REKAPITULASI HARGA SATUAN UNTUK PEKERJAAN JALAN DAN JEMBATAN KOTA BANDAR LAMPUNG TAHUN 20……………….. HARGA SATUAN (Rp) JUMLAH NO. KODE SATUAN TOTAL (Rp) 1 3 4 5 6 7 8 = (5+6+7) 1 Penghamparan lapis tipis aspal beton (Lataston) HRS [buruh] K 636.a M2 662.67 64,667.08 847.54 66,177.29 ………………………………….,……………20………. cv…………………………………… (…………………………………………….) Direktur/Direktris 2 UPAH (Rp.) METERIAL (Rp.) PERALATAN (Rp.) URAIAN

Upload: daniel-burgess

Post on 25-Oct-2015

57 views

Category:

Documents


8 download

DESCRIPTION

anl

TRANSCRIPT

Page 1: Analisa 2011 K 636.a

REKAPITULASI HARGA SATUANUNTUK PEKERJAAN JALAN DAN JEMBATAN KOTA BANDAR LAMP UNG

TAHUN 20………………..

HARGA SATUAN (Rp) JUMLAHNO. KODE SATUAN TOTAL

(Rp)1 3 4 5 6 7 8 = (5+6+7)

1 Penghamparan lapis tipis aspal beton (Lataston) HRS [buruh] K 636.a M2 662.67 64,667.08 847.54 66,177.29

………………………………….,……………20……….

cv……………………………………

(…………………………………………….)

Direktur/Direktris

2

UPAH (Rp.)METERIAL

(Rp.)PERALATAN

(Rp.)URAIAN

Page 2: Analisa 2011 K 636.a

KODE

K - 636.a

PROPINSI :LAMPUNG KODE KODE[071] [018]

URAIAN ANGGAPAN / ASUMSI 1. Pengisian material sampai ke bin spreader 1. Menggunakan alat berat 1500 m2/hari

oleh pemasok 2. Hot Rolled Sheet (LATASTON) dikirim ke lokasi pekerjaan oleh pemasok dari AMP 2. Material dihampar dengan tenaga manusia 3. Tebal padat rata-rata 3 cm

dipadatkan dengan mesin gilas roda baja 4. BJ LATASTON padat 2,2, ton/m3 3. Hamparkan lapis tack / pengikat aspal 5. Sesuai Spek.B.M. No. 12/PT/B/1983 (tabel 3,3) dan rev.Spek.Umum.B.M. Maret 89

cutback @ 0,5 l/m2 Buku - 3

JUMLAH HARI KODE TOTAL VOL UPAH BIAYAORANG (Orang-hari) (Rp/Org/Hari) (Rp)

P Buruh tak terampil 12 1 L 101 12.00 42,000.00 504,000.00E Mandor 1 1 L 061 1.00 62,000.00 62,000.00K Operator terampil 2 1 L 081 2.00 70,000.00 140,000.00E Supir terampil 1 1 L 091 1.00 65,000.00 65,000.00R Pembantu Operator 2 1 L 083 2.00 42,000.00 84,000.00J Pembantu Supir 1 1 L 099 1.00 45,000.00 45,000.00A Buruh terampil 2 1 L 106 2.00 47,000.00 94,000.00

JUMLAH BIAYA UNTUK PEKERJA PEKERJA (I+II) 994,000.00JUMLAH SATUAN KODE TOTAL VOL HARGA SATUAN BIAYA

MATERIAL (Rp) (Rp)

M H.R.S (LATASTON) ton K 035 100.00 904,978.15 90,497,815.00A Aspal Kg 0.00 600.00 8,988.00 5,392,800.00T Minyak bakar Lt 0.00 150.00 7,000.00 1,050,000.00E Alat bantu ( set @ 3 alat ) set 0.00 0.48 125,000.00 60,000.00RIAL

JUMLAH BIAYA UNTUK MATERIAL MATERIAL (I+II) 97,000,615.00JUMLAH HARI KODE JAM KERJA HARGA BIAYA

ALAT KERJA (Rp/Jam) (Rp)

P Masin gilas tandem 6-10 ton 1 1 E 081 5.00 134,804.00 674,020.00E Mesin penyemprot asphal 400 lt 1 1 E 154 5.00 26,147.00 130,735.00R Truck bak terbuka 3,5 ton 1 1 E 221 5.00 93,312.00 466,560.00ALATAN

JUMLAH BIAYA UNTUK PERALATAN PERALATAN (I+II) 1,271,315.00 T O T A L (Rp) 99,265,930.00

VOLUME : 1,500.00 SATUAN : M2 HARGA SATUAN : 66,177.29 per M2

MATERIAL SUB TOTAL

PERALATAN SUB TOTAL

Tahun

PEKERJA SUB TOTAL

MANGHAMPAR LAPIS TIPIS ASPAL BETON (LATASTON)ANALISA HARGA SATUAN

(MENGGUNAKAN BURUH)

BANDAR LAMPUNG CV. …………………………KOTA DISIAPKAN OLEH :

2011

(Rp)

(Rp)