ENCLOSURE ANALYSIS FOR EMI/RFI MAPPING OF AUXILIARY ELECTRIC EQUIPMENT ROOM FOR TENNESSEE VALLEY AUTHORITY'S WATTS BAR NUCLEAR PLANT UNIT 1 PREPARED BY: WESTINGHOUSE ELECTRIC CORPORATION PROCESS CONTROL DIVISION 200 BETA DRIVE PITTSBURGH, PA 15238-2987 9408240138 940812 PDR ADOCK 05000390 Ai PDR

Upload: others

Post on 23-Jul-2020

19 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

ENCLOSURE

ANALYSIS FOR EMI/RFI MAPPINGOF

AUXILIARY ELECTRICEQUIPMENT ROOM

FORTENNESSEE VALLEY AUTHORITY'S

WATTS BAR NUCLEAR PLANTUNIT 1

PREPARED BY: WESTINGHOUSE ELECTRIC CORPORATIONPROCESS CONTROL DIVISION200 BETA DRIVEPITTSBURGH, PA 15238-2987

9408240138 940812PDR ADOCK 05000390Ai PDR

Page 2: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

EMI/RFI MAPPING DATA ANALYSIS OF THEAUXILIARY EQUIPMENT ROOM

FORTENNESSEE VALLEY AUTHORITY'S

WATTS BAR NUCLEAR PLANT-UNIT 1

Written By:

Reviewed By:

Approved By:

v~,LQ

L. k4,//&, 6/2 J

(�I ��4

(0 /am~ I By~

wy /(- -

,7f /V,

Page 3: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EJII/RFI TESTS TEST REPORT

ABSTRACT

The following report provides data concerning current EMI/RFIfields that exist in the Auxiliary Electric Equipment Room atWatts Bar Unit 1 and compares these fields to those generatedduring EMI/RFI type testing of the Eagle-21 Process ProtectionSystem.

i

WATTS BAR EMIIRFI TESTS TEST REPORT

Page 4: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REX TESTS TEST REPORT

TABLE OF CONTENTS

Section Description

TOC Table of Contents

1 Introduction

2 Eagle-21 Process Protection System InitialRFI Tests

3 Watts Bar Auxiliary Electric Equipment RoomEMI/RFI Mapping Overview

4 CE01 Test Results

5 CE03 Test Results

6 CE07 Test Results

7 REXX Test Results

8 RE01.Test Results

9. RE02/RE02.1 Test Results

'10 Theoretical Analysis of Eagle-21 Susceptibilityto 0 to 30 Mhz EMI/RFI

11 Conclusion

Appendixes

A References

B National Technical Systems (NTS) Test Report ofInstallation Electromagnetic Interference (EMI)Mapping of Auxiliary Electric Equipment RoomFor TVA's Watts Bar Station For WestinghouseElectric Corporation, Process Control Division,200 Beta Drive, Pittsburgh, PA 15238

ii

PaQe

ii

1

2

5

7

11

14

15

16

17

19

24

25

26

WATTS BAR EM11/HI TESTS TEST REEPORT

Page 5: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 1: INTRODUCTION

1.0 INTRODUCTION

This report, used in conjunction with the National Technical System(NTS) Report (Appendix B), forms the basis for the as installedEMI/RFI conditions for the Eagle-21 Process Protection System atthe Watts Bar Nuclear Plant Unit 1.

Data provided by the National Technical Systems tests, along withspecial theoretical analysis, and initial Eagle-21 EMI/RFI testdata is used to provide a margin of operation between detectedEMI/RFI fields at Watts Bar and injected EMI/RFI fields..,that maycause the system to fail trip actuation conditions.

This report uses data obtained by National Technical Systems testsperformed at the Watts Bar site from May 3 - 6, 1994. All thetests were performed in accordance with NTS procedure 31590-95M,Revision 0. The EMI test points were jointly established by NTSand TVA. At each point detectors were rotated to ensure that worstcase field strengths were detected. The test equipment used togather this data was capable of detecting emissions from 0 to 1GHz.

The references used to evaluate the data are listed in Appendix A.The actual EMI/RFI Test Report from NTS is included in Appendix B.

WATEMI/RFI

TEST RESPORTWATTS BAR E.MI /RF TESTS

1 TDH-060994

Page 6: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 2: EAGLE-21 PROCESS PROTECTION SYSTEMINITIAL RFI TESTING

2.0 EAGLE-21 PROCESS PROTECTION SYSTEM INITIAL RFI TESTS

The Eagle-21 Process Protection System Radio Frequency Tests were

performed in an anechoic chamber at the University of Michigan in

1988. The testing was done to demonstrate system operability

before, during, and after the adverse noise conditions were

applied.

The description of the tests and the test results are contained in

WCAP-11733 Noise, Fault, Surge, and Radio Frequency Interference

Test Report for Westinghouse Eagle-21 Process Protection Upgrade

System dated June 1988. This WCAP was approved by TVA Watts Bar in

letter number W-6643 dated September 12, 1988.

2.1 INITIAL TEST RESULTS

The- initial tests performed on the Eagle-21 Process Protection

System injected radiated fields into the cabinet under test. The

fields were radiated using both vertical and horizontal polarized

antennas. The system was subjected to RFI fields of 3 V/M and 10

V/M from 20 MHz to 1 GHz.

Radiated emissions for the tests at Watts Bar are measured in

dBuV/m, dBpT, and dBuA units. The dBuV/m must be converted to the

-injected field strength of Volts/meter which was used during the

initial tests of the Eagle-21 Process Protection System. The

following formula was used to convert between the two units of

measure:

dBuV/m = 20 log (Volts/meter) / (1 uv)

Using the injected field strengths, the following dBuV/m values aredetermined from the formula:

129.54 dBuV/m = 20 log (3 V/m) / (1 uV)

140 dBuV/m = 20 log (10 V/m) / (1 uV)

At 129.54 dBuV/m, five frequencies caused Trip Output Failures

(TOF). All of these frequencies are in the 160 to 200 Mhz range.

At 140 dBuv, numerous frequencies caused TOF conditions. Figure 1

shows a simplified plot of the injected fields and the areas where

TOF conditions occurred.

TDH-060994

TEST REPORTWATTS BAR EM11RF1 TESTS

WATEMI/RFI 2

Page 7: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RFI TESTS TEST REPORT

3 V/M Horizontal and Vertical polarized

TOF.............................................................

lI l l

20600400300200100

MHz

10 V/M Horzontal and Vertical polarized

TOF......................

20700600500400300200100

MHz

700

Figure 1: EAGLE-21 ERI SUSCEPTIBILITY

In light of the above data, it is critical that attention be givento the frequency spectrum and dBuv/m levels when comparing measured

fields and tested fields. For example, a measured 139 dBuV/m field

is a high level. However, when that field occurs at 600 Mhz it can

be dismissed as not affecting the operation of the Eagle-21 ProcessProtection System, because no trip outputs failed when subjected toa 140 dBuV field at 600 Mhz.

Although it appears from Figure 1 that many failures can occur inthe Eagle-21 Process Protection System over a fairly broad band of

frequencies, it should be noted that none of the fields measured at

Watts Bar are above the TOF threshold within the susceptiblefrequencies for the Eagle-21 Process Protection System.

Each Section of this report details a composite of the worst case

frequencies and their amplitude and the worst case conditions.

The RFI Tests on the Eagle-21 Process Protection System wereperformed in accordance with _SAMA Standard PMC 33.1-1978. The

entire frequency range from 20 MHz to 1 GHz was radiated at 3 V/Mand 10 V/M field strengths.

TDH-060994

500

3WATEMI/RFI

.. . . . . . . . . .. . ........,,. ....,. . . . . .......... ,

....... ....... :

.. ... .: ...........

::.....:....:.... .

'.' ........

... ..........-

r... I.-. .. - iI ,. . .

TEST RESPORTWATTS BAR EMIIRFI TESTS

Page 8: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Two types of tests were performed. The first test was a modulationtest where a computer controlled the sweep of a frequency generatorthrough 40 data points per octave and 10 seconds at each point.The second test was a keying test where the frequency generator iskeyed on and off to simulate a transmitter being keyed on and off.The generator was cycled on and off at a one second interval.

TDH-060994

TEST REPORTWATTS BAR EMI /R I TESTS

WATEMI/RFI 4

Page 9: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 3: WATTS BAR AUXILIARY ELECTRICEQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW

3.0 EMI/RFI MAPPING OVERVIEW

The Eagle-21 Process Protection System is located within cabinetsinstalled in the Auxiliary Electric Equipment Room at the Unit 1Watts Bar Nuclear Plant.

The purpose of the EMI/RFI Map is to determine the electromagneticfields that equipment will be exposed to, as installed. At WattsBar, the Eagle-21 Process Protection System was already installedand operational at the time the mapping tests were performed.

This is the first time that EMI/RFI mapping was completed while theEagle-21 Process Protection System was installed. Other sitelocations have mapped their equipment rooms with the old protectionsystem racks before the Eagle-21 installation. Thus, the Watts BarEMI/RFI data includes radiations that may be caused by the Eagle-21Process Protection System (e.g. switching power supplies,oscillators from clocks on computer cards, etc.).

The EMI/RFI mapping data at Watts Bar was collected during HotFunctional testing of the plant. Although the plant was not atpower (Mode 0), the operating conditions of the room and equipmentwere as close to operating conditions as reasonably obtainable.

