European Union European Structural and Investment Funds LIST OF OPERATIONS OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020, PRIORITY AXIS 1 WATERBeneficiary name Operation name Operation summary Operation start date and operation end date Total eligible expenditure (BGN) Union co- financing rate Location of operation Country Category of interventio n Date of last update Ministry of regional development and public works - "Water supply and Sewerage" Directorate Effectiveness, management and institutional capacity support for WSS sector The project complies with the principles and needs as defined in the Strategy for Development and Management of the Water Supply and Sanitation Sector in the Republic of Bulgaria 2014 - 2023 and the Action plan for its implementation and includes activities, which aim at the implementation of the measures envisaged in them. The concept of the project proposal’s content reflects the consistency and sustainability in the implementation of the priorities in conducting the policy in the WSS sector, the activities already accomplished and the experience gained during the last programming period 2007- 2013. Within the project activities there will be analyses and actions for the implementation of best international practices in the management and development of water supply infrastructure and provision of services, measures aiming at enhancing the institutional capacity for control, management and planning of water supply and sewerage sector, an increase in efficiency and sustainability, performance of the responsibilities of the Ministry of Regional Development and Public Works as envisaged in the Water Act and related to the development of specialized information systems, support for the definition of changes in the relevant laws and 16.03.2016 - 30.06.2024 15 378 161.00 85% Bulgaria Republic of Bulgaria 021 16.03.2016

Upload: others

Post on 24-Sep-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

LIST OF OPERATIONS

OPERATIONAL PROGRAMME "ENVIRONMENT" 2014-2020,

PRIORITY AXIS 1 “WATER”

Beneficiary name Operation name Operation summary

Operation start

date and

operation end

date

Total eligible

expenditure

(BGN)

Union co-

financing

rate

Location of

operation Country

Category of

interventio

n

Date of last

update

Ministry of

regional

development and

public works -

"Water supply

and Sewerage"

Directorate

Effectiveness,

management and

institutional

capacity support

for WSS sector

The project complies with the principles

and needs as defined in the Strategy for

Development and Management of the

Water Supply and Sanitation Sector in the

Republic of Bulgaria 2014 - 2023 and the

Action plan for its implementation and

includes activities, which aim at the

implementation of the measures envisaged

in them. The concept of the project

proposal’s content reflects the consistency

and sustainability in the implementation of

the priorities in conducting the policy in the

WSS sector, the activities already

accomplished and the experience gained

during the last programming period 2007-

2013. Within the project activities there will

be analyses and actions for the

implementation of best international

practices in the management and

development of water supply infrastructure

and provision of services, measures aiming

at enhancing the institutional capacity for

control, management and planning of water

supply and sewerage sector, an increase in

efficiency and sustainability, performance

of the responsibilities of the Ministry of

Regional Development and Public Works

as envisaged in the Water Act and related to

the development of specialized information

systems, support for the definition of

changes in the relevant laws and

16.03.2016 -

30.06.2024

15 378 161.00 85% Bulgaria Republic

of Bulgaria

021 16.03.2016

Page 2: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

regulations, creating opportunities for the

financial viability of the sector in the long

run, etc.

It is envisaged that the project activities will

be carried out in parallel with the

implementation of project “Support for the

Regional Investment Planning in the Water

and Sanitation Sector”, financed by the

Operational Programme "Environment

2014-2020" (OPE 2014-2020), following

the common principles of ensuring the

sustainability of the reform in the sector,

effective utilisation of grant funds and

implementation of projects under OPE

2014-2020.

Executive

Environment

Agency

Development and

implementation of

methods for

water, sediment

and biota analysis,

and equipping the

laboratories of the

Executive

Environment

Agency.

In response to the recommendations of the

European Commission (EC) when revising

the First plans for management of the river

pools (FMRP) and in accordance to the

requirements of the National and European

legislation regarding the water policies the

number of mandatory for monitoring

priority and specific pollutants is increased

and new matrices for observation are

introduced.

This imposes the development and

introduction of additional methods of

analysis and the purchase of the necessary

precise analytical equipment.

