identified in the Strategy is a
great challenge and requires
unconditional need for their adequate
planning, following a regional and
integrated approach, analyses and
measurements, following the principle
of efficiency and sustainability of the
investments, in line with the applicable
strategic documents and legislature. On
the other hand, the requirement for cost
recovery of the investments in the
water infrastructure, calculation of
adequate depreciation in determining
the prices of water and sewerage
services are the main goal in the
process of implementation of future
infrastructure projects. In this regard
the project proposal also includes
10.02.2016. -
30.06.2024
59 194 263,78
BGN
85%
Sofia
Republic
of Bulgaria
020
022
16.02.2015
European Union European Structural and Investment Funds
activities for preparation of Regional
Feasibility Studies (RFSs) and
Application forms for European Funds
under OPE 2014-2020 for the
designated territories of 14 water
supply and sewerage operators
(WSSO), services for quality assurance
and implementation control of RFSs,
services for reassessment of the value
of public water supply and sewerage
assets for 29 WSSO, as well as
consulting services for supplementing,
and putting into alignment with the
requirements of the OPE 2014-2020, of
the pilot RFS for the designated
territory of "Water supply and
sewerage" Ltd. Smolyan and
implementation of the national and
European legislation in the field of
water supply, collection and treatment
of the wastewater for agglomerations in
it.
Water
management
directorate in
Ministry of
environment and
water
Environmental
assessment and
appropriate
assessment
preparation for
the adoption of
River Basin
Management
Plans 2016 - 2021
and the Marine
Strategy and their
respective
Programmes of
Measures
Environmental assessment and
appropriate assessment of the draft
River Basin Management Plans for the
Danube, Black Sea, East Aegean and
West Aegean River Basin districts and
the draft Marine Strategy, including:
- Preparation of Terms of reference for
the Scope of EA;
- Preparation of draft Appropriate
Assessment (AA) report;
- Preparation of draft Environmental
Assessment (EA) report;
- Carrying out public consultations on
the EA and AA reports;
- Accommodation of comments
received during the process of
11.04.2016 –
11.03.2018
440 559,65
BGN
85% Republic of
Bulgaria
Republic
of Bulgaria
021 11.04.2016
European Union European Structural and Investment Funds
consultations, including public
consultations on the EA and AA and
from the Supreme Environmental
Expert Council;
- Preparation of documents for
submission to the Supreme
Environmental Expert Council.
Municipality of
Shumen
Integrated water
cycle of the
town of Shumen
- stage II -
second phase
This project proposal represents Phase
II of the project “Integrated water cycle
of Shumen–phase II” and it includes 2
subprojects which started in OPE2007-
2013,but due to objective
circumstances could not be completed
in the 2007-2013 programming period.
The subprojects that will be financed
under Phase II are the following:
LOT1:Upbuilding of a biological
purification level with the removal of
nitrogen and phosphorus to the WWTP
LOT3:Construction of SPS
Divdyadovo with a pressure collector
During phase II in the framework of
Lot1 are expected to be implemented
construction works on these objects:
- Sludge dewatering with a
chamber filter press
- Administrative and
laboratory building
- Vertical
planning,landscaping
- Electro-and SCADA
- Platform communications
and roads,replacement of inlet
plumbing
Forthcoming are delivery and
installation of the following machinery
for the SRST and biological
29.06.2016 -
30.06.2024
13 149 478,47
BGN 85% Municipality
of Shumen
Republic
of Bulgaria
022
023
01.07.2016
European Union European Structural and Investment Funds
laboratory.Installation will be carried
out of machinery delivered in Phase I.
During phase II,within LOT3 the
following activities will be
implemented:
- Construction activities and
deliveries in conjunction with the
implementation of the inlet collector to
SPS-Divdyadovo,Outflow canal
- Delivery and installation of
Heating and ventilation equipment of
SPS
- Vertical
planning,landscaping,external power
supply
- Road works
- Strengthening of the
irrigation canal and other
In phase II as eligible activities are
envisaged the implementation of
construction supervision and
architectural supervision.In
addition,there will be implementation
of activities in information and
publicity,establishment PIU,activities
related to support for project
management and audit. The
aforementioned activities will be
charged to the beneficiary.
