Submittal Transmittal
Kitchell Contractors Inc of AZSt. Joe's - Ashlyn Dyer Pool Project # 5722A
350 W. Thomas RoadPhoenix, AZ 85013
Tel: Fax:
Date: 3/6/2012 Reference Number: 0107
From: Caleb GaubLawrence DanczigerTo:
Diversified Interiors of El Paso Inc Kitchell Contractors Inc of AZ4132 W Venus WayChandler, AZ 85226Tel: (480) 961-5930Fax: (480) 961-5495
1810 E Windsor AvePhoenix, AZ 85006Tel: (602) 933-2966Fax: (602) 546-0517
Transmitted For Delivered Via Tracking Number
E-mailAction
Submittal Package No Description Due Date Package Action
ClosedEIFS Product Data0001 - 07 24 00 - 0
Qty
7
Item ActionItems DescriptionQty
1 EIFS Finish Product Data Closed1
2 EIFS Base Coat Product Data Closed1
3 EIFS Sealant Product Data Closed1
4 EIFS Insulation Product Data Closed1
5 EIFS Waterproofing Product Data Closed1
6 EIFS Rienforcing Mesh Product Data Closed1
7 EIFS Detail and Testing Product Data Closed1
Contact Name CopiesCompany NameCc:
Remarks
Reviewed.
Signature Signed Date
Prolog Manager Printed on: 3/6/2012 KCI_Production_Standardized Page 1 of 1
-
Standard
Submittal Transmittal
Kitchell Contractors Inc of AZSt. Joe's - Ashlyn Dyer Pool Project # 5722A
350 W. Thomas RoadPhoenix, AZ 85013
Tel: Fax:
Date: 2/13/2012 Reference Number: 0081
From: Caleb GaubTracy LeeTo:
Orcutt Winslow Kitchell Contractors Inc of AZ3003 N Central AvePhoenix, AZ 85012Tel: (602) 257-1764Fax: (602) 257-9029
1810 E Windsor AvePhoenix, AZ 85006Tel: (602) 933-2966Fax: (602) 546-0517
Transmitted For Delivered Via Tracking Number
E-mailApproval
Submittal Package No Description Due Date Package Action
OPEN2/27/2012EIFS Product Data0001 - 07 24 00 - 0
Qty
10
Item ActionItems DescriptionQty
1 EIFS Finish Product Data OPEN2
2 EIFS Base Coat Product Data OPEN2
3 EIFS Sealant Product Data OPEN1
4 EIFS Insulation Product Data OPEN1
5 EIFS Waterproofing Product Data OPEN1
6 EIFS Rienforcing Mesh Product Data OPEN1
7 EIFS Detail and Testing Product Data OPEN2
Contact Name CopiesCompany NameCc:
Remarks
Please review EIFS Product Data.
Signature Signed Date
Prolog Manager Printed on: 2/13/2012 KCI_Production_Standardized Page 1 of 1
-
InsulFoam® Exterior Grade Insulations
For over forty years the construction industry has specified Insulfoam products for roofing applications, cavity wall, below-grade applications and as a siding underlayment. The InsulFoam Exterior Grade (IEG) Insulation has also been used for years in exterior insulation finish systems (EIFS).
InsulFoam Exterior Grade Insulations offer a high and stable R-value, excellent dimensional stability and superior resistance to misuse and abuse; making it the ideal product for exterior wall systems.
IEG — Provides Certified /Code Listed EPS to meet tough exterior wall industry standards
IEG — Complies with all building codesIEG — UL ClassifiedIEG — Able to fabricate into special shapes and designsIEG — Contains no HCFCs or FormaldehydeIEG — No Thermal Drift, 20-year Thermal WarrantyIEG — 100% Recyclable
A Company
www.insulfoam.com 4005-10/08
-
PROPERTIES AND REQUIREMENTS OF IEG FOR USE IN EIFSICC-ES ESR #1788
PROPERTIES (in accordance with ASTM C578 or as otherwise indicated):
Classification Type I
Density, min, lb/ft3 (kg/m3) .090 (15) Thermal resistance of 1.00 in (25.4 mm) thickness, minF•ft2h/Btu(K•m2/W)
40ºF (4.4ºC) 4.00 (0.70) 75ºF (23.9ºC) 3.60 (0.63)
Compressive resistance at 10% deformation or yield, whichever occurs first, min, psi (kPa) 10.0 (69)
Tensile strength, min, psi (kPA) 15.0 (103) (In accordance with ASTM D1623)
Flexural strength, min psi (kPa) 25.0 (173)
Shear modulus, max, psi (kPa) 400 (2758) (In accordance with ASTM C273)
Water Vapor permeance of 1.00 in (25.4 mm) 5.0 (287) thickness,max,perm(ng/Pa•s•m)
Water absorption by total immersion, max, volume % 4.0 Dimensional stability (change in dimensional), max, % 2.0
Oxygen index, min, volume % 24.0
Flame spread, max
-
NOTEBASF Wall Systems is an operating unit of BASF Corporation (herein referred to as “BASFWall Systems”)
DISCLAIMERThis information and all further technical advice are based on BASF’s present knowledge andexperience. However, BASF assumes no liability for providing such information and adviceincluding the extent to which such information and advice may relate to existing third partyintellectual property rights, especially patent rights. In particular, BASF disclaims all CONDITIONSAND WARRANTIES,WHETHER EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIESOF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY. BASF SHALL NOT BERESPONSIBLE FOR CONSEQUENTIAL, INDIRECT OR INCIDENTAL DAMAGES (INCLUDING LOSS OFPROFITS) OF ANY KIND. BASF reserves the right to make any changes according to technologicalprogress or further developments. It is the customer’s responsibility and obligation to carefullyinspect and test any incoming goods. Performance of the product(s) described herein shouldbe verified by testing and carried out only by qualified experts. It is the sole responsibility of thecustomer to carry out and arrange for any such testing. Reference to trade names used by othercompanies is neither a recommendation, nor an endorsement of any product and does not implythat similar products could not be used.
©2010 BASF Corporation
Printed in U.S.A. 10/10
BASF Wall Systems | 3550 St. Johns Bluff Road South Jacksonville, FL 32224-2614 P: 800.221.9255 F: 904. 996.6300 www.senergy.basf.com
Senershield-RVapor Permeable Air/Water-Resistive Barrier Membrane
LIMITATIONSShipping & StorageProtect BASF materials during transportation and installation to avoidphysical damage. Store BASF materials in a cool, dry place protectedfrom freezing. Store at no less than 4°C (40°F). Protect from extremeheat and direct sunlight.
StackingDo not stack pallets.
Shelf LifeApproximately 2 years, properly stored in original containers.
TECHNICAL SUPPORTConsult the BASFWall Systems Technical Services Department for specificrecommendations concerning all other applications. Consult the Senergywebsite, www.senergy.basf.com, for additional information about productsand systems and for updated literature.
HEALTH AND SAFETYCautionMay be harmful if vapors or mist are inhaled, if absorbed through skin,or if swallowed. May cause eye, skin and respiratory tract irritation.Swallowing this product can cause kidney damage.
PrecautionsAvoid getting in eyes, on skin, or on clothing. Avoid breathing vaporsor mist. Wear safety glasses or goggles, impervious gloves, and clothingwith long sleeves and pants. If TLV or PEL can be exceeded, wearrespirator selected by a technically qualified person. Wash thoroughlyafter handling. Wash contaminated clothing before reuse.
SpillsWipe up small spills with rags. Absorb larger spills with sand, vermiculite,or kitty litter; sweep up and place in a suitable container for disposal.
First AidEyes: For eye contact, rinse eyes with water. Remove any contact lenses,and continue flushing with plenty of water for several minutes. Seekmedical attention if irritation develops and persists.Skin: For skin contact, wash affected areas with plenty of water, andsoap if available, for several minutes. Seek medical attention if irritationdevelops and persists.Internal: If inhaled, remove from area to fresh air. Seek medical attentionif respiratory irritation develops or if breathing becomes difficult. Ifswallowed, give 3-4 glasses of water, but do not induce vomiting unlessdirected to do so by a physician. Do not give anything by mouth to anunconscious or convulsing person. Get medical attention.
Read Material Safety Data Sheet before using this product.Solids74% solids
VOC Content11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369(based in part on EPA method 24).
For medical emergencies only call CHEMTREC at (800) 424-9300.
MIXING1. Use directly from original packaging or prepare in a container that is
clean and free of foreign substances. Do not use a container whichhas contained or been cleaned with a petroleum-based product.
2. Mix SENERSHIELD-R with a clean, rust-free paddle and drill untilthoroughly blended. Dilution of Senershield-R is not recommended.
3. Additives are not permitted.4. Close container when not in use.5. Clean tools and equipment with water immediately after use.
Dried material can only be removed mechanically.
APPLICATIONJob ConditionsDo not apply BASF materials in ambient temperature below 4°C (40°F).Provide supplementary heat during installation and drying period (atleast 24 hours after installation and until dry) when temperatures lessthan 4°C (40°F) prevail. Do not apply BASFmaterials to frozen or frost-ladensurfaces.
Limit the weather exposure of SENERSHIELD-R to a maximum of 180days. Verify surfaces are free of dirt, contaminants, or other deleteriousconditions before application of cladding. Report and correct any suchconditions prior to cladding application. Dry/cure times of adhesivelyapplied EPS insulation board installed over SENERSHIELD-R may beprolonged, particularly in cool and/or damp weather. Non-cementitiousadhesives are not recommended for EPS insulation board attachment toSENERSHIELD-R. Proper application is the responsibility of the user.
Surface PreparationSubstrate shall be dry, clean, sound and free of release agents, paintor other residue or coatings. Verify substrate is flat, free of fins orplanar irregularities greater than 6.4 mm in 3 m (1/4" in 10').Unsatisfactory conditions shall be reported to the general contractorand corrected before application of SENERSHIELD-R.
EquipmentUse a 20 mm (3/4”) nap roller or paint brush. If spraying, refer toSpray Application technical bulletin for spray application equipmentand application instructions.Note: If using roller application, it is necessary to pre-wetthe synthetic roller pad with water and spin out the excesswater. The pre-wetting only needs to be done once at thestart of application.
Procedure1. Substrate shall be of a type acceptable by BASF and shall be
installed per substrate manufacturer’s instructions and localcode requirements.
2. Wrap openings with SHEATHING FABRIC by applying a generousamount of mixed SENERSHIELD-R to all surfaces and immediatelyembedding SHEATHING FABRIC, completely saturating theSHEATHING FABRIC. If necessary, apply a second coat ofSENERSHIELD-R to ensure a complete, void-free membrane.