3.1 TEST PROCEDURES

NTS procedures and testing methods are in accordance withNTS/Northeast's Quality Manual and NTS/Northeast's StandardOperating Procedure N-4. These ensure that the program complieswith the applicable provisions of 10CFR, Part 21 and Part 50,Appendix B.

The tests performed at Watts Bar are two general categories. Thefirst category is conducted emissions as defined in MIL-STD-462.The second category is radiated emissions as defined in MIL-STD-462.

The following tests were performed at the Watts Bar Site:

Conducted Emissions, Method CE01, Power and Signal Leads, 30Hz to 15 KHz, Common and Differential Mode

Conducted Emissions, Method CE03, Power and Signal Leads, 15KHz to 50 MHz, Common and Differential Mode

Conducted Emissions, Method CE07, Power and Signal Leads,Switching Transients, Time Domain, Common and DifferentialMode

Radiated Emissions, Method REXX, DC Magnetic Field

WATEMI/RFI

TEST REPORTWAT TS BAR EMI /RFI TESTS

5 TDH-060994

Page 10: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Radiated Emissions, Method RE01, 30 Hz to 50 KHz

Radiated Emissions, Method RE02, 14 KHz to 1 GHz

Radiated Emissions, Method RE02.1, Hand-Held Radio Profile

TDH-060994

TES T REPOR TWATTS BAR EMIIRFI TESTS

6WATEMI/RFI

Page 11: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 4: CEO i TEST RESULTS

4.0 CE01 OVERVIEW

Test CEOl is a measure of conducted radiation on both power leadsand signal leads. Several data points are measured in selectedcabinets. The cabinets selected were determined by NTS and TVApersonnel.

The first test utilizes a current probe connected around the powerfeed to the cabinet and measures the relative field strengths from30 Hz to 15 KHz in dBuA. The selected cabinets are detailed inSection 4 of the NTS Test Report in Appendix B.

The field strength-in dBuA can be converted to Peak Current by thefollowing formula:

dBuA = 20 log (peak current)/(1 uA)

.707 Peak Current = RMS Current

Because of the relationship between field strength and current, itis expected that the cabinet with the highest measured current flowwill have the highest CE01 emissions. It is also expected that 60Hz (Supply frequency) and the third and fifth harmonics of 60 Hzwill be fields detected in the test.

The second set of CE01 tests has the current probe connected on.selected signal leads in the cabinet and measures the conductedemissions from 30 to 15 KHz in dBuA. The actual signal leadstested are detailed in section 4 of the NTS test report in AppendixB.

4.1 CEO1 TEST RESULTS

The first CE01 tests were conducted on power leads in eight of thefourteen racks installed at Watts Bar. The worst case conditionswere detected in rack 1-R-5. Because different racks havedifferent levels at different frequencies, Figure 2 was developedto show a relative plot of worst case field strengths. This figuredoes not show variances (valleys between peaks), but assumes aworst case smooth transition between all the peaks.

Figure 3 shows the actual detected plots for Rack 1-R-5. From theplot it can be determined, by using the above formula, that the RMSvalue for current in the power lead is about 7 Amps RMS.

TDH-060994

TEST REPORTWATTS BAR EMIIRFrI TESTS

WATEMI/RFI 7

Page 12: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RFI TESTS TEST REPORT

Figure 2: CE01 COMPOSITE WORST CASE CONDUCTED EMISSIONS

Figure 2 was generated from data taken from a current probe on the

ac input power leads for the designated cubicles. The data is from

on a narrow band measurement.

Figure 3 is a plot from measurements of the ac power leads for Rack

1-R-5. This plot differs from the composite in Figure 2 because

figure 2 is a, plot of the peaks of Figure 3. This figure only

shows a continuous plot of peak points along the detected spectrum,

while Figure 3 shows the complete spectrum.

The CE01 test measures the field strengths between 30 Hz and 15

KHz. These levels can be compared to the susceptibility of the

circuit boards, cables, and digital circuitry to these low

frequency fields.

Section 10 of this report shows the susceptibility of the Eagle-21

System to the low frequency spectrum as demonstrated by the

theoretical analysis referenced there.

All the detected fields at Watts Bar are well below the calculated

threshold-where-outputs may be affected.

TDH-060994

DbUA

150

DbUA

.001 .01 .015.0001

MHz

8

TEST REPORTWATTS BAR EMIIRFI TESTS

WATEMI/RFI

Page 13: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RFI TESTS

Figure 3: RACK 1-R-5 ACTUAL CE01 DETECTED EMISSIONS

4.2 CEO1 CONDUCTED EMISSIONS - SIGNAL LEADS

The second part of the CE01 test is to measure the conducted field:strengths on predetermined signal leads. Section 4 of the NTSreport (Appendix B) details those signal leads tested. Twelve ofthe fourteen racks had at least one set of signal leads tested.

All of the measured signal lead emissions are well below thesusceptibility threshold as measured in the power line test fromthe first part of CE01.

Because the power line measurements are acceptable and are athigher measured levels, the signal line tested emissions are alsoacceptable.

WATEMI/RFI

5 May 1994 I9B:K5BNAT1 ?NAL TECHNICRL SYSTEMShp EHIS ION LEVEL[ d uRl PERK

Frpirvwr'y rMwzi a

TEST REPORT

TDH-0609949

Page 14: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REI TESTS TEST REPORT

dBuA150

110

d BuA

90

70

.0001

MHz

Figure 4: CE01 SIGNAL LEAD WORST CASE EMISSIONS

WATEMI/RFI

.001

WATTS BAR EKI /RFI TESTS TEST REPORT

.01 .01 5

TDH-0609941 0

Page 15: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REI TESTS TEST REPORT

SECTION 5: CE03 TEST RESULTS

5.0 CE03 TEST OVERVIEW

The CE03 tests measured the same points as the CE01. The

difference is the frequency spectrum of the tested emissions.

The frequency spectrum is 15 KHz to 50 MHz. Both narrowband and

broadband measurements were made.

When comparing CE01 to CE03, it appears that CE03 measurements

shift. CE01 15 KHz emissions are in the 70 dBuA range. For CE03

tests, the 15 Khz measurements for narrowband is from 15 to 90 dBuA

and ,the broadband.measurements are-in the 100 to 150 dBuA range.

This apparent shift at 15 Khz is due to the actual bandwidth being

measured. The CE01 uses 1.5 Khz as a narrowband bandwidth. The

CE03 test uses 3 KHz as the narrowband bandwidth. This difference

in bandwidth causes the apparent shift in the measured signal. If

the actual field being measured contained only a continuous wave

(CW) transmission, there would be no shift in the measured field

strength. As installed in the plant, the measured fields contain

many frequencies causing the apparent shift in signal strength.

5.1 CE03 TEST RESULTS

The broadband data show the strongest detected fields in Racks 1-R-

5, l-R-9, 1-R-11 and 1-R-12. These four racks are virtually equal

in measured field strengths.

Figure 5 is a composite of all the worst case peak detected

emissions. As before, this plot assumes a continuous level between

plotted points.Using the results of thetheoretical analysis

dBA from section 10, the160 worst case detected

signals are all well*S0 within acceptable

margins.110

There should be noeffect of conductedemissions in the 15 KHz

70 to 50 MHz range.

. 1 10 -0 Figure 6 shows theactual measured plot for

MHz 1-R-5 power lead

connections.

Figure 5: CE03 WORST CASE COMPOSITESIGNALS

TDH-060994

TSST RE:PORTWA TTS BAR EM11/RFrI TES TS

1 1WATEMI/RFI

Page 16: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMIIRFI TESTS TEST REPORT

Rack 5 was chosen because this plot shows the one anomaly detectedin the test data.

A transient of 152 dBuA at about 1.8 MHz occurred 3.5 minutes afterthe start of the measurement on this rack. The origin of thistransient was not determined. This transient does not appear onany of the radiated emission tests or CE03 signal cable tests. Itappears only one time on the power lead test for Rack 5.

This transient of 152 dBuA results in approximately 28.15 Amps RMScurrent. From the analysis of section 10, the lowest digitalcircuitry susceptibility at 1.8 Mhz is about 157 dBuA. Althoughless than the worst case expected susceptibility, it is not morethan 6 dBuA less.

However, the expectedsusceptibility pointswere determined byassuming the cable wasadjacent to the circuit hp MTJ21,', CI¶ SYST 3 ay 1994 iIY2i

boards, no shielding was i5I -Sn m 1c PMT dCmused, and board design | Vj.SEY-JLJU STV iTTS MUR i 19E9-RC W

had no effect on PH111 I l QX No. I X 5

transient limitation. 1In the actual system, IJHshielding on cables is i I I i

used, no signal cables i !are within their own i A !,ii

conductor radius of the I T-board, and inherent I iboard design does limitthe effect of transients ';

because of filtersinstalled on the board _I I

with a 3dB point of 0.5 FREUENCY ndZI

Hz. Due to these designfactors, the extra 1dBuA can be obtained tomeet the 6 dBuA margin.

Figure 6: CE03 Rack 1-R-5 ACTUAL

5.2 CE03 SIGNAL LEAD TEST RESULTS

Like CE01, CE03 also measures the conducted field emissions onselected signal leads in various racks. All of these detectedfields are measured for narrowband and broadband emissions.