As a result of the 2nd phase we will
achieve improvement in the quality of
life of the population in the city of
Shumen,overcoming environmental
health risks,providing quality
environmental services to citizens as
the main target group.
European Union European Structural and Investment Funds
Municipality
Radnevo
Integrated
water project
for building
Urban sewage
treatment plant
effluent
Radnevo
The project “Integrated water project
for building Urban sewage treatment
plant effluent Radnevo” provides
construction of a new wastewater
treatment plan as the existing isn’t able
to perform the growing requirements to
parameters of treatment water and
mainly to remove the nutrients:
nitrogen and phosphorus.
The technology for biological
elimination of nitrogen compounds
includes emergency bioreactor and
anoxic bioreactor. For nitrification can
be used the classical highly loaded
biofilters but available ones in current
sewage treatment plant effluent.
Radnevo do not have the requisite
capacity. It is obsolete, and its
reconstruction and modernization is
very difficult and not appropriate.
During its reconstruction the
wastewater will have to pour for the
time of its implementation straight in
the receiver without purification. The
new sewage treatment plant effluent is
the powerful anoxic – aerobic
treatment system of wastewater and
maintenance of an optimal
concentration the amount of activated
sludge in the working reactors just like
disinfection of treated water with UV.
The same is designed as mechanical –
biological with technology of
continuous aeration with nitrification
and denitrification. This technology
ensures the necessary effectiveness for
reduction of organic pollution and
provides increased removal of nitrogen
05.07.2016 -
30.06.2024
7 411 571,06
BGN
85% Municipality
Radnevo
Republic
of Bulgaria
022 05.07.2016
European Union European Structural and Investment Funds
pollution. The requirement for
increased phosphorus removal is
decided to simultaneous chemical
treatment in the activation tank with
the help of solution of iron salt – iron
trichloride. To assure the work flours
the treatment plant is completed in a
modular scheme which allows the
parallel operation or temporarily turns
off one of the modules of biological
treatment while reducing the load on
treatment equipments. The
measurement of incoming water
amounts is going through ultrasound
device with analog display which
account the current aggregated
amounts and will be installed of the
pipeline after the entry shaft.
Municipality of
Varna
Preparation and
implementation of
a project for
development of
water and
wastewater
infrastructure in
agglomeration
resort "Golden
Sands",
Municipality of
Varna
Implementation of the current project
will ensure achieving the objectives of
project DIR-51011119-18-37
“Preparation and implementation of a
project for development of water and
wastewater infrastructure in
agglomeration resort Golden Sands,
Municipality of Varna” under OP
“Environment” 2007-2013. As a result
of the implementation of the provisions
of Annex for the first phase of the
second stage of the project, complete
project readiness for implementation of
the investment project has been
achieved. The current project proposal
includes two sites:
1. Reconstruction and modernization of
WWTP-Golden Sands. Scheduled for
future load of 72 122 PE in summer
26.07.2016-
30.06.2024
37 150 155.07 85% Varna Republic
of Bulgaria
022 26.07.2016
European Union European Structural and Investment Funds
months and 18 000 PE in winter. The
area served by the treatment plant is of
considerable size including SF Alen
Mak, AR Chaika, Riviera HC, AR
Golden Sands”. The project in the
framework of procedure
BG161M10P002-1.005 provides for
the WWTP to secure better water
treatment – removal of nutrients –
nitrogen and phosphorus from the
agglomeration waste waters. Therefore
the technological plan of WWTP for
the water route includes: coarse grates,
entry WTP, mechanical treatment in a
combined facility, biological treatment
in SB-reactors, UV disinfection. Along
the sludge route, construction is
planned for an anaerobic stabilizer with
compaction, mechanical dewatering by
centrifuge and postvacuum treatment
of cake. 2. Partial construction,
reconstruction/rehabilitation of the
sewerage network in SF Alen Mak. It
is in proximity to AR Chaika” and this
determines its active utilization of
villas and resort purposes with holiday
homes. The current total constructed
sewerage system spans about 20 per
cent of the territory. The project
envisages the construction of four
major gravity sewerage branches with a
total length of 4795 meters and of 265
building pipes. Branches are
discharged into the existing upper
sewerage collector Chaika, passing
through the territory of and discharging
into WWTP – Golden Sands.
