PACIFIC PARTNERSHIP 2012

This brief is classified:UNCLASSIFIED

29 FEB 12OPT Brief

2

UNCLASSIFIED

UNCLASSIFIED

Roll Call

• CDS-7• State Dept – Mr. Weinz• USNS MERCY• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F

• C3F• CTF 76• 351st Civil Affairs Command• DLA Troop Support - Pacific• ETG• 30th NCR• HSC-21 DET 2• MCAST

Blue: Normal participants not expected to attend VTC due to scheduling conflict.

3

UNCLASSIFIED

UNCLASSIFIED

PP 12 Weekly Planning Rhythm

Thurs Fri SatSun

1300-1500W OPT VTC

1100W read ahead slides

posted to APAN

1100W CA WG

1300W LOG WG

1200W MED WG

1300W FP WG Every other week

Mon Tues Wed

1000W COMMS WG

1430W Comm Integration WG

CPF N3 Semi-Monthly Update

1200W ENG WG

Effective 22 FEB

4

UNCLASSIFIED

UNCLASSIFIED

SE

P

OC

T

NO

V

DE

C

JA

N

FE

B

MA

R

AP

R

MA

Y

JU

N

JU

L

AU

G

Mission Planning/CONOPS (CPF)

Meetings/Conferences (CPF/CDS)

Force Sourcing (CPFN3)

Interagency Coord (CPF N5)

NGO Coordination (CPF N5)

Partner Nations (CPF N5/C7F)

Final Transit Plan (CDS)

Funding/Auths (CPF N5/N00F)

Communications (CPF N6)

Assessment (CA WG)

Detailed CONOPS (CDS)

PDSS/Advanced Echelon (CDS)

Deployment (CDS)

Planning Timeline

Advanced Echelon

Deployment

MOU Letters Signed

EXORD

Systems

CPF RFF

Mid Planning Conference

Initial Planning Conference

Initial

PLANORD

PDSS

FSLO Letter

Final

Requirements

PN Invitation letters

Assessment plan

Country CONOPs

5

UNCLASSIFIED

UNCLASSIFIED

ADF Planning Status

General Planning• CJOPS Decision Brief for PP12 signed.

Command• CMDR Ken Walters, RAN confirmed as Commander Australian

Contingent.• Small number of ASNCE staff remain to be identified.

Engineering• 12 engineers confirmed to participate as FIE in Indonesia.

Medical • All Personnel for ADF Health PP12 positions identified.• Credentialing to follow.

No Change

6

UNCLASSIFIED

UNCLASSIFIED

ADF Participation

• Command Element– O-5 Commander and 4/5 support staff.

• CIMIC– 2 personnel.

• Engineering Section– 12 person section.– FIE Indonesia & SIE for remainder of mission.

• Medical – Contribution of 20 personnel in each contingent.

– Contingent 1 embark USNS MERCY in Guam and change out in Subic Bay Philippines.

– Contingent 2: embark USNS MERCY in Subic Bay Philippines and disembark at the conclusion of mission in Cambodia.

– HQJOC Health PP12 POC:• CMDR Kenneth Walters (SO1 Reg / Dom & Joint Ex Hlth Plans)

kenneth.walters@defence.gov.au

No Change

7

UNCLASSIFIED

UNCLASSIFIED

PP12 RFI Tracker

Number Status Date Req Responsible

Question Other

ADF-001 Closed 11 Nov 11 PACFLT Request a copy of the Indonesian PDSS itinerary

ADF-002 Closed 11 Nov 11 PACFLT Status of Partner Nation invitation letter

No Change

8

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• CONOPS of Japan - Developing the CONOPS of Japan Country selection - Philippine - Vietnam Activities - Medical supports - Community service projects Introduction of culture etc. - Studying other activities Vehicles - JMSDF Ship   LST“OOSUMI” - JASDF Aircraft ( C-130   or KC-767× 1)             

