the belmont village revitalization project · 4/11/2012  · how did we get to this point? belmont...

Post on 12-Oct-2020

2 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

The Belmont Village Revitalization The Belmont Village Revitalization ProjectProject

Preferred OptionPreferred OptionPublic  Informational MeetingWednesday, April 11, 2012Corner Meeting House, Belmont, NH

Where We Are In The ProcessWhere We Are In The ProcessBelmont Village Revitalization Project

Advertise First Phase of Project for Bid

Present Final Preferred Design to Town

WE ARE HERE

April 2012

April 2012

3rd Public PresentationPresent Preferred Design

2nd Public Presentation Revised Design

April 2012

Design

Advance Design

February 2012

December January

First Public Presentation

Village Revitalization Committee Explore Feasibility of Ideas November 2011

December 15, 2011

Past Studies2006-2010

How Did We Get To This Point?How Did We Get To This Point?Belmont Village Revitalization Project

On December 15, 2011, our team presented several On December 15, 2011, our team presented several ppconcepts for the downtown village area. concepts for the downtown village area.

Funding Funding –– Grant applicationsGrant applicationsU d di h d ili iU d di h d ili i M i h ili iM i h ili i Undergrounding over head utilities Undergrounding over head utilities –– Met with utilitiesMet with utilities

Meeting with NHDOTMeeting with NHDOT-- Discuss Intersection improvement Discuss Intersection improvement optionsoptionsoptionsoptions

Plan refinementPlan refinement On February 22, our team presented refined options On February 22, our team presented refined options yy

based on Public inputbased on Public input On March 21, our team met with the revitalization On March 21, our team met with the revitalization

committee to present the final preferred optioncommittee to present the final preferred optioncommittee to present the final preferred option.committee to present the final preferred option.

Belmont Village Revitalization Project

Lighting:

Existing Pole Fixture

Sternberg - CARSON CITY - 1843LED

Belmont Village Revitalization Project

Benches &

TrashTrash

Receptacles:

Victor Stanley

Victor Stanley - Model CR-138: Classic Series

Victor Stanley -Model ES-242

Victor Stanley-Model CR-5: Cl i S iClassic Series

Belmont Village Revitalization Project

Bike Racks:

Dero “Bike” Bike Rack

Belmont Village Revitalization Project

Crossings/

SidewalksSidewalks

Streetprint – Manchester, NH –14 year photos

Streetprint14 year photos

Belmont Village Revitalization Project

Trees

•Red Maples

•Kwansan Cherry

•Japanese Lilac Tree

•Columnar Maple

•Summit Ash

Lilac Tree

Maple

Belmont Village Revitalization Project

Shrubs•Spiraea

•Carpet RosesCarpet Roses

•Hydrangea

•Red Maples

•Andorra Juniper

•Compact Pfitzer

•Summit Ash

Pfitzer

•Ever-low Yew

Belmont Village Revitalization Project

Perennials •Day Lilies

•Sedum

•Salvia

•Brown Eyed Susan

•Echinacea

Belmont Village Revitalization Project

Memorial Park Relocated:

Belmont Village Revitalization Project

Belmont Village Revitalization Project

Belmont Village Revitalization Project

Directory/

Way Finding:

Belmont Village Revitalization Project

Gateway Sign:

top related