Status Summary of theO&P Working Group Spa

Koen Van de Poel

General

• Moving at slower pace till after drupa

• 1 monthly meetings, small subgroups

• Digital Printing

• MIS interaction

Change management

• Work in progress

ICS Status

• JDF 1.3: LayCrImp 1.3 and MISPRE 1.3

– Published

– Certification

• LayCrImp: OK

• MISPRE: in progress, target Drupa

• JDF 1.4:

– Update samples (needed?) after schema 1.4 (after

drupa)

– Just ‘refresh’ ICS or make changes?

JDF 1.4 status

• Done

• Need to review the spec PDF

• Discuss minor updates

• Next steps: samples / ICS

Potential Interactions

• DigitalPrinting

• Finishing

• LayoutCreation

Open Action/Work Items at Risk

• Change management still not well defined

Summary

• 1.3 ICS done, moving to certification

– Stripping Application note

• 1.4 spec work finished

– Samples and ICS next steps