victor lara_sample works
Post on 30-Mar-2016
218 Views
Preview:
DESCRIPTION
TRANSCRIPT
-
MOTIVATIONUtilize management and design strategies to tackle varying project typologies, densities, and site conditions throughout the spectrum of the design profession.
EXPERIENCEPROJECT MANAGER, Sprint Network Vision | Jeffrey Rome & Associates Mar 2011- Present (Newport Beach, CA)-Manage telecommunication upgrades for Sprint and AT&T markets ranging from California, Nevada, Wisconsin, and New York. As project manager, I maintain an open dialogue with facility/site acquisition managers to ensure that the scope of work for each project upgrade is satised from its initial stages to construction (ex. audit submission, zoning drawings, construction drawing, structural analyses) at a timely manner.
INTERN | AIA Pasadena & Foothill Chapter Aug 2010- Dec 2011 (Pasadena, CA) -Provide AIA Chapter with event graphics, such as event programs, yers, certicate design, etc, for local Design Awards, Installation Galas, and other chapter events. Serve as Executive Director Assistant with event planning/set-up from start to nish. Delegate tasks as recruiter and spokesperson for the chapter.
PRESIDENT | Cal Poly Pomona AIAS June 2009- June 2010 (Pomona, CA)-Promoted strong student/ faculty relations within the Architecture Department as student representative of the largest AIAS chapter of over 150 chapters. Managed a Board to recruit 233 AIAS members (all-time national record), fundraised to facilitate a series of educational workshops, tours, and conferences for over 500 architecture students. First in command to initiate Freedom By Design Program, a non-prot volunteer service for architecture students. Launched Cal Poly Pomonas rst Alumni Outreach Program in the architecture program.
INTERN ARCHITECT | Mythograph June - Sept 2008 (Claremont, CA)-Provided renderings/editing of presentation images for Serra Mesa-Kearny Mesa Library Education Space Project.
EDUCATIONCalifornia State Polytechnic University | Pomona, CA 2005-10 Bachelor of Architecture Degree, June 2010National Technical University of Athens | Athens, GR 2009 Francisco Bravo Medical Magnet High School | Los Angeles, CA 2001-05
SKILLSAutoCADArchiCAD
RhinocerosRivet
SketchUpArtlantis
Adobe Creative SuiteMicrosoft Ofce
ACHIEVEMENTSService Award |2010| presented by Department of Architecture | CPPKeynote Speaker |2009| presenter at Lecture Series: Tijuana Mexico | CPPInterim Exhibit | Fall 2008 | Winter 2008 | Spring 2008 | Winter 2009 | Fall 2009 | CPP
REFERRALSJeffrey Rome, AIA | Jeffrey Rome and Associates President | jlrome@aol.comJohn Luttrell, AIA | AIA Pasadena & Foothill Chapter 11 President | jbluttrell@yahoo.comJudith Sheine, AIA | Cal Poly ARCH Department Chair | jesheine@csupomona.eduIrma Ramirez | Cal Poly Pomona Professor | ieramirez@csupomona.edu
VICTOR LARA Assoc. AIA
ADDRESS4017 West Kent Avenue
Santa Ana, CA 92660
TEL 626.475.6388EMAIL victorlarajr@gmail.com
-
RHYTHMThis project consists of designing a pedestrian bridge to connect the second floor of Building 9 with the second floor of Building 17 and serve the significant pedestrian traffic between these two buildings. The de-sign must provide exterior pedestrian access between the bridge and the ground surface beneath it and have sufficient span and clearance to facili-tate fire truck access below the bridge.
It is also desirable that the bridge provides some sitting area for students to congregate between classes, a place for them to study and socialize, both on and below the new structure. The design must conform to all ap-plicable codes, and it is preferable that the bridge does not rely on either building for lateral or vertical support.
site map
project description
typology: system
R H Y T H MCOMMUNITY COMPLEX
-
3 bedroom unit
2 bedroom unit
live work unit
unit configuration: resident profile:number of units: 24 units: types: 3
density: 29 units per ace
-
RR
R
R
25 R
. @ 7
13/
64"
24 T.
@ 11
"
R
R
RR
R
RR
OP
EN
TO
AB
OV
E
OP
EN
TO
BE
LOW
STO
RA
GE
ELE
VATO
R
LIFT
ELE
VATO
R
DO
WN
TO
PA
RK
ING
RA
MP
DO
WN
TO
PA
RK
ING
+1.0
+0.0
+15.
0
+15.
0
+15.
0
+15.
0
+5.0
+1
5.0
+10.
0
OP
EN
TO
AB
OV
E
OP
EN
TO
A
BO
VE
OP
EN
TO
A
BO
VE
OP
EN
TO
A
BO
VE
OP
EN
TO
A
BO
VE
OP
EN
TO
A
BO
VE
OP
EN
TO
AB
OV
E
OPEN TO BELOW OPEN TO BELOW OPEN TO BELOW OP
EN
TO
BE
LOW
OPEN TO BELOW
OP
EN
TO
BE
LOW
OP
EN
TO
BE
LOW
BEDROOM
BATHROOMLIVING/ KITCHENLIVING/ KITCHEN
OFFICE/ LIVING
BEDROOMBEDROOM
BEDROOM BEDROOM
BEDROOMBEDROOM
MASTER BEDROOM
MASTER BEDROOM
GARAGE
GARAGE
BRIER AVESILVER LAKE BLVD.
1PLAZA LEVEL
1PL
longitudinal cut
-
OPEN TO BELOW
OP
EN
TO
B
ELO
WO
PE
N T
O
BE
LOW
OPEN TO BELOW
+35.
0
+35.
0
+35.
0+3
5.0
+30.
0
+25.
0
+25.
0
+25.
0
+25.
0
+15.
0
+20.
0+1
5.0
+35.
0+2
5.0
ELEVATOR
+45.
0
+15.
0
+15.
0+2
0.0
+45.
0
+35.
0+2
5.0
+25.
