theater opening syndicate

Post on 31-Dec-2015

36 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Theater Opening Syndicate. Syndicate leaders – LTC Looney / MAJ Toompalu / Responsibilities :. Provide input to the exercise plan Determine movement costs for exercise execution Draft transportation and movement concept Draft manning document to support theater opening - PowerPoint PPT Presentation

TRANSCRIPT

STRONG SOLDIERS, STRONG TEAMS!

UNCLASSIFIED

As of 11 SEP 11SbS 12 IPC In BriefUNCLASSIFIED

• Provide input to the exercise plan• Determine movement costs for exercise execution• Draft transportation and movement concept • Draft manning document to support theater opening• Draft theater opening specific life support requirements • Develop base operations plan for theater opening exercise locations• Draft command and control structure for Theater Opening Joint Task Force• Draft a synchronized Procurement Strategy with NAVEUR/MARFOREUR

contracting assets • Develop initial equipment listing• Determine mode/source of exercise cargo based on available budget and

timeline• Publish initial timeline for decision points and requirements submission• Confirm TO specific site survey requirements and timeline

1

Theater Opening SyndicateSyndicate leaders – LTC Looney / MAJ Toompalu /

Responsibilities:

top related