purpose : development of hadrontherapy technologies not-for-profit created in 1992
Post on 17-Jan-2016
42 Views
Preview:
DESCRIPTION
TRANSCRIPT
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
1
UA-ENLIGHT Workshop-CERN 12-13 Feb 2002 1
THE C N ATHE C N A
OF THE TERA FOUNDATIONOF THE TERA FOUNDATION
Ugo Ugo AmaldiAmaldi
University of University of Milano Bicocca Milano Bicocca and TERA Foundationand TERA Foundation
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
2
Purpose: development of hadrontherapy technologies
Not-for-profit created in 1992Recognised in 1994 by the Health Ministry
In 2002: 22 full time employees 8 staff researcher (physicists and engineers) 10 fellows 3 administratives
2 administratives for ISE (ARONA)
TERA has 4 sections: Novara - Geneva - Milan and Genoa
Collaborations: INFN - CERN - ISS - ENEA - AIRO Oncological Institutes and Universities
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
3
THE PROGRAMMES OF TERATHE PROGRAMMES OF TERA
TERANET Programme ATLANTIDE: No-profit portal for scientific research
COMPACT ACCELERATORS Programme IDRA: Institute for Diagnostics and Radiotherapy Applications LIBO: LInac BOoster
CENTRES OF EXCELLENCE Programme CNA: Centro Nazionale Adroterapia
CAP: Computer Assisted Positioning
MAGIC CUBE & PIXEL CHAMBER
PRASSI: Piani Radioterapici con Adroni e Sistema di Scansione
Integrati
SUCIMA: Silicon Ultra fast Cameras for electron and gamma
sources in Medical Applications
TESI: Testata Superconduttrice per Ioni
0.5 MEuro
50 MEuro
5 MEuro
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
4
CNA: VERSION 1995CNA: VERSION 1995
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
5
CNA: VERSION 1998CNA: VERSION 1998
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
6
CNA: VERSION 1999CNA: VERSION 1999
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
7
CNA: PRESENT VERSIONCNA: PRESENT VERSION
Law 348 - 23.12.00 :
CNAO Foundation: Polyclinics of Milan and Pave, National Neurological Institute, European Institute of Oncology, TERA
10,33 MEuro in 2001
TERA Project Leader: Sandro Rossi
TERA Project group: 7 staff, 7 fellows, 2 consultants (fte)
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
8
CNAO FOUNDATION CNAO FOUNDATION Board:
E. Borloni -Ospedale Maggiore President
G. Arbosti -Istituto Neurologico C. Besta Vice-president
M. Bono -European Institute of Oncology
G. Azzaretti -San Matteo
U. Amaldi -TERA
Letter of the Health Minister to the Board:
1. Use the available funds to produce a detailed design of CNA
2. Acquire further clinical information involving the existing Centres
3. Define the technical details of buildings and high-tech components
4. Quantify the needed personnel
5. Prepare a business plans, based on a ‘reasonable’ financial plan
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
9
CNA Phase 2CNA Phase 2vs PIMMSvs PIMMS
7 MeV/u injection energy
Single IH (GSI) linac inside the ring
Multiturn injection
Space minimisation (PS inside the ring)
Integrate functions extraction lines (fan out)
Isocentric gantries for Phase 2
CNA Phase 1 : 3200 m2
-
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
10
CNA: HIGH TECHNOLOGYCNA: HIGH TECHNOLOGY
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
11
CNA HIGH TECH: SOURCES AND LEBTCNA HIGH TECH: SOURCES AND LEBT
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
12
CNA HIGH TECH: LINAC AND MEBTCNA HIGH TECH: LINAC AND MEBT
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
13
CNA HIGH TECH: BETATRON+QUAD+DIPOLECNA HIGH TECH: BETATRON+QUAD+DIPOLE
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
14
CNA HIGH TECH: THE BETATRONCNA HIGH TECH: THE BETATRON
0 V
50 ms
Gephyrotron
Saturne (Saclay)
High-density,slow -moving