Medical team       - Approximately 20~30

No Change

9

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

• PDSS -Re-survey Philippines with U.S. member in MAR 5 ~ MAR 9

• Humanitarian community in Japan - Recruit on 21 FEB

• POC - PLANNING PRI: LCDR Haga : j3haga@js.mod.go.jp DSN:224-7714 or 7723 SEC: LCDR Yamaguchi : j3yamaguchi_m@js.mod.go.jp - MED PRI: CDR Hayashizaki:j4hayashizaki@js.mod.go.jp SEC: MAJ Yamasaki:j4yamasaki@js.mod.go.jp - PA CDR Maeyama: j1maeyama@js.mod.go.jp

No Change

10

UNCLASSIFIED

UNCLASSIFIED

JSDF Planning Status

Number Status date WG Requests/Questions Comments

JPN -001 19 OCT PDSSDraft plan of PDSS in Philippine and Vietnam

JPN-002 30 NOV PDSSReq. re-survey with US survey member in FEB or MAR.

JPN-003 8 FEB OPSMERCY's arrival/departure port time at Calbayog and Vinh

JPN-0048 FEB

CMO1day seminar' s date,location,participant

No Change

11

UNCLASSIFIED

UNCLASSIFIED

NZDF Planning Status

No Change

NZDF will deploy a multi-disciplinary team of 8 personnel for the duration of the deployment to Vietnam 10 – 24 Jul 12. Exact composition is to be finalised in due course but likely to be as follows with specialties to be advised:

2 x Health Planners1 x Medical Officer 1 x Nursing Officer1 x Dentist or Dental Hygienist2 x Medics1 x Environmental Health Officer

Outline SOM: - Embark USNS MERCY in Subic Bay, Philippines on or prior to 6 July 12.- Conduct tasks as personnel embedded into appropriate health capability bricks.- Disembark at conclusion of Vietnam mission.- RTNZ via either Hanoi or Ho Chi Minh City.

12

UNCLASSIFIED

UNCLASSIFIED

CPF FOPS Update

- Manning Update- Approximately 70 billets being filled by FFC will be in 07MAR SDOB.

- Unknown if USARC will fill the 16 CA billets.

No Change

13

UNCLASSIFIED

UNCLASSIFIED

Medical Update• Medical Assessment to PI completed; report by end of week.

• Medical Assessment to KHR – Political Officer feels redundant. CPF / COE will confirm this, pursue shift to RMI (no MTF staff).

• Staffing – 111/623 billets remain unfilled. 7 positions “unfillable” (cross-billeted, cannot request more). Seeking alternatives through NGO/PN.

• Credential requirements: on track for PI, VN, KHR. IND requesting copies of documents be given to local health officials at port. Will try to “phase” some documents with ADVON to allow SURGCAP to begin on day 1 without delay.

• CONOPS – addendum submitted last week. Annexes submitted to DESRON FEB28 – 70% solution. VET Annexes behind, vet now back from USAF ops.

• MERCEX – working with ETG to design scenarios for both MEDDENCAP and surgical/inpatient services.

Completed On-track Off-Track/Recoverable Off-Track not recoverable

14

UNCLASSIFIED

UNCLASSIFIED

Engineering Update

Site Survey Projects Recommended SMEE Request

Philippines 3 schools & 1 medical clinic P&E; Seawall Cambodia 3 health centers Water; Bldg DesignIndonesia 3 health centers & 1 school Seismic; Disaster Vietnam 2 health centers Disaster; Safety

Philippine Project Package preparation (ACB1 lead)Cambodia Project Package preparation (NMCB40 lead)Indonesia Project Package preparation (ADF lead/NMCB40 Alt)Vietnam Project Package preparation (NMCB40 lead)

Engineering SMEE Plan.

Life Support Requirements.

