vanderbilt energy: 15,000 20,000 25,000 30,000 35,000 40,000 45,000 18,708,842 kilowatt hours

Post on 03-Jan-2016

224 Views

Category:

Documents

0 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Vanderbilt Energy:Vanderbilt Energy:

15,000

20,000

25,000

30,000

35,000

40,000

45,000

18,708,842 Kilowatt Hours

18,708,842 Kilowatt Hours

T-8

T-12

Lighting Retrofit: “the low hanging fruit”Lighting Retrofit: “the low hanging fruit”

General Library:General Library:

Energy Conservation Efforts:

Lighting Retrofit & Control

Replacement of Rooftop Units

BAS Upgrade

Energy Conservation Efforts:

Lighting Retrofit & Control

Replacement of Rooftop Units

BAS Upgrade

KWH 7%

Tennis Center:Tennis Center:

Tennis Center:Tennis Center:

KWH 46%

fc

Student Recreation:Student Recreation:

300

350

400

450

500

550

BeforeAfter

Reduced lighting energy 71.8% from: 28,000 watts to 7,896 watts

Reduced lighting energy 71.8% from: 28,000 watts to 7,896 watts

Energy Conservation Efforts:

BAS-night setback implementation

BAS-variable air volume tuning

Energy Conservation Efforts:

BAS-night setback implementation

BAS-variable air volume tuning

Jacobs / FeatheringillJacobs / Featheringill

KWH 15%

Energy Conservation Efforts:

BAS-night setback implementation

BAS-variable air volume tuning

Energy Conservation Efforts:

BAS-night setback implementation

BAS-variable air volume tuning

KWH 26%

Buttrick Hall:Buttrick Hall:

Energy Conservation Efforts:

BAS-addition of DDC controls to the main HVAC infrastructure

Addition of variable speed drives to the AHU motors

Lighting Retrofit

Energy Conservation Efforts:

BAS-addition of DDC controls to the main HVAC infrastructure

Addition of variable speed drives to the AHU motors

Lighting Retrofit

OGSM:OGSM:

KWH 30%

Night SetbackNight Setback

On during the day

Off after hours

BHP2 =

3

BHP1

RPM2

RPM1

Variable Frequency DriveVariable Frequency Drive

40 HP reduced <10 HP40 HP reduced <10 HPOFF = 100% Energy SavingsOFF = 100% Energy Savings

60%

100%

High Efficiency Equipment

“Maglev” Bearings

High Efficiency Equipment

“Maglev” Bearings

Olin Hall……………… 4%

McGill………………… 19%

McTyeire…………….. 16%

Memorial Gym……… 10%

Kennedy /MRL……… 12%

Other Project Buildings:Other Project Buildings:

Energy Conservation Efforts:

Lighting Retrofit & Control

VFD Installations

Chiller Replacement

BAS Upgrade

Energy Conservation Efforts:

Lighting Retrofit & Control

VFD Installations

Chiller Replacement

BAS Upgrade

KWH

Vanderbilt Energy: February Comparison

17,500,000

18,000,000

18,500,000

19,000,000

19,500,000

20,000,000

20,500,000

21,000,000

21,500,000

22,000,000

22,500,000

Feb-07 Feb-08 Feb-09 Feb-10 Feb-11

KW

H

$0

$200,000

$400,000

$600,000

$800,000

$1,000,000

$1,200,000

$1,400,000

$1,600,000

$1,800,000

Co

st

,

Annual Energy Consumption Trend 15 Project Buildings Combined KWH

Annual Energy Consumption Trend 15 Project Buildings Combined KWH

34,828,261

32,691,607

30,378,677

29,403,742 29,376,866

26,000,00027,000,00028,000,00029,000,00030,000,00031,000,00032,000,00033,000,00034,000,00035,000,000

2007 2008 2009 2010 2011