European Union European Structural and Investment Funds
Municipality of
Bansko
Second phase on
project
"Rehabilitation of
the water supply
and sewerage
system in town of
Bansko with
construction of a
WWTP
The project proposal represents the
second phase of implementation of
activities related to construction,
reconstruction and rehabilitation of
water supply and sewerage network in
the town of Bansko, as well as
construction of a new wastewater
treatment plant (WWTP) to serve the
city. It is envisaged that completion of
construction works in the eastern and
western parts of the city, affecting the
water supply and sewerage network
and the completion of work on the
WWTP, including its external
relations. Separately, as a specific
component of the work is the
completion of the correction of the
Glazne River in order to prevent
flooding of the WWTP.
26.07.2016-
30.06.2024
33 170 034.99 85% Bansko Republic
of Bulgaria
020
022
26.07.2016
TERVEL
MUNICIPALITY
"The second
phase of the
project"
Expansion and
reconstruction of
WWTP Tervel,
reconstruction and
completion of the
sewerage network
and reconstruction
of water supply
network of the
town of Tervel "
The project proposal provide the
implementation of a set of activities for
reconstruction and the expansion of
the wastewater treatment plant in
Tervel.Treatment facility will increase
its capacity and will be able to purify
wastewater from fully established by
implementation of the first phase of
the sewerage network of Tervel.There
will be carried out works on
construction of buildings and
equipment , there will be delivered and
installed new technological equipment.
For insurance of a reliable process the
training of staff of the plant will be
provided.Strict adherence to the
conditions under which an
authorization for construction of the
25.07.2016-
30.06.2024 6 199 965.60 85% Tervel Republic
of Bulgaria
022 27.07.2016
European Union European Structural and Investment Funds
treatment plant will be controlled by a
consultant performing construction
supervision.The designers in different
parts of the detailed design will
perform supervision during the
construction and equipment.All
investment works will be carried out in
accordance with the technical project,
which is coordinated with the control
authorities, it has prepared an report of
its compliance with the essential
requirements for construction and
building .For Project management will
be engaged a team of three employees
of the Municipality Tervel.The
expenses under project will be verified
by a registered auditor and the
implementation of all activities will be
promoted in the implementation of the
approved 2014-2020 OPE measures for
information and publicity.
Yambol
Municipality
Integrated water
cycle project of
Yambol -
construction of
wastewater
treatment plants
and inlet
manifold,
expansion and
reconstruction of
sewerage and
water supply
network in the
city of Yambol -
phase two
Yambol municipality implements the
project "Integrated water cycle project
of Yambol - construction of wastewater
treatment plants and inlet manifold,
expansion and reconstruction of
sewerage and water supply network in
the city of Yambol" contract № DIR-
51011116-S035 / 23.08.2012 on
granting financial assistance within the
Operational Programme "Environment
2007-2013". After an analysis of the
physical implementation of the projects
under Priority Axis 1 of OPE 2007-
2013, the MA 2014-2020 identified 8
projects, including that of the
municipality of Yambol, which can be
05.08.2016 –
30.06.2024
44 419 346.93 85% Yambol Republic
of Bulgaria
020
022
023
08.08.2016
European Union European Structural and Investment Funds
divided into two phases whose second
phase could be financed in the 2014-
2020 programming period two write
phases are technologically and
financially bound.
The Implementation of the project
proposal "Integrated water cycle
project of Yambol - construction of
wastewater treatment plants and inlet
manifold, expansion and reconstruction
of sewerage and water supply network
in the city of Yambol-phase two" will
ensure the successful completion of the
whole infrastructure project. Moreover
this will lead to the overall result of the
project increase in the number of
people with access to improved
wastewater treatment and improved
water supply.