Low-density,fast moving
Transversebeam size
ResonancelinesBeam
Extracted beam
x, p/p, Qh
Ripples
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
15
CNA HIGH TECH: QUAD+COR+PU+SEXTCNA HIGH TECH: QUAD+COR+PU+SEXT
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
16
CNA HIGH TECH: SPECS (QUAD) PREPARATIONCNA HIGH TECH: SPECS (QUAD) PREPARATION
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
17
CNA HIGH TECH: DIPOLE CHAMBER PROTOTYPECNA HIGH TECH: DIPOLE CHAMBER PROTOTYPE
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
18
CNA HIGH TECH: VITROVAC RF CAVITYCNA HIGH TECH: VITROVAC RF CAVITY
Bought from
Saclay
(Saturne)
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
19
CNA HIGH TECH: 3 HORIZ+1 VERTCNA HIGH TECH: 3 HORIZ+1 VERT
3 treatment rooms with protons and carbon – 4 beamlines: 3h + 1v
Active scanning and beam FWHM variation (4 -10 mm) at the isocentre
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
20
TESI: THE LIGHT ION GANTRYTESI: THE LIGHT ION GANTRY
B field = 4 T
Lightweight = simplified mechanics
Cryogenic-free superconductor = low power
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
21
CAP: PATIENT POSITIONINGCAP: PATIENT POSITIONING
• 2 TV Cameras• 100 Hz sample rate• 5 mm markers • 2 real-time acquisitions: at each irradiation (immediately before and during the irradiation) • 5 patients• global 3-D accuracy in marker localisation: 0.34 0.11 [mm] (N=4)
TVC
Gantry
Couch
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
22
MAGIC CUBE & PIXEL CHAMBERMAGIC CUBE & PIXEL CHAMBER
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
23
CNA LAYOUT: TREATMENT LEVEL (-2)CNA LAYOUT: TREATMENT LEVEL (-2)
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
24
CNA LAYOUT: DIAGNOSTICS LEVEL (-1)CNA LAYOUT: DIAGNOSTICS LEVEL (-1)
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
25
CNA SURFACE BUILDINGCNA SURFACE BUILDING
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
26
CNA COSTS CNA COSTS
CNA GLOBAL COSTS IN MEuro MЄ
High-tech and Diagnostics 31.2
Accelerator, beam lines, delivery and auxiliary systems 24.8
Treatment monitoring, patient positioning and planning 4,2
Medical equipment for diagnostics 2,2
Buildings and conventional plants 10.1
Personnel for project management, installation and commissioning 9.3
Services and running costs during installation and commissioning 2.7
VAT 7.2
Contingency 5.2
Total cost 65.7
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
27
CNA: CONSTRUCTION TIMETABLECNA: CONSTRUCTION TIMETABLE
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
28
4170
300
800
100
1
3370
200
2
44
5
7
1
8340
600
1600
200
1
6740
400
2
44
5
7
2
12034
898
2800
350
1
9234
548
2
44
5
7
3
12314
933
3080
385
1
9234
548
2
44
5
7
4 R
Number of sessions per year
Patient treated per year
Totals
Number of sessions per year
Patient treated per year
Equivalent treatment rooms
Carbon ions
Number of sessions per year
Patient treated per year
Equivalent treatment rooms
Protons
Equivalent weeks per year
Working days per week
Working hours per day
Year of running
Running conditions and number of patients in Phase 1
CNA: USEFUL NUMBER - 1
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
29
1'960
1'211
Ocular melanoma
930
2'120
670
Deep seated tumours
Mean in European projects
Mean in Europe
Mean in USA
CNAO
50
21
24
5
1
57
24
28
5
2
65
26
34
5
3
66
26
35
5
4R
Total
Physics Department
Medical Department
Administration
Year of running
Fees per session [Euro]
Personnel of CNAO
CNA: USEFUL NUMBER - 2
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
30
EDMSEDMS: A USEFUL TOOL FOR PROJECT MANAGEMENT: A USEFUL TOOL FOR PROJECT MANAGEMENT
UA- ENLIGHT Workshop - CERN 12-13 Feb 2002
31
THE ENDTHE END
top related