Prototype sector
Ian Wilmut Dec 2012
What we didn’t include in the proposal...
• A fully functioning electrical prototype of staves via services to DAQ and plant, in a partial structure.
• But we do have 90% or the parts for such a prototype in the programme (even when it is descoped).
• Tim has asked me to talk aout what this object might be, and what WP4 would need to provide.
Schematically
.
.
.
Outer Cylinder/Thermal enclosure AKA a big foam box
DAQ (Opto and DCS)
POWER SUPPLIES
Recirculating CO2 Plant
1 service modulen staves (n~7)
Stave insertion frame
But we would need to make compromises...
.
.
.
Outer Cylinder/Thermal enclosure AKA a big foam box
DAQ (Opto and DCS)
POWER SUPPLIES
Blow off CO2 plant
1 service modulen staves (n~3)
Stave insertion frame
What I would like to be able to do
• Operate a number of fully serviced staves in the correct positions – with there correct spacing to their neighbours.
• Staves to be inserted using correct process• Staves to be serviced by service module • “outer cylinder box ” is representative of the
environment.• Cooling is manifold CO2 – so we can test
manifolding and pressure drops/ballencing
What WP4 needs to do• Ahead of time
– Understand what we would like to get out of process– Understand what baseline choices we would make– Have a sketch design of how we could do this
• WP4 items that are not explicitly in programme– “outer cylinder”– Compressed service module
• Efforts we would need to provide– Build test setup– Install staves– Connect to service module– Willingness to move staves– Provide and drive cooling– Build staves– .– .