Proiect - Qua rterlv Progress Report

Promote/s Name Casa Grande Civil Engineering Private LimitedProject Name Casagrand BellissimoProject Registration No TN/01/Buildin sloo28l2ot7Quarter Ending September 23,zOLg

B. Construction

S.No Description Nos. Total Area

- (sq.m)

Plots/Flats Booked size wise(As given in Carpet AreaStatement while registering)

2!9.24937 501.311

3952.069

96s 1.802

2 Parking Lots

339

UDS Registered in Sq.m.

35 t89L.17

S.No Description Block/Tower No. Status

Door Shutter fixing, Painting & Cp sanfixing work is in resS

B Door Shutter fixing, Pajnting & Cp sanfixing work is in progress

ary

C Final Coat painting is in progress, Hanover is in Progress

tng

DFalse ceiling, Door Shutter fixing, pain

CP sanitary fixing & Terrace tile layingis in progress

ng,

ork

EFalse ceiling, Door Shutter fixing, paintCP sanitary fixing work is in progress

ng&

L Stage of construcUon ofeach Block/Tower, Floorwise

FTile laying, Window fixing & paintingis in progress

rk

./../ t'i

II

I5

A. Sales

4

2367 6.7

2BHK 641)

3BH K 156

4BH K 43

L.

40683.

ress

1g isj

Marble & Tile laying, Window fixing &Painting work is in progress

lnternal Plumbing, WaterproofingCompleted & Tile laying work is in p

Block work, lnternal Plastering, plumbiin Progress, Water proofing Complete

2 Status of commonAmenities for eachBlock/Tower, ltem wise Club House Stilt floor roofslab is in

C. Details of Clearances

1-. Completion Certificate No. NA2. Annual Audit Report of Special Account in Form 7 Enclosed

D. Latest Photo with Date (Atleast from 2 angles) - Enclosed in CD

For CASA G CIVIL

U

PVI LTD

d tories

G

J

BLOCK – A   PAINTING WORK, FALSE CEILING, SWITCH PLATE, KITCHEN COUNTER, FINISHING WORK  IN PROGRESS.

BLOCK – A 

BLOCK – B FINISHING WORK IN PROGRESS

BLOCK – B

BLOCK – C FINISHING AND QC SNAG WORK  IN PROGRESS

BLOCK – C

BLOCK – D 3RD FLOORPAINTING   AND KITCHEN GRANITE LAYING, DOOR SHUTTER, COUNTER TOP WASH BASIN, WIRING, SWITCH PLATE GRANITE WORK 

IN PROGRESS

BLOCK – D

BLOCK – E  INTERNAL PAINTING,SWITCH PLAT WORK,KITCHEN PLATFORM, IN PROGRESS

BLOCK – E

BLOCK – F  4TH FLOOR TILE, WALL PUTTY, EXTERNAL PAINTING, UPVC WINDOW WORK IN PROGRESS, WATER PROOFING, WINDOW GRILL

BLOCK – F

BLOCK – G PLUMBING WORK , WATER PROOFING, WALL&FLOOR TILES, MARBLE FLOORING, EXTERNAL PAINTING WORK, GRILL FIXING 

IN PROGRESS

BLOCK – G

BLOCK – H PLUMBING WORK,WATERPROOFING,WALL PUTTY         TILING,EXTERNAL PAINTING IN PROGRESS 

BLOCK – H

BLOCK – J  4th FLOOR BLOCK WORK,2ND  FLOOR PLASTERING WORK, EXTERNAL PLASTERING,1ST FLOOR WALL PUTTY WORK 

IN PROGRESS

CLUB HOUSE ROOF SHUTTERING &BARBENDING CONCRETE WORK

DRAIN & ELECTRICAL TRENCH WORK,CHAMBER ,STILT FLOOR PCC WORK IN, PLUMBING CHAMBER, STILT CEILING GVP WORK, LIFT ELECTRICAL, PROGRESS

TRENCH A to D

EXTERNAL WORK