The retrofit of the laboratories in the

Executive Environmental Agency with

basic and auxiliary equipment for sampling,

sample preparation and sample preservation

will insure higher reliability and

comparability of the data and it will answer

the requirements of the Water Framework

Directive WFD 2000/60/EU, it will also

insure the execution of the Plans for

management of the river pools 2016-2021

and the Transnational Monitoring Network

in the frame of the Convention on the

12.03.2016 –

12.09.2018

5 049 925.00 85% Bulgaria Republic

of Bulgaria

021 14.03.2016

Page 3: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

conservation of the Danube and its

tributaries.

Ministry of

Regional

Development and

Public Works

Support for the

Regional

Investment

Planning in the

Water and

Sanitation Sector

The Project is based on the principles

and needs, defined in the Strategy for

the Development and Management of

the Water Supply and Sanitation Sector

in the Republic of Bulgaria for the

period 2014-2023 and the Action plan

for its implementation, the priorities for

investments in the water sector of the

EC and in the context of the on-going

water reform. The application of

regional approach is in compliance

with European and international good

practices for planning, investment and

management of the water supply and

sanitation infrastructure and services.

The implementation of investment

needs identified in the Strategy is a

great challenge and requires

unconditional need for their adequate

planning, following a regional and

integrated approach, analyses and

measurements, following the principle

of efficiency and sustainability of the

investments, in line with the applicable

strategic documents and legislature. On

the other hand, the requirement for cost

recovery of the investments in the

water infrastructure, calculation of

adequate depreciation in determining

the prices of water and sewerage

services are the main goal in the

process of implementation of future

infrastructure projects. In this regard

the project proposal also includes

10.02.2016. -

30.06.2024

59 194 263,78

BGN

85%

Sofia

Republic

of Bulgaria

020

022

16.02.2015

Page 4: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

activities for preparation of Regional

Feasibility Studies (RFSs) and

Application forms for European Funds

under OPE 2014-2020 for the

designated territories of 14 water

supply and sewerage operators

(WSSO), services for quality assurance

and implementation control of RFSs,

services for reassessment of the value

of public water supply and sewerage

assets for 29 WSSO, as well as

consulting services for supplementing,

and putting into alignment with the

requirements of the OPE 2014-2020, of

the pilot RFS for the designated

territory of "Water supply and

sewerage" Ltd. Smolyan and

implementation of the national and

European legislation in the field of

water supply, collection and treatment

of the wastewater for agglomerations in

it.

Water

management

directorate in

Ministry of

environment and

water

Environmental

assessment and

appropriate

assessment

preparation for

the adoption of

River Basin

Management

Plans 2016 - 2021

and the Marine

Strategy and their

respective

Programmes of

Measures

Environmental assessment and

appropriate assessment of the draft

River Basin Management Plans for the

Danube, Black Sea, East Aegean and

West Aegean River Basin districts and

the draft Marine Strategy, including:

- Preparation of Terms of reference for

the Scope of EA;

- Preparation of draft Appropriate

Assessment (AA) report;

- Preparation of draft Environmental

Assessment (EA) report;

- Carrying out public consultations on

the EA and AA reports;

- Accommodation of comments

received during the process of

11.04.2016 –

11.03.2018

440 559,65

BGN

85% Republic of

Bulgaria

Republic

of Bulgaria

021 11.04.2016

Page 5: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

consultations, including public

consultations on the EA and AA and

from the Supreme Environmental

Expert Council;

- Preparation of documents for

submission to the Supreme

Environmental Expert Council.

Municipality of

Shumen

Integrated water

cycle of the

town of Shumen

- stage II -

second phase

This project proposal represents Phase

II of the project “Integrated water cycle

of Shumen–phase II” and it includes 2

subprojects which started in OPE2007-

2013,but due to objective

circumstances could not be completed

in the 2007-2013 programming period.