3. Spot all fasteners and precoat sheathing joints, terminations,inside and outside corners with mixed SENERSHIELD-R using a101 mm (4") wide by 20 mm (3/4") nap roller, brush or spray.
4.a. Immediately place and center SHEATHING FABRIC over wetSENERSHIELD-R at all sheathing joints, terminations, inside andoutside corners, as well as knot holes and check cracks that mayexist in plywood or OSB. Ensure SHEATHING FABRIC extendsevenly on both sides of the sheathing joint. Completely saturateSHEATHING FABRIC with SENERSHIELD-R.
b.Lap SHEATHING FABRIC 63.5 mm (2 1/2") minimum at intersections.c. If using roller, brush, or trowel application, allow to dry to thetouch before applying SENERSHIELD-R to entire wall surface. Ifspraying, “wet on wet” application is acceptable.
5.a. Apply SENERSHIELD-R to DensGlassTM exterior sheathing, e2XPTM
sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and othercement-boards (ASTM C1325 Type A Exterior) and gypsumsheathing (ASTM C79/ASTM C1396) with a 20 mm (3/4") naproller, stainless steel trowel, brush or spray gun to a consistent,minimum 10 wet mil thickness that is free of voids and pin holes.A fully loaded roller pad is required to obtain a consistent, minimum10 wet mil thickness. Backrolling may be needed to produce apinhole-free film. Note: Refer to Spray Application technicalbulletin for spray application equipment and applicationinstructions.
b. Apply SENERSHIELD-R to plywood, OSB or CMU substrate(s) witha 20 mm (3/4") nap roller or spray to a consistent, minimum 10 wetmil thickness. Prior to application of the second coat, visuallyinspect to assure sheathing surface is blister free and coating isfree of voids and pinholes. Repair if needed and then apply asecond coat after the initial coating is sufficiently dry.Note: A minimum of two (2) 10 mil wet coats ofSENERSHIELD-R is required over OSB, plywood and CMU.SENERSHIELD-R may be sprayed to a 20-mil thicknessover OSB and plywood in one wet application. Backrollingmay be needed to produce a pinhole-free film.
Drying TimeAllow to dry completely, typically 2 to 10 hours, before proceedingwith EIFS or other cladding installation. Protect from rain and fromtemperatures less than 4°C (40°F) for 24 hours.
For Best PerformancePrior to application of EPS insulation boards for EIFS or alternativecladdings, visually inspect the SENERSHIELD-R for voids, pinholes,surface deficiencies, etc. Repair deficiencies and areas that are notintact. Apply additional SENERSHIELD-R as necessary such thatSENERSHIELD-R is free of voids, pinholes, etc. All sheathing joints,terminations, inside and outside corners must be reinforced with4” or 9” SHEATHING FABRIC or SENERFLASH 4 or 9. ReferenceAir/Vapor/Water-Resistive Barrier Guidelines technical bulletin forproper treatment of rough openings and sheathing joints.
Product Bulletin
-
Acceptable Sheathing
Senershield-R
Senergy Adhesive
Senergy Insulation Board
Senergy Base Coat
Senergy Reinforcing Mesh
Senergy Base Coat
Senergy Finish Coat
Brick or Stone
Advantages
Meets ICC-ES AC 212 water-resistive barrier tests; one fully qualified air/water-resistive barrier material for the entire building
Meets requirements of ICC-ES AC 148; can be used as a flexible flashing in rough openings or through-wall penetrations
Self-sealing; meets ASTM D 1970 Nail Sealability requirements
Approved for Senergy Wall Systems; full system warranty with Senergy EIFS and stucco wall claddings
Liquid-applied, continuously-bonded membrane; eliminates seams, lap joints and staples; transmits wind loads directly to the substrate
One component, water-based, very low VOC content; safe for workers and the environment, low odor, easy application
Nonflammable as applied; promotes workplace safety
Spray-, roller-, trowel- or brush-applied; versatile, applicator-friendly performance
Compatible with lightweight, low-cost spray equipment; fast, easy, economical application
No primer required; single pass application on most substrates
Asphalt and plasticizer-free; easy cleanup, will not dry out or leach plasticizer after application
180-day maximum outdoor exposure; can schedule application before cladding installation
Solids 74% solids. VOC Content 11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369 (based in part on EPA method 24).
Multi-Clad Wall Assembly using Senershield-R
DESCRIPTIONSENERSHIELD-R is a one-component fluid-applied vapor permeableair/water-resistive barrier. This waterproof, resilient coating may be spray-,roller-, brush-, or trowel-applied directly to approved above grade wall sub-strates. It provides excellent secondary moisture protection behind mostwall claddings including EIFS, stucco*, brick, siding and metal panels.Senershield-R is listed in ICC ESR-1878.
* A slipsheet is required for stucco claddings.
USESFor use over the following exterior wall substrates:ASTM C1177 type sheathings, including DensGlassTM exterior sheathing,e2XPTM sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and other cement-boards (ASTM C1325 Type A Exterior), Untreated Exposure I or exteriorplywood sheathing (grade C-D or better), Untreated Exposure I OSB,gypsum sheathing (ASTM C79/ASTM C1396), poured concrete/unitmasonry.
Do not use SENERSHIELD-R for below-grade applications or on surfacessubject to water immersion.
COLORGray
COVERAGEApproximate coverage rates are as follows:Over ASTM C1177 Type Sheathing:35–37 m2 (380–400 ft2) per pailOver Cement Board:37–46 m2 (400–500 ft2) per pailOver Plywood:23–32 m2 (250–350 ft2) per pailOver OSB:23–32 m2 (250–350 ft2) per pailOver ASTM C79/C1396 Type Sheathing:46–54 m2 (500–600 ft2) per pailOver CMU:9–28 m2 (95–300 ft2 varies with porosity) per pail
PACKAGING27.2 kg per 19-liter pail (60 lbs per 5-gallon pail)
4" SHEATHING FABRIC: 101.5 mm x 54.8 m (4" x 180 ft ) roll
9" SHEATHING FABRIC: 228.5 mm x 54.8 m (9" x 180 ft ) roll
Senershield-R
SENERSHIELD-R complies with the air barrier requirements of the Massachusetts State Energy Code.
ICC-ES AC 148 Acceptance Criteria for Flexible Flashing Materials
TEST RESULTS
CCMC Tech Guide 07240
Joint Disruption Resistance No cracking, delamination or other deleterious effects at L/180 deflection
Joint Relaxation Resistance PassMax water transmission rate2 x 10-7 kg/m2 · s (4.1 x 10-8 lbs/ ft2 · s) after extension and environmental cycling
Adhesive/Cohesive Bond PassMin 0.3 MPa (43.5 psi) in dry state, 0.1 MPa (14.5 psi) after 48 hour water immersion
Nail Popping Resistance No cracking or delamination around nail head following 1 mm (0.04”) protrusion
Water Absorption PassMaximum 0.004 kg/m2 · s (0.0008 lbs/ ft2 · s)
Accelerated Weather Resistance No visible effects (cracking, flaking, other deleterious effects) after 334 total hours
TEST RESULTS
Cold Temperature PliabilityASTM D 1970, AAMA 711
No cracking after bending around a 25 mm (1”) mandrel after 2 hour exposure to-18° C (0° F)
Nail Sealability after Thermal CyclingASTM D 1970 (Modified), AAMA 711
Pass
Tensile Strength after UV ExposureASTM D 5034, AAMA 711
All samples meet the minimum requirement of 3.5 N/mm (20 lbs/in)
Peel AdhesionASTM D 3330 Method F
Tested over ASTM C1177 glass-mat sheathing,OSB, plywood, pvc and uncoated aluminum
Resistance to PeelingAAMA 711
No signs of distress or failure after 24 hours of exposure at room temperature, 50° C(122° F), 65° C (149° F), 80° C (176° F)
After UV Exposure Pass
After Elevated TemperatureExposureAfter Water Immersion
Pass
Pass
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 148No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 148No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering1.2.3.
After Accelerated Aging Pass
Air Permeance of Building MaterialsASTM E 2178
0.0049 l/s.m2 @ 75 Pa(0.00098 cfm/ft2@ 1.57 psf)
TEST RESULT
Rate of Air LeakageASTM E 283
Pull-Off Strength of CoatingsASTM D 4541
0.0185 l/s·m2 @ 75 Pa (0.0037 cfm/ft2 @ 1.57 psf)
Pass - Min. 110 kPa (15.9 psi) or substrate failure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood; pvcand galvanized flashing)
Surface BurningASTM E 84
Flame spread =15Smoke developed = 95
ICC-ES AC 212 Acceptance Criteria for Water-Resistive Coatings used as Water-Resistive Barriers over Exterior Sheathing
Structural: ASTM E 1233 Procedure A No cracking at joints or interface of flashing
Freeze-ThawASTM E 2485 (Method B)
No sign of deleterious effects after 10 cycles (Tested over exterior gypsum sheathing,ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Water ResistanceASTM D 2247
No sign of deleterious effects after 14 day exposure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Tensile BondASTM C 297
>103 kPa (15 psi) Tested over exterior gypsum sheathing, ASTM C1177 glass-matsheathing, cement board, OSB, plywood, CMU; pvc and galvanized flashing
Tensile Bond (before & after freeze-thaw)ASTM C 297
>103 kPa (15 psi) avg; no failure of the lamina after 10 cycles freeze-thaw(Tested over various substrates)
Nail Sealability (without Sheathing Fabric)ASTM D 1970
Pass - No water penetration at galvanized roofing nail penetration under 127 mm(5”) head of water after 3 days at 4° C (40° F)
Water Vapor TransmissionASTM E 96 Method B
18 Perms (grains/Hr. in Hg. ft2) @ 10 mils wet film thickness14 Perms (grains/Hr. in Hg. ft2) @ 20 mils wet film thickness
Sequential Testing - Structural, Racking, Restrained Environmental Conditioning and Water Penetration
No water penetration after 90 min @ 299 Pa (6.24 psf)Tested over OSB and gypsum sheathing
No cracking at joints or interface of flashingNo cracking at joints or interface of flashing
Racking: ASTM E 72Restrained EnvironmentalConditioning: ICC-ES AC 212
Water Penetration : ASTM E 331
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 212No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 212No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering
1.2.3.
4.
1.2.3.
