water sector: development strategies
Post on 24-Nov-2021
3 Views
Preview:
TRANSCRIPT
11
PAKISTAN DEVELOPMENT FORUMPAKISTAN DEVELOPMENT FORUM
WATER SECTOR:WATER SECTOR:DEVELOPMENT STRATEGIESDEVELOPMENT STRATEGIES
Punjab Irrigation & Power Department
22
PUNJAB IRRIGATION SYSTEM PUNJAB IRRIGATION SYSTEM SALIENT FEATURESSALIENT FEATURES
Headworks / Barrages 14
Main Canal Systems 21
Length of Main Canals and Branches 36,000 Kms
Total Off-takes Capacity 120,000 Cfs
Culturable Commanded Area 21 Million Acres
Overall Designed Irrigation Intensity 67%
Actual Intensity of Irrigation 122%Length of Surface Drains 8000 KmsLength of Flood Embankments 2600 KmsSmall Dams 32Power Potential on Canal System 300 Mega Watts
44
INDUS BASIN IRRIGATION SYSTEM: INDUS BASIN IRRIGATION SYSTEM: THE SETTINGTHE SETTING
Pakistan’s Irrigation System is the largest contiguous gravity
Irrigation network in the world.
The reservoir capacity is highly inadequate - only 12 MAF out of
the 50 MAF flood flows is conserved in Tarbela and Mangla
Dams.
The irrigation system is over 100 years old with ageing
structures and inadequacies to meet the growing water needs. It
requires urgent improvements, modernization and development
for enhancing water resources.
55
INDUS BASIN IRRIGATION SYSTEM: INDUS BASIN IRRIGATION SYSTEM: THE SETTINGTHE SETTING
The system was designed for 67% irrigation intensity which has become outmoded in the context of current agricultural development i e 122 %.Cholistan, Pachad Areas and Potohar comprising 12 million acres remain without irrigation.
Industrialization and urbanization is creating harmful and toxiceffluents which are flowing into rivers and canals and pollutingthe food chain.
The Punjab fresh water aquifer has dropped from 10 to 30 feet due to heavy pumping during the past 3 drought years.
77
VISION VISION
PROVIDE ADEQUATE, EQUITABLE AND SUSTAINED
IRRIGATION TO THE CULTUREABLE LAND OF
PUNJAB, WITHOUT HARMING ITS PRODUCTIVITY,
THUS ENSURING THAT THE FOOD SECURITY OF
PUNJAB AND FOOD DEFICIT OF OTHER PROVINCES
IS MET. ENSURE THAT THE DRINKING WATER
RESOURCE IS SUSTAINED.
88
Adequate Provision Of Irrigation WaterAdequate Provision Of Irrigation Water
As a minimum, provide sufficient water which supports cultivatioAs a minimum, provide sufficient water which supports cultivation n of crops required for food security of the growing population.of crops required for food security of the growing population.
Strategies / Directions :Urgently construct Reservoirs to meet growing food needs.Develop Canals to compensate for enhanced intensities by picking up flood supplies.Line Canals for efficient conveyance and to prevent wastage.
Improve Farming Practices :Laser Land LevelingLaser Land LevelingAdopt Bed Planting Adopt Bed Planting Promote Zero TillagePromote Zero TillageUse Drip/Sprinkler systemsUse Drip/Sprinkler systemsStudy Crop Zoning.Study Crop Zoning.
99
SUSTAINABILITY OF IRRIGATION INFRASTRUCTURE & RESOURCE BASESUSTAINABILITY OF IRRIGATION INFRASTRUCTURE & RESOURCE BASE
To operate and maintain the Irrigation System in a manner that pTo operate and maintain the Irrigation System in a manner that pure ure
irrigation supplies are always provided to healthy cultivable lairrigation supplies are always provided to healthy cultivable lands of nds of
PunjabPunjab
Strategies / Directions :
Sustained Operation
System System RemodelingRemodeling / Modernization/ Modernization
Phased Phased ReplacementReplacement / / ModernizationModernization of Barrages of Barrages
O&M Budget on realistic yardstick
Recruitment Recruitment of essential Staffof essential Staff
Safe Passage of Floods
Continued …
1010
SUSTAINABILITY OF IRRIGATION INFRASTRUCTURE & RESOURCE BASESUSTAINABILITY OF IRRIGATION INFRASTRUCTURE & RESOURCE BASE
To operate and maintain the Irrigation System in a manner that pTo operate and maintain the Irrigation System in a manner that pure ure
irrigation supplies are always provided to healthy cultivable lairrigation supplies are always provided to healthy cultivable lands of nds of
PunjabPunjab
Quality of Supplies
Improved Environmental Management.