In the framework of this project
proposal are implemented works on
finishing the new WWTP (wastewater
treatment plant for urban waste water)
with inlet collector; completion of the
connecting infrastructure to the
WWTP; completion of the
reconstruction of the collector IX;
completion of phase II of Lot1
"Expansion and reconstruction of
sewerage and water supply network in
the town. Yambol" - bringing
collectors from Industrial zone to its
inclusion in Chief. Collector V and
sewage pumping station "Industrial".
Other activities that are going to be
implemented are services which
provide copyright and construction
supervision of listed sites, as well as
European Union European Structural and Investment Funds
mandatory measures for information
and communication in the Operational
Programme "Environment 2014-2020".
Vidin
Municipality
"Completion of
wastewater
treatment plants
(WWTP ) - Vidin
- Second Phase "
Completing the WWTP-Vidin for
wastewater treatment in PE - 56 000
PE about 2041g. The following basic
data of the entrance to the WWTP:
Daily average water kolichestvo- 10
928 m3 / day; BPK5-3 360 kg / day
COD 6720 kg / day suspended solids-
3920 kg / day, total nitrogen, 616 kg /
day, total phosphorus -101 kg / day;
Project "Completion of wastewater
treatment plants (WWTP) - Vidin -
Second phase" includes the following
activities: exercise of supervision
during construction, adequate supply of
materials, equipment and furniture,
construction and works; single,
complex and 72-hour tests, preparation
of as-built documentation and cadastral
surveying of the entire site under the
Law on Cadastre and Property
Register, for commissioning of the
Protocol Form 16 with the operation,
giving permission for polzavane; staff
training; removal of defects within the
specified warranty periods and support
the operation and maintenance of
wastewater treatment plants in these
terms;
11.08.2016-
30.06.2024
22 270 043.76 85% Vidin Republic
of Bulgaria
022
023
22.08.2016
Vratsa
Municipality
Vratsa Integrated
Water Project - II-
nd phase
Vratsa Integrated Water Project is intended
for management of the water cycle of town
of Vratsa and it covers the water
distribution network, the sewer collector
network and the waste water treatment
28.10.2016-
30.06.2024 114 506 125.63 85% Vratsa Republic
of Bulgaria
020
022
28.10.2016
European Union European Structural and Investment Funds
plant. Integrated project is divided into two
phases. First phase was implemented under
Operational Programme Environment 2007-
2013. Second phase of the project provides
for the full completion of the reconstruction
of the urban sewage network and
reconstruction of WWTP, and full
implementation of rehabilitation of the steel
and reconstruction of the existing asbestos
- cement water mains from "Srechenska
bara" dam to the town of Vratsa.
Second phase of the project includes:
• Reconstruction and
rehabilitation of 17,62 km water supply
network, where a lot of breakthroughs and
leakages occur
• Reconstruction and
rehabilitation of 2,35 km of the existing
main sewer collectors of Vratsa
• Reconstruction and
rehabilitation of 7,59 km of the secondary
sewer network
• Extension of the sewer
collector network with 8,77 km in two
quarters of the town of Vratsa – Kulata and
Bistrets, as well as streets in the town of
Vratsa
• Rehabilitation of existing steel
pipe and reconstruction of existing asbestos
- cement water mains from “Srechenska
bara” dam to the town of Vratsa – 33,3 km
• Approval of Detailed Design
and Detailed Urban Plan, establishment of
easement, receiving of construction permit
for water main from “Srechenska bara”
dam to town of Vratsa
• Completion of full renovation
of the Waste Water Treatment Plant
(WWTP) with new mechanical and
electrical equipment, construction of new
and renovation of old buildings, in order to
achieve compliance with EU and Bulgarian
European Union European Structural and Investment Funds
environmental requirements.
• Construction Supervision
• Author's supervision during the
construction works of urban sewage and
water supply network and author's
supervision during the construction works
of water main from Srechenska bara dam to
the town of Vratsa.