Completed On-track Off-Track/Recoverable Off-Track not recoverable

No Change

15

UNCLASSIFIED

UNCLASSIFIED

Logistics Update

• Logistics WG held 28 Feb 12

• Logistics Resource Matrix Completed

• Funding– APRI, ORF, OCO on track

• Pharmaceuticals and Consumables– Indonesia and Vietnam Estimated Contract Award April

• Donation Material – Received 45 pallets from LDSC

• Next Logistics WG meeting scheduled for 6 Mar 12

PP12 Supply and Logistics StatusFUNDING (29FEB12)

16 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

APRI CPF/

SUPPO

5MAR12 - APRI ($1.7M of $1.9M required received)

ORF C7F/

CDS-7/

SUPPO

29FEB12 - ORF plan developed- Draft message completed pending CDS-7 review and approval

OCO CPF/

SUPPO

15APR12 - Requirements data forwarded to CPF - Review in progress

NO CHANGE

17

UNCLASSIFIED

UNCLASSIFIED 17 17 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Indonesia Load List

SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commencing initial purchase of standard consumable items

Philippines Load List

SUPPO 31MAR12 - Standard pharmaceutical items requisitioned- DLA commencing initial purchase of standard consumable items

Vietnam Load List

SUPPO 31MAR12 - Estimated contract award April 2012 - DLA commencing initial purchase of standard consumable items

Cambodia Load List

SUPPO 31MAR12 -Standard pharmaceutical items requisitioned

- DLA commencing initial purchase of standard consumable items

PP12 Supply and Logistics StatusPHARMACEUTICALS and CONSUMABLES (29FEB12)

18

UNCLASSIFIED

UNCLASSIFIED 18 18 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Load Plan MSC/

SUPPO

31JAN12 - Load plan developed and approved by MSC MERCY- 240 pallet maximum established

Project Handclasp

SUPPO 15MAR12 - 40 pallets scheduled for delivery nlt 15 Mar- Goal established at 60 pallets total

LDSC SUPPO 15MAR12 - 45 pallets received 28 FEB- Weekly deliveries scheduled

Worldwide VETs

SUPPO 15MAR12 - 2 Pallets Received

PP12 Supply and Logistics StatusDONATION MATERIAL (29FEB12)

19

UNCLASSIFIED

UNCLASSIFIED 19 19 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

IT & Radio Operator Manning

CPF N3/ CDS /

01MAR12 - JCSE IEP (3 ea +OIC= 7 pers ) approved 05DEC- 4+Remote MEDCAP manning assignment by name- IMEF providing 4 PERS/ 6 PRC-117 Radios

Annex K /

COMM Plan

CPF/ C3F/CTF-76/CDS

15MAR12

- IAW NTTP 3-57 Navy HCA OPS and NWP 3-29- Country CIS inventory and CONOPS Plan developed at MPC.- OPTASK COMMS will include daily plan based on CONOPS and Japanese ship COMMs capability

BGAN SATCOM

CPF N6/

CDS POST-MPC

- Not required for PDSS. (17OCT11 CDS-7 N6 email).- OPTEST CPF BGANs (FEB12).- Develop CONOPS for BGAN use.- ADVON BGAN training by MERCY TBD

Host Nation Spectrum Mgt

C7F/CTF-76 /CDS

01MAR12 - Awaiting C7F response to CDS-7 01FEB request for frequency assignments and restrictions for each host nation. Info rcvd 21FEB12.

ENCAP CIS

Requirements

CDS 15MAR12 - CDS determine CIS requirements.

PP12 CIS Information Systems Status(29FEB12)

20

UNCLASSIFIED

UNCLASSIFIED 20 20 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

PAO Network CPF PAO/N6

/ CDS/

MERCY

15MAR12 - Defense Video & Imagery Distribution System (DVIDS) : PAO confirmed system is available. Ashore use only.- Verified Fast File Transfer (FFT) SW (version 2.43) Installed in MERCY. FFT ATO pkg in development at DMA. PAO assist in progress

PN-NGO Business Center

(SSC LANT CHARLESTON)

CPF N6 / CDS

/MERCY

APR12 -SPAWAR PN-NGO Business Center (Wireless and terminals) is the afloat solution. - MERCY to coordinate refresh/OPTEST/training in San Diego by SPAWAR. SOW in development (09JAN12).- CDS procure printer consumables for entire mission.- IA/business rules provided CDS-7 N6 03NOV11.