The subprojects that will be financed

under Phase II are the following:

LOT1:Upbuilding of a biological

purification level with the removal of

nitrogen and phosphorus to the WWTP

LOT3:Construction of SPS

Divdyadovo with a pressure collector

During phase II in the framework of

Lot1 are expected to be implemented

construction works on these objects:

- Sludge dewatering with a

chamber filter press

- Administrative and

laboratory building

- Vertical

planning,landscaping

- Electro-and SCADA

- Platform communications

and roads,replacement of inlet

plumbing

Forthcoming are delivery and

installation of the following machinery

for the SRST and biological

29.06.2016 -

30.06.2024

13 149 478,47

BGN 85% Municipality

of Shumen

Republic

of Bulgaria

022

023

01.07.2016

Page 6: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

laboratory.Installation will be carried

out of machinery delivered in Phase I.

During phase II,within LOT3 the

following activities will be

implemented:

- Construction activities and

deliveries in conjunction with the

implementation of the inlet collector to

SPS-Divdyadovo,Outflow canal

- Delivery and installation of

Heating and ventilation equipment of

SPS

- Vertical

planning,landscaping,external power

supply

- Road works

- Strengthening of the

irrigation canal and other

In phase II as eligible activities are

envisaged the implementation of

construction supervision and

architectural supervision.In

addition,there will be implementation

of activities in information and

publicity,establishment PIU,activities

related to support for project

management and audit. The

aforementioned activities will be

charged to the beneficiary.

As a result of the 2nd phase we will

achieve improvement in the quality of

life of the population in the city of

Shumen,overcoming environmental

health risks,providing quality

environmental services to citizens as

the main target group.

Page 7: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

Municipality

Radnevo

Integrated

water project

for building

Urban sewage

treatment plant

effluent

Radnevo

The project “Integrated water project

for building Urban sewage treatment

plant effluent Radnevo” provides

construction of a new wastewater

treatment plan as the existing isn’t able

to perform the growing requirements to

parameters of treatment water and

mainly to remove the nutrients:

nitrogen and phosphorus.

The technology for biological

elimination of nitrogen compounds

includes emergency bioreactor and

anoxic bioreactor. For nitrification can

be used the classical highly loaded

biofilters but available ones in current

sewage treatment plant effluent.

Radnevo do not have the requisite

capacity. It is obsolete, and its

reconstruction and modernization is

very difficult and not appropriate.

During its reconstruction the

wastewater will have to pour for the

time of its implementation straight in

the receiver without purification. The

new sewage treatment plant effluent is

the powerful anoxic – aerobic

treatment system of wastewater and

maintenance of an optimal

concentration the amount of activated

sludge in the working reactors just like

disinfection of treated water with UV.

The same is designed as mechanical –

biological with technology of

continuous aeration with nitrification

and denitrification. This technology

ensures the necessary effectiveness for

reduction of organic pollution and

provides increased removal of nitrogen

05.07.2016 -

30.06.2024

7 411 571,06

BGN

85% Municipality

Radnevo

Republic

of Bulgaria

022 05.07.2016

Page 8: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

pollution. The requirement for

increased phosphorus removal is

decided to simultaneous chemical

treatment in the activation tank with

the help of solution of iron salt – iron

trichloride. To assure the work flours

the treatment plant is completed in a

modular scheme which allows the

parallel operation or temporarily turns

off one of the modules of biological

treatment while reducing the load on

treatment equipments. The

measurement of incoming water

amounts is going through ultrasound

device with analog display which

account the current aggregated

amounts and will be installed of the

pipeline after the entry shaft.

Municipality of

Varna

Preparation and

implementation of

a project for

development of

water and

wastewater

infrastructure in

agglomeration

resort "Golden

Sands",

Municipality of

Varna

Implementation of the current project

will ensure achieving the objectives of

project DIR-51011119-18-37

“Preparation and implementation of a

project for development of water and

wastewater infrastructure in

agglomeration resort Golden Sands,

Municipality of Varna” under OP

“Environment” 2007-2013. As a result

of the implementation of the provisions

of Annex for the first phase of the

second stage of the project, complete

project readiness for implementation of

the investment project has been

achieved. The current project proposal

includes two sites:

1. Reconstruction and modernization of

WWTP-Golden Sands. Scheduled for

future load of 72 122 PE in summer

26.07.2016-

30.06.2024

37 150 155.07 85% Varna Republic

of Bulgaria

022 26.07.2016

Page 9: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

months and 18 000 PE in winter. The

area served by the treatment plant is of

considerable size including SF Alen

Mak, AR Chaika, Riviera HC, AR

Golden Sands”. The project in the

framework of procedure

BG161M10P002-1.005 provides for

the WWTP to secure better water

treatment – removal of nutrients –

nitrogen and phosphorus from the

agglomeration waste waters. Therefore

the technological plan of WWTP for

the water route includes: coarse grates,

entry WTP, mechanical treatment in a

combined facility, biological treatment

in SB-reactors, UV disinfection. Along

the sludge route, construction is

planned for an anaerobic stabilizer with

compaction, mechanical dewatering by

centrifuge and postvacuum treatment

of cake. 2. Partial construction,

reconstruction/rehabilitation of the

sewerage network in SF Alen Mak. It

is in proximity to AR Chaika” and this

determines its active utilization of

villas and resort purposes with holiday

homes. The current total constructed

sewerage system spans about 20 per

cent of the territory. The project

envisages the construction of four

major gravity sewerage branches with a

total length of 4795 meters and of 265

building pipes. Branches are

discharged into the existing upper

sewerage collector Chaika, passing

through the territory of and discharging

into WWTP – Golden Sands.

Page 10: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

Municipality of

Bansko

Second phase on

project

"Rehabilitation of

the water supply

and sewerage

system in town of

Bansko with

construction of a

WWTP

The project proposal represents the

second phase of implementation of

activities related to construction,

reconstruction and rehabilitation of

water supply and sewerage network in

the town of Bansko, as well as

construction of a new wastewater

treatment plant (WWTP) to serve the

city. It is envisaged that completion of

construction works in the eastern and

western parts of the city, affecting the

water supply and sewerage network

and the completion of work on the

WWTP, including its external

relations. Separately, as a specific

component of the work is the

completion of the correction of the

Glazne River in order to prevent

flooding of the WWTP.

26.07.2016-

30.06.2024

33 170 034.99 85% Bansko Republic

of Bulgaria

020

022

26.07.2016

TERVEL

MUNICIPALITY

"The second

phase of the

project"

Expansion and

reconstruction of

WWTP Tervel,

reconstruction and

completion of the

sewerage network

and reconstruction

of water supply

network of the

town of Tervel "

The project proposal provide the

implementation of a set of activities for

reconstruction and the expansion of

the wastewater treatment plant in

Tervel.Treatment facility will increase

its capacity and will be able to purify

wastewater from fully established by

implementation of the first phase of

the sewerage network of Tervel.There

will be carried out works on

construction of buildings and

equipment , there will be delivered and

installed new technological equipment.

For insurance of a reliable process the

training of staff of the plant will be

provided.Strict adherence to the

conditions under which an

authorization for construction of the

25.07.2016-

30.06.2024 6 199 965.60 85% Tervel Republic

of Bulgaria

022 27.07.2016

Page 11: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

treatment plant will be controlled by a

consultant performing construction

supervision.The designers in different

parts of the detailed design will

perform supervision during the

construction and equipment.All

investment works will be carried out in

accordance with the technical project,

which is coordinated with the control

authorities, it has prepared an report of

its compliance with the essential

requirements for construction and

building .For Project management will

be engaged a team of three employees

of the Municipality Tervel.The

expenses under project will be verified

by a registered auditor and the

implementation of all activities will be

promoted in the implementation of the

approved 2014-2020 OPE measures for

information and publicity.

Yambol

Municipality

Integrated water

cycle project of

Yambol -

construction of

wastewater

treatment plants

and inlet

manifold,

expansion and

reconstruction of

sewerage and

water supply

network in the

city of Yambol -

phase two

Yambol municipality implements the

project "Integrated water cycle project

of Yambol - construction of wastewater

treatment plants and inlet manifold,

expansion and reconstruction of

sewerage and water supply network in

the city of Yambol" contract № DIR-

51011116-S035 / 23.08.2012 on

granting financial assistance within the

Operational Programme "Environment

2007-2013". After an analysis of the

physical implementation of the projects

under Priority Axis 1 of OPE 2007-

2013, the MA 2014-2020 identified 8

projects, including that of the

municipality of Yambol, which can be

05.08.2016 –

30.06.2024

44 419 346.93 85% Yambol Republic

of Bulgaria

020

022

023

08.08.2016

Page 12: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

divided into two phases whose second

phase could be financed in the 2014-

2020 programming period two write

phases are technologically and

financially bound.