0
OP
EN
TO
A
BO
VE
OP
EN
TO
A
BO
VE
OPEN TO ABOVEOPEN TO ABOVE
OP
EN
TO
BE
LOW
OP
EN
TO
BE
LOW
OP
EN
TO
B
ELO
WO
PE
N T
O
BE
LOW
OP
EN
TO
B
ELO
W
OP
EN
TO
B
ELO
W
OP
EN
TO
B
ELO
W
OP
EN
TO
B
ELO
W
OP
EN
TO
B
ELO
W
OP
EN
TO
B
ELO
W
LIFT
ELE
VATO
R
ELEVATOR
+20.
0+1
5.0
+15.
0
+15.
0
+25.
0
+25.
0+2
5.0
+25.
0
+25.
0
+25.
0+2
5.0
+25.
0
SIL
VE
R L
AK
E B
LVD
.
BR
IER
AV
E.
SILVER LAKE BLVD.
EN
TRA
NC
E T
O
PAR
KIN
G
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
E
OP
EN
TO
AB
OV
EO
PE
N T
O A
BO
VE
ELE
VATO
R
UP
TO
PAR
KIN
G
ELE
VATO
R
MECHANICAL
+5.0
+4.0
+3.0
+2.0
+0.0
+2
.5
+5.0
+5.0
OFFICE/ LIVING
BEDROOMGARAGE
GARAGE
BEDROOM
LIVING/ KITCHENCONFERENCE ROOM
BEDROOMLIVING/ KITCHEN
LIVING/ KITCHEN
GLENDALE BLVD
2G
43
G
3PL
2PL
4PL
transverse cut
-
Tijuana, often seen as a tourist destination by Americans, is home to roughly over 1.4 million residents who arrive from poorer parts of the country in search of employment opportunity and hopes of entering the United States. Many people migrating to Tijuana for employment work in maquiladoras or assembly plants are sometimes forced to live in shacks adjacent or in close proxim-ity to the these plants because of lack of transportation. Tijuana is considered one of the fastest growing communities in Mexico with an average of 80,000 people moving annually (population growth of 6% annually) and roughly growing about 20,000 square meters daily. Over the next 20 years, Mexican towns near the American border are anticipated to gain an additional 13.5 mil-lion people. This saturation of new arrivals overwhelms the infra-structure of basic services and complicates the task of city plan-ning. In their eagerness for a place to stay, they become squatters, who invade the unoccupied hillsides, canyons, and riverbeds of no value to real estate speculators. Since 1984 Tijuana has been building on lands that were set aside for ecological conservation. It is estimated that half of the new arrivals to the city live in squat-ter communities, which are often overcrowded and have inad-equate infrastructure that are limited or have no access to clean water. In addition, they are often located on land that is geologi-cally hazardous, having a high risk of flooding and/or is located in close proximity to industrial zones and pollutants. Families live in dwellings made of wood pallets with walls of black tarpaper and cardboard. Generally, thousands of squatters live in shacks made of discarded materials and whatever they can find, such as tires, garage doors, signs, pallet racks, etc.
Tijuana redefines recycling. For instance, vehicles are recycled from their old California owners and reused in Tijuana. Tijuana survives thanks to the waste and second hand material of the United States. As Tijuana expands into the hilly terrain to the east, squatters have come up with elaborate systems to accommo-date for their placement of homes, such as utilizing tires packed with earth to create retaining walls. However, these dwellings frequently lack doors and windows. Since the most valuable property is located near the downtowns of the cities, squatters usually establish themselves on the outskirts of the cities. In a sense, they become owners over a plot of land until the city or a developer evicts them. However, Mexican laws says that an individual may take legal possession of a property after 5 years of peaceful occupation, therefore, many establish themselves with the hope that the legal owner will not discover them and expel them before time. When enough people arrive, they petition the city to bring in services, such as a line of electric-ity. Sometimes to survive, they have to illegally tap into the aque-duct that runs under their lands to supply water to their homes.
In conclusion, Tijuanas shantytowns should not be ignored or overlooked because of its harsh conditions of these settlements, but viewed as an opportunity to create a workable environment that uses recycled materials as a base for home construction.
Modular Entertainment/Work StationM.E.W.S.
-
Tijuana Settlementsproject description
Part I: Schematic Ideas from observational studyUsing the research and documentation of the sites and families you are work-ing with, each of you will develop 3 schematic design ideas for the most pressing problems of the house that you are working with. These design ideas are meant to have you be prepared to efficiently interact with the com-munity when the issues come up during your interview. Although we would like to hear from the community what their main issues are, you can direct the discussion with the community when the issues come up.
Part II: Dialogue Preparation: Conversing with the Corazon familiesStudents will visit and dialogue with families to develop and understanding of house performance and user satisfaction. Dialogues with the community will lead to the development of a design strategy. To prepare for this dialogue, you will develop a questionnaire consisting of 15 questions per team. Bring ques-tions to class for discussion.
Part III: Design DevelopmentAfter completing your dialogues with the community, you will continue devel-oping design ideas individually. Depending on what the ideas are, the issue being addressed, the scale of the project, the complexity, cost, etc. We will decide with the input of the community and of Corazon which interventions will be built. Ultimately, the building phase will be a team project.
-
NOTES1.Hay alguien en su familia que habla ingles?Does anyone in your family speak English?No, unfortunately no one in this family speaks English. However, some of them are learning English right now.
2.Que es lo que le mas gusta de su casa? Que es lo que menos le gusta de su casa?What do you like best about your house? What dont you like about it?There were no major complaints about the house from the family. While there is always room for improvement, they were not open to making any suggestions about the house specifically. The family did note, however, that the smaller storage loft above the kitchen was of particular use to them. Normally, they use the larger loft as stor-age also, because the whole family fits on the bottom floor, but when they have guests that stay for extended periods of time, they can organize all their storage into the smaller area to accommodate their visitors above.
