Update of Booster Alignment & Magnet Moves August 21, 2013 Bill Marsh, Bill Pellico , Kiyomi Seiya, Dean Still, Kent Triplett Alex Waller. Status Moved four magnets at L16 Aperture scan and orbit measurements before and after move. - PowerPoint PPT Presentation

TRANSCRIPT

Update of Booster Alignment & Magnet Moves

August 21, 2013

Bill Marsh, Bill Pellico, Kiyomi Seiya, Dean Still, Kent Triplett Alex Waller

Status

Moved four magnets at L16

Aperture scan and orbit measurements before and after move.

Applications for aperture scan, B75 and Java. (A. Waller)

Aperture scan at period 5 -24. (Operation)

Orbit smooth at 7 break points with B80. (W. Marsh, K. Triplett)

-0.004

-0.002

0

0.002

0.004

1 1.5 2 2.5 3

1.5 2 2.5 3 3.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

3 3.5 4 4.5 5

3.5 4 4.5 5 5.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

5 5.5 6 6.5 7

5.5 6 6.5 7 7.5

perood #

MAD per iod #

-0.004

-0.002

0

0.002

0.004

7 7.5 8 8.5 9

7.5 8 8.5 9 9.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

9 9.5 10 10.5 11

9.5 10 10.5 11 11.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

11 11.5 12 12.5 13

11.5 12 12.5 13 13.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

13 13.5 14 14.5 15

13.5 14 14.5 15 15.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

15 15.5 16 16.5 17

15.5 16 16.5 17 17.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

17 17.5 18 18.5 19

17.5 18 18.5 19 19.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

19 19.5 20 20.5 21

19.5 20 20.5 21 21.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

21 21.5 22 22.5 23

21.5 22 22.5 23 23.5

perood #

MAD period #

-0.004

-0.002

0

0.002

0.004

23 23.5 24 24.5 25

23.5 24 24.5 25 25.5

perood #

MAD period #

#1D F F D D F F D

#2 #3D F F D D F F D

#4 #5D F F D D F F D

#6 #7D F F D D F F D

#8 #9D F F D D F F D

#10 #11D F F D D F F D

#12

#13D F F D D F F D

#14 #15D F F D D F F D

#16 #17D F F D D F F D

#18 #19D F F D D F F D

#20 #21D F F D D F F D

#22 #23D F F D D F F D

#24

+5mm

-5mm

0

+5mm

-5mm

0

1.3 mm

1.3 mm

Magnet move 4Four magnets were realigned on Aug. 6, 201315-3 upstream: 0mm 15-3 downstream: +0.6mm

15-4 upstream: +0.7mm 15-4 downstream: +1.3mm 16-1 upstream: -1.3mm 16-1 downstream: -1.3mm 16-2 upstream: -1.3mm 16-2 downstream: -1.3mm

Orbit difference before and after Move4 (simulation)

MAD

Magnet Move program

+/-0.6mm

Orbit difference before and after Move4 (measurement)

Vertical

Horizontal

+/-0.8mm

Aperture scan at L16

Before Move4 After Move4

-0.004

-0.002

0

0.002

0.004

14 14.5 15 15.5 16

-0.004

-0.002

0

0.002

0.004

16 16.5 17 17.5 18

-0.004

-0.002

0

0.002

0.004

18 18.5 19 19.5 20

-0.004

-0.002

0

0.002

0.004

20 20.5 21 21.5 22

-0.004

-0.002

0

0.002

0.004

22 22.5 23 23.5 24

-0.004

-0.002

0

0.002

0.004

24 24.5 25 25.5 26

Current vertical alignment at RF section (period 14 – 24)

Aperture plot and analysis on Java

Orbit at injection

August, 2013 April, 2012 ($19 operation cycle)

Orbit smooth with B80 at 7 break points

2.4msec 3.0msec

6.0msec 10msec

Orbit smooth at 7 break points (cont.)

20msec

35msec

32msec

Plan

Orbit smooth with new desired positions

Magnet move -Vertical: L11, L16

-Horizontal: next long shutdown