The Implementation of the project

proposal "Integrated water cycle

project of Yambol - construction of

wastewater treatment plants and inlet

manifold, expansion and reconstruction

of sewerage and water supply network

in the city of Yambol-phase two" will

ensure the successful completion of the

whole infrastructure project. Moreover

this will lead to the overall result of the

project increase in the number of

people with access to improved

wastewater treatment and improved

water supply.

In the framework of this project

proposal are implemented works on

finishing the new WWTP (wastewater

treatment plant for urban waste water)

with inlet collector; completion of the

connecting infrastructure to the

WWTP; completion of the

reconstruction of the collector IX;

completion of phase II of Lot1

"Expansion and reconstruction of

sewerage and water supply network in

the town. Yambol" - bringing

collectors from Industrial zone to its

inclusion in Chief. Collector V and

sewage pumping station "Industrial".

Other activities that are going to be

implemented are services which

provide copyright and construction

supervision of listed sites, as well as

Page 13: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

mandatory measures for information

and communication in the Operational

Programme "Environment 2014-2020".

Vidin

Municipality

"Completion of

wastewater

treatment plants

(WWTP ) - Vidin

- Second Phase "

Completing the WWTP-Vidin for

wastewater treatment in PE - 56 000

PE about 2041g. The following basic

data of the entrance to the WWTP:

Daily average water kolichestvo- 10

928 m3 / day; BPK5-3 360 kg / day

COD 6720 kg / day suspended solids-

3920 kg / day, total nitrogen, 616 kg /

day, total phosphorus -101 kg / day;

Project "Completion of wastewater

treatment plants (WWTP) - Vidin -

Second phase" includes the following

activities: exercise of supervision

during construction, adequate supply of

materials, equipment and furniture,

construction and works; single,

complex and 72-hour tests, preparation

of as-built documentation and cadastral

surveying of the entire site under the

Law on Cadastre and Property

Register, for commissioning of the

Protocol Form 16 with the operation,

giving permission for polzavane; staff

training; removal of defects within the

specified warranty periods and support

the operation and maintenance of

wastewater treatment plants in these

terms;

11.08.2016-

30.06.2024

22 270 043.76 85% Vidin Republic

of Bulgaria

022

023

22.08.2016

Vratsa

Municipality

Vratsa Integrated

Water Project - II-

nd phase

Vratsa Integrated Water Project is intended

for management of the water cycle of town

of Vratsa and it covers the water

distribution network, the sewer collector

network and the waste water treatment

28.10.2016-

30.06.2024 114 506 125.63 85% Vratsa Republic

of Bulgaria

020

022

28.10.2016

Page 14: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

plant. Integrated project is divided into two

phases. First phase was implemented under

Operational Programme Environment 2007-

2013. Second phase of the project provides

for the full completion of the reconstruction

of the urban sewage network and

reconstruction of WWTP, and full

implementation of rehabilitation of the steel

and reconstruction of the existing asbestos

- cement water mains from "Srechenska

bara" dam to the town of Vratsa.

Second phase of the project includes:

• Reconstruction and

rehabilitation of 17,62 km water supply

network, where a lot of breakthroughs and

leakages occur

• Reconstruction and

rehabilitation of 2,35 km of the existing

main sewer collectors of Vratsa

• Reconstruction and

rehabilitation of 7,59 km of the secondary

sewer network

• Extension of the sewer

collector network with 8,77 km in two

quarters of the town of Vratsa – Kulata and

Bistrets, as well as streets in the town of

Vratsa

• Rehabilitation of existing steel

pipe and reconstruction of existing asbestos

- cement water mains from “Srechenska

bara” dam to the town of Vratsa – 33,3 km

• Approval of Detailed Design

and Detailed Urban Plan, establishment of

easement, receiving of construction permit

for water main from “Srechenska bara”

dam to town of Vratsa

• Completion of full renovation

of the Waste Water Treatment Plant

(WWTP) with new mechanical and

electrical equipment, construction of new

and renovation of old buildings, in order to

achieve compliance with EU and Bulgarian

Page 15: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

environmental requirements.