Partner Nation Interoperability

CPF N6 / CDS

POST-MPC

- Identify JS OOSUMI (LST) CIS POC and CIS capability in progress- Develop CIS Interoperability Matrix in Annex K.

Health Engagement Information System (HEIS)

CIS WG/

CDS N6

TBD - HERS from MARFORPAC Experimental Center (MEC) is not available-Medical information collection is not a mission requirement. No further action required.

PP12 CIS Information Systems Status(29FEB12)

21

UNCLASSIFIED

UNCLASSIFIED 21 21 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Remote MED-DENCAP /CC Comms Arch

CDS / CPF

PRE-MPC

- Draft CIS Element architecture and inventory under review at CDS-7 (20JAN12)- Completed at MPC.

Host Nation

MIL C4

PDSS OIC

PDSS AAR

- PDSS OICs for assessment action.

- Training provided to Blue Team 21OCT11.

Host Nation

CIVIL Comms

PDSS OIC

PDSS AAR

- PDSS OICs for assessment action.

- Training provided to Blue Team 21OCT11.

Remote Site US Mission CIS

Assessment

PDSS OIC/

AOIC

PDSS

AAR

- JCSE Planner not included in PDSS. PDSS AOIC to conduct assessments with provided checklists and guidance.- Command Center (CC) Comms assessment.- Training provided to Blue Team 21OCT11.

PDSS CIS

Comms

CPF/ CDS PDSS OICs

PRE-PDSS

- Iridium Phones: CPF N6 issued phone to Blue OIC.- In country cell phones: MERCY to provide from PP10 mission phones.- Automated Data Collection (8 cell phones app) issued to OIC.

PP12 CIS Information Systems Status(29FEB12)

No Change

22

UNCLASSIFIED

UNCLASSIFIED 22 22 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

Knowledge Management /Data Protection

CDS/

MERCY

7MAR12 - MEDCAP/CDS/Mission Data storage and protection

Command Center Ashore CIS

CDS PDSS

AAR

- Identify configuration and location in each country.- Completed at MPC

IT SMEE

Requests

CDS PDSS AAR

- PDSS determine scope (SYSADMIN, repair, training, etc.).- No IT SMEE were requested by the host nations

SATCOM Requests

C3F/

C7F/

CDS

FEB12 - Standard USN process.

Mission COMMs Readiness

CDS /

MERCY

APR12 - Pre-deployment COMM Checks (DVIDS, FTP, FFT, NMCI FAS, MERCY COMMs Suite)

PP12 CIS Information Systems Status (29FEB12)

23

UNCLASSIFIED

UNCLASSIFIED 23 23 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req

Notes

FSET on MERCY

CPF /

MSC

13APR12 - Field Service Engineering Team (FSET) rqmt for San Diego to Guam cost estimate from SPAWAR received 16FEB12. SD-Guam

-Funding transfer to SPAWAR in progress.

End of Mission CIS Exit Plan

CPF/

CDS

TBD - Hardware: Transfer custody of loaned CIS items back to CPF-Data Exit Plan: TBD

VHF Handheld Radios

CPF/

CDS

FEB12 -CDS determine required quantities

ADVON CIS CDS MAR12 -Requirements determined at MPC. Under review at CPF N6/N3

Embarked Documentary Team

CDS Ongoing -CDS determine requirements and set expectations

-Afloat connectivity limited to NGO Business Center

Rehearsal CIS CDS 01MAR12 -15FEB CDS requirements: Cell phones and 1 UHF voice net.

PP12 CIS Information Systems Status(29FEB12)

No Change

24

UNCLASSIFIED

UNCLASSIFIED

Force Protection Update

• Landside Security Force Tasking- MESG-1 Det Guam ForAc

• Next FPWG, Tuesday, 6 March, 1300 HST

• Pre-Deployment travel Requirements– Updated ISOPREPs– APACS– iATP– AOR location specific brief– Level I ATFP– SERE 100 B

25

UNCLASSIFIED

UNCLASSIFIED

CAWG Update (29 FEB)

Item / Task Status Action Date Req Notes

CJ-CMCC Concept Paper Dev CPF N5 15 FEB

-Completed-Chops received and incorporated from DESRON, PP 09, 10, 11 reps, COE-DMHA (IHC) -CMCC concept document inputs received during MPC TTX.