Excessive Pumping of the Punjab Aquifer.
Improved Drainage
1111
EQUITABLE WATER DISTRIBUTIONEQUITABLE WATER DISTRIBUTION
Ensure that in all circumstances specially shortage situation, wEnsure that in all circumstances specially shortage situation, water ater
is shared equitably, by large and small farmers alike, as per is shared equitably, by large and small farmers alike, as per
scientific requirementsscientific requirements
Strategies / Directions :
Rationalize Rationalize WaterWater AllowancesAllowances on scientific requirements
Improved Improved RegulationRegulation and Operationand Operation of canals. of canals.
Regular Maintenance Regular Maintenance and and DesiltationDesiltation of canals.of canals.
Joint Management through Nehri Joint Management through Nehri PanchayatsPanchayats..
1212
Food Security
Ensure that the basic food needs of the population are met, now Ensure that the basic food needs of the population are met, now
and in the futureand in the future
Strategies / Directions :
Measures to control population required. Measures to control population required.
Need for horizontal and vertical growth in agriculture.Need for horizontal and vertical growth in agriculture.
Development of Development of NewNew Irrigation Systems for Poverty Irrigation Systems for Poverty
Alleviation.Alleviation.
1313
5.06.05.03.01.0-----20.00Un Ident.Punjab Barrages Modernization Project
(Phase-II)
4.
4.05.05.04.02.0-----20.00Un Ident.ISRP (Phase-II)2.
1.01.01.01.01.51.51.01.00.750.2510.0ADP/
Multi Lat
Small Dams7
0.10.10.10.10.10.10.10.150.10.051.00NDP/
DonorsInstitutional Reforms
6
---5.77.06.06.03.02.00.330.0PSDPPunjab Barrages Modernization Project
(Phase-I)
3.
-2.44.04.05.05.04.04.03.00.131.5PSDPLining of Canals*5
----2.05.05.05.03.50.521.0PSDP
Irrigation System
Rehabilitation Project (ISRP-Phase-I)
1
13121110090807060504
PhasingCost
Funding
SourceProjectNo
Proposed Water Sector Projects(Rs in Billion)
Continued…
1414
National Drainage Programme – II 2.02.02.52.03.02.01.00.5--15.0Multi Lat14.
21.627.326.628.329.627.222.816.210.32.6211.5Total
7.07.05.03.03.03.01.50.5--30.0ADP/
Multi Lat
Improving trans-basin transfer capacity to utilize flood flow
12
---1.01.01.51.00.5-0.55.0ADP/ Multi Lat
Jalalpur Canal Project10
2.02.02.02.02.01.01.0--0.512.0ADP/
Multi Lat
Dajal Branch Extension Project11
-1.01.01.51.01.01.00.5--7.0Multi LatPunjab Flood Protection Sector Project-III
13
Proposed Water Sector Projects(Rs in Billion)
13121110090807060504
PhasingCostFundingSource
ProjectNo
-0.30.50.50.50.50.50.50.50.24.0ADP/ Multi Lat
Cholistan Project-Village Reservoirs
9
0.50.50.50.50.50.60.70.50.50.25.0ADP/ Multi Lat
Management of Hill Torrents
8
1515
PROJECTS PROPOSED PROJECTS PROPOSED FOR FINANCINGFOR FINANCING
21.0Irrigation System Rehabilitation Project2
31.5Lining of Canals3
96.5Total
4.0Cholistan Villages Reservoirs 5
10.0Small Dams in Potohar Area4
30.0Punjab Barrages Rehabilitation and
Modernization Project1
Estimated Cost(Billion Rs)
ProjectSr.No.