3.Que tan siguido usted habla con sus familiares y amistades?How often do you spend time talking with friends and family members?Typically, most of the socialization happens on Sundays, because the husband works, and so does the mother in law. Mrs. Nunez has one son who is fourteen and lives with her in the Corazon home, and he goes to school. Since most of her time is occupied by household chores and helping with Corazon, Sundays are really the only day of the week that everyone can sit down and talk and relax. However, when family and friends have free time off of work, they come and visit me.
4. Que tan frequente tienen visitas? Se quedan con usted por la noche? Donde se quedan? En donde se entretienen? Tienen muchos amigos y famil-iares? Donde comen con ellos?How often do you have guests over? Do they often spend the night? Where do they stay? Where do you entertain? Do you ever have large gatherings? Where do people eat?The family typically has visitors over every eight to sixteen day period. Recently, her daughter has moved in with her for a month because the rent is too high for her and her children, and is currently sleeping in the loft area. Meanwhile, her other mother-in-law is oc-cupying the guesthouse. The daughter has four kids, so there are frequently children around the house with no real place to play. There is a guesthouse behind the Corazon house that is used on occasion, but in this situation, the family has cleared the loft area for their visi-
tors. The main gathering space is outside, to the side of the Corazon house and in front of the mother in laws house.
5. Cuantas horas del dia esta adentro de la casa? Cuanto tiempo toma afuera en el patio de la casa?How many hours do you spend inside in a day? How many outside? The family is usually inside their home until 4:00 pm. After 4:00pm, they spend their time outside until 6:00pm, where then they return inside to prepare dinner.
6. Donde estan mas agusto durante el dia y durante la noche?Where are you most comfortable being during the day and during the night? Depending on the weather conditions they decide where they rather spend their time indoors or outdoors. When the weather is hot they spend more time outside, and when its cold they stay inside.
7. En algun tiempo han tenido problemas con seguridad? Tienen miedo que alguien entre a su casa?Have you ever had a problem with security? Are you afraid that someone might break in? This family has never had a problem with security before, nor are they afraid that anyone will ever try to break in. She commented that when they leave things outside in the front yard, they find it in the exact same spot on the next day. Mrs. Nunez told us that the neighbors are friendly and tend to look out for one another.
8. Que proposito tiene la pared de frente de su casa? Quien la con-struyo? Le gusta? Usan el espacio entre la cerca y la casa segido?What is the purpose of the wall in front of your house? Who built it? Do you like it? Do you use the space between the fence and house often? My husband helped build the wall. The wall functions for privacy. We are thinking about extending the house for-ward. Her husband started building a CMU block wall in front of the house, but they ran out of money to finish, so they have an interim wood paneled fence. They still have rebar set up so that they can continue the CMU wall when more money comes in. Aside from retaining dirt, it serves them for privacy from the street. They plan on using the space in between the wall and the Corazon home for future expan-sion. They would like to construct a bathroom or increasing the size of the kitchen at a later time.
9. Como se siente acerca de las plantas? Como las riegan? Toman mucho tiempo cuidando las plantas?How do you feel about plants? How do you water them? Do you spend a lot of time taking care of them?
-
the water runs down the middle of the driveway and down the south side of the house.
15. Como un dia tipico para ustedes?How do you spend a typical day? The following list are Mrs. Nunez every day activities (starting form the morning to the later evening):o Wake upo Fix rooms (clean)o Prepare foodo Water plantso Works for Corazon when they have meetings/activities (ex. look-ing after kids)
16. Que tan importante es mantener el espacio de estasionamiento?How important is it to maintain the driveway space? The space for parking is not that important. Guest have the option of parking on the side of the road. The space is more important for social gatherings.
17. Que es lo que hace con la agua usada de los trastes y del bano?What do you do with the used water for dishes/bathing? The water from the indoor sink is collected in a bucket and when it is relatively clean, it is recycled for watering the plants. When it has too much bleach and cleaning products in it, they just dump it on the dirt. There is an outdoor sink that the water overflows directly onto plants below.
18. Usted trabaja? Que tipo de trabajo hace para mantener a su familia?Do you work? What do you do for a living? Mr. Nunez is a security guard, and Mrs. Nunez spends her day doing laundry, cooking and cleaning, and doing work with Corazon. The mother in law also works.
19. De que manera ilumina afuera y adentro de su casa?What type of lighting do you use inside and outside? The family gets their power from cables that run from a power pole. An extension cord is used for lighting the outside. The light is hung by my motherin-laws house or on a nail that is on the Cora-zon house. They do this when it they have large gatherings.
20. Porque no cosina afuea?Why dont you cook outside (in between the two houses)? Mrs. Nunez is afraid that the house might catch on fire when it gets windy.
21. Porque todabia hay material en frente de la casa? Why is the construction material in the front of the house? The material in the front is leftover of the slab. Mrs. Nunez mentioned to Corazon to pick up the remaining material, but they havent done so. Her mother-in-law would like to use the space that the material is occupying for additional planting.
Mrs. Nunez and her mother-in-law love the plants that they have outside of their home, and theyd like to have space to put them more and to be able to arrange them to look better. They use sink water that they collect to water them as long as it is reasonably clean. They dont spend an excessive amount of time watering them, but they appear to be well taken care of.
10. Que tan seguido cocinan afuera de la casa? Le gusta cocinar afuera o lo hace por necesidad?How often do you cook outdoors? Do you enjoy it or is it just out of necessity? Typically they only cook outdoors when they run out of gas. Mrs. Nunez doesnt typically enjoy it because it is usually windy and she fears the house may catch fire. She said that if there were better conditions, she could see herself enjoying it more.
11. Como son sus vecinos? Le caen bien?How are your neighbors? Do you like them? The family has a good relationship with the neighbors, no major problems. Nothing gets stolen because they take care of one another.
12. Como usan el espacio en medio de las dos casas?What do you use the space in between the Corazon house and Guesthouse for? We use the space between the Corazon home and guest-house is used for laundry and cooking outside when they run out of gas. The family would like to put the washer in a differ-ent place, but they dont know where.