• Construction Supervision

• Author's supervision during the

construction works of urban sewage and

water supply network and author's

supervision during the construction works

of water main from Srechenska bara dam to

the town of Vratsa.

Sofia

Municipality

Preparation of

regional

feasibility study

for water supply

and sanitation for

the territory of

Sofia

Municipality

The Project proposal includes activities for

preparation of a Regional feasibility study

(RFS) for the territory of Sofia

Municipality, preparation of infrastructural

conceptual designs, project documentation,

assessments and evaluation of compliance

with environmental legislation and other

analytical documents, preparation of

institutional, financial and economic

analyzes, costs and benefits analyze for the

consolidated region, as well as preparation

of documentation for subsequent

application under OP Environment 2014 –

2020 for the indentified in RFS measures,

incl. Application form.

The implementation activities set in the

Project proposal target the population in the

whole territory of the municipality. After its

accomplishment reconditions for increasing

the share of population connected to the

sewage system of Sofia Municipality will

be established. The measures will create

possibility for implementation of the

requirements of 91/271/EIO EU Directive

urban waste water treatment, the collection

of waste water will improve by increasing

the number of households connected to the

sewage system. The leaks and infiltration

into the sewage system will be decreased as

well.

The presence or lack of engineering

infrastructure, in particular – sewage

system, is important factor directly

22.11.2016-

21.04.2020

5 240 800.00 85% Sofia

Municipality

Republic

of Bulgaria

022

020

08.11.2016

Page 16: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

influencing the quality of the environment

and its attractiveness to potential investors

and respectively - for the implementation of

municipal policies. Public investments in

sewage systems are one of the most

efficient tools available to the Municipality

to targer urban development and to

accomplish the goals set in its strategic

documents.

Municipality Pleven

Integrated water

cycle Pleven -

Dolna Mitropoliya

The current project is submitted under call

for proposals under procedure

BG16M1OP002-1.006 "Implementation of

early water supply and sewage projects,"

Specific objective 1 "Protection and

improvement of water resources" Priority

axis 1 "Water" of OPE 2014-2020. Project

"Integrated Water Cycle Pleven– Dolna

Mitropoliya" aims to improve the water

cycle of agglomerations Pleven, Trastenik,

D.Mitropoliya, Yasen and Bukovlak for

achieving the objectives of the various

strategic documents at local, regional and

national level.

In the project proposal are included:

- “Reconstruction, rehabilitation

and modernization of the common WWTP -

Pleven for group of settlements in the

municipalities of Pleven and

D.Mitropoliya" with capacity -130 780 PE-

inclusion of waste water, generated by the

agglomerations, falling within the scope of

the investment proposal, to be collected and

delivered for treatment in WWTP;

- construction of water supply

and sewage networks in Yasen, Bukovlak,

D.Mitropoliya and Trastenik - rehabilitation

of major and secondary water supply

branches and building derivations to the

networks; construction of domestic sewage

with major branches and secondary

branches and building derivations;

18.01.2017-

30.06.2024 117 150 300.52 85% Pleven

Dolna

Mitropoliya

Republic of

Bulgaria

020

022

023

23.01.2017

Page 17: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

construction of new rain sewage;

construction of new sewage pumping

station (SPS) in town of Trustenik and

village of Yasen and sewer collector.

Main project activities are: Organization

and management of the project, Information

and communication measures (publicity

and visualization), Research and design,

Construction works, Supply of machines

and equipment, Supervision during

construction.

Target group: The main benefits of the

project are for the population of

agglomerations Pleven, D.Mitropoliya,

Trastenik, Yasen and Bukovlak, who will

benefit from the improved water supply and

sewage network and WWTP Pleven.

Municipality

Primorsko

Integrated

investment project

in the water sector

agglomeration

Primorsko-Kiten

Integrated project in the water sector

agglomeration Primorsko - Kiten " was

developed to overcome the problems

associated with the existing infrastructure to

ensure the environmentally treatment and

discharge of waste water. The main

activities envisaged under the project are: 1.