Air Leakage of Air Barrier AssembliesASTM E 2357
0.0007 l/s.m2 (0.0001 cfm/ft2 ) @ 75 Pa (1.57 psf) positive / post conditioning0.0014 l/s.m2 (0.0003 cfm/ft2 ) @ 75 Pa (1.57 psf) negative / post conditioning
-
Acceptable Sheathing
Senershield-R
Senergy Adhesive
Senergy Insulation Board
Senergy Base Coat
Senergy Reinforcing Mesh
Senergy Base Coat
Senergy Finish Coat
Brick or Stone
Advantages
Meets ICC-ES AC 212 water-resistive barrier tests; one fully qualified air/water-resistive barrier material for the entire building
Meets requirements of ICC-ES AC 148; can be used as a flexible flashing in rough openings or through-wall penetrations
Self-sealing; meets ASTM D 1970 Nail Sealability requirements
Approved for Senergy Wall Systems; full system warranty with Senergy EIFS and stucco wall claddings
Liquid-applied, continuously-bonded membrane; eliminates seams, lap joints and staples; transmits wind loads directly to the substrate
One component, water-based, very low VOC content; safe for workers and the environment, low odor, easy application
Nonflammable as applied; promotes workplace safety
Spray-, roller-, trowel- or brush-applied; versatile, applicator-friendly performance
Compatible with lightweight, low-cost spray equipment; fast, easy, economical application
No primer required; single pass application on most substrates
Asphalt and plasticizer-free; easy cleanup, will not dry out or leach plasticizer after application
180-day maximum outdoor exposure; can schedule application before cladding installation
Solids 74% solids. VOC Content 11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369 (based in part on EPA method 24).
Multi-Clad Wall Assembly using Senershield-R
DESCRIPTIONSENERSHIELD-R is a one-component fluid-applied vapor permeableair/water-resistive barrier. This waterproof, resilient coating may be spray-,roller-, brush-, or trowel-applied directly to approved above grade wall sub-strates. It provides excellent secondary moisture protection behind mostwall claddings including EIFS, stucco*, brick, siding and metal panels.Senershield-R is listed in ICC ESR-1878.
* A slipsheet is required for stucco claddings.
USESFor use over the following exterior wall substrates:ASTM C1177 type sheathings, including DensGlassTM exterior sheathing,e2XPTM sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and other cement-boards (ASTM C1325 Type A Exterior), Untreated Exposure I or exteriorplywood sheathing (grade C-D or better), Untreated Exposure I OSB,gypsum sheathing (ASTM C79/ASTM C1396), poured concrete/unitmasonry.
Do not use SENERSHIELD-R for below-grade applications or on surfacessubject to water immersion.
COLORGray
COVERAGEApproximate coverage rates are as follows:Over ASTM C1177 Type Sheathing:35–37 m2 (380–400 ft2) per pailOver Cement Board:37–46 m2 (400–500 ft2) per pailOver Plywood:23–32 m2 (250–350 ft2) per pailOver OSB:23–32 m2 (250–350 ft2) per pailOver ASTM C79/C1396 Type Sheathing:46–54 m2 (500–600 ft2) per pailOver CMU:9–28 m2 (95–300 ft2 varies with porosity) per pail
PACKAGING27.2 kg per 19-liter pail (60 lbs per 5-gallon pail)
4" SHEATHING FABRIC: 101.5 mm x 54.8 m (4" x 180 ft ) roll
9" SHEATHING FABRIC: 228.5 mm x 54.8 m (9" x 180 ft ) roll
Senershield-R
SENERSHIELD-R complies with the air barrier requirements of the Massachusetts State Energy Code.
ICC-ES AC 148 Acceptance Criteria for Flexible Flashing Materials
TEST RESULTS
CCMC Tech Guide 07240
Joint Disruption Resistance No cracking, delamination or other deleterious effects at L/180 deflection
Joint Relaxation Resistance PassMax water transmission rate2 x 10-7 kg/m2 · s (4.1 x 10-8 lbs/ ft2 · s) after extension and environmental cycling
Adhesive/Cohesive Bond PassMin 0.3 MPa (43.5 psi) in dry state, 0.1 MPa (14.5 psi) after 48 hour water immersion
Nail Popping Resistance No cracking or delamination around nail head following 1 mm (0.04”) protrusion
Water Absorption PassMaximum 0.004 kg/m2 · s (0.0008 lbs/ ft2 · s)
Accelerated Weather Resistance No visible effects (cracking, flaking, other deleterious effects) after 334 total hours
TEST RESULTS
Cold Temperature PliabilityASTM D 1970, AAMA 711
No cracking after bending around a 25 mm (1”) mandrel after 2 hour exposure to-18° C (0° F)
Nail Sealability after Thermal CyclingASTM D 1970 (Modified), AAMA 711
Pass
Tensile Strength after UV ExposureASTM D 5034, AAMA 711
All samples meet the minimum requirement of 3.5 N/mm (20 lbs/in)
Peel AdhesionASTM D 3330 Method F
Tested over ASTM C1177 glass-mat sheathing,OSB, plywood, pvc and uncoated aluminum
Resistance to PeelingAAMA 711
No signs of distress or failure after 24 hours of exposure at room temperature, 50° C(122° F), 65° C (149° F), 80° C (176° F)
After UV Exposure Pass
After Elevated TemperatureExposureAfter Water Immersion
Pass
Pass
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 148No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 148No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering1.2.3.
After Accelerated Aging Pass
Air Permeance of Building MaterialsASTM E 2178
0.0049 l/s.m2 @ 75 Pa(0.00098 cfm/ft2@ 1.57 psf)
TEST RESULT
Rate of Air LeakageASTM E 283
Pull-Off Strength of CoatingsASTM D 4541
0.0185 l/s·m2 @ 75 Pa (0.0037 cfm/ft2 @ 1.57 psf)
Pass - Min. 110 kPa (15.9 psi) or substrate failure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood; pvcand galvanized flashing)
Surface BurningASTM E 84
Flame spread =15Smoke developed = 95
ICC-ES AC 212 Acceptance Criteria for Water-Resistive Coatings used as Water-Resistive Barriers over Exterior Sheathing
Structural: ASTM E 1233 Procedure A No cracking at joints or interface of flashing
Freeze-ThawASTM E 2485 (Method B)
No sign of deleterious effects after 10 cycles (Tested over exterior gypsum sheathing,ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Water ResistanceASTM D 2247
No sign of deleterious effects after 14 day exposure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Tensile BondASTM C 297
>103 kPa (15 psi) Tested over exterior gypsum sheathing, ASTM C1177 glass-matsheathing, cement board, OSB, plywood, CMU; pvc and galvanized flashing
Tensile Bond (before & after freeze-thaw)ASTM C 297
>103 kPa (15 psi) avg; no failure of the lamina after 10 cycles freeze-thaw(Tested over various substrates)
Nail Sealability (without Sheathing Fabric)ASTM D 1970
Pass - No water penetration at galvanized roofing nail penetration under 127 mm(5”) head of water after 3 days at 4° C (40° F)
Water Vapor TransmissionASTM E 96 Method B
18 Perms (grains/Hr. in Hg. ft2) @ 10 mils wet film thickness14 Perms (grains/Hr. in Hg. ft2) @ 20 mils wet film thickness
Sequential Testing - Structural, Racking, Restrained Environmental Conditioning and Water Penetration
No water penetration after 90 min @ 299 Pa (6.24 psf)Tested over OSB and gypsum sheathing
No cracking at joints or interface of flashingNo cracking at joints or interface of flashing
Racking: ASTM E 72Restrained EnvironmentalConditioning: ICC-ES AC 212
Water Penetration : ASTM E 331
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 212No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 212No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering
1.2.3.
4.
1.2.3.
Air Leakage of Air Barrier AssembliesASTM E 2357
0.0007 l/s.m2 (0.0001 cfm/ft2 ) @ 75 Pa (1.57 psf) positive / post conditioning0.0014 l/s.m2 (0.0003 cfm/ft2 ) @ 75 Pa (1.57 psf) negative / post conditioning
-
Acceptable Sheathing
Senershield-R
Senergy Adhesive
Senergy Insulation Board
Senergy Base Coat
Senergy Reinforcing Mesh
Senergy Base Coat
Senergy Finish Coat
Brick or Stone
Advantages
Meets ICC-ES AC 212 water-resistive barrier tests; one fully qualified air/water-resistive barrier material for the entire building
Meets requirements of ICC-ES AC 148; can be used as a flexible flashing in rough openings or through-wall penetrations
Self-sealing; meets ASTM D 1970 Nail Sealability requirements
Approved for Senergy Wall Systems; full system warranty with Senergy EIFS and stucco wall claddings
Liquid-applied, continuously-bonded membrane; eliminates seams, lap joints and staples; transmits wind loads directly to the substrate
One component, water-based, very low VOC content; safe for workers and the environment, low odor, easy application
Nonflammable as applied; promotes workplace safety
Spray-, roller-, trowel- or brush-applied; versatile, applicator-friendly performance
Compatible with lightweight, low-cost spray equipment; fast, easy, economical application
No primer required; single pass application on most substrates
Asphalt and plasticizer-free; easy cleanup, will not dry out or leach plasticizer after application
180-day maximum outdoor exposure; can schedule application before cladding installation
Solids 74% solids. VOC Content 11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369 (based in part on EPA method 24).
Multi-Clad Wall Assembly using Senershield-R
DESCRIPTIONSENERSHIELD-R is a one-component fluid-applied vapor permeableair/water-resistive barrier. This waterproof, resilient coating may be spray-,roller-, brush-, or trowel-applied directly to approved above grade wall sub-strates. It provides excellent secondary moisture protection behind mostwall claddings including EIFS, stucco*, brick, siding and metal panels.Senershield-R is listed in ICC ESR-1878.
* A slipsheet is required for stucco claddings.
USESFor use over the following exterior wall substrates:ASTM C1177 type sheathings, including DensGlassTM exterior sheathing,e2XPTM sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and other cement-boards (ASTM C1325 Type A Exterior), Untreated Exposure I or exteriorplywood sheathing (grade C-D or better), Untreated Exposure I OSB,gypsum sheathing (ASTM C79/ASTM C1396), poured concrete/unitmasonry.
Do not use SENERSHIELD-R for below-grade applications or on surfacessubject to water immersion.
COLORGray
COVERAGEApproximate coverage rates are as follows:Over ASTM C1177 Type Sheathing:35–37 m2 (380–400 ft2) per pailOver Cement Board:37–46 m2 (400–500 ft2) per pailOver Plywood:23–32 m2 (250–350 ft2) per pailOver OSB:23–32 m2 (250–350 ft2) per pailOver ASTM C79/C1396 Type Sheathing:46–54 m2 (500–600 ft2) per pailOver CMU:9–28 m2 (95–300 ft2 varies with porosity) per pail
PACKAGING27.2 kg per 19-liter pail (60 lbs per 5-gallon pail)
4" SHEATHING FABRIC: 101.5 mm x 54.8 m (4" x 180 ft ) roll
9" SHEATHING FABRIC: 228.5 mm x 54.8 m (9" x 180 ft ) roll
Senershield-R
SENERSHIELD-R complies with the air barrier requirements of the Massachusetts State Energy Code.
