preparation for field visits

Post on 12-Jan-2016

27 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

DESCRIPTION

Preparation for Field Visits. Prepared by Dr. Nittana Southiseng. 8 July 2011 15:30 – 15:45 pm. Six Companies ( 11-14 July 2011). Khon Kaen Province (11-12 July) Tung Hung Chiang Khon Kaen Ceramic Praepan Group Nakhonratchasima province (13-14 July) K.T.M. Metal Work Chao Din - PowerPoint PPT Presentation

TRANSCRIPT

Prepared byDr. Nittana Southiseng

Preparation for Field Visits

8 July 2011

15:30 – 15:45 pm

Six Companies(11-14 July 2011)

Khon Kaen Province (11-12 July)

1. Tung Hung Chiang

2. Khon Kaen Ceramic

3. Praepan Group

Nakhonratchasima province (13-14 July)

1. K.T.M. Metal Work

2. Chao Din

3. Ekcharoen Rice (Exseng Rice) Co., Ltd.

Company’s Profiles

See more detail in the reference

Guidelines for Field Visits

Schedule for Field Visits

Grouping

Work in group of 4 members. After visiting 6 companies, each group has to choose

one most interesting company to write a report and make a presentation.

The selection of the company is allowed for “first come first serve”.

Each group can choose the company only after visiting all 6 companies.

GroupingGroup 1:

Group 2:

Group 3:

Group 4

AssignmentNow, please prepare a 5-page (or more) report consisting of the

following format:Description of the SME cluster/EC visited Product and Services to customers, Product and Services to SME tenants,

subcontractors, etc.Value chain diagram and Strengths, Weaknesses, Opportunities and Threats

analysisProblems and Concerns RecommendationsLesson Learnt from group work (strengths and limitations)Prepare PPT for presentationBest Presentation and well-prepared report will be awarded a PRIZ! (15 mins

presentation and 5 mns for Q&A)

(Note! Your presentation and report are not limited within the guidelines above. You are encouraged to develop creative

preparation and presentation)

Job AllocationSelect main coordinator Allocating the jobs

Taking photosNoteObservationCollecting additional informationLead discussionWriting report Make presentationOthers …….

Dress & Preparation

Normal dressingComfortable shoesHat, cap (if you have)Name cards

Luggage

You can keep your packages at MI

Last but not least

BOD Setting for Field Trip

Day 1:

Day 2:

Day 3:

Day 4:

“Mood Meter, Energizing, Time keeping, Collecting Feedback, Thanks to the Field Visits”

Post Evaluation

Module 1

top related