Extension of existing WWTP for 55 000

PE, mechanical and biological stage and

degree of purification that meets

requirements of Directive 91/271 / EEC

incl. technical infrastructure. As a result of

the project will be achieved to improve the

quality of living in the city. Primorsko and

the town. Kiten, overcoming environmental

health risks and providing quality

environmental services to citizens as the

main target group. The estimated

population to be served by the rehabilitated

water supply infrastructure has 3948

permanent residents. The estimated

population to be served by the rehabilitated

system will be hundreds of thousands of

tourists who visit both cities available on

21.01.2017-

21.12.2019

22 272 737.01 85% Primorsko

Republic

of Bulgaria

022 23.01.2017

Page 18: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

the Black Sea coast during the summer. The

treatment plant will serve 55 000 PE.

Municipality

Aytos

Wastewater

treatment plant of

town Aytos

The preparation of project "Wastewater

treatment plant of town Aytos" started back

in 2011 with the financial support of the EU

with implementation of a project funded by

contract grant (DBFP) №DIR-51011119-1-

13 of priority axis 1 of OPE 2007-2013 on

procedure reference №BG161PO005 / 10 /

1.11 / 03/19. Needs to be met by the project

are in accordance with the planned

contribution of the OPE 2014-2020,

through actions for the implementation of

macro-regional strategies and sea basin

strategies in the region. The project will

contribute to the implementation of macro-

regional EU strategy for the Danube region.

With the implementation of the project

activities will contribute to achieving one of

the main priorities of the Danube Strategy,

namely: 4) Restoration and preservation of

water quality, set the target for

"Environmental Protection in the Danube

region." With the implementation of the

project will achieve the main objectives set

in the Water Framework Directive (WFD)

and its daughter directives and Directive

91/271 / EEC on the treatment of

wastewater from settlements and Directive

98/83 / EC on water quality intended for

human consumption. Achieving these

objectives will fully capture the primary

target group, namely the population of the

municipality Aytos, they will contribute to

improving their quality of life. The main

activities to be implemented under the

project are: 1) construction of WWTP of

town Aytos 2) Construction of connecting

and inlet manifold and supporting

infrastructure to the WWTP and connecting

21.01.2017-

21.12.2019

18 929 054.03 85% Aytos Republic

of Bulgaria 022 23.01.2017

Page 19: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

existing major collectors. The main results

of the project are to achieve connectivity of

the existing sewerage system serving the

population WWTP by which to achieve

wastewater treatment.

Municipality of

Elhovo

Design and

construction of a

waste water

treatment plant,

inlet manifold and

partial

rehabilitation of

the water supply

and sewerage

network in the

city of Elhovo

The project of the municipality of

Elhovo includes two main components:

1). partial rehabilitation of the water

supply and sewerage network in the

city and 2). Construction of a waste

water treatment plant incl. construction

of inlet manifold to it. Within the

project activities it is foreseen

development of a detailed design

project for construction of the WWTP

as its capacity according to the results

of the feasibility study is 11 100 pe.

28.03.2017-

28.02.2020

18 867 785.73 85% Elhovo Republic

of Bulgaria 020

022

29.03.2017

Ministry of health

Improving the

monitoring of

drinking water

quality

The project aims to bring the scope and

frequency of monitoring the quality of

drinking water conducted by the authorities

of State Health Control in full compliance

with European and national legislation. The

project will be provided equipment for

laboratories in the system of the State

Health Control for conducting monitoring

of the quality of drinking water in response

to the recommendations for Bulgaria from a

Summary report of the European

Commission by 16 June 2014 for the

quality of drinking water in the European

Union dealing reports from Member States

for 2008-2010, granted under Directive

98/83 / EC of 3 November 1998 on the

quality of water intended for human

consumption (EC report (COM (2014) 363

final).

The project will improve the capacity of

laboratories in the system of the state health

control by extending and enhancing the

30.03.2017-

30.03.2019

10 000 000.00 85% Republic of

Bulgaria

Republic

of Bulgaria 021 30.03.2017

Page 20: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

technical capacity to analyze in full the

mandatory in European and national

legislation indicators related to ensuring the

quality and safety of drinking water.