ICC-ES AC 148 Acceptance Criteria for Flexible Flashing Materials
TEST RESULTS
CCMC Tech Guide 07240
Joint Disruption Resistance No cracking, delamination or other deleterious effects at L/180 deflection
Joint Relaxation Resistance PassMax water transmission rate2 x 10-7 kg/m2 · s (4.1 x 10-8 lbs/ ft2 · s) after extension and environmental cycling
Adhesive/Cohesive Bond PassMin 0.3 MPa (43.5 psi) in dry state, 0.1 MPa (14.5 psi) after 48 hour water immersion
Nail Popping Resistance No cracking or delamination around nail head following 1 mm (0.04”) protrusion
Water Absorption PassMaximum 0.004 kg/m2 · s (0.0008 lbs/ ft2 · s)
Accelerated Weather Resistance No visible effects (cracking, flaking, other deleterious effects) after 334 total hours
TEST RESULTS
Cold Temperature PliabilityASTM D 1970, AAMA 711
No cracking after bending around a 25 mm (1”) mandrel after 2 hour exposure to-18° C (0° F)
Nail Sealability after Thermal CyclingASTM D 1970 (Modified), AAMA 711
Pass
Tensile Strength after UV ExposureASTM D 5034, AAMA 711
All samples meet the minimum requirement of 3.5 N/mm (20 lbs/in)
Peel AdhesionASTM D 3330 Method F
Tested over ASTM C1177 glass-mat sheathing,OSB, plywood, pvc and uncoated aluminum
Resistance to PeelingAAMA 711
No signs of distress or failure after 24 hours of exposure at room temperature, 50° C(122° F), 65° C (149° F), 80° C (176° F)
After UV Exposure Pass
After Elevated TemperatureExposureAfter Water Immersion
Pass
Pass
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 148No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 148No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering1.2.3.
After Accelerated Aging Pass
Air Permeance of Building MaterialsASTM E 2178
0.0049 l/s.m2 @ 75 Pa(0.00098 cfm/ft2@ 1.57 psf)
TEST RESULT
Rate of Air LeakageASTM E 283
Pull-Off Strength of CoatingsASTM D 4541
0.0185 l/s·m2 @ 75 Pa (0.0037 cfm/ft2 @ 1.57 psf)
Pass - Min. 110 kPa (15.9 psi) or substrate failure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood; pvcand galvanized flashing)
Surface BurningASTM E 84
Flame spread =15Smoke developed = 95
ICC-ES AC 212 Acceptance Criteria for Water-Resistive Coatings used as Water-Resistive Barriers over Exterior Sheathing
Structural: ASTM E 1233 Procedure A No cracking at joints or interface of flashing
Freeze-ThawASTM E 2485 (Method B)
No sign of deleterious effects after 10 cycles (Tested over exterior gypsum sheathing,ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Water ResistanceASTM D 2247
No sign of deleterious effects after 14 day exposure (Tested over exterior gypsumsheathing, ASTM C1177 glass-mat sheathing, cement board, OSB, plywood)
Tensile BondASTM C 297
>103 kPa (15 psi) Tested over exterior gypsum sheathing, ASTM C1177 glass-matsheathing, cement board, OSB, plywood, CMU; pvc and galvanized flashing
Tensile Bond (before & after freeze-thaw)ASTM C 297
>103 kPa (15 psi) avg; no failure of the lamina after 10 cycles freeze-thaw(Tested over various substrates)
Nail Sealability (without Sheathing Fabric)ASTM D 1970
Pass - No water penetration at galvanized roofing nail penetration under 127 mm(5”) head of water after 3 days at 4° C (40° F)
Water Vapor TransmissionASTM E 96 Method B
18 Perms (grains/Hr. in Hg. ft2) @ 10 mils wet film thickness14 Perms (grains/Hr. in Hg. ft2) @ 20 mils wet film thickness
Sequential Testing - Structural, Racking, Restrained Environmental Conditioning and Water Penetration
No water penetration after 90 min @ 299 Pa (6.24 psf)Tested over OSB and gypsum sheathing
No cracking at joints or interface of flashingNo cracking at joints or interface of flashing
Racking: ASTM E 72Restrained EnvironmentalConditioning: ICC-ES AC 212
Water Penetration : ASTM E 331
No cracking or bond failure to substrateUV Light Exposure: ICC-ES AC 212No cracking or bond failure to substrateAcclerated Aging: ICC-ES AC 212No water penetrationHydrostatic Pressure Test:
AATCC 127-1985
Sequential Testing - Weathering
1.2.3.
4.
1.2.3.
Air Leakage of Air Barrier AssembliesASTM E 2357
0.0007 l/s.m2 (0.0001 cfm/ft2 ) @ 75 Pa (1.57 psf) positive / post conditioning0.0014 l/s.m2 (0.0003 cfm/ft2 ) @ 75 Pa (1.57 psf) negative / post conditioning
-
NOTEBASF Wall Systems is an operating unit of BASF Corporation (herein referred to as “BASFWall Systems”)
DISCLAIMERThis information and all further technical advice are based on BASF’s present knowledge andexperience. However, BASF assumes no liability for providing such information and adviceincluding the extent to which such information and advice may relate to existing third partyintellectual property rights, especially patent rights. In particular, BASF disclaims all CONDITIONSAND WARRANTIES,WHETHER EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIESOF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY. BASF SHALL NOT BERESPONSIBLE FOR CONSEQUENTIAL, INDIRECT OR INCIDENTAL DAMAGES (INCLUDING LOSS OFPROFITS) OF ANY KIND. BASF reserves the right to make any changes according to technologicalprogress or further developments. It is the customer’s responsibility and obligation to carefullyinspect and test any incoming goods. Performance of the product(s) described herein shouldbe verified by testing and carried out only by qualified experts. It is the sole responsibility of thecustomer to carry out and arrange for any such testing. Reference to trade names used by othercompanies is neither a recommendation, nor an endorsement of any product and does not implythat similar products could not be used.
©2010 BASF Corporation
Printed in U.S.A. 10/10
BASF Wall Systems | 3550 St. Johns Bluff Road South Jacksonville, FL 32224-2614 P: 800.221.9255 F: 904. 996.6300 www.senergy.basf.com
Senershield-RVapor Permeable Air/Water-Resistive Barrier Membrane
LIMITATIONSShipping & StorageProtect BASF materials during transportation and installation to avoidphysical damage. Store BASF materials in a cool, dry place protectedfrom freezing. Store at no less than 4°C (40°F). Protect from extremeheat and direct sunlight.
StackingDo not stack pallets.
Shelf LifeApproximately 2 years, properly stored in original containers.
TECHNICAL SUPPORTConsult the BASFWall Systems Technical Services Department for specificrecommendations concerning all other applications. Consult the Senergywebsite, www.senergy.basf.com, for additional information about productsand systems and for updated literature.
HEALTH AND SAFETYCautionMay be harmful if vapors or mist are inhaled, if absorbed through skin,or if swallowed. May cause eye, skin and respiratory tract irritation.Swallowing this product can cause kidney damage.
PrecautionsAvoid getting in eyes, on skin, or on clothing. Avoid breathing vaporsor mist. Wear safety glasses or goggles, impervious gloves, and clothingwith long sleeves and pants. If TLV or PEL can be exceeded, wearrespirator selected by a technically qualified person. Wash thoroughlyafter handling. Wash contaminated clothing before reuse.
SpillsWipe up small spills with rags. Absorb larger spills with sand, vermiculite,or kitty litter; sweep up and place in a suitable container for disposal.
First AidEyes: For eye contact, rinse eyes with water. Remove any contact lenses,and continue flushing with plenty of water for several minutes. Seekmedical attention if irritation develops and persists.Skin: For skin contact, wash affected areas with plenty of water, andsoap if available, for several minutes. Seek medical attention if irritationdevelops and persists.Internal: If inhaled, remove from area to fresh air. Seek medical attentionif respiratory irritation develops or if breathing becomes difficult. Ifswallowed, give 3-4 glasses of water, but do not induce vomiting unlessdirected to do so by a physician. Do not give anything by mouth to anunconscious or convulsing person. Get medical attention.
Read Material Safety Data Sheet before using this product.Solids74% solids
VOC Content11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369(based in part on EPA method 24).
For medical emergencies only call CHEMTREC at (800) 424-9300.
MIXING1. Use directly from original packaging or prepare in a container that is
clean and free of foreign substances. Do not use a container whichhas contained or been cleaned with a petroleum-based product.
2. Mix SENERSHIELD-R with a clean, rust-free paddle and drill untilthoroughly blended. Dilution of Senershield-R is not recommended.
3. Additives are not permitted.4. Close container when not in use.5. Clean tools and equipment with water immediately after use.
Dried material can only be removed mechanically.
APPLICATIONJob ConditionsDo not apply BASF materials in ambient temperature below 4°C (40°F).Provide supplementary heat during installation and drying period (atleast 24 hours after installation and until dry) when temperatures lessthan 4°C (40°F) prevail. Do not apply BASFmaterials to frozen or frost-ladensurfaces.
Limit the weather exposure of SENERSHIELD-R to a maximum of 180days. Verify surfaces are free of dirt, contaminants, or other deleteriousconditions before application of cladding. Report and correct any suchconditions prior to cladding application. Dry/cure times of adhesivelyapplied EPS insulation board installed over SENERSHIELD-R may beprolonged, particularly in cool and/or damp weather. Non-cementitiousadhesives are not recommended for EPS insulation board attachment toSENERSHIELD-R. Proper application is the responsibility of the user.
Surface PreparationSubstrate shall be dry, clean, sound and free of release agents, paintor other residue or coatings. Verify substrate is flat, free of fins orplanar irregularities greater than 6.4 mm in 3 m (1/4" in 10').Unsatisfactory conditions shall be reported to the general contractorand corrected before application of SENERSHIELD-R.
EquipmentUse a 20 mm (3/4”) nap roller or paint brush. If spraying, refer toSpray Application technical bulletin for spray application equipmentand application instructions.Note: If using roller application, it is necessary to pre-wetthe synthetic roller pad with water and spin out the excesswater. The pre-wetting only needs to be done once at thestart of application.
