TRANSCRIPT

Installation Case Studies

April 2016

www.solarclothcompany.com Office:+44 (0)1223 941020

February 2016

Harvey Hadden Sports Village

Nottingham City Council

Commercial in confidence 2

Commercial in confidence 3

Part of Nottingham City Council’s ambitious energy transformation programme- upgrading the sports centre to provide state-of-the-art facilities for the local community, whilst significantly reducing its carbon footprint.

Commercial in confidence 5

• 67.2 kW peak power• Occupies 40 spaces• Produces 50,856 kWh/year • Or 10% of the sports village’s yearly electricity usage • 21 tonnes of CO2 emissions saved per year

Note: this installation faces North East

Commercial in confidence 6

Commercial in confidence 7

“We engaged SCC as they have a reputation for being the industry leaders and they proved they were. We received 1st class service and got what we wanted on time and on budget. The end result is that Nottingham have a fantastic solution, delivered by people who know their industry and product.”

David Williams, Commercial Development Manager (Energy), Nottingham City Council

Milton School

Cambridgeshire County Council

Commercial in confidence 8

Commercial in confidence 9

• 30 kW peak power

• Produces 30,320 kWh/year

• Or 10% of the school’s yearly electricity usage

• 12 tonnes of CO2 emissions saved per year

• Programme: National RE:FIT programme

Commercial in confidence 10

“This programme installation works enables the school to

improve its energy efficiency, enabling us to invest in

learning and provide a sustainable working environment

for the future.”

David Lee, Chair of School Governors, Milton School

Amundsen House

Cambridgeshire County Council

Commercial in confidence 11

Commercial in confidence 12

• 50 kWp peak power

• Produces 44,334 kWh/year

• Or 20% of total site demand

• 20.3 tonnes of CO2 emissions saved per year

• Programme: National RE:FIT programme

“The team was very pleased with the final installation. In particular, the CIGS panels demonstrate an aesthetically appealing solid black finish that far exceed the look of conventional silicon panels.”

Miles Messenger, Energy Engineering Manager, Bouygues Energies and Services UK, Cambridgeshire County Council

Cambridge Research ParkClearbell Capital

Commercial in confidence 14

Commercial in confidence 15

• 14 kW peak power• Occupies 15 spaces• Produces 12,308 kWh/year• 5 tonnes of CO2 emissions saved per year

Commercial in confidence 16

Commercial in confidence 17

“We love the product and are excited to be the first in the world, and of course I think it was well worthwhile to install such a striking car-parking structure. Sometimes it is not about the financials but about the beauty and the simplicity of the idea and the belief in the commitment to green energy.”

Dominic Moore, Asset Management Director, Clearbell Capital

Heathrow AirportHeathrow Airport and APCOA

Commercial in confidence 18

Commercial in confidence 19

• 3.5 kW peak power• Produces 3,259 kWh/year• Or 30% of car wash’s yearly electricity usage• 1.5 tonnes of CO2 emissions saved per year

Commercial in confidence 20

“Many thanks for the successful installation of the solar panelled car wash canopy at Heathrow. As our first project together and with the added complications of being at a major airport it had the potential for serious mishaps but was successfully delivered on time and without any issues. That was mainly due to the planning and diligence by SCC.”

Philip Wills, Technical Services Project Manager, Heathrow APCOA

Trumpington Park & Ride

Cambridgeshire County Council

Commercial in confidence 21

Commercial in confidence 22

• 10 kW peak power• Produces 11,004 kWh/year • Or 20% of total site demand • 5 tonnes of CO2 emissions saved per year

Commercial in confidence 23

We designed a system that was in line with the energy usage profile for the P&R commuter bus terminal.

Whilst installing the system, we had a lot of positive comments and support from commuters. It was clear to see that the effort of installing clean energy was getting noticed and appreciated.

Thank Youkevin.mcintyre@thesolarclothcompany.com

Office:+44 (0)1223 941020