8/3/2019 updatedSTRUCTURE LIST2009
1/8
WORK ORDER NO. E6BBAS1
ACCOUNT NO. 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT
PROJECT / PLANT :CULION DIESEL POWER PLANT
LOCATION : SO. PILAPIL, CULION, PALAWAN
A.) WAREHOUSE :
Concrete and reinforced structure for storage of supplies/materials for Plant operation of Culion DPP.
Walls of concrete hollow blocks properly reinsforced with reinforcing bars. Both sides of walls are
finished with cement plaster.
The floor dimensions are 3.7m length and 3.24m width. Located in the front side are the entrance do
and window. Window is made of jalousy glass and aluminum casing attached to the wooden jamb.
Floor finish is by porous concrete cement surface buildup. The walls were painted white with latex
paint.
Roof truss is made of hard wood assembled trusses, with gauge 26 galvanized corrugated sheets us
in roofing.
The project is located in the extreme right side of the Power Plant lot area.
B.) REMARKS :
Date Completed :
Certified Correct :
Noted :
Republic of the Philippines
NATIONAL POWER CORPORATION
Culion Diesel Power Plant
STRUCTURE LIST REPORT
Manager, Palawan Area
A. R. ZABALA
Principal Engineer, Culion DPP
May 15, 2008
J. MO. D. OLLERAS
-
8/3/2019 updatedSTRUCTURE LIST2009
2/8
r
d
-
8/3/2019 updatedSTRUCTURE LIST2009
3/8
WORK ORDER NO. E6BAAS1
ACCOUNT NO. 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT
PROJECT / PLANT :CULION DIESEL POWER PLANT
LOCATION : SO. PILAPIL, CULION, PALAWAN
A.) MAINTENANCE WORKING SHED :
Concrete and reinforced structure used as workshop. Front side walls are open, with just about
1M from the floor of reinforced concrete walls. The front is open with steel frame serving as steel gate.
Floor area dimension is 7.70M x 3.6M.
All exposed surfaces of concrete hollow blocks were finished with cement plaster.
Floor finish is by porous concrete cement surface buildup with steel reinforcement.
Roof is made of hardwood trusses with galvanized corrugated sheet used as roofing.
The structure is adjacent and attached to one side of the Lube Oil Shed building.
B.) REMARKS :
Date Completed :
Certified Correct :
Noted :
Manager, Palawan Area
A. R. ZABALA
Principal Engineer, Culion DPP
J. MO. D. OLLERAS
Republic of the Philippines
NATIONAL POWER CORPORATION
Culion Diesel Power Plant
STRUCTURE LIST REPORT
October 19, 2008
-
8/3/2019 updatedSTRUCTURE LIST2009
4/8
-
8/3/2019 updatedSTRUCTURE LIST2009
5/8
WORK ORDER NO. E6BDAS1
ACCOUNT NO. 311/321/331/341/252/390 - STRUCTURES AND IMPROVEMENT
PROJECT / PLANT :CULION DIESEL POWER PLANT
LOCATION : SO. PILAPIL, CULION, PALAWAN
A.) LUBE OIL SHED :
Concrete and reinforced structure for storage of Lubricating Oil drummings of Culion DPP.
Walls of concrete hollow blocks properly reinsforced with reinforcing bars. Both sides of walls are
finished with cement plaster. The building structure is in between and is attached to the WarehouseBuilding and Maintenance Working Shed structure
The floor dimensions are 3.8 m length and 3.0 m width. The front side of the structure is fully open wi
steel gate frame.
Floor finish is by porous concrete cement surface buildup, and the walls are painted white with
latex paint/
Roof truss if made of hard wood assembled trusses, with gauge 26 galvanized corrugated sheet used
as roofing.
The project is located in the extreme right side of the Power Plant lot area.
B.) REMARKS :
Date Completed :
Certified Correct :
Noted :
Manager, Palawan Area
A. R. ZABALA
Principal Engineer, Culion DPP
J. MO. D. OLLERAS
Republic of the Philippines
NATIONAL POWER CORPORATION
Culion Diesel Power Plant
STRUCTURE LIST REPORT
October 19, 2008
-
8/3/2019 updatedSTRUCTURE LIST2009
6/8
h
-
8/3/2019 updatedSTRUCTURE LIST2009
7/8
WORK ORDER NO. E6CRAS1
ACCOUNT NO. 342 - FUEL HOLDERS, PRODUCERS AND ACCESSORIES
PROJECT / PLANT : CULION DIESEL POWER PLANT
LOCATION : SO. PILAPIL, CULION, PALAWAN
A.) VERY SLOW FLOW METER :
METER, Slow Flow Fuel Analog Registration in Liters,
Flange ends ;
Nominal Diameter : 1/2"
Fuel Feed Pressure : 15- 30 psi
Max. Temp. : 180 C
Nominal Flow Rate : 400 ltr / hr
Maximum Flow Rate : 600 ltr / hr
Minimal Flow Rate : 10 ltr / hr
Starting Flow Rate : 4 ltr / hr
Safety Filter Mesh Size : 0.400 mm
Dirt Filter Mesh Size : 0.250 mm
Volume of measuring Chamber : 12 m
Weight with Flanges PN 25 : Approx. 3.8 kg
Installed on Fuel Daytank of unit no. 2 Generator Set
B.) REMARKS :
Date Completed :
Certified Correct :
Noted :
Republic of the Philippines
NATIONAL POWER CORPORATION
Culion Diesel Power Plant
STRUCTURE LIST REPORT
Manager, Palawan Area
A. R. ZABALA
Principal Engineer, Culion DPP
J. MO. D. OLLERAS
July 11, 2008
-