1616
Progressive Storage Loss in the Major Reservoirs
0.00
2.00
4.00
6.00
8.00
10.00
12.00
14.00
16.00
18.00
Mangla Chashma Tarbela TotalReservoir
Initi
al /
Exi
stin
g liv
e st
orag
e
DesignExisting2020
1818
DESIGNED VS ACTUAL IRRIGATIONDESIGNED VS ACTUAL IRRIGATION
0
5
10
15
20
25
30
M .
A
1947
1957
1967
1977
1987
1992
2002
DESACT
1919
Lining of Irrigation Channels in Punjab Lining of Irrigation Channels in Punjab Salient Features Salient Features
The project has been approved by ECNECStatus
Federal GovernmentSource of Funding
The Project involves lining of 8832 miles of distributaries
and minors in order to salvage 0.87 MAF water
surrendered by Punjab from Rabi uses in favour of NWFP
Canals.
Project Objective
Rs. 31,585 Million Estimated Cost
2020
Irrigation System Rehabilitation ProjectIrrigation System Rehabilitation ProjectSalient Features Salient Features
The project approved by ECNEC.Status Federal Government Source of Funding
i) The Project aims rehabilitation of 12,500 Kms of link canals, main canals, branch canals and distributaries / minors
ii) Repair / replacement of 5000 regulators, bridges and escape structures
iii) Rehabilitations of tubewells and small damsiv) Recouping of transport and machinery fleet
Project Components
Rs. 20.17 Billion Estimated Cost
2121
Irrigation System Rehabilitation ProjectIrrigation System Rehabilitation ProjectMain ComponentsMain Components
700Improving Transport Facilitiesv588Modern Telecommunication Systemvi27Upgradation of Research Institutevii
1,000Augmentation of Desilting Capability(Procurement of Machinery)
iv
20,107Total
86Small Dams Rehabilitation iii 75Drainage Improvementii
17,631Canal Rehabilitationi
Cost (Rs. in Million)
ComponentSr.No.
2222
Rehabilitation and Modernization of Punjab Barrages Rehabilitation and Modernization of Punjab Barrages Salient Features Salient Features
The project approved by ECNECStatus
Federal Government Source of Funding
i) Rehabilitation and modernization of 6 No.
Barrages
ii) Modernization of Gates and Gearings
iii) Structural Improvements
Project Components
Rs. 29,000 Million Estimated Cot
2323
PUNJAB BARRAGES REHABILITATION AND MODERNIZATION PROJECT
Emergent / Long Term Remedial Measures on Six Barrages
Jinnah, Taunsa, Khanki, Balloki, Sulemanki & Islam
1.60Rehabilitation of Islam Head Works8.
0.40Emergent repair works on Seven Barrages including Punjnad Head Works
2.
0.10Feasibility Study for Six Barrages1.
29.0Total:
4.90Detailed Engineering Design price contingencies 9.
2.30Rehabilitation of Sulemanki Head Works7.
1.50Rehabilitation of Balloki Head Works6.
7.40Replacement of Khanki Head Works5.
5.70Rehabilitation of Taunsa Barrage4.
5.10Rehabilitation of Jinnah Barrage3.
Cost (Rs. Billion)
Type of work Sr. No.
2424
HUDIARA DRAIN WATER QUALITY
0.50.370.70Lead (Pb) mg L-110.
0.010.0140.01Mercury (Hg) mg L-19.
0.10.210.14Cadmium (Cd) mg L-18.
1.02416.6Sulphide (mg L-1)7.
150620616Chemical Oxygen Demand (COD) mg L-1
6.
80180228Biochemical Oxygen Demand (BOD) mg L-1
5.
200220347Total Suspended Solid (TSS) mg L-1 4.
35001120900Total dissolved solids (TDS) mg L-13.
6-109.59.2pH2.
-180187Discharge (Cusecs)1.
NEQSEntry point at Ravi
Entry point in Pak.Parameters Sr.
No.
2525
PUNJAB GROUND WATER STATUS
=
=
=
=
10-30 ft. Depletion of Aquifer 4.
35 MAFAnnual pumpage during Drought Years3.
600,000Number of Tubewells Installed2.
15.0 MAFEstimated Aquifer Annual Recharge in FGW
Areas
1.
