IH35E

Open Summer 2

013

KEV IN SLOAN STUD IO

Representative Projects:

The AT&T Center for the Performing Arts

SABRE World Headquarters

Sprint World Headquarters

Vitruvian Park

George W. Bush Presidential Library

Downtown Carrollton Parking Plan

IH35E

Belt Line Road

Vandergriff

5th St

Main St

4th St

Elm St B

roadway

Carroll St

Main

St

EX

ISTIN

G P

AR

KIN

G -

SEPT.

20

10

Carroll Street81 Spaces

“In” Square46 Spaces

On Street: 201Off Street: 191

Gravely62 Spaces

IH35E

Open Summer 2

013

PU

BLI

C P

AR

KIN

G T

OD

AY

Vandergriff43 Off Street 39 On Street

Spaces

Union At Carrollton Square 314 Apts.

Phase 2 Opens 2/2014

Public Garage125 Spaces

Main St20 Spaces

Gravely10 Frost +52 Spaces

On Street84 Spaces

“In” Square46 Spaces

NEW On Street84 Spaces

City Lease18 Spaces

NEW On Street

84 Spaces

75 On StreetSpaces

On Street: 335 Off Street: 296 Net Gain Over 3 Years = 239 Spaces

Reference:

IH-35E and Belt Line RoadLooking South

IH-3

5E a

nd

Belt

Lin

e R

oad

Square Vandergriff Drive

DARTStation

Retention Pond

Hike andBike Trail

Main StreetPioneer Park

GreenParkingLot

Crosby Rec.

Site

City of Carrollton’sInfrastructure Investment Costs 2008-2013:

Item Cost

Catalyst Development Infrastructure $8,229,296

Crosby Recreational Center Reconstruction $2,800,000

Green Parking Lot $477,807

South Main Street and Pioneer Park $1,200,000

Retention Pond $950,000

Hike and Bike Trail (Phase 1) $867,775

Vandergriff Drive (Funded by NCTCOG Grant) $1,840,800

Total $16,365,678