regnno.tneng/2014/55442 rocno.22928/2012/e/2 ...dr.mannarmannan& dr.r.palaniswamy...
Post on 23-Mar-2021
5 Views
Preview:
TRANSCRIPT
May 16 2019th
Volume - 06 Issue - 10
Postal Registration No. CB/115/2017-19Date of Publication 14.05.2019
Regn No. TNENG/2014/55442 ROC No. 22928/2012/E/2
Rs. 3/-
Published by Dr.S.Karthick Prabhu (Founder)Printed by V.Sampathkumar
on behalf of Coimbatore Branch of Indian Medical Association.Printed at Premier Printing Press, 77, Karunanidhi Nagar, Trichy Road, Sungam,
Ramanathapuram,Coimbatore - 641045, andpublished from92, SyrianChurchRoad, Coimbatore - 641 001.
Disclaimer : IMA assumes no responsibility for the authenticity or reliability of any product, equipment, gadget orany claim by medical establishments/ institutions/manufacturers or any training programme in the form ofadvertisements appearing in CIMA and also does not endorse or give any guarantee to such products or trainingprogrammes promote any such thingor claimsmade so far.
BMWMeeting 9.5.2019Press Meet 2.5.2019
IMA AMS CME 12.5.2019Fellowship Certificate Course inDiabetology started 12.05.19@ Coimbatore IMA Hall byDr. Mannar Mannan &Dr. R. Palaniswamy
‘‘TNPCB - SOUTH OFFICE’’
Valparai Taluk
Kinathukadav
Pollachi
Perur
Taluk J. Sathesh (AE) - 8870470653
Taluk
Taluk
Madukkari Taluk S. Neelamegam (AE) - 8870470671
Coimbatore South Taluk Bulea (AE) - 8056015421
Sulur Taluk R.Venkatesan (AEE) - 8056042207
Coimbatore North Taluk Mr.Ramesh (AE) - 8870470674
Annur Taluk Mr.Swaminathan (AEE) - 8056042220
Mettupalayam Mr.Chandrasekar(AEE) - 8056042211
Vilankurichi
‘‘TNPCB - NORTH OFFICE’’
OFFICIALS TO BE CONTACT DOUBTS
for BMW Registration and PCB issues Please login"coimbatoreima.com/announcements”
whereonemoreof Sakthi Peedamswhere a face of Parvathi fell, thenwewere taken
to Suyambunath Buddha stupa where we worshipped Seethalamma devi and
Buddha. After overnight stay on 12.5.2019,wewere taken toDharbar squarewhere
Lalithpur fort, in this palace king use to rule and Pathan Museum. After that we
prayed Golden Buddha in Lalithpur. After that we were dropped in Tribhuvan
International Airport andafter a delayof 1hour30minutes started fromKathmandu
we return to Coimbatore on 13.5.2019 at12.30am.
Message from Secretary
Dr.N.Sathian
Deardoctors!Needof thehour for doctors having clinics and hospitals, is to sign a
MOUwith the BioMedicalWastemanagement group (BMW) and get
authorisation from pollution control board. This bulletin will feature
facts about registration and contacts details of official from pollution
control board. I hereby wish “Nurshing staff” of all Hospitals for their
selfless service on the occasion of International Nurse Day. Doctors
data is being validated at our branch and I request our esteemed
members to provide us with your contact address, your mail id and
your personal mobile number, which will help us to facilitate during
upcomingelection.LONG LIVE IMA !
Dr.V.Rajesh BabuDistrict Coordinator - PPLSSS, IMATNSB, 9360030094
Tamilnadu Medical Council, Chennai.
The Tamilnadu Medical Council calls all its Registered Medical Practitioners
Practicing in Tamilnadu, Puducherry, Andaman&Nicobar to strictly comply to code
of medical ethics of the council on the writing of prescriptions and also follow the
standardprescription format inA4orA5sizesDirections:1. The name of the drug / medicine shall be written legibly and perferably in
capital letters.2. The Generic names of the drugs shall be written in prescription slip wherever
possible.3. The prescription pad be in specified format and sizes. Prescriptions pads
will beofeitherA4orA5sizesonly.The Tamil Nadu Medical Council in its business meeting held on 30.10.2018 has
resolved to circulate and promote the above advisory for strict implementation.