13. Cuantos anos tiene su hijo? Que hace para divertirse? Donde juega su hijo?How old is your son? What does he do for fun? Where does your child play? Her son is 14 years old. He is taking medication for epilepsy, so he usually doesnt go out and play often. He usually sits in his room and does homework, but sometimes he goes out-side to play with his ball. When he does go outside, he usually plays in the street or in front of the house for an hour or so.
14. En algun tiempo ha tenido problemas con rececionamiento de agua?Have you experienced any problems with water? They havent really experienced a rainy season in the house yet, but they are digging trenches to keep water away from the house in anticipation of how the water will flow. Drainage is fairly simple, the property slopes down towards the street so
-
CONCEPT
-
engineer bridge
This project consists of designing a pedestrian bridge to connect the second floor of Building 9 with the second floor of Building 17 and serve the significant pedestrian traffic between these two buildings. The design must provide exte-rior pedestrian access between the bridge and the ground surface beneath it and have sufficient span and clearance to facilitate fire truck access below the bridge.
It is also desirable that the bridge provides some sitting area for students to congregate between classes, a place for them to study and socialize, both on and below the new structure. The design must conform to all applicable codes, and it is preferable that the bridge does not rely on either building for lateral or vertical support.
The bridge must be constructed principally of wood and be an example of the effective use of wood as a sustainable construction material. Other materials, such as steel or reinforced concrete, also may be used when appropriate, but the best designs will minimize the need for other materials.
The bridge should also be a learning tool, and thus would be instrumented.
Ingenieurbrucke I n g e n i e u r b r c k ee n g i n e e r b r i d g e
-
plans
1/4 Steel Tenshion Cable
4x6 Wood Column
Bolt Assembly
1/2 Steel Plate
Concrete Foundation
Steel Plate
Bolt Assembly
Canopy Covering
Metal Tube
Bolt and Washer
4x6 Wood Joist
4x6 Wood Railing
Bolt and Washer Assembly
1/4 Steel Flitch Plate
4x6 Wood Column
Steel axial Plate
Bolt and Waher Assembly
Wood Screw and Washer
4x6 Wood Arcs
Canopy Covering
Bolt and Washer Assembly
1/4 Steel Tenshion Cable
Bolt and Washer Assembly
1/2 Steel Flitch Plate
4x6 Wood Column
4x6 Wood Joist
site map
Axial Steel Plate to Column
Steel Column to Canopy Covering
Arc to Canopy Covering
Railing Detail
Deck to Column Connection
Foundation Connection Joist to Beam Connection
connections
-
plans
AA
B
B
10-0 typ. 4-2 7-0 5 7-0 6-6
2-4 3-0 5-4 661-0
10-0
typ
.4
-0
5-0
10
6
1-7
9-8
3
-0
2-0
1
-3
2-2
2
-3
7-0
top plan
north elevation
Beam to Column Connection Flitch Plate Joist to Beam Connection
-
connections
east elevation
Details
1/2 Steel Flitch Plat e
4x6 Joist
Steel Axial Plate
Steel T eshion Cables
A
G
-
connections
south elevation
1/2 Steel Flithch Plat e
A
4x6 Joist
Wood Column
Steel Axial Plate
Steel T enshion Cables
Steel Arc
framing plan
canopy plan
reverse ceiling plan
-
elementaryCAHUENGA INCLINECAHUENGA INCLINE( d i a g o n a l ro o f p l a y g ro u n d )
The site is located at the intersection of Western Ave. and 2nd St. in Koreatown in the City of Los Angeles.
Develop design proposals for Cahuenga El-ementary School using the Program generated by the Los Angeles Unified School District. You are to begin your design concept by looking carefully at the site logistics.
Therefore, the objective is to design a high performance school to create a better learning environment for chil-dren. Consequently, this will provide an optimum learning environment.
north elevation
-
site plan
site
-
GG
PROGRAM diagrams
ground level
OPEN
TO BELO
W
OPEN
TO A
BOVE
OPEN
TO A
BOVE
OPEN TO ABOVE
A
B
B
AN
AD
MIN
ISTR
ATIO
N GYM
KIN
DER
GA
RDEN
CLASSROOMS
LIBRARY MULTIPURPOSE CAFETERIA
CLASSROOMSCLASSROOMS
-
OPEN
TO BELO
W
OPEN
TO BELO
W
OPEN TO BELOW
OPEN
TO A
BOVE
+16.0
+13.0
OPEN
TO A
BOVE
OPEN
TO BELO
W
+16.0
+13.0
+29.0
+33.0
+29.0
site plan
SSub
11L
22L
-
south elevatioin
Elevationsandsections
north elevation
west elevation
east elevation
-
Elevationsandsections
A
CROSS SECTION1/16 = 1-0
transverse
B
LONGITUDINAL SECTION1/16 = 1-0
longitudinal
path two
egress
path one
-
TAM InternationalTA M I n t e r n a t i o n a l
PROJECT STATEMENTAn airport is the gateway to a new realm of adventures and unprecedented expectations. As both global popula-tion and foreign affairs increase each year, the demand for air travel as a means of transportation rises exponentially. As a result, large artery airports that act as the connec-tors for transfers and international flights, such as Mexico Citys Juarez International Airport, are becoming over-whelmed with larger passenger traffic. These airports are constructing additional terminal buildings and are increas-ingly exploring the decentralization of flights as a solution to offset/reroute passenger flows. Consequently, modifi-cations of regional scaled airports are being considered to handle this ongoing issue.
Therefore, the focus of my thesis has geared me to revi-talize/transform the Gen F Javier Mina Regional Airport, located in Tampico, Tamaulipas MX, into an international airport (while keeping the domestic component). T.A.M. International could help alleviate air traffic and to revamp/accommodate for higher tourism. With that being said, I would like to take advantage of this opportunity to create a new experience for its visitors, primarily for the traveling passengers, by celebrating the circulation through clarity and enhancing this experience with local art.