Sofia
Municipality
Preparation of
regional
feasibility study
for water supply
and sanitation for
the territory of
Sofia
Municipality
The Project proposal includes activities for
preparation of a Regional feasibility study
(RFS) for the territory of Sofia
Municipality, preparation of infrastructural
conceptual designs, project documentation,
assessments and evaluation of compliance
with environmental legislation and other
analytical documents, preparation of
institutional, financial and economic
analyzes, costs and benefits analyze for the
consolidated region, as well as preparation
of documentation for subsequent
application under OP Environment 2014 –
2020 for the indentified in RFS measures,
incl. Application form.
The implementation activities set in the
Project proposal target the population in the
whole territory of the municipality. After its
accomplishment reconditions for increasing
the share of population connected to the
sewage system of Sofia Municipality will
be established. The measures will create
possibility for implementation of the
requirements of 91/271/EIO EU Directive
urban waste water treatment, the collection
of waste water will improve by increasing
the number of households connected to the
sewage system. The leaks and infiltration
into the sewage system will be decreased as
well.
The presence or lack of engineering
infrastructure, in particular – sewage
system, is important factor directly
22.11.2016-
21.04.2020
5 240 800.00 85% Sofia
Municipality
Republic
of Bulgaria
022
020
08.11.2016
European Union European Structural and Investment Funds
influencing the quality of the environment
and its attractiveness to potential investors
and respectively - for the implementation of
municipal policies. Public investments in
sewage systems are one of the most
efficient tools available to the Municipality
to targer urban development and to
accomplish the goals set in its strategic
documents.
Municipality Pleven
Integrated water
cycle Pleven -
Dolna Mitropoliya
The current project is submitted under call
for proposals under procedure
BG16M1OP002-1.006 "Implementation of
early water supply and sewage projects,"
Specific objective 1 "Protection and
improvement of water resources" Priority
axis 1 "Water" of OPE 2014-2020. Project
"Integrated Water Cycle Pleven– Dolna
Mitropoliya" aims to improve the water
cycle of agglomerations Pleven, Trastenik,
D.Mitropoliya, Yasen and Bukovlak for
achieving the objectives of the various
strategic documents at local, regional and
national level.
In the project proposal are included:
- “Reconstruction, rehabilitation
and modernization of the common WWTP -
Pleven for group of settlements in the
municipalities of Pleven and
D.Mitropoliya" with capacity -130 780 PE-
inclusion of waste water, generated by the
agglomerations, falling within the scope of
the investment proposal, to be collected and
delivered for treatment in WWTP;
- construction of water supply
and sewage networks in Yasen, Bukovlak,
D.Mitropoliya and Trastenik - rehabilitation
of major and secondary water supply
branches and building derivations to the
networks; construction of domestic sewage
with major branches and secondary
branches and building derivations;
18.01.2017-
30.06.2024 117 150 300.52 85% Pleven
Dolna
Mitropoliya
Republic of
Bulgaria
020
022
023
23.01.2017
European Union European Structural and Investment Funds
construction of new rain sewage;
construction of new sewage pumping
station (SPS) in town of Trustenik and
village of Yasen and sewer collector.
Main project activities are: Organization
and management of the project, Information
and communication measures (publicity
and visualization), Research and design,
Construction works, Supply of machines
and equipment, Supervision during
construction.
Target group: The main benefits of the
project are for the population of
agglomerations Pleven, D.Mitropoliya,
Trastenik, Yasen and Bukovlak, who will
benefit from the improved water supply and
sewage network and WWTP Pleven.
Municipality
Primorsko
Integrated
investment project
in the water sector
agglomeration
Primorsko-Kiten
Integrated project in the water sector
agglomeration Primorsko - Kiten " was
developed to overcome the problems
associated with the existing infrastructure to
ensure the environmentally treatment and
discharge of waste water. The main
activities envisaged under the project are: 1.
