tea ecology
Post on 21-Nov-2014
8.759 Views
Preview:
DESCRIPTION
TRANSCRIPT
POWER PLANTuse waste from slaughterhouses.
without smoke and odors according to
EU regulations 1069/2009
Outward appearance of the power plant, according to EU Regulation 1069/2009
Power Plant - installation loaction
Outward appearance of the power plant,according to EU Regulation 1069/2009
Power Plant - installation loaction
Power Plant EKO 450
• adm. office• chimny• Heat exchangers• sec. chamber • primary tank 10m3• hidraulic system for loadnig waste• primary chamber
Power Plant EKO 450
Distribution system for hot water
Power Plant EKO 450
Control box
hatch / door for removing ash
Power Plant EKO 450
• heat exanger• sec. chamber• prim, tank 10m3• prim. chamber
Power Plant EKO 450
NEW MODELS
NEW MODELS
Poultra waste
Slaughterhouse waste - bones and intestines of cattle and pigs
EKO 450Power Plant with primary tank of 25m3
EKO 450Heat exchanger with sec. chimney
Power Plant work Primary chamber
EKO 250 Hydraulic system for opening the lock chamber and loading of waste
Hydraulic loading of wastePrimary chamberHydraulic loading
Waste in primary chamberPrimary chamber
Waste themselves on fire - work without burner
Waste themselves on fire - work without burner
Waste on fire - work with burne
Poultry wasteEKO 120
Poultry waste
On the farm
On the farm -2
On the farm -2
Incineration of poultry waste-primary chamberBurners in operation
Ashes - remains burning – bones waste first category
Graphic display temperature of power plant
Control box
Power plantheat exchanger Sec. chimny Sec chamber
EKO 250Control box napa hydraulic system
EKO 250Sloops, with slaughterhouse waste ready for loading in a power plant
EKO 250Automatic loading of waste
Working with power plant Automatic lifting, opening the primary chamber System for loading
Power Plant EKOUnloading waste
EKO 450 - assembly
Secondary tank 20m3Secondary tank 20m3
Export