The expected outcome of the project is

improved capacity of the laboratories of the

bodies of State Health Control for

monitoring the quality of drinking water in

full compliance in full with the

requirements of EU and national

legislation.

The project will contribute to the

implementation of the Specific Objective 2:

"Improving the assessment of water status."

The project duration is 24 months and the

budget - 10 million BGN.

Ministry of

environment and

water

Completion of

water quantity

monitoring

networks

Upgrading and/or optimizing groundwater

quantity monitoring networks, incl. –

development of information maps;

assessment of the structure and the state of

existing monitoring points; impact analysis

of groundwater abstraction on existing

monitoring points and on ones envisaged to

be built;-identifying requirements and

measures to prevent lowering of water

levels in the selected points from the

monitoring network; identifying the

structure and equipment of monitoring

points;- assessment of the structure and the

state of existing monitoring points;

development of proposal for replacement of

monitoring points;- assessing the need of

additional expansion of monitoring

networks;- survey on land ownership of the

sites monitoring points are to be built;-

substantiate the construction of new and or

restoring existing monitoring points and

substantiate equipment to be installed or the

use of portable monitoring devices;-

development of proposal/guidance for

upgrading /complementing monitoring

09.10.2017-

09.09.2020

14 999 898.82 85% Republic of

Bulgaria

Republic

of Bulgaria 021 09.10.2017

Page 21: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

networks and programmes. Building new

groundwater quantity monitoring points.

Equipment of existing and newly built

groundwater monitoring stations with

measurement devices.

Design and justification of expansion

(optimization) of surface water monitoring

networks; incl.-analysis of existing points;-

analysis of geographical location and

necessary measurements of water quantity;

- identifying the sites for setting up

monitoring points;- ;- survey on land

ownership of the sites monitoring points are

to be built;- substantiate equipment for

monitoring points; identification of

necessary activities for the construction of

monitoring points; development of

proposals/ guidance for upgrading

/complementing monitoring networks and

programmes. Building new surface water

monitoring points and their elements.

Supply of equipment for monitoring on site.

Carrying out and participating in relevant

activities. Activities for technical assistance

in project preparation.

Municipality of

Chirpan

Construction of a

waste water

treatment plant in

the town of

Chirpan and main

sewer collectors

The town of Chirpan belongs to the

agglomerations above 10 000 PE and is a

priority agglomeration for financing under

Priority Axis 1 of Operational Programme

"Environment" 2014-2020. According to

data from the National Statistical Institute

the permanent population of the town of

Chirpan as of 31 December 2016 is 14 424

permanent residents, which form the main

project target group, together with the

business operators and visitors of the town.

Currently in the town of Chirpan there is no

a waste water treatment plant (WWTP) and

the waste waters are discharged directly in

Tekirska river, which is a tributary to

Maritsa river.

06.11.2017 -

06.10.2020

15 020

421.58

85% Chirpan Republic

of Bulgaria 022

020

06.11.2017

Page 22: OPERATIONAL PROGRAMME ENVIRONMENT 2014-2020, …ope.moew.government.bg/.../list_of_operations_water_en_07.11.2017… · methods for water, sediment and biota analysis, and equipping

European Union European Structural and Investment Funds

The specific project results include:

1. Constructed and operational waste water

treatment plant (WWTP) and main sewer

collectors in the town of Chirpan, with indicative capacity of 19461 PE, including:

- successful putting into operation of the WWTP;

- trained personnel for WWTP exploitation; - accepted and put into exploitation WWTP;

- successful period of warranty exploitation;

- successful tests for treatment of the waste waters by WWTP – Chirpan

2. Constructed main sewer collectors from the town sewerage system, which will include

approximately 70% of the population to the

WWTP.

3. Constructed technical infrastructure to WWTP

- Chirpan - inlet collector, water supply, access road, electrical supply.

The main project activities include: 1. Revision and update of tender

dossiers in compliance with the newly adopted

procurement legislation 2. Construction of WWTP – Chirpan

and main sewer collectors

3. Execution of supervision contract for WWTP – Chirpan and main sewer collectors

4. Project organisation and

management 5. Information and communication

measures.

6. Execution of author (designer) supervision for water collectors