Procedure1. Substrate shall be of a type acceptable by BASF and shall be
installed per substrate manufacturer’s instructions and localcode requirements.
2. Wrap openings with SHEATHING FABRIC by applying a generousamount of mixed SENERSHIELD-R to all surfaces and immediatelyembedding SHEATHING FABRIC, completely saturating theSHEATHING FABRIC. If necessary, apply a second coat ofSENERSHIELD-R to ensure a complete, void-free membrane.
3. Spot all fasteners and precoat sheathing joints, terminations,inside and outside corners with mixed SENERSHIELD-R using a101 mm (4") wide by 20 mm (3/4") nap roller, brush or spray.
4.a. Immediately place and center SHEATHING FABRIC over wetSENERSHIELD-R at all sheathing joints, terminations, inside andoutside corners, as well as knot holes and check cracks that mayexist in plywood or OSB. Ensure SHEATHING FABRIC extendsevenly on both sides of the sheathing joint. Completely saturateSHEATHING FABRIC with SENERSHIELD-R.
b.Lap SHEATHING FABRIC 63.5 mm (2 1/2") minimum at intersections.c. If using roller, brush, or trowel application, allow to dry to thetouch before applying SENERSHIELD-R to entire wall surface. Ifspraying, “wet on wet” application is acceptable.
5.a. Apply SENERSHIELD-R to DensGlassTM exterior sheathing, e2XPTM
sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and othercement-boards (ASTM C1325 Type A Exterior) and gypsumsheathing (ASTM C79/ASTM C1396) with a 20 mm (3/4") naproller, stainless steel trowel, brush or spray gun to a consistent,minimum 10 wet mil thickness that is free of voids and pin holes.A fully loaded roller pad is required to obtain a consistent, minimum10 wet mil thickness. Backrolling may be needed to produce apinhole-free film. Note: Refer to Spray Application technicalbulletin for spray application equipment and applicationinstructions.
b. Apply SENERSHIELD-R to plywood, OSB or CMU substrate(s) witha 20 mm (3/4") nap roller or spray to a consistent, minimum 10 wetmil thickness. Prior to application of the second coat, visuallyinspect to assure sheathing surface is blister free and coating isfree of voids and pinholes. Repair if needed and then apply asecond coat after the initial coating is sufficiently dry.Note: A minimum of two (2) 10 mil wet coats ofSENERSHIELD-R is required over OSB, plywood and CMU.SENERSHIELD-R may be sprayed to a 20-mil thicknessover OSB and plywood in one wet application. Backrollingmay be needed to produce a pinhole-free film.
Drying TimeAllow to dry completely, typically 2 to 10 hours, before proceedingwith EIFS or other cladding installation. Protect from rain and fromtemperatures less than 4°C (40°F) for 24 hours.
For Best PerformancePrior to application of EPS insulation boards for EIFS or alternativecladdings, visually inspect the SENERSHIELD-R for voids, pinholes,surface deficiencies, etc. Repair deficiencies and areas that are notintact. Apply additional SENERSHIELD-R as necessary such thatSENERSHIELD-R is free of voids, pinholes, etc. All sheathing joints,terminations, inside and outside corners must be reinforced with4” or 9” SHEATHING FABRIC or SENERFLASH 4 or 9. ReferenceAir/Vapor/Water-Resistive Barrier Guidelines technical bulletin forproper treatment of rough openings and sheathing joints.
Product Bulletin
-
NOTEBASF Wall Systems is an operating unit of BASF Corporation (herein referred to as “BASFWall Systems”)
DISCLAIMERThis information and all further technical advice are based on BASF’s present knowledge andexperience. However, BASF assumes no liability for providing such information and adviceincluding the extent to which such information and advice may relate to existing third partyintellectual property rights, especially patent rights. In particular, BASF disclaims all CONDITIONSAND WARRANTIES,WHETHER EXPRESS OR IMPLIED, INCLUDING THE IMPLIED WARRANTIESOF FITNESS FOR A PARTICULAR PURPOSE OR MERCHANTABILITY. BASF SHALL NOT BERESPONSIBLE FOR CONSEQUENTIAL, INDIRECT OR INCIDENTAL DAMAGES (INCLUDING LOSS OFPROFITS) OF ANY KIND. BASF reserves the right to make any changes according to technologicalprogress or further developments. It is the customer’s responsibility and obligation to carefullyinspect and test any incoming goods. Performance of the product(s) described herein shouldbe verified by testing and carried out only by qualified experts. It is the sole responsibility of thecustomer to carry out and arrange for any such testing. Reference to trade names used by othercompanies is neither a recommendation, nor an endorsement of any product and does not implythat similar products could not be used.
©2010 BASF Corporation
Printed in U.S.A. 10/10
BASF Wall Systems | 3550 St. Johns Bluff Road South Jacksonville, FL 32224-2614 P: 800.221.9255 F: 904. 996.6300 www.senergy.basf.com
Senershield-RVapor Permeable Air/Water-Resistive Barrier Membrane
LIMITATIONSShipping & StorageProtect BASF materials during transportation and installation to avoidphysical damage. Store BASF materials in a cool, dry place protectedfrom freezing. Store at no less than 4°C (40°F). Protect from extremeheat and direct sunlight.
StackingDo not stack pallets.
Shelf LifeApproximately 2 years, properly stored in original containers.
TECHNICAL SUPPORTConsult the BASFWall Systems Technical Services Department for specificrecommendations concerning all other applications. Consult the Senergywebsite, www.senergy.basf.com, for additional information about productsand systems and for updated literature.
HEALTH AND SAFETYCautionMay be harmful if vapors or mist are inhaled, if absorbed through skin,or if swallowed. May cause eye, skin and respiratory tract irritation.Swallowing this product can cause kidney damage.
PrecautionsAvoid getting in eyes, on skin, or on clothing. Avoid breathing vaporsor mist. Wear safety glasses or goggles, impervious gloves, and clothingwith long sleeves and pants. If TLV or PEL can be exceeded, wearrespirator selected by a technically qualified person. Wash thoroughlyafter handling. Wash contaminated clothing before reuse.
SpillsWipe up small spills with rags. Absorb larger spills with sand, vermiculite,or kitty litter; sweep up and place in a suitable container for disposal.
First AidEyes: For eye contact, rinse eyes with water. Remove any contact lenses,and continue flushing with plenty of water for several minutes. Seekmedical attention if irritation develops and persists.Skin: For skin contact, wash affected areas with plenty of water, andsoap if available, for several minutes. Seek medical attention if irritationdevelops and persists.Internal: If inhaled, remove from area to fresh air. Seek medical attentionif respiratory irritation develops or if breathing becomes difficult. Ifswallowed, give 3-4 glasses of water, but do not induce vomiting unlessdirected to do so by a physician. Do not give anything by mouth to anunconscious or convulsing person. Get medical attention.
Read Material Safety Data Sheet before using this product.Solids74% solids
VOC Content11 g/l, or 0.09 lbs/gal less water and exempt solvents per ASTM D2369(based in part on EPA method 24).
For medical emergencies only call CHEMTREC at (800) 424-9300.
MIXING1. Use directly from original packaging or prepare in a container that is
clean and free of foreign substances. Do not use a container whichhas contained or been cleaned with a petroleum-based product.
2. Mix SENERSHIELD-R with a clean, rust-free paddle and drill untilthoroughly blended. Dilution of Senershield-R is not recommended.
3. Additives are not permitted.4. Close container when not in use.5. Clean tools and equipment with water immediately after use.
Dried material can only be removed mechanically.
APPLICATIONJob ConditionsDo not apply BASF materials in ambient temperature below 4°C (40°F).Provide supplementary heat during installation and drying period (atleast 24 hours after installation and until dry) when temperatures lessthan 4°C (40°F) prevail. Do not apply BASFmaterials to frozen or frost-ladensurfaces.
Limit the weather exposure of SENERSHIELD-R to a maximum of 180days. Verify surfaces are free of dirt, contaminants, or other deleteriousconditions before application of cladding. Report and correct any suchconditions prior to cladding application. Dry/cure times of adhesivelyapplied EPS insulation board installed over SENERSHIELD-R may beprolonged, particularly in cool and/or damp weather. Non-cementitiousadhesives are not recommended for EPS insulation board attachment toSENERSHIELD-R. Proper application is the responsibility of the user.
Surface PreparationSubstrate shall be dry, clean, sound and free of release agents, paintor other residue or coatings. Verify substrate is flat, free of fins orplanar irregularities greater than 6.4 mm in 3 m (1/4" in 10').Unsatisfactory conditions shall be reported to the general contractorand corrected before application of SENERSHIELD-R.
EquipmentUse a 20 mm (3/4”) nap roller or paint brush. If spraying, refer toSpray Application technical bulletin for spray application equipmentand application instructions.Note: If using roller application, it is necessary to pre-wetthe synthetic roller pad with water and spin out the excesswater. The pre-wetting only needs to be done once at thestart of application.
Procedure1. Substrate shall be of a type acceptable by BASF and shall be
installed per substrate manufacturer’s instructions and localcode requirements.
2. Wrap openings with SHEATHING FABRIC by applying a generousamount of mixed SENERSHIELD-R to all surfaces and immediatelyembedding SHEATHING FABRIC, completely saturating theSHEATHING FABRIC. If necessary, apply a second coat ofSENERSHIELD-R to ensure a complete, void-free membrane.
3. Spot all fasteners and precoat sheathing joints, terminations,inside and outside corners with mixed SENERSHIELD-R using a101 mm (4") wide by 20 mm (3/4") nap roller, brush or spray.
4.a. Immediately place and center SHEATHING FABRIC over wetSENERSHIELD-R at all sheathing joints, terminations, inside andoutside corners, as well as knot holes and check cracks that mayexist in plywood or OSB. Ensure SHEATHING FABRIC extendsevenly on both sides of the sheathing joint. Completely saturateSHEATHING FABRIC with SENERSHIELD-R.
b.Lap SHEATHING FABRIC 63.5 mm (2 1/2") minimum at intersections.c. If using roller, brush, or trowel application, allow to dry to thetouch before applying SENERSHIELD-R to entire wall surface. Ifspraying, “wet on wet” application is acceptable.