CMCC Battle Rhythm Sych DESRON 19 JAN - Inputs submitted to DESRON.

Non-Medical SMEE CONOPS Draft Plan CAWG 23 JAN

-Complete- Plan details will continue to be added, as possible, between now and ADVON deployment. However, CONOP finalization will not occur until ADVON.

Operational Assessment Plan CAWG MAR 12

- Assessment WG has produced draft task list which will be socialized and refined during WGs.-Geared toward MOPs

NGO and Partner Nation Engagement Process

CAWG /

CPF N5

MPC

- 90% plan post MPC but add-ins will be ongoing.

26

UNCLASSIFIED

UNCLASSIFIED

CAWG Update (29 FEB)

Item / Task Status Action Date Req Notes

PN Participation CAWG 01 MAR 12

-Singapore will participate in VT only -Costa Rica drops out-Probably French add soon- Expect PN manning lists end of Feb

NGO Specialties Assignment

CAWG /

MWG

Mid-March

Specialty requests are back from NGOs/PN and will distribute this list back to MTF for additional input, comments & requests. -95% details by 01 MAR- 90% by name by 15 MAR

Donation Plan

CAWG

DESRON 01 MAR 12

- Philippines and Cambodia donation lists with DESRON for approval- Indonesia and Vietnam lists still with USEMB

27

UNCLASSIFIED

UNCLASSIFIED

Projected HN/PN Participation by Mission CountryProjected HN/PN Participation by Mission Country (29 FEB 2012) (29 FEB 2012)

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

Indonesia FP, Engineers, Medical                    LCDR Chris GiacomaroGiacomaroCM@state.gov

PhilippinesFP, Engineers, Medical

                 LCDR Scott AlmsAlmsSC@state.gov

VietnamFP, Engineers, Medical

                   LTC Wayne TurnbullTurnbullPW@state.gov

CambodiaFP, Engineers, Medical

                   LTC Kristin Means MeansKA@state.gov

AustraliaMedical 15-20 PAXEngineer Section

                   

CMDR Kenneth Walters:kenneth.walters@defence.gov.auSQNLDR Owen Gardner, owen.gardner@defence.gov.au.

Canada Medical/Dental 9 May

15 Pax

15 Pax

15 Pax

4 July 15 Pax 15 Pax 15 Pax 4 SepCAPT Lee Gagne LEE.GAGNE@forces.gc.ca

JapanJMSDF Ship Aircraft (C-130 or KC-767)Medical Team: 20-30 pax

                    LCDR Haga : jj3haga@js.mod.go.jp

New Zealand 8-12 PAX Medical TeamMAJ Andrew Brooksandrew.brooks@nzdf.mil.nz

Singapore Medical teamMajor Chow Weien: CHOW_Weien@starnet.gov.sg

ThailandMedical, Engineers and CA Approx 15 Pax

LCDR Jason Starmer starmer@jusmagthai.org

ROKCAPT Steve MerrllMerrillSR@state.gov

Chile 1 PAXMedical 5 July

24 July

LCDR Julian MaldonadoJulian.maldonado.cl@navy.mil

Costa Rica 1 PAX Medical 25 APR

LCDR David L Ricciriccidl@tcsc.southcom.mil

UAE 1 PAX Medical CDR James C. AndersonMarbleAD@state.gov

28

UNCLASSIFIED

UNCLASSIFIED

Projected NGO Participation by Mission CountryProjected NGO Participation by Mission Country (29 FEB 2012) (29 FEB 2012)

