time meeting: agenda

Post on 20-Mar-2016

40 Views

Category:

Documents

1 Downloads

Preview:

Click to see full reader

DESCRIPTION

Time Meeting: Agenda. Safety Budget News Schedule: Past, Present and Future RHIC and Experiments Reports Machine and Systems Reports AOB. Safety. Take 5 for Safety………….. Ed Lessard. Schedule: Future. Budget News…….. Derek Lowenstein. Schedule: Past. - PowerPoint PPT Presentation

TRANSCRIPT

SafetyBudget NewsSchedule: Past, Present and

FutureRHIC and Experiments ReportsMachine and Systems ReportsAOB

Take 5 for Safety…………..Ed Lessard

Budget News…….. Derek Lowenstein

Vacuum problems: L05 J17 I17 sprung a leak this week. Likely due to Gold beam striking the flange weld.

Changing (again) the way we do business with Gold in the AGS and Booster.

APEX is scheduled for tonight Tuesday 18 Dec 2007, beginning at 9:00PM finishing by 8:00AM tomorrow.

Maintenance Day follows APEX, with Injectors OFF at 7:00AM and beam restored to RHIC beginning at 4:00PM.

C-AD Holiday Open House tomorrow from 9:00-10:30.

Next maintenance day set for 2 Jan 2008, immediately preceded by an APEX shift.

Continue to push to improve delivered beam Decreasing Deuteron background in PHENIX. Decreasing ALL backgrounds in STAR.

RHIC………………………….…….Kip Gardner STAR...................................Jim Sowinski PHENIX.................................Mike Leitch MonoPole…............Vasily Dzhordzhadze BLIP…………………….…..Leonard Mausner Operations…………………………Fulvia Pilat IPMs……..……..……………..Roger Connolly

Operations………….…...Peter Ingrassia Sources...............................Jim Alessi Booster and AGS...............Leif Ahrens Maintenance………….…Paul Sampson Beam Lines…………………..Al Pendzick Instrumentation……...……..Tom Russo

Vacuum..........................Mike Mapes Cryogenics…………..Andy Warkentien Power………………………Jon Sandberg RF................................Alex Zaltsman Controls...........................John Morris Access Controls……….Jonathan Reich RCF………………………....Michael Ernst

top related