Extension of existing WWTP for 55 000
PE, mechanical and biological stage and
degree of purification that meets
requirements of Directive 91/271 / EEC
incl. technical infrastructure. As a result of
the project will be achieved to improve the
quality of living in the city. Primorsko and
the town. Kiten, overcoming environmental
health risks and providing quality
environmental services to citizens as the
main target group. The estimated
population to be served by the rehabilitated
water supply infrastructure has 3948
permanent residents. The estimated
population to be served by the rehabilitated
system will be hundreds of thousands of
tourists who visit both cities available on
21.01.2017-
21.12.2019
22 272 737.01 85% Primorsko
Republic
of Bulgaria
022 23.01.2017
European Union European Structural and Investment Funds
the Black Sea coast during the summer. The
treatment plant will serve 55 000 PE.
Municipality
Aytos
Wastewater
treatment plant of
town Aytos
The preparation of project "Wastewater
treatment plant of town Aytos" started back
in 2011 with the financial support of the EU
with implementation of a project funded by
contract grant (DBFP) №DIR-51011119-1-
13 of priority axis 1 of OPE 2007-2013 on
procedure reference №BG161PO005 / 10 /
1.11 / 03/19. Needs to be met by the project
are in accordance with the planned
contribution of the OPE 2014-2020,
through actions for the implementation of
macro-regional strategies and sea basin
strategies in the region. The project will
contribute to the implementation of macro-
regional EU strategy for the Danube region.
With the implementation of the project
activities will contribute to achieving one of
the main priorities of the Danube Strategy,
namely: 4) Restoration and preservation of
water quality, set the target for
"Environmental Protection in the Danube
region." With the implementation of the
project will achieve the main objectives set
in the Water Framework Directive (WFD)
and its daughter directives and Directive
91/271 / EEC on the treatment of
wastewater from settlements and Directive
98/83 / EC on water quality intended for
human consumption. Achieving these
objectives will fully capture the primary
target group, namely the population of the
municipality Aytos, they will contribute to
improving their quality of life. The main
activities to be implemented under the
project are: 1) construction of WWTP of
town Aytos 2) Construction of connecting
and inlet manifold and supporting
infrastructure to the WWTP and connecting
21.01.2017-
21.12.2019
18 929 054.03 85% Aytos Republic
of Bulgaria 022 23.01.2017
European Union European Structural and Investment Funds
existing major collectors. The main results
of the project are to achieve connectivity of
the existing sewerage system serving the
population WWTP by which to achieve
wastewater treatment.
Municipality of
Elhovo
Design and
construction of a
waste water
treatment plant,
inlet manifold and
partial
rehabilitation of
the water supply
and sewerage
network in the
city of Elhovo
The project of the municipality of
Elhovo includes two main components:
1). partial rehabilitation of the water
supply and sewerage network in the
city and 2). Construction of a waste
water treatment plant incl. construction
of inlet manifold to it. Within the
project activities it is foreseen
development of a detailed design
project for construction of the WWTP
as its capacity according to the results
of the feasibility study is 11 100 pe.
28.03.2017-
28.02.2020
18 867 785.73 85% Elhovo Republic
of Bulgaria 020
022
29.03.2017
Ministry of health
Improving the
monitoring of
drinking water
quality
The project aims to bring the scope and
frequency of monitoring the quality of
drinking water conducted by the authorities
of State Health Control in full compliance
with European and national legislation. The
project will be provided equipment for
laboratories in the system of the State
Health Control for conducting monitoring
of the quality of drinking water in response
to the recommendations for Bulgaria from a
Summary report of the European
Commission by 16 June 2014 for the
quality of drinking water in the European
Union dealing reports from Member States
for 2008-2010, granted under Directive
98/83 / EC of 3 November 1998 on the
quality of water intended for human
consumption (EC report (COM (2014) 363
final).
The project will improve the capacity of
laboratories in the system of the state health
control by extending and enhancing the
30.03.2017-
30.03.2019
10 000 000.00 85% Republic of
Bulgaria
Republic
of Bulgaria 021 30.03.2017
European Union European Structural and Investment Funds
technical capacity to analyze in full the
mandatory in European and national
legislation indicators related to ensuring the
quality and safety of drinking water.
