tel-aviv metropolitan mass transit network may 2017 2 il.pdf · tel aviv metropolitan area 47% of...

Post on 26-May-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Tel-Aviv Metropolitan Mass Transit Network May 2017

2

Contents

• NTA

• Tel – Aviv metropolitan area

• The Red Line

• Future LRT lines

• Metro lines

3

NTA

4

NTA - Metropolitan Mass Transit System Ltd. , a government-owned company, appointed to promote the Tel Aviv

Metropolitan Area Mass Transit Network

NTA

August 2015

Construction begins on the Red Line project

2015

Red Line begins commercial operation

NTA – Time Line

2016

.

Governmental decision - implementation of the Green & Purple Lines

2021

.

5

6

Tel-Aviv metropolitan area

7

1,500 square kilometers

From Netanya in the north to Ashdod in the south

31 cities

22 local councils

12 regional councils

Tel Aviv Metropolitan Area

Approx. 3.4 million residents

44% of the population of the State of Israel

Tel Aviv Metropolitan Area

8

Tel Aviv Metropolitan Area

growth rate of Approx. 1% / year

4.4 million residents in the metropolitan area in 2030

5.1 million residents in the metropolitan area in 2040

9

Tel Aviv Metropolitan Area

47% of all people employed in Israel (approx. 1.0 million people) work within the metropolitan area

Every work day approx. 440,000 vehicles enter the metropolitan area.

An increase of 20,000 vehicles per year is expected

10

11

The Red Line

The Red Line - ID

Length: 24 KM; 12 KM U/G + 12 KM A/G

10 Underground stations24 At-Grade stations

‘Backbone’ of the Network: passes through the most congested regions of the

metropolitan area: Petah-Tikva, Bnei-Brak, Ramat-Gan, Tel-Aviv-Yafo and Bat-Yam

Frequency: 3 minutes in rush hour

Rolling Stock: Low Floor 90 Vehicles

Operation: October 2021

Expected Annual Ridership: 70 Million Passengers

12

The Red line Project management and design is carried out by international companies:

The project’s execution incorporates Israeli and international companies in JV’s:

Danya Sebus /CCECCSolel Boneh /CRTG CRC

Project Quality Assurance:

The Red Line

13

The Red Line Procurement Strategy

Red Line Project

S&TCTrack,

Power & Comm.

Main

Packag

es

Rolling Stock

Portals & TBM

O&MDepot

Under Procurement

At Grade Civil

Works

14

Completed / Ongoing Tenders

15

Future LRT lines

16

The Green Line - ID

Underground: 4.5 km, 4 stations

Estimated cost: 20 billion NIS

At-grade: 34.5 km, 59 stations

17

The Purple Line - ID

40 stations

Estimated cost: 8.6 billion NIS

At-grade: 30 km

18

The Brown Line - ID

45 stations

At-grade: 32 km

19

Mass Transit System - 2024

The Green and purple Lines Procurement Strategy

Design of INFRA 2

Design of INFRA 1

PMCSegments

PMC (construction)

Under ProcurementOngoing Tenders

20

21

Metro Lines

The Metro Lines

NTA is promoting preparation for detailed feasibility study report for the development of a high-capacity metro rail system in the Tel Aviv Metropolitan Area.

The purpose of the study is to initiate the development of three metro lines that will provide a safe, efficient and environmentally sustainable transport network as a complement to the existing one.