Host / Partner Nation

Material / Platform Support

Personnel Participation by Port

SD HI GU ID RP RP VN KM GU HI SD POC

LDSMedical, Engineering, SMEEs, Donations

     35 57     51 67       Dr. Susan PulsPulsSu@lsdchurch.org

UCSD PDSMedical, Engineering, SMEEs

     51 53+    54+   50+    Dr. Irv Silversteindsilverstein22@cox.net

Project HopeMedical , SMEES

    16 16     16  16      Lynn Bemillerlsbemiller@gmail.com

World VetsVeterinary, SMEEs

     6  6   7  6       Katie Hornkatie@worldvets.org

UH Nursing Medical     5  5     4 4    Kristine Qureshikqureshi@hawaii.edu

UH Engineering Engineering 2 2 2 2Ashish Babbarashishbabbar@gmail.com

Project Handclasp

Donations 0 0 0 0LT Aron Rotkleinaron.rotklein@navy.mil

Global Grins Donations 0 0 0 0

Joselyn Millerjoselyn.miller@globalgrins.org

Vietnam Medical Assistance Program

Medical TBD Nguyen Nguyennguyen.nguyen@vnmap.org

Totals 115 139 134 145

In-Country NGOs

Indonesia Philippines Vietnam Cambodia

Help for Orphans(?) Calbayog Rotary Club Compassion Flower TDBHope World Wide GIZ (TBD) Vietnam Woman’s Union

ASWHO

29

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

- Admin• Fulfilled MRX PA requirements

- Media Coordination• SLV media wrap-up completed

30

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

PAG CDS PACPF PA

TBD Draft to CDRE 15 DECRouting will happen D-30 to 45 days

DC media trip/mission announcement

CDS PA APR 2012 Coordinating dates with PA stakeholders

PP Fact Sheet CDS PA, CPF PA

30 DEC Mission info to NAVINFO WEST for vetting

Smartphone SOP

CIWG, CPF Social Media

15 MAR Coordinating with CPF PA on phone aquisition

Online presence brief

CDS PA, CPF PA

9 DEC Social media, websites, etc

30 Completed On-track Off-Track/Recoverable Off-Track not recoverable

31

UNCLASSIFIED

UNCLASSIFIED

Public Affairs Update

Item/Task Status Action Suspense Date

Notes

Equipment requirements

CDS PA, NPASE

TBD Dialogue initiated w/ MERCY on 04 JANBGAN support- emergency use only, provided by CPF COMCAM

PO&AM inputs CDS PA, CPF PA

14 DEC Due to FOPS.PA-specific updates in progress

Media Training Plan

CDS PA

30 MAY SL media training 1300-1500, 12 MAR

COMREL purchase list

CPF PA

24 FEB List approved by CPF PAO, CPF JAG. CDS PAO has list for CDRE approval.

31 Completed On-track Off-Track/Recoverable Off-Track not recoverable

32

UNCLASSIFIED

UNCLASSIFIED

PP12 Communication Integration

• Identified initial list of communication “products” at MPC– Posters, gifts, backpacks, SMEE aids, etc.

• Coordinating communication assessment support for PP12 (MAY – SEP 12)

– Working with CPF N01H and N5 to develop assessment approach

– Linguist candidates to support in-country media analysis, and CA/PA engagement

• IND (1), TAG (3), VIET (2), CAMB (0)

• Next CIWG meeting scheduled for: 29 FEB 12

33

PP12 Communication Integration

33 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Stakeholder Analysis

CIWG 15 NOV - Initial product completed. Briefing with Commodore Morgan scheduled for early Dec.

Characterize Information Environment

CPF N2/N39

15 NOV – 30 JAN

-Political Military Economic Social Infrastructure and Information (PMESII) product status is as follows: Cambodia 100%, Indonesia 100%, Vietnam 100%, Philippines 100%.

Communication Strategy/ Implementation Plan

CPF N2/N39

31 DEC - This product will detail integrated approach for internal, external messaging. This product will be a draft until finalized as an Annex to the CPF PP12 Campaign Plan.