The Tamil Nadu Medical Council also resolved to standardized prescription cum
location cum appointments software at affordable cost for utilisation by all
registeredMedical Practioners.
Advisory 2/2018 to Registered Medical Practitioners.
MESSAGE FROM DISTRICT COORDINATOR - PPLSSS, IMA TNSB
INDIANMEDICAL ASSOCIATION, COIMBATORE FAMILY TOUR 2019MUKTINATH YATRA
We25people including8of our IMAmembers startedMuktinathYatra family tour
at 1.10 am on 7.5.2019 from Coimbatore.We reached Kathmandu at 9 am via Delhi,
one stop. After reaching Kathmandu we were taken to Boudhanath's Stupa,
Guhyeshwari temple, it is one of the 51 Sakthi Peedams, here the back of the
Parvathi is worshipped. After lunch, we were taken to Jalanarayan Temple and
Pasupathinath temple deepa harathi. On 8.5.2019,We started at 8 am to Pokhra by
a small flight with 40 passengers and reached at 9.30 am. Then we went to
Bindhyabasini temple, o Devis falls and Gupteswar Mahadev Gupha (cave) and
temple. Next day, on 9.5.2019 morning 6 am, we were taken by a small flight 19
capacity to Jomsom.Afterbreak fast, from Jomsom,wewere takenbya small bus for
21 kilometers to the base of Muktinath temple. From the foot hill 4 people reached
by Dolly and 6 people climbed by pony(Climbed by horse) and rest of the people
climb by foot. In the top of the hill, one of accompaniedwomen had syncopal attack
and was revived by KG hospial first aid loading dose medicines pack (Tab.
Atorvastatic 80mg + Tab. Clopilet 150 mg + Tab. Dysprin 350mg). In Muktinath
behind that Mukthinathar temple there are 108 theerthas depicting 108 Perumal
Divyadesams, Ice cold- Chill water flowing, all of us tookbath in 108 theerthas at the
end two theerthas in front of the temple, Pava theertham and Punyatheertham.
Then, after changing the dress worshipped the godMuktinath Perumal on one side
Sridevi and on other side Poodevi. In front of the Muktinath statue, one Buddha's
statue on right and other Buddha on the left and small statues of Ramunujar,
Vinayagar, Thirumangai Aazhvar and Karudaazhlvar. After worshipping god, we
came down, four people went in dolly (carried by 4 people), 4 people came down
with the pony and rest of 17 by walk. After over night stay at the Jomsom, climate
with 9°C temperature. On 10.5.2019, we started from Jomsom with small 19
passengers capacity at 7 am and reached Pokhara. After breakfast in Pokhara, we
visitedMahindra cave and Bats cave and Bathrakali temple wherewe need to climb
160 steps, Seti river, a site seeing point where water is running fast and this water is
used to generate electricity, Phewa lake, where we were to take a boat ride to
worshipgoddess Bharahi devi temple, is 500 meteres away from the bank of the
lake. After overnight stay next day on 11.5.2019, we travelled from Pokhara to
Kathmandu by a 40 passengers capacity Ketti airways flight. After lunch, we were
taken to Chandangiri hill wherewe need to climb the hill top by a cable car. From the
cable car stationweneed to climb for1 kilometer to theBoleshwarMahadev temple
Warm Greetings to my
colleagues.
LokSabha Election results are
awaited. Our branch candidate
is contesting for State President
post. National Green Tribunal
has asked Pollution Control
Board to ensure all Healthcare
establ ishments to fol low
Biomedical Waste Management
Norms and get Air and Water
Consent . Cent ra l Hea l th
Intelligence Agency is collecting
D a t a a b o u t He a l t h c a r e
Establishments. It is mandatory
to share our data, as it is a
central government agency.
May31 is last day to apply online
forCEA
LONG LIVE IMA !
President : Dr.M.Mariappan
9944331294
President Elect : Dr.C.P.Shanmugasundaram
Vice President : Dr.V.Rajesh Babu
Secretary : Dr.N.Sathian
9944332519
Secretary Elect : Dr.M.Doraikannan
Finance Secretary : Dr.K.Priya
Joint Secretary : Dr.K.S.Maheswaran
Contact No. :
Contact No. :
Dr. N. Mahendran
United we Stand.
