KEV IN SLOAN STUD IO

Representative Projects:

The AT&T Center for the Performing Arts

SABRE World Headquarters

Sprint World Headquarters

Vitruvian Park

George W. Bush Presidential Library

Page 6: Square update presentation

Downtown Carrollton Parking Plan

Page 7: Square update presentation

IH35E

Belt Line Road

Vandergriff

5th St

Main St

4th St

Elm St B

roadway

Carroll St

Main

St

EX

ISTIN

G P

AR

KIN

G -

SEPT.

20

10

Carroll Street81 Spaces

“In” Square46 Spaces

On Street: 201Off Street: 191

Gravely62 Spaces

Page 8: Square update presentation

IH35E

Open Summer 2

013

PU

BLI

C P

AR

KIN

G T

OD

AY

Vandergriff43 Off Street 39 On Street

Spaces

Union At Carrollton Square 314 Apts.

Phase 2 Opens 2/2014

Public Garage125 Spaces

Main St20 Spaces

Gravely10 Frost +52 Spaces

On Street84 Spaces

“In” Square46 Spaces

NEW On Street84 Spaces

City Lease18 Spaces

NEW On Street

84 Spaces

75 On StreetSpaces

On Street: 335 Off Street: 296 Net Gain Over 3 Years = 239 Spaces

Page 9: Square update presentation
Page 10: Square update presentation

Reference:

Page 11: Square update presentation

IH-35E and Belt Line RoadLooking South

Page 12: Square update presentation

IH-3

5E a

nd

Belt

Lin

e R

oad

Page 13: Square update presentation

Square Vandergriff Drive

DARTStation

Retention Pond

Hike andBike Trail

Main StreetPioneer Park

GreenParkingLot

Crosby Rec.

Site

Page 14: Square update presentation

City of Carrollton’sInfrastructure Investment Costs 2008-2013:

Item Cost

Catalyst Development Infrastructure $8,229,296

Crosby Recreational Center Reconstruction $2,800,000

Green Parking Lot $477,807

South Main Street and Pioneer Park $1,200,000

Retention Pond $950,000

Hike and Bike Trail (Phase 1) $867,775

Vandergriff Drive (Funded by NCTCOG Grant) $1,840,800