TDH-060994

TEST REPORTWATTS BA.R EXI/RF1 TESTS

WATEMI/RFI 12

Page 17: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

All of the measured emissions are well below the detected powerlead test levels. Therefore, these emissions will not effectoperation of the Eagle-21 Process Protection System at Watts Bar.

TDH-060994

TEST RErPORTWATTS BAR EMIIRFI TESTS

WATEMI/RFI 1 3

Page 18: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 6: CEO7 TEST RESULTS

6.0 CE07 TEST OVERVIEW

Test CE07 measures the time that transients from equipment cyclesaffect the power feeds. A current probe is connected to the acpower feed in selected cabinets. All of the measurements taken atWatts Bar were done at a Steady State condition. No outputs orswitching devices sharing the instrumentation bus were switchedduring this test.

6.1 CEO7 TEST RESULTS

All of the measured results are shown in the NTS Test Reportlocated in,Appendix-B. The graphical results shown in the reportwere obtained with a storage oscilloscope connected to a currentprobe on the power leads.

The major contributors to the measured levels shown on this displayare the switching power supplies used in the Eagle-21 ProcessProtection System. The wave shape and frequency are withinexpected levels as measured in the Qualification Units located atthe Westinghouse Process Control Division.

TDH-060994

TEST RESPORTWATTS BAR PHI 1RF1 TESTS

WATEMI/RFI 14

Page 19: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 7: REXX TEST RESULTS

7.0 REXX TEST OVERVIEW

The RE01 test is the first of the Radiated Emissions tests. The

purpose of RE01 is to measure the DC Magnetic Fields around the

racks in the Auxiliary Electric Equipment Room. Measurements are

in Gauss as detected by a Magnetic Instrumentation Gaussmeter. All

of these tests are in accordance with MIL-STD-1399, Section 070,

Part 1.

7.1 REXX TEST.RESULTS

The maximum detected DC field was located in the Right Rear. of Rack

l-R-9. This level was 4.0 Gauss. As a point of reference the

highest levels were measured at the front and rear of Racks 1-R-9,

1-R-10, and 1-R-11. These three racks are mounted adjacent to eachother.

All of the measured levels dropped to less than 0.5 Gauss within

2.0 inches of the Racks being tested.

WATEMI/RFI

TEST REwPORTWATTS BAR EMI /RFI TESTS

TDH-06099415

Page 20: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RFI TESTS TEST REPORT

SECTION 8: RE01 TEST RESULTS

8.0 RE0l TEST OVERVIEW

The RE0l Test is a measurement of the radiated field between 30 Hzand 50 KHz. A loop antenna was utilized and rotated through itsaxis until the worst case levels were detected. The test dataacquisition system did a sweep between 30 Hz and 50 KHz to recordthe radiated emissions.

8.1 RE0l TEST RESULTS

The results of the tests are graphically displayed in the NTS TestReport in Appendix B and are recorded in dBpT (dB PicoTesla). Thisprovides a measurement of'the detected magnetic fields around theEagle-21 Process Protection System equipment. Figure 7 shows a plotof the composite worst case field strengths.

The worst case Racks d4T

were Racks l-R-9 Rearand l-R-28 Side. The 10highest emission was 110 1' ,dBpT at 180 Hz. Using

data from Section 10 and V0

c o n v e r t i n g t opicoTeslas, this point d8T

70is about 3.1 X 10E5picoTeslas. At the 180Hz location, thisprovides approximatelysix decades of margin 3.xE5 .1 O .01 .

from the worst casepredicted levels. MH

The twospikes at.l8 KHz Figure 7: RE01 COMPOSITE WORST CASEand 36 kHz are being EMISSIONSradiated from the MMICart when the CRT isenergized. Even at these levels, there is between three and fourdecades margin between the measured levels and the worst caseexpected levels. It should be noted that the MMI CRT is energizedonly during system testing. In fact, if the plant changesconditions during testing, (e.g. Bistables trip for reasons otherthan testing actuation) testing is administratively terminated andthe system returned to normal operations.

Ac Radiated Magnetic Fields will not effect operation of the Eagle-21 System at Watts Bar.

WATEMI/RFI

WATTS BAR EM1 /RFI TESTS TEST REPORT

1 6 TDH-060994

Page 21: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REI TESTS TEST REPORT

SECTION 9: RE02/RE02. 1 TEST RESULTS

9.0 RE02/RE02.1 TEST OVERVIEW

The RE02 tests are a measure of the radiated fields between 14 KHz

and 1 GHz. The field strengths are measured in dBuV/m and show the

relative field strength of the entire frequency spectrum in the

area under test. The fields are measured in both narrowband and

broadband modes.

The RE02.1 portion of the test is specific to the hand-held radio

transmitters and repeater stations used at the Watts Bar Plant.

The Nuclear Regulatory Commission issued Information notice IE-83-

83 concerning the use of portable radio transmitters inside nuclear

power plants. This. notice recommends that portable radio use be

restricted for use in Instrumentation Rooms due to reported cases

of interference caused by their use.

At Watts Bar the Auxiliary Electric Equipment Room is designated as

a restricted area for radio use. However, radios are permitted

just outside the room. The RE02.1 test keys these radios and

measures the field strength of the signal inside the Auxiliary

Electric Equipment Room with the door closed.

9.1 RE02 TEST RESULTS

The broadband spectrum measurements provide the largest field

strength. Figure 8 shows a composite of the worst case emissions.

All of the worst case vbconditions are wellwithin the 6 dB margin 146

f or acceptableoperation.

The spikes in the 100 to200 MHz range are the

r a d i o repeatertransmitters on the

turbine deck and otherhand-held radios beingused in the plant.These signals were MH 1 M tz 100 lowdetected in theAuxiliary ElectricEquipment Room. Figure 8: RE02 COMPOSITE WORST CASE

Even at the worst caselevel of 110 dBuV/m,there is nearly"20 dB-margin between where injected levels caused

Trip failures,as defined in WCAP-11733, and the detected levels at

Watts Bar.

TDH-060994

TEST REPORTWATTS BAR EMI1RF1 TESTS

17WATEMI/RFI

Page 22: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

The 130 dBuV/m injected levels caused trips at only specificfrequencies (See Figure 1). None of the frequencies used at WattsBar are in the range that caused trip output failures in theQualification test referenced in WCAP-11733.

9.2 RE02.1 TEST RESULTS

Four different hand-held radio transmitter frequencies were keyedat various locations outside the Auxiliary Electric Equipment Room.The field strengths for these specific carrier frequencies weremeasured within the room. The receiving antenna was rotatedthrough the X, Y, and Z axis to detect the worst case conditions.

The worst case conditions were 1 m from the stairway door when a

HT-1000 portable radio at 172.^1 MHz was keyed. This test conditionwas detected at about 117 dBuV/m field strength within the room.

This detected field strength still allows a 13 dB margin betweenpotential frequency disruption and actual detected field strength.Only six frequencies caused trip failures at the 130 dB injectionlevel. The actual Watts Bar frequency detected at this high levelis not one-of the six Trip Output Failure frequencies.

TDH-060994

TEST REPORTWATTS BAR EMIIRFI TESTS

WATEMI/RFI 18

Page 23: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SECTION 10: THEORETICAL ANALYSIS OF EAGLE-21SUSCEPTIBILITY TO 0 TO 30 MHZ EMI/RFI

10.0 ANALYSIS OVERVIEW

In 1992, in response to inquiries regarding the Eagle-21 ProcessProtection System's ability to withstand EMI/RFI fields between 0and 30 KHz, an analysis was performed delineating susceptibilitymargins in this frequency range. A report, STC REPORT 92-lSVO-EMIRFI-R1 was developed showing the results of this analysis.

This report concluded that Eagle-21 was not susceptible to 0 to 30Mhz EMI/RFI fields. The report assumed worst case conditions.Some of the conditions assumed were:

* No shielding to limit interference.* Maximum conductor lengths and loop areas* No common mode signal rejection* No filtering on system circuits* No design practices that would limit interference

10.1 TEST REPORT DATA

The report focused-three potential areas of susceptibility. Thefirst was the digital electronic circuits. It was assumed that aconductor causing interference was located such that the maximum

* afield was coupled into the circuits. The second was susceptibilityof the circuit board to magnetic interference. The third was thecabinet cables susceptibility to magnetic interference.

WATEMI/RFI

WATTS BAR EM11RF I TESTS TEST REPORT

19 TDH-060994

Page 24: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REX TESTS TEST REPORT

Figure 9: DIGITALCURRENT CONDUCTOR.

ELECTRONICS SUSCEPTIBILITY TO NEARBY

Figure 9 shows the relationship of conductor current in RMS Amps tothe height of the conductor. Although four heights were used onlythe 1 cm height is plotted. Since it is the closest conductor, itprovides the worst case most limiting conditions.

TDH-060994

AMPS(RMS

1 OE91~ 0 8. . ... ... . .. . . ...... .. ... ..

1OE87 ...... . . . . .

10E7 . . . . . . . .. .

1 OE6 ..... .

1OE5 .... .

1OE4 ... . .

10E3 h-lcom -

lOE2 .m10O E .............. ........ .... ............ :. '....... .. . . . . .

Amps1OE-1 .2.. ..