Solution: -- Enhance capacities of canals in proportion to actual intensities.
-- Transfer of flood supplies from River Chenab to pass through rivers Ravi & Sutlej.
2626
AUGMENTATION OF DE-SILTING CAPABILITY OF IRRIGATION DEPtt.
60.0020.003Low Bed Trailer 8.4.001.004Pick-Up9.90.88Spare Parts at 10%10.
999.68Say Rs. 1,000.00 M
Total:
68.0017.004Motor Grader 150-160 HP.7.200.0010.0020Dump Truck6.36.809.204Wheel Loader 110 HP.5.
145.0014.5010Crawler Dozer 180-190 H.P.4.
150.0015.0010Hydraulic Excavator Wheel Type Reach: 30-35 ft.
3.
110.0011.0010Hydraulic Excavator (Crawler) Reach: 30-35 ft.
2.
135.0013.5010Hydraulic Excavator (Crawler) Reach: 50-60 ft.
1.
TOTAL PRICE (Million Rs.)
UNIT PRICE (Million Rs.)QTYEQUIPMENT S.No
2727
MAIN CANALS WATER ALLOWANCES (NON-PERENNIAL)
8.5
15 15
17.6
12.6
14 14
666.36
3.5
02468
101214161820
Muzaffa
r Garh
UCC
DG Khan
Ghotki
Begari
Desert
Pat Fe
eder
Rice Kalri
Fuleli
Pinyari
Cus
ecs
Per 1
000
Acre
s
2828
3.182.84 2.84
4.25
2.9 2.8
4.27 4.27
7.7
9
0
1
2
3
4
5
6
7
8
9
10
Thal
LCC
LJCAbasia
Canal
RohriEaster
n Nara
Khairpur E
astKhair
pur Wes
t
Kalri Bhaggar
Feeder
Line Chan
nel
CUSE
CS
PER
100
0 AC
RES
MAIN CANALS WATER ALLOWANCES (PERENNIAL)
2929
MANAGEMENT DURING DROUGHT
14.551%2001-20023.
15.537%2000-20012.
17.6520%1999-20001.
WHEAT PRODUCTION(M.Tons)
SHORTAGE RABI(%)
YEARS.No
3030
WORK PLANWORK PLAN FOR ESTABLISHMENT OF FOR ESTABLISHMENT OF FARMERS ORGANIZATIONS (FOs)FARMERS ORGANIZATIONS (FOs)
21068--Beyond January 2005
Total During
the period
210210210210Total
142606868July to December 2004
82506060January to June 2004
32325050July-December 2003
--3232Upto June 2003
Operationalization
of NPsTraining & Capacity
Building (NPs)
Social Mobilization
(NPs)
Period
3131
IRRIGATION FOR POVERTY ALLEVIATIONIRRIGATION FOR POVERTY ALLEVIATION
Concept paper in process.
Hill Torrents effect the Piedmont areas, comprising over 475,000 acres, playing havoc with habitations in their path. A Pilot on Kaha Hill Torrent guided the Torrential flows into adjuring areas providing precious water for cropping which raised agriculture activity from 6000 acres to 75000 acres while saving habitations from damages. It is planned to construct 13 such Diversionary Structure on Hill Torrents in D.G.Khan, Rajanpur & Mianwali Districts providing irrigation to 475,000 acres and preventing destruction.
Rs. 5.0 Billion
Flood Management of Hill Torrents.
3.
Concept paper in process.
Flood channels operating for 100 days provide irrigation for Summer Crop. Lack of irrigation water for remaining period of year precludes further cropping. Shortages lead to mass migration & poverty. It is planned to construct 375 Village Reservoirs in Cholistan to bring prosperity and stability to the area.
Rs. 3.0 Billion
Cholistan Village Reservoirs
2.
Concept paper in process.
Small Dams shall collect run off for sustained irrigation and water supply. Experience of existing Small Dams shows marked improvement in social & economic parameters. It is planned to construct 30 Small Dams, 100 Linked Dams and 200 Village Reservoirs in Potohar.
Rs. 5.0 Billion
Small Dams in Potrohar
1.
STATUSBENEFITSCOSTPROJECTS.NO.