TAMPICO, TAMAULIPAS MX
-
TAM International
-
As global population increase, large ar-tery airports that act as the connectors for transfers and international flights, such as Mexico Citys Juarez Internation-al Airport, are becoming overwhelmed with larger passenger traffic. As a result, these airports are constructing additional airport terminal buildings and are also ex-ploring decentralization of flights as a so-lution to offset/reroute passenger flows. Consequently, modifications of regional scaled airports are being considered to handle this ongoing issue. Therefore, for my thesis, I have decided to transform the Gen F Javier Mina Airport, located in Tampico, Tamaulipas MX, into an interna-tional airport that could help alleviate air traffic. Tampico is an up and coming site that can achieve a promising future for aviation and Mexican government due to its placement in North America and its touristic attractions.
DATA: CRISIS
RETAIL
INDOOR LANDSIDE
OUTDOOR LANDSIDE
AIRSIDE
LANDSIDE
SECU
RITY
CH
ECK
AIRSIDE
OUTDOOR
AIRSIDE
INDOOR
BACK OF HOUSE AIRSIDE
BACK OF HOUSE LANDSIDE
AIRSIDE SERVICE
YARD
DESK/ BAGGAGE CHECK IN
OFFICES
AIRCRAFT
AIRCRAFT
LANDSIDE SERVICE
YARD
BAGGAGE HANDLING/ SHORTING
BAGGAGE SHORTING
BAGGAGE HANDLING
BAGGAGE RECLAIM
BAGGAGE RECLAIM
IMMIGRATION
CUSTOMS
CHECK-IN HALL
AIRSIDE DEPARTURE
LOUNGE(DOMESTIC)AIRSIDE
ARRIVALLOUNGE
(DOMESTIC)
TOILETS
TOILETS
ARRIVAL CURBSIDE
DUTY FREE
DUTY FREE
RETAIL
RETAIL
RETAIL
PASSPORT CONTROL
DOCUMENTCHECK
CIRC.
CIRC.
CIRC.
GATE.
GATE.
DEPARTURE CURBSIDE
DEPARTURES LANDSIDE
CONCOURSE
ARRIVAL LANDSIDE
CONCOURSE
ENTRY
DOMESTIC
ARRIVAL
INTERNATIONA
L
DEPARTURE
DOMESTIC
DEPARTURE
EXIT
SECURITYPROCESSING
AIRSIDE DEPARTURE
LOUNGE(INTERNATIONAL)
AIRSIDE ARRIVA LOUNGE
(INTERNATIONAL)
RETAIL
RETAIL
INTERNATIONA
L
ARRIVAL
HEALTHCHECK
TOILETS
TOILETS
TRANSFER SECURITY
CONCEPT: celebrate Circulation
-
PASSENGER MOVEMENT SYSTEM
Health CheckNational/Alien
Passport control
Transfer check-in
Passport Control
DOMESTIC DEPARTURE
INTERNATIONALDEPARTURE
DOMESTICARRIVAL
INTERNATIONALARRIVAL
GENERAL CONCOURSE GENERAL CONCOURSE
SECURITY CHECK
SECURITY CHECK
CHECK-IN
DOMESTIC DEPAR-TURE LOUNGE
PASSPORT CONTROL
RENT-A-CAR GREETERSRENT-A-CAR INFORMA-TION
INTERNATIONAL DEPATURE LOUNGE
TRANSIT LOUNGE
CUSTOMSCONTROL
BAGGAGE RECLAIM
SHORT TERMPARKING
CURB
LONG TERM PARKING
BAG CURB CHECK
TO CURB
GATE LOUNGE INTERNATIONAL LOUNGE
AIRPORT ENTRANCE
TO PARKING VALET PARKING AT CURB
Access To: Train, Bus, Car, TaxiAccess From: Train, Bus, Car, Taxi
PRIVATE VEHICLE
LONG TERM
PARKING
AIRPORTEXIT
PUBLIC TRANSPORTA-
TION
RENTAL PICK-UP
VALET PICK UP
PASSENGER MOVEMENT SYSTEM
Health CheckNational/Alien
Passport control
Transfer check-in
Passport Control
DOMESTIC DEPARTURE
INTERNATIONALDEPARTURE
DOMESTICARRIVAL
INTERNATIONALARRIVAL
GENERAL CONCOURSE GENERAL CONCOURSE
SECURITY CHECK
SECURITY CHECK
CHECK-IN
DOMESTIC DEPAR-TURE LOUNGE
PASSPORT CONTROL
RENT-A-CAR GREETERSRENT-A-CAR INFORMA-TION
INTERNATIONAL DEPATURE LOUNGE
TRANSIT LOUNGE
CUSTOMSCONTROL
BAGGAGE RECLAIM
SHORT TERMPARKING
CURB
LONG TERM PARKING
BAG CURB CHECK
TO CURB
GATE LOUNGE INTERNATIONAL LOUNGE
AIRPORT ENTRANCE
TO PARKING VALET PARKING AT CURB
Access To: Train, Bus, Car, TaxiAccess From: Train, Bus, Car, Taxi
PRIVATE VEHICLE
LONG TERM
PARKING
AIRPORTEXIT
PUBLIC TRANSPORTA-
TION
RENTAL PICK-UP
VALET PICK UP
CONCEPT: celebrate Circulation
-
Advantages-easy passenger orientation; and -short walking distance between the terminal and gate and the correspondingly short journey from -simple separation of arriving and departing passenger; -baggage handling, -lower baggage systems costs (conveying/sorting); -simple construction-long kerb lengths, which allow plenty of space for setting down and picking up passengers
Disadvantages-long walking distances for transfer passengers-longer minimum connecting time-duplication of facilities and services-high capital and building running costs-lack of flexibility for catering for different aircraft designs-special logistics for handling of transfer bags
Level OrganizationGround Level . . . . . 116,375 sq ftMuseum . . . . . . . 33,075 sq ft2nd Level . . . . . . . 69,825 sq ft
Total Gross Sq Footage . . . . . . . . 219,275
Side-by-side arrivals and departures on a single main level-appropriate for most smaller scaled domestic terminals where first-floor movement of passengers from terminal to aircraft meaning that arrival and departure routes split horizon-tally and passengers board/disembark aircraft via airside bus/walk.