1 OE-3

1 OE-41OE-5 ...:.. .

1HOER. ...1OE-7

10E2 10E3 10E4 10ES 10E6 10E7 10E8 10E9Hz

TEST REPORTWATTS BAR EMII /2FI TESTS

WATEMI/RFI 2 0

I

Page 25: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR E1�I/RPI TESTS TEST REPORT

Figure 10: WATTS BAR CE01 AND CE03 EMI/RFI PLOTS

Figure 10 places the measured fields from CE01 and CE03 onto the

susceptibility plot. It can be seen from the plot that even the

worst case plots are well within the predicted worst case failure

conditions.

It should be recalled that the apparent shift in amplitude at the

15 KHz is the result of a change in the bandwidth being measured

between the CE01 and the CE03 test.

TDH-060994

AMPS(RMS

1 OE9

10E8

1 OE7

10E6

1 OE5

1 OE4

10E3

1 0E210

Amps 1

1bE-1

IOE-2

1 OE-3

1OE-4

I E-5

10E-6

1OE-7

10E2 10E3 10E4 1OE5 1OE6 10E7 10E8 1OE9Hz

TEST REPORTWATTS BAR ElJI/R Z I TESTS

WATEMI/RFI 2 1

Page 26: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMIIRFI TESTS

Figure 11: CIRCUIT BOARD SUSCEPTIBILITY

Figure 11 shows the Board Susceptibility to magnetic interferenceand the detected fields at the Watts Bar Auxiliary Equipment Room.

WATEMI/RFI

BETA (PICO TESLAS)

10E16

... .......... ......... .. . ........

l0E 14 .. . .. t. .........

.BOARD SUSCEPTIBILITY....

10E12 .

1 0 E 10 . .. . .......... . ......

BETA10E8

1 E6 ..... ...

.,, ....... .A. . ........ . ... ..... ........

10E4

10E2 \

10E2 10E3 10E4 10E5 10E6 10E7 10E8 10E9

Hz

TEST PEPORT

2 2 TDH-060994

Page 27: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RFI TESTS TEST REPORT

Figure 12:;CABLE SUSCEPTIBILITY

Figure 12 shows the Cable Susceptibility and the fields detected atthe Watts Bar Auxiliary Electric Equipment Room.

TDH-060994

BETA (PICO TESLAS)

1OE16 .. . . ..:.

10E14 . .. . . . . .

. ...... ... ... . ...

l O E 1 2 .......................

10E12 .i . . . .... .

BETA CABLE SUSCEPTIBILIT(1 OE8

.... .. . ..A... ..... ............ ....10E6

10OE4

.. \. ....... . ..... .. .. .. .. ... . ..

10E2 ...

1OE2 1OE3 1OE4 10E5 10E6 1OE7 10E8 10E9

Hz

- j

TEST REPORTWATTS BAR EMIIRFI TESTS

WATEMI/RFI 2 3

Page 28: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/RF TESTS TEST REPORT

SECTION 11: CONCLUSIONS

11.0 CONCLUSIONS

Based on the data from the NTS Report and STC REPORT 92-1SVO-

EMIRFI-RlSTC, it is the conclusion of Westinghouse Electric

Corporation, Process Control Division that the Eagle-21 Process

Protection System in Watts Bar Nuclear Plant Unit 1 meets current

EMI/RFI standards and will not be adversely effected by EMI/RFI as

installed.

TDH-0609942 4WATEMI/RFI

Page 29: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMIIRFI TESTS

APPENDIX A: REFERENCES

STC REPORT 92-lSVO-EMIRFI-RlSTC, Theoretical Analysis of EMIIRFISusceptibility of the Digital Electronics of the Eagle-21 Equipmentto be Installed at Zion Unit #1. Westinghouse ElectricCorporation, March 12, 1992.

Test Report 31590-95M, Revision 0. Test Report For Point OfInstallation Electromagnetic Interference (EMI) Mapping OfAuxiliary Electric Equipment Room For TVA's Watts Bar Station ForWestinghouse Electric Corporation Process: Control. Division,. -200...Beta Drive Pit.tsburgh,_.PA.A15238, National Technical Services, May5, 1994.

Test Report 60012-93M, Test Report For Electromagnetic Interference(EMI) Mapping Of Auxiliary Electric Equipment Room, Zion Station,Unit #1, National Technical Services, March 9, 1992.

- FundamentalsOf Electric Circuits. David A. Bell. Reston PublishingCompany. 1984.

WCAP-11733 Noise, Fault, Surge, and Radio Frequency InterferenceTest Report for Westinghouse Eagle-21 Process Protection UpgradeSystem. Westinghouse Power Systems. June 1988.

WATEMI/RFI

TEST REPORT

2 5 TDH-060994

Page 30: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

WATTS BAR EMI/REX TESTS TEST REPORT

APPENDIX B: National Technical Systems (NTS)Test Report of

Installation Electromagnetic Interference(EMI) Mapping of AuxiliaryElectric Equipment Room

For TVA's Watts Bar StationFor

Westinghouse Electric Corporation,Process Control Division,

200 Beta Drive, Pittsburgh, PA 15238

TDH-060994

TEST REFPORTWATTS BAR EKI1RFI TESTS

WATEMI /RFI 2 6

Page 31: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSTRANSDUCER TABLETransducer Title : LOG PERIODIC S/N 714

* Sign of Trans. : PLUS- Freq Interpolat. : LOG

Number of Points : 37

Point

123456789

10111213141516171819202122232425262728293031323334353637

Trans FactorFrequency (MHz)---------------

290325350375400425450475500525550575600625650675700725750775800825850875900925950975100011001200130014001500160017001800

*- X-[ -- X

16.5171717.31717.418.418.518.919.119.820.420.920.921.42120.821.221.222.222.723.424.123.723.523.4242424.625.925.827.527.329.931.230. 132. 8

Page 32: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

/#97 National Technical Systems

TEST REPORT FOR POINT OFINSTALLATION ELECTROMAGNETICINTERFERENCE (EMD MAPPING OF

AUXILIARY ELECTRIC EQUIPMENT ROOM FORTVA'S WATTS BAR STATION

FOR

WESTINGHOUSE ELECTRIC CORPORATIONPROCESS CONTROL DIVISION

r

J

Page 33: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

/2z9-Test Report 31590-95MWRevision 0

TEST REPORT FOR POINT OFINSTALLATION ELECTROMAGNETICINTERFERENCE (EMI) MAPPING OF

AUXILIARY ELECTRIC EQUIPMENT ROOM FORTVA'S WATTS BAR STATION

FOR

WESTINGHOUSE ELECTRIC CORPORATIONPROCESS CONTROL DIVISION

200 BETA DRIVEPITTSBURGH, PA 15238

IPurchase Order No. PA 19288Interdivision MJO No. 60429-95N

Prepared by:

IndependentReviewer:

Reviewed andApproved by:

Martin J. Metcg( EMC Manage VLPApoe ignatoryNTS/Northeast533 Main Street, Acton, MA 01720

NTS/Northeast

IL4. rapManager, Nuclear Services

Date 5- _ / -Y

Date 5_-31-__ f

Date /3 j Iq

MJM/sml/3 159095M. WES

Page 34: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

0- SECTION

1.0 PROGRAM SCOPE

2.0 APPLICABLE DOCUMENTS

3.0 GENERAL REQUIREMENTS

4.0 APPLICABLE FIGURES

5.0 TEST REQUIREMENTS

6.0 TEST PROCEDURE

7.0 TEST EQUIPMENT LIST

8.0 ANTENNA/PROBE CORRECTION FACTORS

Report No. 31590-95M

Page No. i

TABLE OF CONTENTS

PAGE NOS.

1-1

2-1 to 2-2

3-1

4-1 to 4-6

5-1 to 5-4

6-1 to 6-168

7-1 to 7-2

8-1 to 8-5

Z2�9�F

Page 35: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

1.0 PROGRAM SCOPE

This test report presents the data collected and describes the methods used for point of

installation electromagnetic interference mapping of the Auxiliary Electric Equipment Room at

TVA's Watts Bar Nuclear Power Plant. Testing was performed in accordance with NTS Test

Procedure No. 31590-95M, Revision 0.

1.1 Mapping - Point of Installation

The Westinghouse Eagle 21 Reactor Protection System (RPS) has had susceptibility

testing performed on it. The EMI point of installation mapping presents the actual EMI

profile the RPS system is exposed to, as installed, and will be used to determine whether

the susceptibility testing was performed at the appropriate levels.

The EMI point of installation mapping consisted of test points whose locations were

determined by agreement between NTS and TVA personnel to insure that the actual Worst

Case EMI Noise Profile for electric and magnetic field emissions was mapped. At each test

point, the field strengths were measured in the X, Y, and Z axes and recorded in the

orientation that presented the worst case emissions level. The frequency range for this

testing was from DC to 1 GHZ.

After test completion, verification of a 6 db margin (minimum) between the RPS

System susceptibility test levels and the Auxiliary Electric Equipment Rooms' Point of

Installation Emissions Noise Profile should be performed. If a determination is made that

the 6 db (minimum) margin does not exist, further susceptibility testing should be performed

on the RPS System, at adequate levels to insure that a 6 db margin exists.