5.a. Apply SENERSHIELD-R to DensGlassTM exterior sheathing, e2XPTM
sheathing, GlasRoc® sheathing, SecurockTM glass-mat sheathing,Weather DefenseTMPlatinum sheathing, GreenGlass® sheathing,PermaBaseTM cement-board by National Gypsum and othercement-boards (ASTM C1325 Type A Exterior) and gypsumsheathing (ASTM C79/ASTM C1396) with a 20 mm (3/4") naproller, stainless steel trowel, brush or spray gun to a consistent,minimum 10 wet mil thickness that is free of voids and pin holes.A fully loaded roller pad is required to obtain a consistent, minimum10 wet mil thickness. Backrolling may be needed to produce apinhole-free film. Note: Refer to Spray Application technicalbulletin for spray application equipment and applicationinstructions.
b. Apply SENERSHIELD-R to plywood, OSB or CMU substrate(s) witha 20 mm (3/4") nap roller or spray to a consistent, minimum 10 wetmil thickness. Prior to application of the second coat, visuallyinspect to assure sheathing surface is blister free and coating isfree of voids and pinholes. Repair if needed and then apply asecond coat after the initial coating is sufficiently dry.Note: A minimum of two (2) 10 mil wet coats ofSENERSHIELD-R is required over OSB, plywood and CMU.SENERSHIELD-R may be sprayed to a 20-mil thicknessover OSB and plywood in one wet application. Backrollingmay be needed to produce a pinhole-free film.
Drying TimeAllow to dry completely, typically 2 to 10 hours, before proceedingwith EIFS or other cladding installation. Protect from rain and fromtemperatures less than 4°C (40°F) for 24 hours.
For Best PerformancePrior to application of EPS insulation boards for EIFS or alternativecladdings, visually inspect the SENERSHIELD-R for voids, pinholes,surface deficiencies, etc. Repair deficiencies and areas that are notintact. Apply additional SENERSHIELD-R as necessary such thatSENERSHIELD-R is free of voids, pinholes, etc. All sheathing joints,terminations, inside and outside corners must be reinforced with4” or 9” SHEATHING FABRIC or SENERFLASH 4 or 9. ReferenceAir/Vapor/Water-Resistive Barrier Guidelines technical bulletin forproper treatment of rough openings and sheathing joints.
Product Bulletin
-
1017583PRODUCT BULLETINAlpha Base Coat
Description100% acrylic adhesive andbase coat that is field-mixedwith Type I or Type II Portlandcement. Very creamy texturethat spreads easily.
Packaging27.2 kg per 19-liter pail(60 lbs per 5-gallon pail)
CoverageApproximate coverage rates areas follows:1. Adhere EPS insulation boardto substrate:14.8 m2 (160 ft2) per pail vianotched trowel method,16.7 m2 (180 ft2) per pail viaribbon & dab method
2. Embed FLEXGUARD 4:26 m2 (280 ft2) per pail,Embed INTERMEDIATE 12:18.5 m2 (200 ft2) per pail,Embed HI-IMPACT 20 &FLEXGUARD 4: 14.8 m2(160 ft2) per pail
3. Adhere EPS insulation boardto substrate and embedFLEXGUARD 4: 11.1 m2(120 ft2) per pail
Uses1. For use with the Senerflex® Wall System to adhere expanded polystyrene insulation board to the
following acceptable substrates: SENERSHIELD®, SENERSHIELD®-R, unpainted and unglazedconcrete or unit masonry, DensGlass Gold® (ASTM C1177), Fiberock Aqua-ToughTM sheathing,water-resistant core gypsum sheathing (ASTM C79/ASTM C1396), new and untreated Exposure 1or exterior grade plywood or Exposure 1 OSB, PermaBaseTM cement-board,WonderBoard® cement-board, DurockTM cement-board, Harditex® cement-board, and Eterspan cement-board (ASTM C1325Type A Exterior).Note: Wood-based sheathing substrates require priming with Senerprime.
2. To adhere expanded polystyrene insulation board to expanded polystyrene insulation board.3. For use with Senerflex®, SenturionTM I, II, and III, Senergy® Cement-Board StuccoTM System and all
Senergy Surfacing Systems to embed CORNER MESH and SENERGY REINFORCING MESH.
Technical InformationConsult our Technical Services Department for specific recommendations concerning all other applications.Consult the Senergy website, www.senergy.basf.com, for additional information about products andsystems and for updated literature.
Features Benefits
Smooth, creamy consistency Trowels on easily, speeds mesh embedment,reduces applicator arm fatigue, increasesjob-site productivity
Familiar 1:1 mixing ratio Easy to mix—less chance of error
100% Acrylic Provides long-term durability
Water based Safe, non-toxic, clean up easily with soap & water
Mixing1. Prepare in a container which is clean and free of foreign substances. Do not use a container
which has contained or been cleaned with a petroleum-based product.2. Mix the contents of the ALPHA BASE COAT pail with a low speed drill and paddle mixer until
thoroughly blended. Mix one part (by weight) Portland cement with one part ALPHA BASE COAT.Add Portland cement in small increments, thoroughly mixing to a homogeneous consistencyafter each additional increment.
3. Clean, potable water may be added to adjust workability.4. Let stand for 5 to 10 minutes, then remix and retemper before use.5. Additives are not permitted.6. Close container when not in use.7. Clean tools with soap and water immediately after use.
ApplicationTo adhere EPS to acceptable substrates or to other EPS:NOTCHED TROWEL METHOD—Apply mixed ALPHA BASE COAT to entire surface of insulation boardusing a stainless steel trowel with 13 mm x 13 mm (1/2" x 1/2") notches spaced 13 mm (1/2") apart,or 10 mm x 10 mm (3/8" x 3/8") notches spaced 10 mm (3/8") apart.
-
-OR-RIBBON & DAB METHOD—Apply a ribbon of mixed ALPHA BASE COAT approximately 50 mm (2")wide by 10 mm (3/8") thick to entire perimeter of each board with a trowel. Apply dabs or ribbonsof 10 mm (3/8") thickness by 100 mm (4") in diameter, approximately 200 mm (8") o.c. over entiresurface of board to ensure uniform contact and high initial grab.
Note: Ribbon & dab method is not recommended on gypsum sheathing substrates orDensGlass Gold®. Allow application of insulation board to dry (normally 8 to 10 hours)prior to application of ALPHA BASE COAT/Reinforcing Mesh.To adhere EPS to approved substrates on Senerflex Channeled Adhesive Design option only:Apply to solid surface of insulation board using a stainless steel trowel with 13mm x 13mm (1/2" x1/2") notches spaced 50.8 mm (2") apart, with the notches installed vertically [parallel to the 50.8 mm(2") dimension]. Allow application of EPS insulation board to dry (normally 8 to 10 hours) prior toapplication of ALPHA BASE COAT/REINFORCING MESH.As a Base Coat for embedding Reinforcing Mesh:ALPHA BASE COAT shall be applied so as to achieve Reinforcing Mesh embedment with no reinforcingMesh color visible. Ensure Reinforcing Mesh is free of wrinkles. Allow ALPHA BASE COAT with embeddedReinforcing Mesh to dry hard (normally 8 to 10 hours) prior to application of Senergy Primer or Finish.
Limitations1. Requires job-site mixing. Must be used after mixing.2. Protect Senergy materials during transportation and storage to avoid physical damage.3. Store Senergy materials in a cool, dry place protected from freezing. Store at no less than 4˚C
(40˚F). Protect from extreme heat and direct sunlight. Shelf life is two years when unopened andstored as directed.
4. Do not apply Senergy materials in ambient temperatures below 4˚C (40˚F). Provide supplementaryheat during installation and drying period (at least 24 hours after installation and until dry) whentemperatures less than 4°C (40°F) prevail.
5. Do not apply Senergy materials to frozen surfaces.
Health and SafetyCautionContains silica, crystalline quartz.RiskIngestion or inhalation of dust may cause irritation. Contains crystalline silica. NTP and IARC recognizerespirable crystalline silica as a human carcinogen. Repeated or prolonged overexposure to free respirablequartz may cause silicosis or other serious and delayed lung injury.PrecautionsAvoid contact with skin, eyes and clothing. Prevent inhalation of dust. Wash thoroughly afterhandling. Keep container closed. DO NOT take internally. Use only with adequate ventilation. Useimpervious gloves, eye protection and if the TLV is exceeded or used in a poorly ventilated area,use NIOSH/MSHA approved respiratory protection in accordance with applicable Federal, state andlocal regulations.First Aid1. For eye contact, flush thoroughly with water for at least 15 minutes.2. For skin contact, wash affected areas with soap and water. If irritation persists, SEEK MEDICAL
ATTENTION. Remove and wash contaminated clothing.3. If inhalation causes physical discomfort, remove to fresh air. If discomfort persists or any
breathing difficulty occurs or if swallowed, SEEK IMMEDIATE MEDICAL ATTENTION.Read Material Safety Data Sheet before using this product.Proposition 65This product contains materials listed by the state of California as known to cause cancer, birth defectsor other reproductive harm.VOC Content7 g/l, or 0.06 lbs/gal less water and exempt solvents.For medical emergencies only call Chemtrec at (800) 424-9300.
Alpha Base Coat
NoteBASF Wall Systems is an operating unit ofBASF Construction Chemicals, LLC. (hereinafter referred to as “BASF Wall Systems”)
Residential PolicyOn one and two-family residential framedconstruction, BASF Wall Systems requiresthat the wall system selected be one thatincludes provisions for water drainage.The choices include Senturion® line ofwater drainage EIFS, commercialSenerflex® Channeled Adhesive orChanneled Insulation Design, SenergyStucco Wall System, and Senergy Cement-Board StuccoTM Systems. There are noexceptions to this policy. Under nocircumstances will BASF Wall Systemswarrant the use of any other system onthis type of construction without expressedwritten authorization from BASF WallSystems [Residential construction usingEIFS on masonry (CMU) or poured concretedoes not require the additional waterdrainage provisions described above.Senergy Exterior Surfacing Systems forinsulating concrete forms are alsoacceptable.] See the Senergy ResidentialPolicy Bulletin for a more detailed discussionof this topic. Consult BASF Wall SystemsTechnical Services Department for specificrecommendations concerning all otherapplications. Consult the Senergy website,www.senergy.basf.com for additionalinformation about products and systemsand for updated literature.
DisclaimerThis information and all further technicaladvice are based on BASF Wall Systems’present knowledge and experience.However, BASF assumes no liability forproviding such information and adviceincluding the extent to which suchinformation and advice may relate toexisting third party intellectual propertyrights, especially patent rights. In particular,BASF Wall Systems disclaims any and allCONDITIONS AND WARRANTIES, WHETHEREXPRESS OR IMPLIED, INCLUDING THEIMPLIED WARRANTIES OF FITNESS FORA PARTICULAR PURPOSE ORMERCHANTABILITY. BASF WALL SYSTEMSSHALL NOT BE RESPONSIBLE FORCONSEQUENTIAL, INDIRECT OR INCIDENTALDAMAGES (INCLUDING LOSS OF PROFITS)OF ANY KIND. BASF Wall Systems reservesthe right to make any changes accordingto technological progress or furtherdevelopments. It is the customer’sresponsibility and obligation to carefullyinspect and test any incoming goods.Performance of the product(s) describedherein should be verified by testing andcarried out only by qualified experts. It isthe sole responsibility of the customer tocarry out and arrange for any such testing.Reference to trade names used by othercompanies is neither a recommendation,nor an endorsement of any product anddoes not imply that similar products couldnot be used.
