Sectoral Operational Programme for Transport2007-2013

BUCHAREST, ROMANIA

2008

MINISTRY OF TRANSPORTMANAGING AUTORITHY FOR SOP-T

SOP-Transport 2007-2013

WHAT IS SOPT?

Document elaborated upon the objectives of the National Strategic Reference Framework (NSRF), establishing:

The priorities The goals The allocationfor development of the transport sector in Romania with EU Structural and Cohesion Funds during 2007-2013.

SOP-Transport 2007-2013

RESOURCES

Total Budget: 5.694 MEUR

Sources: State Budget: 1.130 MEUR European Union financial support: 4.563 MEUR

Cohesion Fund European Regional Development Fund

Co-financing: 85 % CF, 75% ERDF

SOP-T budget

UE81%

Buget deStat19%

UE

Buget de Stat

Strategy

Priority Axis 1 - 3.854 MEUR (CF + SB) Modernization and development of TEN-T priority

axes, aiming at sustainable transport system integrated with EU transport network.

K.A.I. 1.1. - Road infrastructure along the TEN-T Priority Axis no. 7; 1.850 MEUR

K.A.I. 1.2. - Railway infrastructure along the TEN-T Priority Axis no. 22; 1.775 MEUR

K.A.I. 1.3. - Water transport infrastructure along the TEN-T Priority Axis no. 18.

228,9 MEUR

Strategy

Priority Axis 2 – 1.397 MEUR (ERDF + SB)

Modernization and development of the national transport infrastructure outside the TEN-T priority axes, aiming at sustainable national transport system.

K.A.I. 2.1 - National road infrastructure, 509,47 MEUR K.A.I. 2.2 - National railway infrastructure, 634,67 MEUR K.A.I. 2.3 - River and maritime ports, 179,64 MEUR K.A.I. 2.4 - Air transport infrastructure, 74,515 EUR

Strategy

Priority Axis 3 – 322,89 MEUR (ERDF + SB)

Modernization of transport sector, aiming at higher degree of environmental protection, human health and passenger safety.

K.A.I. 3.1- Promote inter-modal transport, 34,082 MEUR K.A.I. 3.2 - Improve traffic safety across all transport modes,

270,50 MEUR K.A.I. 3.3 - Minimize adverse effects of transport on the

environment, 18,313 MEUR

Strategy

Priority axis 4 – 119,67 MEUR (ERDF + SB)Technical Assistance

K.A.I. 4.1 - Provide support for effective SOP-T managing, implementing, monitoring and controlling,

89,742 MEUR K.A.I. 4.2 - Provide support for information and publicity

regarding SOP-T. 29,930 MEUR

Beneficiaries

National Company for Motorways and National Roads.

National Company for Railways “CRF SA”.

Others: maritime and fluvial port administrations, airport administrations.

Projects

Projects for 2008

Works for the improvement of road safety on the national roads – FS

Pilot Project for ERTMS, level 2 on Chitila – Crivina – FS

Constanta Port rail access – FS Danube – Black Sea Canal road bridge – FS North breakwater extension – FS RORIS II – FS

Projects Project Mod of transport Estimative period

Motorway Nădlac-Arad road September 2009

Motorway Lugoj - Deva road September 2009

Motorway Orastie – Sibiu (inclusive Sebes by-pass)

road June 2009

Motorway Timisoara – Lugoj road January 2009

By-passes (Adjud, Dej, Mihailesti, Craiova, Pucioasa, Budesti, Buftea, Mangalia, Targu Frumos, Targu Jiu, Filipasi, Falticeni)

road December 2009

By-passes (Carei, Valea lui Mihai, Sculeni, Pascani)

road December 2010

Zalau – Alesd road rehabilitation road November 2009

Galati – Vaslui County limit – Crasna – Albita road November 2009

Alexandria – Craiova road rehabilitation (inclusive Alexandria and Caracal by-passes)

road June 2010

Projects Project Mod of

transportEstimative period

Bucharest – Adunatii Copaceni road rehabilitation

road September 2009

Railway stations upgrade (Baia Mare, Satu Mare)

rail February 2009

Railway stations upgrade ( 16 stations) rail February 2011

Rehabilitation of the railway bridges / tunnels (on TEN-T)

rail May 2008

Works for the improvement of road safety on rail infrastructure

rail February 2010

Portile de Fier II/ Calarasi – Silistra naval April 2009

Sulina Canal works naval Can not be estimated

Call for proposals

Call for proposals

Rules: the call will be announced within 12 months before the dead-line on MT website Guidelines will be elaborated for each call

Rolling stock renewal rail Call for proposals

Modernization and development of national water transport infrastructure

naval Call for proposals

Modernization and development of airports infrastructure

air Call for proposals

THANK YOU FOR YOUR ATTENTION !

http://www.mt.ro/dgrfe/post/engleza/POS_Transport_final_EN.pdf