Report No. 31590-95M

Page No. 1-1

Page 36: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

2.0 APPLICABLE DOCUMENTS

IEC Standard 801-3 International Electrotechnical Commission IEC Standard,Edition 1, dated 1984

SAMA PMC33.1-1978 Electromagnetic Susceptibility of Process ControlInstrumentation, Scientific Apparatus Makers Association

MIL-STD-461C Electromagnetic Emission and Susceptibility Requirements forthe Control of Electromagnetic Interference, dated 4 August1986

MIL-STD-462 Electromagnetic Interference Characteristics Measurement of,dated 31 July 1967

MIL-STD-463 Definitions and System of Units, Electromagnetic Interferenceand Electromagnetic Compatibility Technology.

MIL-STD-45662A Calibration Systems Requirements dated 1 August 1988

DI-EMCS-80201 Electromagnetic Interference Test Report

MIL-STD-1399 Interface Standard for Shipboard Systems, DC MagneticSection 070, Part 1 Field Environment, dated 26 February 1979

Code of Federal Regulations, Title 10, Part 50, Appendix B,Quality Assurance Criteria for Nuclear Power Plants and FuelReprocessing Plants

Code of Federal Regulations, Title 10, Part 21, Reporting ofDefects and Noncompliance

NTS/Northeast Quality Manual, Revision 3, dated 14 July1992

IE Information Use of Portable Radio Transmitters Inside NuclearNo. 83-83 Plants

NTS Interdivision Form, dated 08 March 1994

Westinghouse Document Purchase Order, EMI Mapping, dated 07 February 1994No. PA19288

Report No. 31590-95M

Page No. 2-1

Page 37: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

2.0 APPLICABLE DOCUMENTS (continued)

NTS Procedure No.3 1590-95M

Test Procedure for Point of Installation (EMI) Mapping ofAuxiliary Electric Equipment Room for TVA's Watts BarStation, Revision 0, dated 25 April 1994

Report No. 31590-95M

Page No. 2-2

Page 38: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

3.0 GENERAL TEST REQUIREMENTS

3.1 Test Subcontractors

All testing was performed by NTS personnel.

3.2 Plant Operations Interface and Site Work Controls

Manipulation or operation of plant equipment was performed in accordance with

TVA approved procedures by TVA personnel. All connections of test equipment probes to

operable plant components or wiring were made by TVA personnel. The TVA test

coordinator obtained plant operation permission prior to connection of test equipment

probes.

Report No. 31590-95M

Page No. 3-1

Page 39: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

. 4.0 APPLICABLE FIGURES

4.1 Description

The Auxiliary Electric Equipment Room is located at TVA's Watts Bar Nuclear

Plant, in Spring City, Tennessee. The equipment room's physical layout is depicted in

Figure 4-1 and shows all permanent equipment. The use of hand-held radios is prohibited

within the equipment room, but their use is allowed outside the equipment room and some

amount of this energy penetrates into the equipment room and is considered as part of the

Auxiliary Electric Equipment Room environment.

4.2 Identification

The Auxiliary Electric Equipment room equipment is listed in Figure 4-2.

4.3 Operation

0 The Auxiliary Electric Equipment Room was in operation on the test dates of May

3 through 6, 1994 during Hot Functional Testing (HFT) which was occurring during this

period.

Report No. 31590-95M

Page No. 4-1

Page 40: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

_b?�Z47

i , -

- i'*!Rt- -,1 - - I I9 I

2 I - -I a I, - I - I., tj .7 ; - ; i ,, 2

t i -1 7.( - - I - A - - --

-. ', - -,I

9.' ___ I.

.~~- t-4 w

!J.I~L~ - -s LLLL - - |

- I

FIGURE 4-1: AUXILIARY ELECTRIC EQUIPMENT ROOM PHYSICAL LAYOUT

Report No. 31590-95M

Page No. 4-2

1- .1: 1-~ r Ii

3 1IS I2< 1

7-. -

-A_, 7 I

. , ffJQr I z

29 i qz i~

*1l I S so

Page 41: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

FIGURE 4-2: AUXILIARY ELECTRIC EQUIPMENT ROOMEQUIPMENT LIST IDENTIFICATION

The following EMI noise sources were tested for their impact on the Auxiliary Electric EquipmentRoom environment:

A) Radios

Frequency (MHz)Output Power

(Watts) Antenna Location

172.025173.050171.3875173.7625164.25(Fl)172. 1(F2)162.025(F1)164.25(F2)

505050506666

Repeater on Turbine Floor*Repeater on Turbine Floor*Repeater on Turbine Floor*Repeater on Turbine Floor*Motorola HT1000 Hand HeldMotorola HT1000 Hand HeldMidland 70-150B Hand HeldMidland 70-1SOB Hand Held

*These repeaters were evaluated during RE02 and during RE02.1 when hand held radios wereintentionally keyed.

Report No. 31590-95M

Page No. 4-3

Page 42: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

FIGURE 4-2: AUXILIARY ELECTRIC EQUIPMENT ROOMEQUIPMENT LIST IDENTIFICATION

B) Equipment within the Point-of-Installation cabinets:

Protection Set IProtection Set IIProtection Set IIIProtection Set IV

I-R-1 thru 1-R-4I-R-5 thru I-R-81-R-9 thru 1-R-l1I-R-12, 1-R-13, and 1-R-28

Report No. 31590-95M

Page No. 4-4

Page 43: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

FIGURE 4-2: AUXILIARY ELECTRIC EQUIPMENT ROOMEQUIPMENT LIST IDENTIFICATION

C) The following power leads/cables were measured during(CEOl/CE03/CE07) portion of the test program:

the conducted emissions

CABINET NO. TERMINAL POINTS TVA CABLE NO. VITAL INVERTERTVA DWG. NO. VITAL AC BOARDw DWG. NO. TVA DWG. NO.

1-R-1 TB-1X, 5 & 6 IPV16D 1-I45N1661-1 1-BD-235-1-D5D63347 SHT. 3 1-45W706-1

1-R-3 TB-3X,5 & 6 IPV825D 1-I45N1661-3 1 -BD-235- 1 -D5D63347 SHT. 7 1-45W706-1

1-R-5 TB-5X, 5 & 6 1PV135E 1-II45N1662-1 1 -BD-235-2-E5D63347 SH. 11 1-45W706-2

1-R-7 TB-7X, 5 & 6 IPV826E 1-II45N1662-3 1 -BD-235-2-E5D63347 SHT. 15 1-45W706-2

1-R-9 TB-9X, 5 & 6 1PV255F 1-III45N1663-1 1 -BD-235-3-F5D63347 SHT. 19 1-45W706-3

1-R-11 TB-11X, 5 & 6 1PV827F 1-11I45N1663-3 1 -BD-235-3-F5D63347 SHT.23 1-45W706-4

1-R-12 TB-12X, 5 & 6 IPV374G 1-IV45N1664-1 1-BD-235-4-G5D63347 SHT.25 1-45W706-4

1-R-28 TB-28X, 5 & 6 1PV828G 1-IV45N1664-3 1 -BD-235-4-G5D63347 SHT.29 1-45W706-4

D) The following signal leads/cables were during the conducted emissions (CE03/CE07) portionof the test program (see next page):

E) The largest loads in the area are the Plant Air Compressors, which are immediatelyadjacent to the Auxiliary Electric Equipment Room. The compressors were cyclingnormally during all testing.

Report No. 31590-95M

Page No. 4-5

Page 44: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

AI-7CABINET NO. TERMINAL POINTS IDENTIFICATION

I-R-1 TB"A" 10 & 11 Flow Sensor (containment)TB"A" 4 & 5 Pressure Sensor (containment)TB"A" 1 & 2 Pressurizer Pressure Sensor (containment)

I1-R-2 TB"C" 7 & 8 Pressure Transducer (aux. bldg.)TB"B" 1 - 4 RTD Loop I (containment)TB"E" 1 - 4 RTD Loop 2 (containment)TB"C" 4 & 5 NIS (control room)

1-R-3 TB"D" 1 & 2 RWST Est. TankTB"C" 1 & 2 Boric Acid Tank Lvl.TB"B" 10 & 11 Anulus - containment pressureTB"A" 4 & 5 Steam Pressure Flow (vault)TB"B" 1 & 2 Feedwater Flow Loop 4 (aux. bldg.)TB"A" O& I I Steam Pressure (vault)

1-R-4 TB"A" 1 O& 1 I Steam Pressure (containment)TB"B" 7 & 8 Turbine Impulse PressureTB"A" 7 & 8 Steam PressureTB"B" I & 2 FW Flow (aux. bldg.)TB"A" 1 & 2 FW Flow (aux. bldg.)TB"A" 4 & 5 Steam Flow (containment)TB"C" 1 & 2 Sump Lvl. (containment)

1-R-5 TB"B" 1 & 2 RCFTB"C" I & 2 WR Pressure (containment)

I-R-6 TB"B" 1 - 4 RTD Loop 3 (containment)TB"E" I - 4 RTD Loop 4 (containment)

. TB "G" 10 & 11 RCS Pressure1-R-7 TB"A" 1 & 2 Feedwater Flow Loop I (aux. bldg.)