BASF Wall Systems3550 St. Johns Bluff Road SouthJacksonville, FL 32224-2614Phone 800 • 221 • 9255Fax 904 • 996 • 6300www.senergy.basf.com
©2007 BASF Construction Chemicals, LLC.Printed in U.S.A. 12/07
-
Tel: 480-850-5757 • Fax: 480-850-4333 • 8800 E Chaparral Rd • Ste 110 • Scottsdale, AZ 85250
February 21, 2011
Phoenix Cement® – Type I/II/V (LA)
Product Information Statement for LEED® New Construction (NC) 2.2 Credit Documentation
Project Name ‐Location: All Commercial, Industrial and Residential Projects – Southwest Region
Phoenix Cement® Type I/II/V (LA) is general, all‐purpose cement for use in most general construction applications for use in concrete products meeting the requirements of ASTM C1157.
Salt River Materials Group (SRMG) certifies the following information for Phoenix Cement® Type I/II/V (LA).
Regional Materials
98% of Phoenix Cement® Type I/II/IV (LA) is extracted and manufactured at the Clarkdale Facility,
located in at 3000 W. Cement Plant Road, Clarkdale, AZ, 86324 and qualifies for LEED® Credit 5.1 and 5.2 Local and Regional Materials if located within 500 miles of the project site.
Scott Palmer, LEED‐AP
Market Development Manager
Salt River Materials Group
Based on the above information, SRMG certifies that Phoenix Cement® Type I/II/V (LA) will
contribute to the following LEED® NC Credits:
MR Credit 5.1: Regional Materials: 10% Extracted, Processed & Manufactured Regionally
MR Credit 5.2: Regional Materials: 20% Extracted, Processed & Manufactured Regionally
-
1017606PRODUCT BULLETINSenergy®Reinforcing Mesh
Uses1. For use with all Senerflex® Wall Systems and Senturion® Wall Systems, Senergy Surfacing Systems
and Senergy Cement-Board StuccoTM Systems and for EPS shapes on Senergy Stucco Wall Systemthat use either EPS or polyisocyanurate insulation boards and for use over EPS shapes on allSenergy Wall Systems.
2. For above ground use with all Senergy Surfacing Systems.3. Senergy SELF-ADHERING MESH TAPE only: reinforces SENERSHIELDTM over acceptable sheathing
joints and reinforces SENERSHIELD over rough openings and at terminations.4. FIBERLATH MESH only: reinforces and provide a keying device for base coat on Senerthik Class PM EIFS.5. 4", 9" SHEATHING FABRIC only: reinforces SENERSHIELD-R over acceptable sheathing joints and
reinforces SENERSHIELD-R over rough openings and terminations.
Technical InformationConsult our Technical Services Department for specific recommendations concerning all other applications.Consult the Senergy website, www.senergy.basf.com, for additional information about products andsystems and for updated literature.ApplicationCorner Mesh:Install CORNER MESH at exterior corners. Apply mixed Base Coat to insulation board at outsidecorners. Immediately embed the CORNER MESH into the Base Coat by troweling from the corner,butt edges and avoid wrinkles. After Base Coat is dry and hard, apply a layer of FLEXGUARD 4,INTERMEDIATE 6 or 12 Reinforcing Mesh over the entire surface of the CORNER MESH.Flexguard 4, Intermediate 6 and 12 Reinforcing Meshes:Fully embed clean mesh into wet base coat and smooth with a trowel so as to achieve meshembedment with no mesh color visible. Double layers of FLEXGUARD 4 and INTERMEDIATE 6 meshmust be applied at all inside and outside corners. Window corners also require secondaryreinforcement as per details. Lap Reinforcing Mesh 64 mm (2 1/2") minimum at edges.Strong 15 and Hi-impact 20 Reinforcing Meshes:Embed STRONG 15 or HI-IMPACT 20 Reinforcing Mesh in wet base coat by troweling from the center tothe edges. Butt STRONG 15 or HI-IMPACT 20 Reinforcing Mesh at all adjoining edges, do not use tobackwrap or bend around corners. Butt STRONG 15 or HI-IMPACT 20 Reinforcing Mesh at adjoiningedges of CORNER MESH. Ensure Reinforcing Mesh is free of wrinkles and embedded in Base Coat sothat no Reinforcing Mesh color is visible. After Base Coat with embedded Reinforcing Mesh is dry andhard (normally 8 to 10 hours), apply a layer of FLEXGUARD 4 or INTERMEDIATE 6 Reinforcing Mesh overthe entire surface to achieve total nominal Base Coat/Reinforcing Mesh thickness of 2.4 mm (3/32").
DescriptionBalanced, open-weave glass,fiber reinforcing mesh, twistedmulti-end strands treated forcompatibility with SenergyBase Coats. A variety ofReinforcing Mesh types areavailable to meet the differentrequirements of impactresistance at specific walllocations. Senergy SELF-ADHERING MESH TAPE, inaddition to having the sameproperties as described above,is coated with a pressuresensitive adhesive.
ColorSenergy meshes are white,except 4" and 9" SHEATHINGFABRIC which are gray.
Features Benefits
Alkali resistance, compatibility Maintains tensile strength and flexibility forwith all Senergy Base Coats long-term durability
Senergy SELF-ADHERING MESH Simplifies and speeds application ofTAPE SENERSHIELD Air/Weather Barrier
-
Self-Adhering Mesh Tape:Substrate shall be acceptable to BASF Wall Systems Substrate shall be dry, clean, sound and free of release agents, paint or othercontaminants. Verify that the substrate is flat, free of fins or anything that would hinder adhesion of the mesh. Unsatisfactory conditionsshall be reported to the general contractor and corrected before application of the Senergy Wall System. Senergy SELF- ADHERING MESHTAPE may be applied direct from the roll. Center the mesh over the area to be reinforced. Firmly press the mesh onto the surface whileunrolling. Avoid creating wrinkles and fish-mouths. If they occur cut out the area with a utility knife and re-apply. Overlap Senergy SELF-ADHERING MESH TAPE a minimum of 65 mm (2 1/2"). Cover SELF-ADHERING MESH TAPE with a layer of SENERSHIELD.4", 9" Sheathing Fabric:Apply mixed SENERSHIELD-R at all sheathing, joints, terminations, inside and outside corners and rough openings. Immediately place andcenter 4" or 9" SHEATHING FABRIC over wet SENERSHIELD-R outside corners and rough openings. Ensure fabric extends evenly on bothsides of the sheathing joint. Lap mesh 63.5 mm (2 1/2") minimum at intersections. Allow to dry to the touch, before applying SENERSHIELD-Rto entire wall surface.
Limitations1. Protect Senergy Reinforcing Mesh during transportation and installation to avoid physical damage.2. Store Senergy Reinforcing Mesh in a cool, dry place protected from exposure to moisture.3. See Senergy Specifications and Details for complete information on installation of Senergy Wall Systems.4. Apply in temperatures of 4˚C (40˚F) and higher.