Single-deck road, single-level terminal, and apron access to aircraft
Design Guidlines-Create an airport that does not compromise the experience of travel with security concerns.-Museum/Gallery component will function as an economic booster for Tamaulipas Mexico by educating regarding art, attractions, etc.-Make spaces, such as baggage claim and security checkpoints, capable to accommodate the incorporation of live music for users through elevated platforms, etc.-Entrance concourse will have a clear panoramic view of the airside (undisturbed by check-in counter) by pushing the check-in counters by facing the back of the concourse.-Blur the lines between landside to airside through glazing to optimize views.-Minimize walking distances and level changes through the stacking of program and/or laying out long horizontal bars, by grouping/organizing passengers (arrival and departure).-Easy orientation for travelling public through the use of light, signage, and clear view from landside to airside and vice versa.-Separate air carrier functions (international, national, commuter) but provide easy interconnections.-Maximize marketing and rental opportunities-Built-in flexibility to accommodate future changes in dynamic industry through modularity of bays.-Provide passenger services of various kinds (shopping, toilets, eating, meeting and greeting, business and conference).-Minimize time spent waiting in lines and make waiting periods more engag-ing and pleasant all while providing the highest possible level of security.-Provide security through openness of program and minimizing blind spots.-Departure lounge: will act as a major node for congregation/circulation to serve passengers (transfers, departing, transiting); wide and spacious to serve a mixture uses (banks, business facilities, health clubs); views over the airport with plenty of natural light.
Program Summary
Total Net Sq Footage . . . 15,4986
Total Gross Sq Ft 201,439
(30% efficiency factor) 46,486
Entrance Concourse . . 71,050 sq ftAirline Operations . . . . 30,288 sq ftBaggage Claim . . . . . 5,315 sq ftWaiting . . . . . . . . . . 15,225 sq ftGallery/Mix . . . . . . . 33,075 sq ft
TAM AEROPUERTOSITE ALTERNATIVE_1
245'
-0"
245'
-0"
245'
-0"
245'
-0"
245'
-0"
245'
-0"
95'-0
"40'-
2 1/2"13
5'-2 1
/2"
135'-
0"
1225
'-0"
Height Restriction: Unlimited (Special Reviewed)F.A.R. n/a (Determined by Operating Committee) LXI legislatura states in LEY de aeropertos
Building Envelope
Front: None (specified by Secretaria de Comunicaciones y Transportes)Side: None (specified by Secretaria de Comunicaciones y Transportes)
Setbacks
Design Guidlines-Create an airport that does not compromise the experience of travel with security concerns.-Museum/Gallery component will function as an economic booster for Tamaulipas Mexico by educating regarding art, attractions, etc.-Make spaces, such as baggage claim and security checkpoints, capable to accommodate the incorporation of live music for users through elevated platforms, etc.-Entrance concourse will have a clear panoramic view of the airside (undisturbed by check-in counter) by pushing the check-in counters by facing the back of the concourse.-Blur the lines between landside to airside through glazing to optimize views.-Minimize walking distances and level changes through the stacking of program and/or laying out long horizontal bars, by grouping/organizing passengers (arrival and departure).-Easy orientation for travelling public through the use of light, signage, and clear view from landside to airside and vice versa.-Separate air carrier functions (international, national, commuter) but provide easy interconnections.-Maximize marketing and rental opportunities-Built-in flexibility to accommodate future changes in dynamic industry through modularity of bays.-Provide passenger services of various kinds (shopping, toilets, eating, meeting and greeting, business and conference).-Minimize time spent waiting in lines and make waiting periods more engag-ing and pleasant all while providing the highest possible level of security.-Provide security through openness of program and minimizing blind spots.-Departure lounge: will act as a major node for congregation/circulation to serve passengers (transfers, departing, transiting); wide and spacious to serve a mixture uses (banks, business facilities, health clubs); views over the airport with plenty of natural light.
Advantages: -easy passenger orientation; and -short walking distance between the terminal and gate and the correspondingly short journey from -simple separation of arriving and departing passenger; -baggage handling, -lower baggage systems costs (conveying/sorting); -simple construction-long kerb lengths, which allow plenty of space for setting down and picking up passengers
Disadvantages: -long walking distances for transfer passengers-longer minimum connecting time-duplication of facilities and services-high capital and building running costs-lack of flexibility for catering for different aircraft designs-special logistics for handling of transfer bags
TAM AEROPUERTOSITE ALTERNATIVE_2
135'-
0"
480'
-0"
95'-0
"
490'
-0"
241'
-0"
731'
-0"
Side-by side arrivals and departures with two-level terminal -horizontally split the program and eliminate the need for elevated roads because all curbside activity, such as vehicular access, is brought down to ground level.