TB"B" 1 & 2 Feedwater Flow Loop 3 (aux. bldg.)TB"A" 10 & 11 Steam Pressure (vault)TB"A" 4 & 5 Steam Flow

1-R-8 TB"A" 1 & 2 Feedwater Flow Loop 2 (aux. bldg.)TB"A" 7 & 8 Steam Pressure (containment)TB"B" 7 & 8 Turbine Impulse Pressure

1-R-9 TB"A" 7 & 8 RCS Flow1-R-10 TB"D" 8 - 11 RHR Pump RTD

TB"D" 1 -4 Pressurizer RTD1-R-ll TB"A" 7 & 8 Steam Generator Level Loop 1

TB"A" 10 & 11 Steam Generator Level Loop 2TB"A" 1 & 2 Steam Generator Level Loop 3TB"A" 4 & 5 Steam Generator Level Loop 4

1-R- 13 TB"D" 1 - 4 Pressure Vapor Temp. RTDTB"D" 8 - 11 RHR Pump Discharge Temp. RTD

1-R-28 TB"A" 7 & 8 Boric Acid Tank

Report No. 31590-95M

Page No. 4-6

Page 45: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

. 5.0 TEST REQUIREMENTS

5.1 Qualitv Assurance

All work conducted for this program was performed in accordance with the

requirements of NTS/Northeast's Quality Manual, Revision 3, dated July 14, 1992, and

NTS/Northeast Standard Operating Procedure N-4, Revision 0, dated March 19, 1990,

ensuring the program's compliance to the applicable provisions of 10 CFR, Part 21 and Part

50, Appendix B.

5.2 Testing

NTS performs a majority of its EMI testing for the military in accordance with MIL-

STD-461 and MIL-STD-462. NTS is accredited by the National Institute of Standards and

Technology (NIST) under the NVLAP program, to perform testing to these specifications

(NVLAP Lab Code #0347). Full details of the accreditation are available upon request.

The following tests was performed at TVA's Watts Bar Nuclear Plant.

5.2.1 Conducted

* Conducted Emissions, Method CE01, Power and Signal Leads, 30 Hz to 15 KHz,Common and Differential Mode

* Conducted Emissions, Method CE03, Power and Signal Leads, 15 KHz to 50 MHz,Common and Differential Mode

* Conducted Emissions, Method CE07, Power and Signal Leads, Switching Transients,Time Domain, Common and Differential Mode

Report No. 31590-95M

Page No. 5-1

Page 46: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

5.0 TEST REQUIREMENTS (continued)

5.2 Testing (continued)

5.2.1 Conducted (continued)

When performing common mode conducted emissions measurements on signal cables, the

current probe was placed around as many conductors as possible in the cable bundle.

Similarly, when performing common mode measurements on power leads, the probe was

placed around as many conductors as possible including the ground wire (where applicable).

When performing differential mode conducted emissions measurements on signal

leads, the current probe was placed around the conductors in the cable bundle that are most

exposed to electric and magnetic fields. These are typically the conductors that break out

of the bundle and run the greatest distance to the point of termination, and or signal leads

* in close proximity to power leads within the cabinet.

5.2.2 Radiated

* Radiated Emissions, Method REXX, DC Magnetic Field

* Radiated Emissions, Method REOI, 30 Hz to 50 KHz

* Radiated Emissions, Method RE02, 14 KHz to 1 GHz

* Radiated Emissions, Method RE02. 1, Hand-Held Radio Profile

When performing radiated emissions testing, the field strengths were measured in the

X, Y and Z axis and recorded in the orientation that presents the worst case emissions level.

Report No. 31590-95M

Page No. 5-2

Page 47: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

* 5.0 TEST REQUIREMENTS (continued)

5.3 Post Measurement Data Analvsis (Emission Tests)

The Hewlett Packard (HP) 8566S Automated Microwave Measurement System is

software controlled and is used for making automated commercial and military emissions

measurements. The EMI measurement system is comprised of a spectrum analyzer, RF

preselector, CPU, display unit, printer/plotter, disk drive, keyboard and control knob as

listed in Section 7.0.

The HP3 10 CPU controls the bandwidth and scanning speed of the spectrum analyzer

and ensures a continuous scan of all frequencies in the desired range.

The basic scheme of the measurement is that the CPU processes the trace data from

the spectrum analyzer at the end of a sweep, initiates the next sweep, and processes the data

from the previous sweep while the current sweep is occurring. Processing of trace data

involves corrections for transducer correction factor, preamplifier gain and external

attenuation and then plotting it on the display unit for visual feedback of the tests' progress.

Test results are displayed in log frequency format. Test results can be stored in the library

disc for future reference or creating a hard copy.

When measuring radiated emissions, the program will automatically signal the

spectrum analyzer to halt the measurement process when the upper frequency range limit

of the current antenna is reached. A message is then displayed on the Display unit

instructing the operator to change the antenna and/or amplifier for the next frequency sweep

range.

Report No. 31590-95M

Page No. 5-3

Page 48: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

5.0 TEST REOUIREMENTS (continued)

5.3 Post Measurement Data Analysis (Emission Tests) (continued)

The system program consists of four major sections: the Test Library, the Data

Library, the Measurement section and the Test Setup table. The Test Setup table includes

the Transducer and Limit Libraries which are used for storing transducer factor values and

commonly used emission limits.

5.4 Narrowband/Broadband Discernment

The Narrowband/Broadband emissions determination is made by manually tuning to

the frequency of interest (center frequency) and recording the frequency and amplitude.

The analyzer or receiver will then be tuned over a range of +/- 2 Impulse

Bandwidths (IBW) around the center frequency.

A change in peak response of 3 db or less indicates a Broadband emission. Any

change of greater than 3 db indicates a Narrowband emission.

5.5 Measurement Accuracy

All measurements will be made in accordance with MIL-STD-462 and have the

following accuracies (Reference Section 7.0 - Test Equipment List).

A. Frequency Accuracy: Where specified limits are exceeded, the frequencyaccuracy of the measurements shall be accurate to within +0.1%.Verification with a frequency counter or other measuring device will berequired.

B. Amplitude Accuracy: Amplitude accuracy shall be +2 db.

Report No. 31590-95M

Page No. 5-4

Page 49: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE

6.1 Conducted Emissions, Method CEOI. Power and Signal Leads. 30 Hz to 15 KHz

Requirements

Conducted emission measurements, from 30 Hz to 15 KHz, will be made in

accordance with the applicable portions of Test Method CEOI of MIL-STD-462. Reference

Section 6. 1, Test Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. An A.H. Systems Clamp-on Current Probe, Model

BCP-200/510, was connected to a Hewlett Packard Automated Microwave Measurement

System, Model 8566S through a 50-foot length of RG-214/U coaxial cable. The probe was

clamped around a selected power lead, within the RPS cabinet designated as "Phase" and

the frequency range was slowly swept from 30 Hz to 15 KHz, and plots were generated for

narrow band measurements.

The preceding procedure was then performed on the remaining power lead designated

as "Neutral", "Phase/Neutral Bundle" (including ground where accessible), and the

appropriate signal lead bundles (Reference Figure 4-2).

Sample Test Results

Test Results

CEOI Conducted Emissions, 30 Hz - 15 KHz Westinghouse ElectricCorporation will performanalysis for all tests.

Report No. 31590-95M

Page No. 6-1

Page 50: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

,- I .n, ,5T IU I Tot;lFU lrIF

AC PHASE I NEUTRAL AC FHA`E c

r ~EUT FO'JEP CABLE

CD10

CrINDUCTED EMISSIONS) METHOID CE0I1, T' YPIFAJIT -\EST SETUP

0

Page 51: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

145EMISSION LEVEL[ dEuR I PERK

I :-''''!''''!'-'--Y''''' ---- -t------.- .-- ..-....... .......... -.------- ........ ...............C....MIL-STfl 4GIC PART 4 - CE-bi

WESTINGHOUSE MJO 31590-G9Mi........-- . ........... .- . . TVA WRTTS BAR UNIT1 RUX ELEC RM

REACTOR PROTECTION SET IRACK NO. 1-R-1 TD-1X.5

.... .... .. . . ...... . .. ..4 . ..* . .. . .. . . . .. . . . .... . . . . . . . . . . ... .. .. . ..

... . . . . . . .... ..... j .:

* ......... . ...........

.. . .... .... ......................

......- . ...... .......... . . ..i ' ' .'. . 1 I.....~~............... t. | .. .. .. .... .... ... .. . ... o..oo...o 1

.. . . . . . . . . . ... .. .. . . .. . . . .. .. .. . .. . . . . . . . . . ... .. . . . ........

-sLeLei~~~ ;0i5

125

105

B5

65

3. E

FREQUENCY [MHz]

5 May 1994 89:88 : 44h p NATIONAL TECHNICRL SYSTEMShp EMISSION LEVELE d~uRJ

145:............. ... .............. .... .

12 I... ...............

12 . ... , .. .........-

105 . .. me....

............ ...... .. .

95 ........ ..... ............

65 '~~~~~~~. .------.--.---,-----................ ......... .

.515FREQUENCY 0MHz3

PERK

I

6 3

Ct?

5 Mayv 1994- 09: 01:55

5 May 1994 09:OB: 44

hrn NnTIONAL TECHNICRL-SYSTEMS

Page 52: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

14, .1 45

rortI irjrv rML-.v

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR)

5 May 1994PERK

09:32:36

MIL-STD 4GIC PART 4 - CE-WiWESTINGHOUSE MJO 21592-ASM

.....................'---'''---.T----.----i WATTS ARA UNITi RUX ELEC RMRPS I RACK NO. 1-P-i

.....*.,.2CONT. PRES. SENS. TBR 4.5. . -4 . . . .................. ........... ..................