Identify/Coordinate key messaging events

CIWG 15 JAN - Identified; coordinating CIWG support:-- ETG Leadership Training-- MPC Assessment planning-- SLV support

Develop messaging products

CIWG/ CPF N2/N39, PA

15 APR - Identified initial information products to support mission execution. Researching feasibility, and working with mission SMEE coordinators to ID additional requirements; coordinating with PACOM, SOCPAC, USARPAC, in-country teams.

34

PP12 Communication Integration

34 Completed On-track Off-Track/Recoverable Off-Track not recoverable

Item / Task Status Action Date Req Notes

Develop communication MOE Indicators

CIWG/ N2/N39

15 JAN - Draft indicators developed as part of overall PP12 assessment effort.

Define Communication assessment methodology

CPF N2/N39

30 JAN - Completed communication assessment framework and methodology for incorporation into overall PP12 assessment effort.

Coordinate and monitor communication during execution

CPF N2/N39

During PP12

- Identified initial monitoring requirements, resources and tools to support communication assessment, such as media analysis.

Conduct communication assessment

CIWG During PP12

- Not started.

Develop AAR CPF N2/N39, PA

30 SEP - Not started.

35

UNCLASSIFIED

UNCLASSIFIED 35

Host Nation

Opening Ceremonies

DatesVisiting FO/GO

(Service)

Closing Ceremonies

DatesVisiting FO/GO

(Service)

Indonesia: North Sulawesi 31 May 2012 15 June 2012

Philippines: Samar 18 June 2012 01 July 2012

Vietnam: Vinh 10 July 2012RDML Penniman

(USN)(T) 24 July 2012

Cambodia: Sihanoukville 28 July 2012 11 August 2012

RDML Gregory (USN)

   

Flag Engagement Plan

No Change

36

UNCLASSIFIED

UNCLASSIFIED 36

Planning Timeline

UPDATED: 29FEB12

37

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities

• Country CONOPS Development– CONOPS Addendums (personnel, logistics, communications, FP

tables) integrated into CONOPS (COMPLETE)– CONOPS Medical and Engineering Annexes (IN PROGRESS) – 80%

complete– CONOPS Veterinarian Annex (NOT STARTED)

• CPT Mclean (USA) – not available due to assignments• LTCOL Lancaster (USA) – reservist, not activated

– 29FEB: CONOPS and Medical/Eng Annexes forwarded to CPF– 01MAR: Tactical level planning– 02MAR: Post CONOPS to APAN (proposed)

• ADVON Composition / Notification– 29FEB: Composition forwarded to CPF

• Voyage Planning– Status of CPF major sked change?

• Chop to C7F 16MAY12; Chop to C3F: 31AUG12; RTHP: 14SEP12– 29FEB: Transit plan submitted to C3F/C7F (COMPLETE) – DTG 291731Z

FEB 12)

38

UNCLASSIFIED

UNCLASSIFIED

Mission Commander Priorities (continued)

• MRX Planning– 02MAR: Stakeholders provide input to CDS7 N3 on personnel

participation– 01MAR: MRX planning TELCON (#2)

• Participants: MTF MERCY, USNS MERCY, HSC 21, ENG, EST, CDS7: OPS, FP, Comms, & PAO reps

• Pre-deployment Briefings– 02APR 1630 PST (030030ZAPR12) – CTF76 (VTC)– 27MAR 1400 PST (272200ZAPR12) – C3F– 09APR 1630 PST (100030ZAPR12) – C7F (VTC)– TBD – CPF (13APR – proposed)

• Concerns– Manning

• ~70 unfilled billets• 16x USA CA billets (351st)

– JCSE funding– Medical Credentialing– Logistics for Port of Cua Lo, Vietnam

39

UNCLASSIFIED

UNCLASSIFIED

Closing Questions/Comments

• CPF Staff• State Dept – Mr. Weinz• AUS HQ JOC• HQ JFNZ• JSDF• FLC-Yokosuka• C7F• C3F• CTF 76

• 351st Civil Affairs Command• DLA Troop Support - Pacific• 30th NCR• ETG• HSC-21 DET 2• MCAST• USNS MERCY• CDS-7

top related