Supporting ServicesPhoto Gallery

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Billingsley Elementary School

Dr. Samuel A. Mudd Elementary School

Dr. Samuel A. Mudd Elementary School

Dr. Samuel A. Mudd Elementary School

Arthur Middleton Elementary SchoolOpen Space Enclosure

Arthur Middleton Elementary SchoolOpen Space Enclosure

Arthur Middleton Elementary SchoolOpen Space Enclosure

Dr. James Craik Elementary School Full Day Kindergarten Addition

Dr. James Craik Elementary School Full Day Kindergarten Addition

Berry Elementary SchoolFull Day Kindergarten Addition

Berry Elementary SchoolFull Day Kindergarten Addition

Daniel of St. Thomas Jenifer Elementary SchoolSite Improvements

Pre-K to 2nd Grade 3rd to 5th

Daniel of St. Thomas Jenifer Elementary SchoolSite Improvements

Paving and Concrete Repairs

Paving and Concrete Repairs

John Hanson Middle SchoolStorm Drainage & Flood Protection

The school has a long history of standing

water at the east end of the classroom

wing. That particular area of the school

is 2-feet below grade resulting in an

increased concern for storm drainage and

flooding. During the late 1990’s the

Director of Maintenance & Operations

implemented a French drain to alleviate

the ponding. Over the years the French

drain clogged and there was a concern for

soil saturation and overflow. Due to the

recent flooding during a 3”- 4” rain event,

the Office of Supporting Services took a

new long term solution by adding a

concrete swale with positive drainage

path away from the building reducing

concerns for both ponding and flooding

but also, a reduction in subterranean

water against the classroom space below

the ground level.

John Hanson Middle SchoolStorm Drainage & Flood Protection

CCPS has a contractor

completing some other

drainage work on site

and they quickly

mobilized to install a new

concrete swale with

positive drainage. This

solution moves water

away from the doors and

foundations in this area.

The arrows depict the

areas where drainage

piping feeds to the area

(3 roof drains and play

asphalt from left).

Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.

Mattawoman Middle School

New Guided vestibule to admin.

Existing open access from entry doors

into school

Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.

Daniel of St. Thomas Jenifer Elementary School

New doorway from vestibule to admin.

New doorway from vestibule to admin.

Guided VestibulesVestibules to direct school visitors to Admin. area for proper check-in.

Arthur Middleton Elementary School

View of enclosed Admin. area with door allowing entry to main corridor

View of Admin. side with new guided entry door (main corridor is beyond right wall)