60 H4Z LIM iW

........ ........ .......................... ........ , . .,.,,,',

.... @ +.... .. ... ..... . . . . . .'

4..,.. ......... ............. I..............I..............*.... .4... .. .... ... 4. ........

..... ... ...' ' ..................... ........... . . ....... ...... ..

........... .... ............ ..... g.....C lls o ;- *-- *- *- -

, WuO L

FREQUENCY [MHz].015

EMISSION LEVELE dluRJ PERK......................... ..................................................................................... MIL-STD 4flC PART A - CE-21

* . . .. .WESTINGHOUSE MJO 3159-95M-..... ............ ...... TVA WR cAT S BRo UNIRTIRUX ELEC RMRP*IPAKNO. 1-P-i

............. ..... .CONT. FLOW SENS. TDA 18112

......... ......... . ...... .,

L'............. ..... ........... ..... ........ ..

, ........ ........ ........... -. .. '.''''.'''.'''....' ......... .......... ....... ........

................ .'.'. ' .'.'

...... .... . . . . i. t .. t . i... . . .... 015... .. ... . ; ,;. .. .. . ..... ...... ..... ...... .... ........

;.... ........ ...... ...

-5a ,E~ .O~l .01

125

105

B5

hp145

125

105

B5

E5

3.E-

I

6 4

I oLeu1L - -. Lirn ItJ

5 Mav 1994- L39:25:35

Qz . tl3

h n NRTIONAL TE.CH'NICAL-SYSTEMS

Page 53: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 5

hp NATIONAL TECHNICRL SYSTEMS 5 May 1994 09:40:43EMISSION LEVEL[ d~uR) PERK1i.....i..t. ... iC PART 4-.CE..... i..

.WESTINGHOUSE MID 31590-R5M''''.'--'--------... '''............--''''''-'-,--'----.- ...... T VA WATTS BAR UNITi AUX ELEC RM

..,Pg I RACK NO. 1-R-1CONT. PRESSURIZER SENS.Ten 1,2

125 ...... -- ---................... ......... -.- ,- .............

* '. ... .. ............................................. ........ . . . .. ......... .

.10 ., .. , ...o. L o io

9 5 ..''' ''\-''| '''' V' ''' ' "'' '''.... .... ........... ... .. .. . .... . .. .. ..

3 .. E5 1. 0 i . . 1 .......... . .. .5

FREQUENCY [MHz)

Page 54: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

-°-. ................................. ...

5 May 1994- 12:44:4?hp NATIONAL TECHNICAL SYSTEMSP EMISSION LEVELE dRuRP''''''!''''''''Y-.. .... ''Y'.!.!... ''''''''.............. --.. ....I 9D ................ ........................... ... ......... ...............

MIL-STD 4S1C PART 4 - CE-22WESTINGHOUSE MJO 315920-95MTVR WATTS BAR UNIT1 AUX ELEC RMRPS I RACK NO. 1-R-2AUX DLDG PRES. TRANS. TOC 7,9

''Y'-Y--!-' ........ ........ - ....-v.....V .125i

15

65 ji

a. E-5

rorai iruwrv u~- ir I LuL I L"flL J

I INIWWLrJ1L I L LrlLZ .

8015

. . ...-.- - -. ................. .... .........

.l .4 ',' ,. '., ' .'.'........ ..........,*'., ,.,,'

. . - - - ......,

......... ...... ...... '. . ... . ........ . . .. . ...*, . '. .......

.......... .. .........

.... ..................... .... . ..;.....

Ihp 2�{A�7�i SYSTEMS S May 1994 12:52:38

PERK14D

125

105

B5

65

a. E-

MI L-STD 4SiC PART 4 - CEtt iWESTINGHOUSE MJO 31590-95MiTVR WATTS BAR UNITI AUX ELEC RM:RT- I RACK NO. 1-R-2

iRTD LOOP I TDD 1-4. .... . -... .. .. .........

i.... ......,. .. j......................4..... ...........

.S .T ..t.....)........................

,,..,, .. ...... . ,... *............,.'.... '... .

