vvccd - dr. prem reddy health sciences building - construction progress

Post on 16-Apr-2017

2.056 Views

Category:

Education

2 Downloads

Preview:

Click to see full reader

TRANSCRIPT

Victor Valley College Dr. Prem Reddy

Health & Sciences Building

Construction Progress Pictures

Grading

Off loading Ground Utility Vault

Utility Trenching

Underground ventilation

ductwork for labs

Pouring Footings with Structural Steel & Electrical Conduits

Crane Pouring Footings

First Course of Block

top related