The expected outcome of the project is
improved capacity of the laboratories of the
bodies of State Health Control for
monitoring the quality of drinking water in
full compliance in full with the
requirements of EU and national
legislation.
The project will contribute to the
implementation of the Specific Objective 2:
"Improving the assessment of water status."
The project duration is 24 months and the
budget - 10 million BGN.
Ministry of
environment and
water
Completion of
water quantity
monitoring
networks
Upgrading and/or optimizing groundwater
quantity monitoring networks, incl. –
development of information maps;
assessment of the structure and the state of
existing monitoring points; impact analysis
of groundwater abstraction on existing
monitoring points and on ones envisaged to
be built;-identifying requirements and
measures to prevent lowering of water
levels in the selected points from the
monitoring network; identifying the
structure and equipment of monitoring
points;- assessment of the structure and the
state of existing monitoring points;
development of proposal for replacement of
monitoring points;- assessing the need of
additional expansion of monitoring
networks;- survey on land ownership of the
sites monitoring points are to be built;-
substantiate the construction of new and or
restoring existing monitoring points and
substantiate equipment to be installed or the
use of portable monitoring devices;-
development of proposal/guidance for
upgrading /complementing monitoring
09.10.2017-
09.09.2020
14 999 898.82 85% Republic of
Bulgaria
Republic
of Bulgaria 021 09.10.2017
European Union European Structural and Investment Funds
networks and programmes. Building new
groundwater quantity monitoring points.
Equipment of existing and newly built
groundwater monitoring stations with
measurement devices.
Design and justification of expansion
(optimization) of surface water monitoring
networks; incl.-analysis of existing points;-
analysis of geographical location and
necessary measurements of water quantity;
- identifying the sites for setting up
monitoring points;- ;- survey on land
ownership of the sites monitoring points are
to be built;- substantiate equipment for
monitoring points; identification of
necessary activities for the construction of
monitoring points; development of
proposals/ guidance for upgrading
/complementing monitoring networks and
programmes. Building new surface water
monitoring points and their elements.
Supply of equipment for monitoring on site.
Carrying out and participating in relevant
activities. Activities for technical assistance
in project preparation.
Municipality of
Chirpan
Construction of a
waste water
treatment plant in
the town of
Chirpan and main
sewer collectors
The town of Chirpan belongs to the
agglomerations above 10 000 PE and is a
priority agglomeration for financing under
Priority Axis 1 of Operational Programme
"Environment" 2014-2020. According to
data from the National Statistical Institute
the permanent population of the town of
Chirpan as of 31 December 2016 is 14 424
permanent residents, which form the main
project target group, together with the
business operators and visitors of the town.
Currently in the town of Chirpan there is no
a waste water treatment plant (WWTP) and
the waste waters are discharged directly in
Tekirska river, which is a tributary to
Maritsa river.
06.11.2017 -
06.10.2020
15 020
421.58
85% Chirpan Republic
of Bulgaria 022
020
06.11.2017
European Union European Structural and Investment Funds
The specific project results include:
1. Constructed and operational waste water
treatment plant (WWTP) and main sewer
collectors in the town of Chirpan, with indicative capacity of 19461 PE, including:
- successful putting into operation of the WWTP;
- trained personnel for WWTP exploitation; - accepted and put into exploitation WWTP;
- successful period of warranty exploitation;
- successful tests for treatment of the waste waters by WWTP – Chirpan
2. Constructed main sewer collectors from the town sewerage system, which will include
approximately 70% of the population to the
WWTP.
3. Constructed technical infrastructure to WWTP
- Chirpan - inlet collector, water supply, access road, electrical supply.
The main project activities include: 1. Revision and update of tender
dossiers in compliance with the newly adopted
procurement legislation 2. Construction of WWTP – Chirpan
and main sewer collectors
3. Execution of supervision contract for WWTP – Chirpan and main sewer collectors
4. Project organisation and
management 5. Information and communication
measures.
6. Execution of author (designer) supervision for water collectors