Single-deck road, one-and-a-half or double-level terminal, and elevated access to aircraft
Level OrganizationGround Level . . . . . 88,682 sq ft2nd Level . . . . . . . 67,180 sq ft3rd Level . . . . . . . 46,550 sq ft
Total Gross Sq Footage . . . . . . . . 202,412
Double Level Terminal
Height Restriction: Unlimited (Special Reviewed)F.A.R. n/a (Determined by Operating Committee) LXI legislatura states in LEY de aeropertos
Building Envelope
Front: None (specified by Secretaria de Comunicaciones y Transportes)Side: None (specified by Secretaria de Comunicaciones y Transportes)
Setbacks
Program Summary
Total Net Sq Footage . . . 15,4986
Total Gross Sq Ft 201,439
(30% efficiency factor) 46,486
Entrance Concourse . . 71,050 sq ftAirline Operations . . . . 30,288 sq ftBaggage Claim . . . . . 5,315 sq ftWaiting . . . . . . . . . . 15,225 sq ftGallery/Mix . . . . . . . 33,075 sq ft
ANALYSIS
MAIL CARGOENPLANING BAGGAGEENPLANING CARGO
AIRCRAFT
TRANSFERTO AIRCRAFT
SHORT-TERMHOLD
LONG-TERMHOLD
BAGGAGESTAGING
INTRALINE BAGGAGE
GATEBAG CHECK
INTERLINE BAGGAGE
CURB BAG CHECK
COUNTER BAG CHECK
AIRPORT DESTINATION
DECISION
CARGO COLLECTOR PER AIRLINE
FREIGHT FORWARDERS
PER PRINTED SCHEDULES
SHORT-TERMSTORAGE
LONG-TERMSTORAGE
PASSENGERFLIGHT GATE
CARGOFLIGHT GATE
INTRALINECARGO
SPECIFICLOCATION
INTERLINECARGO
CARGOCHECK-IN
SPECIFIC AIRLINE
AIRPORTPOST DEPOT
PER PRINTEDSCHEDULES
BILL OF LADINGDOCUMENTATION
CLEARANCE
CARGOFLIGHT GATE
PASSENGERFLIGHT CATE
CARGOFLIGHT
MAILTRUCK
PASSENGERFLIGHT
PASSENGERFLIGHT
TRANSFERTO AIRLINE
REPACK
DISTRIBUTION
SORT
AIRPORTPOST FACILI-
TIES
A N A L Y S I S
-
Advantages-easy passenger orientation; and -short walking distance between the terminal and gate and the correspondingly short journey from -simple separation of arriving and departing passenger; -baggage handling, -lower baggage systems costs (conveying/sorting); -simple construction-long kerb lengths, which allow plenty of space for setting down and picking up passengers
Disadvantages-long walking distances for transfer passengers-longer minimum connecting time-duplication of facilities and services-high capital and building running costs-lack of flexibility for catering for different aircraft designs-special logistics for handling of transfer bags
Level OrganizationGround Level . . . . . 116,375 sq ftMuseum . . . . . . . 33,075 sq ft2nd Level . . . . . . . 69,825 sq ft
Total Gross Sq Footage . . . . . . . . 219,275
Side-by-side arrivals and departures on a single main level-appropriate for most smaller scaled domestic terminals where first-floor movement of passengers from terminal to aircraft meaning that arrival and departure routes split horizon-tally and passengers board/disembark aircraft via airside bus/walk.
Single-deck road, single-level terminal, and apron access to aircraft
Design Guidlines-Create an airport that does not compromise the experience of travel with security concerns.-Museum/Gallery component will function as an economic booster for Tamaulipas Mexico by educating regarding art, attractions, etc.-Make spaces, such as baggage claim and security checkpoints, capable to accommodate the incorporation of live music for users through elevated platforms, etc.-Entrance concourse will have a clear panoramic view of the airside (undisturbed by check-in counter) by pushing the check-in counters by facing the back of the concourse.-Blur the lines between landside to airside through glazing to optimize views.-Minimize walking distances and level changes through the stacking of program and/or laying out long horizontal bars, by grouping/organizing passengers (arrival and departure).-Easy orientation for travelling public through the use of light, signage, and clear view from landside to airside and vice versa.-Separate air carrier functions (international, national, commuter) but provide easy interconnections.-Maximize marketing and rental opportunities-Built-in flexibility to accommodate future changes in dynamic industry through modularity of bays.-Provide passenger services of various kinds (shopping, toilets, eating, meeting and greeting, business and conference).-Minimize time spent waiting in lines and make waiting periods more engag-ing and pleasant all while providing the highest possible level of security.-Provide security through openness of program and minimizing blind spots.-Departure lounge: will act as a major node for congregation/circulation to serve passengers (transfers, departing, transiting); wide and spacious to serve a mixture uses (banks, business facilities, health clubs); views over the airport with plenty of natural light.
Program Summary
Total Net Sq Footage . . . 15,4986
Total Gross Sq Ft 201,439
(30% efficiency factor) 46,486
Entrance Concourse . . 71,050 sq ftAirline Operations . . . . 30,288 sq ftBaggage Claim . . . . . 5,315 sq ftWaiting . . . . . . . . . . 15,225 sq ftGallery/Mix . . . . . . . 33,075 sq ft
TAM AEROPUERTOSITE ALTERNATIVE_1
245'
-0"
245'
-0"
245'
-0"
245'
-0"
245'
-0"
245'
-0"
95'-0
"40'-
2 1/2"13
5'-2 1
/2"
135'-
0"
1225
'-0"
Height Restriction: Unlimited (Special Reviewed)F.A.R. n/a (Determined by Operating Committee) LXI legislatura states in LEY de aeropertos
Building Envelope
Front: None (specified by Secretaria de Comunicaciones y Transportes)Side: None (specified by Secretaria de Comunicaciones y Transportes)
Setbacks
Design Guidlines-Create an airport that does not compromise the experience of travel with security concerns.-Museum/Gallery component will function as an economic booster for Tamaulipas Mexico by educating regarding art, attractions, etc.-Make spaces, such as baggage claim and security checkpoints, capable to accommodate the incorporation of live music for users through elevated platforms, etc.-Entrance concourse will have a clear panoramic view of the airside (undisturbed by check-in counter) by pushing the check-in counters by facing the back of the concourse.-Blur the lines between landside to airside through glazing to optimize views.-Minimize walking distances and level changes through the stacking of program and/or laying out long horizontal bars, by grouping/organizing passengers (arrival and departure).-Easy orientation for travelling public through the use of light, signage, and clear view from landside to airside and vice versa.-Separate air carrier functions (international, national, commuter) but provide easy interconnections.-Maximize marketing and rental opportunities-Built-in flexibility to accommodate future changes in dynamic industry through modularity of bays.-Provide passenger services of various kinds (shopping, toilets, eating, meeting and greeting, business and conference).-Minimize time spent waiting in lines and make waiting periods more engag-ing and pleasant all while providing the highest possible level of security.-Provide security through openness of program and minimizing blind spots.-Departure lounge: will act as a major node for congregation/circulation to serve passengers (transfers, departing, transiting); wide and spacious to serve a mixture uses (banks, business facilities, health clubs); views over the airport with plenty of natural light.
