tour rio grande, project - new mexico state universitysmiley.nmsu.edu/pdnwc/docs/tour_pics for...

Post on 02-Jun-2020

3 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Watershed Tour of Rio Grande, 319(h) Project

Hilary Brinegar (NMDA) and Chris Canavan (NMED) explaining the 319(h) process.

Gary Esslinger summarizing  Elephant Butte Irrigation District programs.

Dr. Phil King describing flows in Rio Grande and water quality.

Stop 1.  Tributary inflows to the Rio Grande discussion.

Stop 2.  Broad Canyon Floodplain Restoration on Rio Grande.

Stop 3.  Dr. Phil King describing the Selden Test Bed Site.

Stop 3.  Selden Test Bed Site – objective to slow down water flow.

Stop 4.  Daniel Borunda (IBWC) describing future wetland site to slow water to river.

Stop 5.  Peter Bennett (City of Las Cruces) describes the city’s plans to reduce pollution to river.

Stop 5.  CLC plan to reduce nonpoint pollution in the Rio Grande.

Stop 5.  Michael Montoya (NMED) discussing septic tank concerns.

319 (h) grants provide resources for solving water quality problems through regional collaboration.

top related