Public Kick-Off Meeting

Northeast Gateway: Welaunee BoulevardProject Development & Environment Study

From Fleischmann Road to Centerville Road at Shamrock Street

Leon County, Florida

March 11, 2019

2

Blueprint Project Examples

3

Overview

Purpose and Need

Building Upon A Solid Foundation

Scope of Services

1

2

3

Typical Sections

Project Schedule

Staying Involved

4

5

6

Visit the project website at

NEGateway.com

4

Purpose and Need

PU

RP

OS

E Improve regional mobility

Enhance connectivity for motorized and

non-motorized users

Reduce traffic congestion on adjacent roadways

NE

ED

Provide an alternative route for existing users of Centerville and

Miccosukee Roads

Support ongoing and proposed development of the 7,000-acre

Welaunee Critical Area Plan

Provide relief to US 319 (Thomasville Road) and US 90

(Mahan Drive)

5

Building Upon A Solid Foundation

Private Initiative City, County, or State Initiative Blueprint Initiative

2013

20142010 2011

2016

2002

Canopy Concept

Planned Unit

Development

(CNL)

Welaunee

Critical Area Plan

(City of Tallahassee

& Leon County)

Welaunee Utilities

Master Plan

(City of Tallahassee)

Welaunee Stormwater

Facilities Master Plan

(City of Tallahassee)

Project

Programming &

Concept Development

Welaunee Boulevard

& I-10 Interchange

(City of Tallahassee)

Phase 1

PD&E Study

Northeast Gateway:

Welaunee Boulevard

(Blueprint)

Canopy CDD

Construction Begins

Approval of Sales

Tax Project –

Northeast Gateway:

Welaunee Boulevard

(City of Tallahassee)

I-10 Multimodal

Master Plan

(FDOT)

Welaunee Greenway

Conceptual Plan

(Powerhouse, Inc.)

2018

2015

2040 Regional

Mobility Plan

Welaunee Boulevard

Extension

(CRTPA)

1990

Tallahassee-Leon

County Comprehensive

Plan designated much

of Welaunee as a

critical planning

area.

City of Tallahassee

entered into an Urban

Services-Development

Agreement with

Powerhouse, Inc.

6

Canopy Development

South of I-10

North of I-10

Project Study Area

6

Canopy Development

South of I-10

North of I-10

Project Study Area

6

Canopy Development

South of I-10

North of I-10

Project Study Area

6

Canopy Development

South of I-10

North of I-10

Project Study Area

7

Welaunee North of I-10 Proposed Land Use Change

8

3 Components of a PD&E Study

Environment

EngineeringPublic

Involvement

9

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Project

Traffic

Analyses

10

Collect data for daily, AM peak, and PM peak traffic conditions

Forecast traffic for Opening Year 2024 and Design Year 2045

Evaluate No Build, Build, and Transportation Systems Management and Operations (TSM&O) alternatives

Conduct safety analyses

Project Traffic Analyses

11

Project Traffic Data Collection

12

Project Traffic Analysis Area

13

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Drainage

& Pond Siting

Evaluation

14

Develop drainage concepts

Identify potential pond site locations

Identify and evaluate environmental impacts

Review permitting requirements

Drainage and Pond Siting Evaluation

15

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Noise

Study

16

Evaluate existing and projected future noise Construction-based

Traffic-based

Identify noise abatement measures, as necessary

Evaluate noise abatement Reasonable

Feasible

Auxiliary noise study

Noise Study

17

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Natural

Resources

Evaluation

18

Evaluate the environmental impacts of all alternatives

Identify protected species and habitats

Identify wetlands and surface waters

Evaluate avoidance strategies and mitigation options

Natural Resources Evaluation

19

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

20

Conduct archaeological survey

Conduct architectural survey

Evaluate sites for eligibility in the National Register of Historic Places

Assess direct, indirect, and cumulative sociocultural effects

Cultural Resources & Sociocultural Effects

21

Conceptual

Design

Plans

Project

Traffic

Analyses

Bridge

Development

AnalysesUtilities

Assessment

Environmental

Natural

Resources

Evaluation

Conceptual

Stage

Relocation

Plan

Noise

Study

Air Quality

Analysis

Floodplain

Evaluation

Drainage

& Pond Siting

Evaluation

Typical

Section

Package

Geotechnical

Evaluation

Contamination

Screening

Evaluation

Water

Quality

Impact

Evaluation

Sociocultural

Effects

Evaluation

Cultural

Resources

Assessment

Engineering

Scope of Services

Typical

Section

Package

22

Welaunee Boulevard Typical Section

23

Shamrock Street Extension Typical Section

24

Welaunee Greenway Typical Section

25

Project Schedule

26

Community Engagement

Alternatives Public Meeting

Fall 2019

Public Hearing

Spring 2020

Other Informal Meetings & Briefings

Ongoing

27

▪City of Tallahassee

▪ Leon County

▪Capital Region Transportation Planning Agency (CRTPA)

▪ Florida Department of Transportation (FDOT)

▪Neighborhood associations

▪Adjacent property owners

▪ Permitting agencies

▪And others

Other Informal Meetings & Briefings

28

Community Engagement

Alternatives Public Meeting

Fall 2019

Public Hearing

Spring 2020

Other Informal Meetings & Briefings

Ongoing

29

Greg Kern, AICPProject Manager

Blueprint Intergovernmental Agency315 S. Calhoun Street

Tallahassee, Florida 32301(850) 219-1060

Greg.Kern@BlueprintIA.org

Contact Us

Susan EmmanuelPublic Information Officer

Blueprint Intergovernmental Agency315 S. Calhoun Street

Tallahassee, Florida 32301(850) 219-1060

Susan.Emmanuel@BlueprintIA.org

Or visit the project website at

NEGateway.com

For more information regarding the project, please contact:

top related