Program Summary
Total Net Sq Footage . . . 15,4986
Total Gross Sq Ft 201,439
(30% efficiency factor) 46,486
Entrance Concourse . . 71,050 sq ftAirline Operations . . . . 30,288 sq ftBaggage Claim . . . . . 5,315 sq ftWaiting . . . . . . . . . . 15,225 sq ftGallery/Mix . . . . . . . 33,075 sq ft
TAM AEROPUERTOSITE ALTERNATIVE_3
95'-0
"
270'-
0"
69'-0
"
70'-0
"
320'
-6"
70'-0
"
320'
-6"
70'-0
"60
'-0"
245'
-0"
490'
-0"
245'
-0"
30'-0
"
430'
-0"
30'-0
"
980'
-0"
Advantages: -centralization of facilities/resources and the clear, -visible relationship between terminal and departure piers, -economical to build, -efficient use of land, -economies of scale (human, facilities, amenities)
Disadvantages:-congestion in the terminal kerbside at peak times, -lack of car parking space at the terminal entrance (for the number of passengers), -limited expansion capability, -long walking distances from terminal to gate -reduced circulation and maneuverability for aircraft alongside gates, and the need to separate arriving and departing passengers on different levels. -involves extensive baggage conveying and the need to provide travellators. -The geometry of the layout makes expansion difficult.
Level OrganizationGround Level . . . . . 169,150 sq ft2nd Level . . . . . . . 567,000 sq ft(+ Satellites)
Total Gross Sq Footage . . . . . . . . 225,850
Building Footprint . . . . . . . . 169,150 sq ftTotal Lot Size . . . . . . . . . . . . . 855 Acre (37,269,768 sq ft)
Lot/Building Size
Height Restriction: Unlimited (Special Reviewed)F.A.R. n/a (Determined by Operating Committee) LXI legislatura states in LEY de aeropertos
Building Envelope
Front: None (specified by Secretaria de Comunicaciones y Transportes)Side: None (specified by Secretaria de Comunicaciones y Transportes)
Setbacks
ANALYSISTERMINAL ARRIVAL FLOW
EXIT
ARRIVALSAREA
CUSTOMSCONTROL
BAGGAGECLAIM
IMMIGRATIONCONTROL
TRANSFERPASSENGERS
TRANSITPASSENGERS
BAGGAGESORT
TRANSFERBAGGAGE
AIRCRAFT
Interna-tional
Domestic
STRUCTURE OF RETAIL FACILITIES FOR ARRIVALS PASSENGERS
Airside concourse Control Arrival concourse
IMMIGRATION
SHOPS
CATERING
TOURIST INFORMATION
CAR RENTAL
AIRCRAFT
BAGGAGE CLAIM
BAGGAGE CLAIM
DEPARTURECUSTOMS CONTROL
Domestic
Interna-tional
STRUCTURE OF RETAIL FACILITIES FOR DEPARTURE
Arrival concourse Departure concourse Airside concourse
SHOPS/RESTAURANTS
CAR RENTAL SER-VICES
EMIGRATIONDUTY FREE
SHOPS CATERING
SHOPS/CATERING INTERNATIONAL LOUNGE
CHECK-IN
KIOSKS/BAR
SECURITY
AIRCRAFT
GATE LOUNGE AIRCRAFT
KIOSKS/BAR
ARRIVAL
Control
TERMINAL DEPARTURE FLOW
Baggage Flow
Passenger Flow
ENTRANCE
TICKET CHECK-IN
IMMIGRATIONCONTROL
SECURITYCHECK
DEPARTURE LOUNGE
TICKETSALES
BAGGAGE SECURITY CHECK
BAGGAGE SORT
GATE LOUNGE
BOARDING PASS CHECK
AIRCRAFT
TERMINAL ARRIVAL FLOW
EXIT
ARRIVALSAREA
CUSTOMSCONTROL
BAGGAGECLAIM
IMMIGRATIONCONTROL
TRANSFERPASSENGERS
TRANSITPASSENGERS
BAGGAGESORT
TRANSFERBAGGAGE
AIRCRAFT
Interna-tional
Domestic
STRUCTURE OF RETAIL FACILITIES FOR ARRIVALS PASSENGERS
Airside concourse Control Arrival concourse
IMMIGRATION
SHOPS
CATERING
TOURIST INFORMATION
CAR RENTAL
AIRCRAFT
BAGGAGE CLAIM
BAGGAGE CLAIM
DEPARTURECUSTOMS CONTROL
Domestic
Interna-tional
STRUCTURE OF RETAIL FACILITIES FOR DEPARTURE
Arrival concourse Departure concourse Airside concourse
SHOPS/RESTAURANTS
CAR RENTAL SER-VICES
EMIGRATIONDUTY FREE
SHOPS CATERING
SHOPS/CATERING INTERNATIONAL LOUNGE
CHECK-IN
KIOSKS/BAR
SECURITY
AIRCRAFT
GATE LOUNGE AIRCRAFT
KIOSKS/BAR
ARRIVAL
Control
TERMINAL DEPARTURE FLOW
Baggage Flow
Passenger Flow
ENTRANCE
TICKET CHECK-IN
IMMIGRATIONCONTROL
SECURITYCHECK
DEPARTURE LOUNGE
TICKETSALES
BAGGAGE SECURITY CHECK
BAGGAGE SORT
GATE LOUNGE
BOARDING PASS CHECK
AIRCRAFT
-
PLANSP L A N S
-
departuredisembark
PLANS
GSub 11L
GG
-
Reduced_1.pdfReduced_2b.pdfreduced_3b.pdfReduced_4b.pdfReduced_5b.pdfRevised_6b.pdf
top related