•
•
•
•
•
o
Whyaction isbeing taken suddenly?
o DuetoNationalGreenTribunalOrder.
Is PCBnormsonly forHealthSector?
o No–Forall IndustriesE.g.Mines, River bed, sand, Textilesetc. etc.
Is PCBNorms followed inother states?
o Yes
Has IMAtakenany steps regardingPCBnormsearlier?
o Yes in 2017 our senior office bearer appeared in the NGT Southchapter when closure notice was given for 245 hospitals andpreventedaction.
o On recent issues current office bearers represented to PCB and gotofflineconsentandauthorizationprocess.
What is theFutureplanofActionof IMA?
o Since PCB norms are central Act – National IMA HBI is preparingproper Scientific Document to be represented to National PCB &NGT.
Since we are considered as a part of Industry & consent fee is basedon Asset value, IMA is going to ask for separate Health SectorNormsandamendments inexistingnorms.
DR. A. K. RAVIKUMAR VICE CHAIRMAN – IMA HBI
죂ì˜. «õ. ͬ÷, õì ÜÁ¬õ CA„¬ê G¹í˜ó£«üw ð£¹,
õ£Œ å†ì£î °øœ å¡Á Ãø¾‹?
õ¬êåNò õ£›õ£«ó õ£›õ˜; Þ¬êåNò
õ£›õ£«ó õ£ö£ îõ˜.(ÜFè£ó‹24. ¹è›, °øœ : 240)
BMW DOCUMENTS For BMW AUTHORISATION TO BE UPLOADED FOR CLINICS
1. CovringLetter
2. Topo Sketch Showing the Location of the Facility andNearby Environmental
Features - SelfDrawn
3. LayoutPlanof theFacilit-SelfDrawn
4. BriefDiscriptionPFMethodofSegregti on, StorageTreatmentandDisposal.
5. Copyof theBMWMOUwithCommonFacilitator
6. Land Document copy or Rental Agreement or Letter from Owner of the
Building.
Mukthinat Tour by IMA Coimbatore7th to 12th May
Take off from Coimbatore
Our Members at Mukthinat
• Whatare thecertificates tobeobtainedregardingpollutioncontrol?
Airconsent -FromPCB
Waterconsent - fromPCB
Biomedicalwasteauthorization - fromPCB
BiomedicalwastedisposalMOU- fromcommonfacilitator.
•
•
•
•
POLLUTION CONTROL ISSUES - COMMON QUERIES?
ANSWERS
• Howtoget theseCertificates?
o Air; water consent & BMW authorization to be obtained fromTNPCB by online application by visiting www.tnocmms.nic.in (or)for abriefperiodoffline
o BMW MOU – to be obtained from the common facilitator of yourarea.Rates permonth fixedby IMATNSBwith common facilitator.
What is the fee tobepaid forPCB?
o Air / Water consent fee – according to your fixed assets visit –http://www.tnpcb.gov.in/consentfee.php (OrangeCategory)
o BMWauthorization–NoFee.
Forhowmanyyears consent fee is valid?
o Since we are in Orange category if we pay for one year it is valid fortwoyears.
Forhowmanyyearsone canpay consent feeata time?
o Canbepaidata time for5yearswhichwill be valid for10years.
FromwhenPCBnormsarebeing followed?
o From1982
ShouldBMWAuthorization forHospitalsbe renewed?
o Yes – along with consent. [consent & BMW Authorization dates willbe synchronized]
•
•
•
•
•
1. Consultation room
2. Clinics (part time / Free life
full time
û û û û
ü üû û
û û ü ü
ü ü ü ü
time
3. Polyclinics (if Free life
generate BMW) time
4. Hospitals
Who all should obtain these Certificates?S.No
Establishment Air consentWaterconsent
BMWAuthorization
BMWMOU
BMWMeeting 9.5.2019 Coimbatore Child Welfare Committeemeeting at Seva Nilayam ,Coimbatore on 14.5.2019
Health Camp by Women Doctors Wing for BPL Children 7.5.19
top related