reeves why ptp
Post on 12-Sep-2014
619 Views
Preview:
DESCRIPTION
TRANSCRIPT
Michael ReevesPresidentPorts-to-Plains Alliance
Ports-to-Plains Corridor
1,390 miles corridor lengthAbout 40% of route is either 4 or 6 lane divided, or under design/construction15 Relief routes planned, totaling 113 miles
Ports-to-Plains Alliance Partners
Ports-to-PlainsNorth
Development of eastern corridor to improve freight flow, especially to Ft McMurray, rural economic developmentExpand Port of Wild HorseExisting interstate connection to Hwy 2
D.F.
Piedras Negras
SLP
Querétaro
Ciudad Hidalgo
Salina Cruz
Cancún
ChilpancingoOaxaca
Hermosillo Chihuahua
DurangoLa Paz
Culiacán
MonterreySaltillo
Mexicali
Mérida
Campeche
Villa Hermosa
Tuxtla Gutiérrez
Chetumal
Tijuana
Nogales Ciudad Juárez
Nuevo Laredo
Matamoros
Mazatlán
Acapulco
Lázaro Cárdenas
ColimaManzanillo
Tampico
Tuxpan
Progreso
Veracruz
Torreón
ZacatecasAgs
Cd.Victoria
Guadalajara
Tepic
MoreliaToluca D.F.
CuernavacaPuebla
Jalapa
San PedroMonclova
5Texas Tech University
San AntonioHouston
Dallas
Del Rio
To Ports-to-Plains
Allende
Ports-to-Plains Benefits
Economic development to rural areas of North AmericaInfrastructure to improve commerce, particularly agriculture and energy industriesImproved highway safety
Safety
Completion of PTP projected to reduce accidents by the following rates:
Texas – 47%Oklahoma – 44%New Mexico – 33%Colorado – 28%
Ports-to-Plains Economic Impact
Will create more than 40,000 new jobsEconomic impact of more than $4.5 billionExpand tax baseEconomic benefit of more than 3:1
Agriculture Corridor
Who buys U.S. Farm ProductsTop 5 markets for 2006
Oil and Gas Corridor
Oil and Gas Corridor
5 of top 6 gas producing states6 of top 10 oil producing statesAlberta has world’s second largest oil reserves, behind only Saudi Arabia
PTP serves oil exploration
PTP serves oil exploration
Ports-to-Plains is logical route for trade between Alberta, Texas and Mexico
Wind Power Corridor
Wind Power Corridor
7 of top 8 top states for wind power potential9 of top 12 states for wind power potential
Infrastructure Demands
Approximately 8 trucks per tower for major parts (not including concrete, rebar, crane, etc.)Boone Pickens planning 4000 MW farm or 2667 towersWill require approximately 21,336 trucks for tower parts aloneAnother 42,672 pilot cars
Infrastructure Demands
Get involved
Energy Advisory CouncilIdentify areas of mutual interestTap into Ports-to-Plains grassroots network to promote joint interestsBusiness memberships in Ports-to-Plains Alliance
Michael Reeves5401 N. MLK #395Lubbock, TX 79403
(806) 775-2338www.portstoplains.com
michael.reeves@portstoplains.com
top related