thailand implementation of cns/atm infrastructure thailand

Post on 14-Dec-2015

253 Views

Category:

Documents

4 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Thailand Implementation of CNS/ATM Infrastructure

Thailand

Communication Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

• Continental– VHF, SATCOM (backup)

• Oceanic– VHF, CPDLC, SATCOM

Navigation Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

Thailand National Working Group on PBN & GNSS Implementation consists of representatives from:

- DCA Thailand

- Airlines

- Thai Pilot Association

- Aeronautical Radio of Thailand

Navigation Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

• Transition between pre-PBN RNAV & RNP-10 routes to PBN RNAV-5 and RNAV-10 routes

• Assessing possibility for new PBN routes

Navigation Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

Implementation activities start Terminal Areas/Approach

Q1/FY2008 Phuket

Q1/FY2008 Krabi

Q3/FY2008 Suvarnabhumi

Q3/FY2008 Don Mueang

Q1/FY2009 Hat Yai

Q1/FY2009 Samui

Q1/FY2009 Khon Kaen

Q3/FY2009 Chiang Mai

Q3/FY2009 Mae Hong Sorn

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

Surveillance Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

• Full surveillance coverage• Joint use of civil-military

surveillance infrastructure• Transition towards SSR

Mode-S and ADS-B

Surveillance Infrastructure

Makati City The Philippines 2008

30th APEC Transportation Working Group Meeting

• 22 ADS-B Ground Stations being deployed– cover all BKK FIR

top related