Technical DataASTM E 695 impact resistance:No cracks in the exterior insulation and finish system from a drop height of 1.83 m (6'). Maximum indentation did not exceed 8.5 mm (0.33").EIMA impact standard 101.86:FLEXGUARD 4/Standard Base Coat Standard Impact Resistance [2.8–5.6 J (25–49 inch-lbs)]INTERMEDIATE 6/Standard Base Coat Standard Impact Resistance [2.8–5.6 J (25–49 inch-lbs)]INTERMEDIATE 12/Standard Base Coat Medium Impact Resistance [5.7–10.1 J (50–89 inch-lbs)]INTERMEDIATE 12 & FLEXGUARD 4/Standard Base Coat High Impact Resistance [10.2–17.0 J (90–150 inch-lbs)]STRONG 15 & FLEXGUARD 4/Standard Base Coat Ultra High Impact Resistance [over 17.0 J (150 inch-lbs)]HI-IMPACT 20 & FLEXGUARD 4/Standard Base Coat Ultra High Impact Resistance [over 17.0 J (150 inch-lbs)]Dade county protocol 201 impact tests (large and small missile):Passed with various wall assemblies. See Technical Bulletin, 1017674 EIFS and Coatings Tests Results, for details.Flexguard 4 Reinforcing Mesh:A single-layer application of FLEXGUARD 4 provides reinforcement for wall system areas not expected to receive abnormal abuse or traffic.Weave: LenoWeight: 142 g/m2 (4.2 oz/yd2) +/- 5%Fabric Count: 6 x 5Packaging: 96.5 cm x 45.7 m (38" x 150') roll: 475 sf - 44.1 m2
9" Starter rolls: 24.1 cm x 45.7 m (9" x 150'): 112.5 sf - 11.0 m2
122 cm (48" width): 600 sf - 5.58 m2
183 cm (72" width): 900 sf - 8.36 m2
244 cm (96" width): 1200 sf - 111.51m2
Intermediate 6 Reinforcing Mesh:A single-layer application of INTERMEDIATE 6 provides reinforcement for wall system areas not expected to receive abnormal abuse or traffic.Weave: LenoWeight: 190 g/m2 (5.6 oz/yd2) +/- 5%Fabric Count: 6 x 5Packaging: 96.5 cm x 45.7 m (38" x 150') roll: 475 sf - 44.1 m2
Intermediate 12 Reinforcing Mesh:A versatile, intermediate weight mesh. While capable of being used for a complete single-layer application, INTERMEDIATE 12 is oftenused in conjunction with FLEXGUARD 4 or INTERMEDIATE 6 to offer added impact resistance at specific areas (i.e. around doors or walkways).Weave: LenoWeight 373 g/m2 (11 oz/yd2) +/- 5%Fabric Count: 16 x 12Packaging: 96.5 cm x 22.8 m (38" x 75') roll: 237.5 sf - 22.1 m2
Senergy® Reinforcing Mesh
lawrenceHighlight
lawrenceHighlight
lawrenceHighlight
lawrenceHighlight
lawrenceLine
lawrenceLine
lawrenceLine
-
Strong 15 Reinforcing Mesh:A medium/heavy-weight mesh intended for areas expected to receive traffic and abuse. STRONG 15 has special installationprocedures including:1. Edges are butted (not overlapped).2. STRONG 15 cannot be used for backwrapping and will not bend around corners.3. An application of STRONG 15 requires a continuous and lapped FLEXGUARD 4 or INTERMEDIATE 6 application as an overlay.Weave: Hurl LenoWeight: 508 g/m2 (15 oz/yd2) + 5%Fabric Count: 4 x 4Packaging: 96.5 cm x 22.8 m (38" x 75') roll: 237.5 sf - 22.1 m2
Hi-impact 20 Reinforcing Mesh:A heavy-weight mesh intended for areas expected to receive a high degree of traffic and abuse. HI-IMPACT 20 has special installationprocedures including:1. Edges are butted (not overlapped).2. HI-IMPACT 20 cannot be used for backwrapping and will not bend around corners.3. An application of HI-IMPACT 20 requires a continuous and lapped FLEXGUARD 4 or INTERMEDIATE 6 application as an overlay.Weave: Hurl LenoWeight: 675 g/m2 (20.0 oz/yd2) +/- 5%Fabric Count: 4 x 3Packaging: 99.0 cm x 22.8 m (39" x 75') roll: 243.75 sf - 22.6 m2
Corner Mesh:An intermediate-weight mesh for use at exterior corners when added impact resistance or clean, crisp corners are desired. CORNERMESH is pre-marked for easy bending. An overlay of FLEXGUARD 4, INTERMEDIATE 6 or 12 is required when CORNER MESH is used.Weave: Plain or HurlWeight: 304 g/m2 (9.0 oz/yd2) +/- 5%Fabric Count: 12 x 4Packaging: 22.9 cm x 45.7 m (9" x 150') roll: 112.5 sf - 10.47 m2
Self-Adhering Reinforcing Mesh Tape:A standard weight mesh coated with a pressure sensitive adhesive and used with SENERSHIELD air/ moisture barrier as reinforcementover acceptable sheathing joints, rough openings and at terminations.Weave: LenoWeight: 169 g/m2 (5 oz/yd2) +/- 10%Packaging: 4" Rolls: 10.2 cm x 45.7 m (4" x 150'): 50 sf - 4.66 m2
9" Rolls: 22.9 cm x 45.7 m (9" x 150'): 112.5 sf - 10.47 m2
4", 9" Sheathing Fabric:4", 9" SHEATHING FABRIC is used with SENERSHIELD-R air/moisture barrier as reinforcement over acceptable sheathing joints, roughopenings and at terminations.Packaging: 4" SHEATHING FABRIC: 10.2 cm x 54.8 m (4" x 180 ft ) roll: 60 sf - 5.59 m2
9" SHEATHING FABRIC: 22.9 cm x 54.8 m (9" x 180 ft ) roll: 135 sf - 12.55 m2
lawrenceLine
lawrenceHighlight
-
NoteBASF Wall Systems is an operating unit ofBASF Construction Chemicals, LLC. (hereinafter referred to as “BASF Wall Systems”)
Residential PolicyApply walls systems in accordance withlocal building codes in force at the timeof construction. On one and two-familyresidential framed construction, BASF WallSystems requires that the wall systemselected be one that includes provisionsfor moisture drainage. Please view theSenergy Residential Policy Bulletin on theSenergy website for a more detaileddiscussion of this topic.
DisclaimerThis information and all further technicaladvice are based on BASF Wall Systems’present knowledge and experience.However, BASF assumes no liability forproviding such information and adviceincluding the extent to which suchinformation and advice may relate toexisting third party intellectual propertyrights, especially patent rights. In particular,BASF Wall Systems disclaims any and allCONDITIONS AND WARRANTIES, WHETHEREXPRESS OR IMPLIED, INCLUDING THEIMPLIED WARRANTIES OF FITNESS FORA PARTICULAR PURPOSE ORMERCHANTABILITY. BASF WALL SYSTEMSSHALL NOT BE RESPONSIBLE FORCONSEQUENTIAL, INDIRECT OR INCIDENTALDAMAGES (INCLUDING LOSS OF PROFITS)OF ANY KIND. BASF Wall Systems reservesthe right to make any changes accordingto technological progress or furtherdevelopments. It is the customer’sresponsibility and obligation to carefullyinspect and test any incoming goods.Performance of the product(s) describedherein should be verified by testing andcarried out only by qualified experts. It isthe sole responsibility of the customer tocarry out and arrange for any such testing.Reference to trade names used by othercompanies is neither a recommendation,nor an endorsement of any product anddoes not imply that similar products couldnot be used.
BASF Wall Systems3550 St. Johns Bluff Road SouthJacksonville, FL 32224-2614Phone 800 • 221 • 9255Fax 904 • 996 • 6300www.senergy.basf.com
©2009 BASF Construction Chemicals, LLC.Printed in U.S.A. 08/09
Senergy® Reinforcing Mesh
-
1. Typical Channeled Adhesive
2. Typical Application
3. Typical Application over CMU
4. Typical Application over Brick
5. Typical Aesthetic Reveal
6. Typical Corner Mesh Application with Flexguard 4,Intermediate 6 or 12
7. Typical Pipe Penetration
8. Typical Light Fixture
9. Typical Expansion Joint
10. Typical Expansion Joint at Change in Substrate
11. Typical Expansion Joint at Floorline
12. Typical Drainage at Floorline
13. Typical EIFS Abutment to Brick with Drainage at Floorline
14. Typical Termination at Foundation
15. Typical EIFS Abutment to Brick
16. Typical Termination at Foundation (Flush)
17. Typical Window Head (Flush)
18. Typical Window Head with Weep Tubes (Flush)
19. Typical Window Head with Diverter Track (Flush)
20. Typical Window Head (Recessed)
21. Typical Window Jamb (Flush)
22. Typical Window Sill (Flush)
23. Typical Window Jamb (Recessed)
24. Typical Window Sill (Recessed)
25. Typical Coping
26. Typical Parapet Cap
27. Typical Kick-Out Flashing
28. Typical Roof Edge Flashing
29. Typical Section at Fascia/Soffit
30. Typical Core Mounted Railing Attachment
31. Typical Railing Attachment
32. Typical Sign Attachment
Typical Details
Senerflex® Channeled Adhesive DesignWater Drainage Class PB Exterior Insulation and Finish System
-
Notes:• Verify all materials are installed in accordance
with current installation instructions.• Apply mixed base coat to entire surface of
insulation board using a stainless steel trowel with13 mm x 13 mm (1/2" x 1/2") notches spaced50 mm (2") apart. Ribbons of adhesive must beapplied parallel to the 610 mm (2’) dimension ofthe EPS insulation board to ensure they are verticalwhen the EPS insulation board is applied to thesubstrate.
• Set EPS insulation board into place and applypressure over entire surface of board toensure positive uniform contact and high initialgrab. Do not slide board into place.
TYPICAL CHANNELED ADHESIVE
TYPICAL APPLICATION
CA-01 0111
CA-02 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Ensure a means for drainage is provided at
system termination.
-
TYPICAL APPLICATION OVER CMU
TYPICAL APPLICATION OVER BRICK
CA-03 0111
CA-04 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Ensure a means for drainage is provided at
system termination.
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Ensure a means for drainage is provided at
system termination.
-
Notes:• Verify all materials are installed in accordance
with current installation instructions.• Maintain a minimum 19 mm (¾”) thick EPS
insulation board behind all reveals & aestheticgrooves.
• Reinforcing mesh shall be continuous and careshall be taken to ensure reinforcing mesh is notcut during base coat application.
• Horizontal reveals shall provide for outwardpositive drainage.
• Reveals must not occur at the abutment of twopieces of EPS insulation board.
TYPICAL AESTHETIC REVEAL
TYPICAL CORNER MESH APPLICATIONWITH FLEXGUARD 4, INTERMEDIATE 6 OR 12
CA-05 0111
CA-06 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• Ensure Flexguard 4, Intermediate 6 or 12
reinforcing mesh is lapped a minimum of 203 mm(8”) around corners.
-
TYPICAL PIPE PENETRATION
TYPICAL LIGHT FIXTURE
CA-07 0111
CA-08 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced basecoat.• Ensure all penetrations into the system are
properly sealed.• Provide continuous air seal around perimeter
of penetration prior to EPS insulation boardapplication.
• Do not apply finish to areas that will receivesealant.
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Ensure all penetrations into the system are
properly sealed.
-
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Do not apply finish to areas that will receive
sealant.• Ensure drainage plane is continuous and
unobstructed at expansion joint.• Install expansion joints in the system at all
changes in substrate, through existing expansionjoints, floor lines in multi-levelwood frameconstruction, and where movement isanticipated. It is the sole responsibility of thedesign professional to determine specificexpansion joint location, placement and design.
TYPICAL EXPANSION JOINT
TYPICAL EXPANSION JOINT AT CHANGEIN SUBSTRATE
CA-09 0111
CA-10 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Do not apply finish to areas that will receive
sealant.• Ensure drainage plane is continuous and
unobstructed at expansion joint.• Install expansion joints in the system at all
changes in substrate, through existing expansionjoints, floor lines in multilevel wood frameconstruction, and where movement is anticipated.It is the sole responsibility of the design professionalto determine specific expansion joint location,placement and design.
-
TYPICAL EXPANSION JOINT AT FLOORLINE
TYPICAL DRAINAGE AT FLOORLINE
CA-11 0111
CA-12 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Do not apply finish to areas that will receive
sealant.• Install expansion joints in the system at all
changes in substrate, through existing expansionjoints, floor lines in multilevel wood frameconstruction, and where movement isanticipated. It is the sole responsibility of thedesign professional to determine specificexpansion joint location, placement and design.
• It is recommended that a means for drainage isprovided at every third floor. (See Detail 12)
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Do not apply finish to areas that will receive
sealant.• Install expansion joints in the system at all
changes in substrate, through existing expansionjoints, floor lines in multilevel wood frameconstruction, and where movement is anticipated.It is the sole responsibility of the design professionalto determine specific expansion joint location,placement and design.
• It is recommended that a means for drainage isprovided at every third floor.
-
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mesh reinforced base coat.• Ensure a means for drainage is provided at
system termination at brick.• Brick ties not shown for clarity.• Brick must be installed per local code requirements.
TYPICAL EIFS ABUTMENT TO BRICKWITH DRAINAGE AT FLOORLINE
TYPICAL TERMINATION AT FOUNDATION
CA-13 0111
CA-14 0111
Notes:• Verify all materials are installed in accordance
with current installation instructions.• All terminations must be fully encapsulated with
mes