'5 . 00maml-.815

MrorAIrturV rMu-I 6 6

I

hp. EMILssYHb TECHENItCAL SYlSTEMS

~~~~............... .......... : - --

PERK

I , W30L

5 May 1994 12:52:3B

- ww

Page 55: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 ,

NATIONAL TECHNICAL SYSTEMSMPERK 5 May 1994 16:4P:2?

. MIL-STD 4iiC PART 4 - EiWESTINGHOUSE MJO 21590-RSM

††††††††TVA WATTS BAR UNITI AUX ELEC PMRPS I RACK NO. 1-R-2NIS CCONTROL RM) TDC 4,5

........... .... .. . .... . .....

FREQUENCY [MHz]

Page 56: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMS 5 May 1994 14:20:19

NETISONL TECHNL CRL SYSTEMSEMISSION LEVEL[ dlauR3hp

145

125

105

B5

s5

*NL~I.L. '~ I LI llL -I

MIL-STD 4GiC PART 4 - CE-0iWESTINGHOUSE MJO 31592-95M

................... --.......... . TVA WRTTS ERR UNITI RUX ELEC RM. . . .. .RPS I PACK NO. 1-P-2

. ! . .. RTD LOOP 2 TEE 1-4

,W.... .... ... *.. .. .... . .

............... .... ..... ........... ....... ..... ........

. ..''''.'''.''!'.''' ''''.,........ ....... ...........

.. ... .. ... . ... ... .. ..... ... ... .... ....e.. ... ... ... . .. ..... ....... ... ...

i. ..... .... . . .. .. ................. '- ..-.................. ...:..:::

I

6 8

5 May 1994- 14:00:19PERK

.UOUl L . OU .015

Page 57: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Hp

145

125

NATIONAL TECHNICAL SYSTEMS S May 1994 14:22:45NETIONAL TECHNICRL PYSTEMSEMISSION LEVELE dlauR3

MIL-STD 4GC PART 4 - CE-GiWESTINGHOUSE MJO 21590-95M

*...... TVA WATTS BAR UNITI AUX ELEC* . k. RPS I PACK NO. 1-R-3

. 1 21 . . TD-2X 5

B5

......... . t t. . -f ... ...... . -y.....T . . ... f S Y -

, .... ..... . ..... . hzLM ........ ............

' '° '- ' SW V °g ' - g'- > |; - e............ .... .. ..... .. ... .. '. ..... '.'..'.'.

-4-4-4 , ...........

t tt .................... ............... ..... ... ........

................. ............ ........ ... .... ...........

FREQUENCY [MHz3

3. E-

NHIIONRL TECHNICRL SYSTEMSEMISSION LEVELE d~uR)

.0C00

PERK

eeL

S May 1994

FREQUENCY CMHz]

J4:J9:25

.015

I

6

hp145

125

155

5

t5

. 3.E-

........... ....... !.......'--" ..----'--...... T f RR

± . . .WESTINGWOUSE M02 31590-95M...... . .... . .. . RAT R UNTI AUX ELEC R.

. I MPSI RACK No. 1-R-2

Tn-ax G... . ......... ..... :

f : HZ LIMIT

.4...*4 .4... ...... geii

..... ........ , . 4 . ... Z4 *4..@........... ....i i i i i i j~~~. jj9jjjj,..........'1

....I. ........ ....... ... . ..I...........*...i~ . .I. .. ....... .. .. .. ...

i''......tt ii i .... 4 .... ........... ...... ..... .... ........... ....... 1..... .. .i- ...... I

.. .. ............ ,i .. ...... .......... .. . ... ..... ....... ....... ..... ....... ,i .. i, ... ,i .......

:---'-'!'''-!''' ''' -' '''-''''''''-'' . .. ... ........................................................ ...............................................

:RM :

--- - - ----- ---

5 May 1994- 14:0?:45PERK

*5

Page 58: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

h NRTIONL TECHNICAL SYSTEMShp EMISSION LEVEL[ d~uR)145

NATIONAL TECHNICAL SYSTEMS S May 1994 15:88:49

PERKw @ YY@ Y ---2------2- MIL-STD) iGiC PART 4 - CE-01

. . .... . . . .WESTINGHOUSE MJO 31590-95M

. .. ....................... ......... .. . ..... . . . . .. ............. T RN..D 1 ,TV WAT BA -NT AU iLE PM, @ ''t'Y''"Y '''''''"'''''''' '''''' 'Y''Y'''''

, ------------ RPS PACK--------.------ NO L M-

j WG jV jX.TN jP j3jj1 iii2~

........... ...... ..... ..... i . .. . .. . ... ........... ...... -. .... . .....

.............. ,..... ,, t. e [email protected].;.... ........e...e...e.... . eeosei.......... ..... w v.........

............ ...... n. ............. ........... . .... .. .- e--...........|oe

.. .... . ..... tI..h.... ---- .................... ........... ... ........

...... .... ... ... ...... --...............;................ .. ................................. .... ... ....

125

105

B5

.015rori :rwrv rMLF,1

I

6 10

U7

5 May 1994hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~uR] EA145

125

105

B5

Ei5

3. E-i

......... ..... ... ................... .................... ..... . . . . . . .g gj.YYgY ggggMIL-STD 4iC PART 4 - CE-0 i

g WESTINGHOUSE MJO 21590-9SM.................. --'i-i--- ''''. ...... TVA WATTS BAR UNITI AUX ELEC RM

~RPS I RACK NO.- 1-R-ag jORIC ACID TANK LYL. TDC J.2

.E.......,.4 -. ... L.. .M..f ........ ......- . .

. ... . . ...... . ..

.gg--... .g . ...... .......

. . .................l 9 . V .. R ^. g g* S .S - Sj g

5.- .R~ U15 -.

FREQUENCY tMHzJ

5 May 1994- 15:00:49

.OU L

15:0?: jsPERK

- .w�� . .RJWJ . e15

Page 59: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~uR3 PERK

5 May 1994 14:42:00

MIL-STD 4GIC PART 4 - CE-21

WESTINGHOUSE MJO 31592-RSM................. -----..--. - TVR WATTS BAR UNITi AUX ELEC RM-

RPS I PACK NO. i-P-3ANULUS-CONT. PRESS TRD 1B,11

.,.-,..,.-.-. ......................-.

hp145

125

05

s5

£5

. JU L

I l II iL

hp P. MIIONHL TECHNICRL SYSTEMS.-- MISIONLEVELE d~uR)

125

]05

a5

GS

3.E-

PERK5 May 1994 14:54:1I

....... ........................ ... . . . ....... ..

.'. . , , , . MI L-STDi 4fc PR~T i CE-Ai.............. . -.. . ., 'WESTINGHsOU5E MiO 21590-95Sm

....... ..................... TVA WATTS BNA UNITi AUX ELEC RM-STEAM PRESS(CAULT) FLOW TOR 4,5........... ...... ..... . ... .. i.- .. w^v*. ... ---.-------v@ ............................... .. ..... -. .......RP I AKN. 1-p- -... MI

........... ,

ijji... .. ...... -.... . . ....... .. i.. ........... ....... ......... i... ... i .. ..... ......... ...

I.......... ... ..... ........ . ..... mj . j i

e '.... +................ ...... .... ............

....................,. ..I

..................... .. ....;jj;.. ;........ ........ .J

...................

c . .....

rbrru urkirv r. IlflZ.015

.I.. i... .e.. . . .. .. * --. ..... .

.-, -................... ......... -- .. .....

t-.. . -.-.-. .-ee-. ---- ---................ . . . . . . . ..................... ............ ....... .. .- ..... . ............

. . . ... . . . .. . . . .. ..4.. . . ...I . I.. ... .. g . . . ...

.* - - -e9....-.........................-.-...-.....-..-

-C'-------------'----'-jjjjjj-;......... ..... L3. E-

I

6 11

......... I........... . .... .. ........................... ................................ .............. -- ---------

r Mr-MuPr-M I LM-I nn

.01 I5I.a aFPFrhi iFrmly rmu-i.

145

,

I

. 10010L

Page 60: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELC d~uR)145 ................. .

125.

055

B55

S5 i

3. E-E

I6z~w.S. * ...... i ...... .... . -4- --

5 May 1994 14:26:32PERK

MIL-STD 461C PROT 4 - CE-2iWESTINGHOUSE MJO 21590-RSMTVA WATTS BAR UNIT1 AUX ELECRPS I RACK NO. 1-P-3F.W. FLOW TPR 1,2

PM

....................-..... .. I. .... ................ -- e-- .4. ...........

... . . . . - ' ' '. . . . .. ' . ' . ' . ' . ' . '..

.. -| | + + v | |~~~~..-.----... - -- -..+-.. . --- ... ....... ..... o--§--e.... -

.::::.::::...::: ... ... ... .U:FREQUENCY EMHzJ

... MIL-STD 4G1C PART 4- CE-Bi:WI .WESTINGWOUSE MJO 3159ORSM

T .................... W.....................T.......................... TVA WATTS ERR UNITI AUX ELEC RM-.:IIRPS I RACK NO.. 1-R2

STERM PREG. (VAULT) TER 29,11

. ............... ........ . ..-. -...... ...... .. ...........

.. . .. T. ' ' ................... i....*.. ..........

.... . ... . T § , . ..... ............. ................ .... .......

.................... . .. .. LI...... . ...J

S May 1994 14:33:33hp NATIONAL TECHNICAL SYSTEMSP - EMISSION LEVELC d~uR) PERK145

125

105

B5

65

3. E-

FREQUENCY [MHz]

I

6 12

I

........................................................................ ...--------............................"-' ' ''!' '- *:

.................... . ... ... ........................... ............................

m ; ; ;; :

I M .00L . el1s

5 May J994 14:33:33

-5 .eee0 .01aL . B15

Page 61: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR3 PERK

S May 1994 1?:22:26hp145

125

105

B5

65

- I .015FREQUENCY EMHz)

........... *------... ........ -- vv. ............................. -|P-..........f. . . . j MIL-SDT 4GiC PART 4 - CE-1i

WESTINGHOUSE MJO 31590-OSM R............... .................................. TVA WATTS .. 0R UNIT AUX ELEC RM.

RPS I RRCK NO 1-.R-4STERM PRESS. CCONT) TPR 19,22

;--'''4---4- - 1 .................... . ........... ........ ...... ................................ ....... ...........-'----'-------'--------'-''

.... ... . .......... ........ .. .. ........ . . ... ..... . .... . ..

soBSHZ LbIMlT

.................. ........ i ..... i... .. ..,. .......

.. .. , .. ..... , . ......

...... ..... . ..... ...... ......... ... j,'i........ ..... .................... .............i

.. ..... ... l n .. ....

MIL-SITM lIL PHRT 4 - CE-W1

WESTINGHOUSE MJO 21590-DSMTVR WATTS BAR UNIT1 AUX ELEC RMRPS I RACK NO. 1-R-4TURD. IMPULSE PRESS. TDD 7,9

5 May 1994hp NATIONAL TECHNICAL SYSTEMSP EMISSION LEVELE d~uRP145

125

105

B5

95

3.E

FREQUENCY (MHz)

I

1 3

, MM L

J?:29:29PERK

Page 62: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS 5 Play 1994 1?:B?:25

NETISONL TECHNL CRL SYSTEMSEM ISSI ON LEVEL C d Su R.hp

145

125

105

B5

E5

3.E-FQF(Iilrwrv rmij.,

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dGuRJ

. ccc L

PERK5 May 1994

.00L

1?: 14:34

.515FREQUENCY CMHzJ

I

6 14

(4&J

j j j ,. j MIL-STD 46iC PART 4 - CE-0IWESTINGHOUSE MJO 3150925-95MTVR WATTS BAR UNITI AUX ELEC RMPPS I RACK NO. 1-R-4STEAM PRESS TPR 7,6

Q31 H4Z LIMIT

. ... ........ ........... ...... ...........

. ........... .................... .. ........

.......5. ... .. .-............ .....

j .. -e ---...... ..... . .. U-2*ej4-- ................. ........... ........ . .. .... -.d -- ............. ¢jo

hp145

125

105

B5

Es5

3. E-

, ..jj . . * jMIL-STD 4SiC PART 4 - CE-2iWESTINGHOUSE MJO 31592A-5M.................... ''-.''j-i .. -- .. .. .. . TYR WATTS BAR UNITI AUX ELEC RMi

jjPS I RACK NO. 1-R-4..2.:... W FLOW CRUX) TUD 1.2

ji .... .. . ..... . .. .. .. ' ... ,j .. ' .. j. . *..

... 4.-....L'.'fir........... ....... j ...........

I. ... .s- S. ... , . ,,...I .t,. .*.4., . ..... .. S.... ........................ .- - --...... . ................ ............ ........ ..... I.........

....................... -.---------............ . . . . . .. . . . i . . . . . . .... .. .

. . � " � I

li

5 May J994- 1?:OP:25

!3

PERK

. e1s

I.ese0

.;a

Page 63: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~uRJ PERK

5 May 1994 1E:55:03

MIL-STD 4fiC PRT 4 - CE-. iWESTINGHOUSE MJO 21592-OSMTVA WATTS BAR UNITI AUX ELECRPS I RACK NO. 1-R-4FW FLOW CAUX) TER 1,2

v-vv v.................... ....... --- e- ..... f. ....-. Tv.v.-.

hp145 j

125 j

105

i...3. E-S

.... * .. y ..............-..... ... ......... . .. ......-......... . . .

MIL-STD 4fi1c P RT 4 - CE4* -. IWESTINGHOUSE MJO 215g29-SSM

.........-... ,Tvg"GTsUEM:I~5a-S ........ .. .......... .... ........ . WTA WATTS BAR UNITI ALUX ELEC RM I. . ;RPS I RACK NO. 1-R-4

;...j.......... jSTEAM FLOW CCONT.) TDA 4,5

.-.-.$ --e--.e-- .... . .. -----.----- #.'-----.--- -------.- . ............................... ........ ...... . .. - *-- . + ...........---

.... . ......... ....... ... ..................

60HZ LIMIT-

.--........... e-----.---.-..-- . ........... [email protected]........... --- -z --+-......................... .. .... ...... . ... ........... +

........................ . .....

I.* ..... i .... &4*..* ........... .

. .......... . .. . .. . .

3 -"'''''-R' *l .T cc '- - C !'-- -'0''-1'-

S May 1994hp NATIONAL TECHNICAL SYSTEMS- EMISSION LEVELE S~uRJ PERKi *;D

125

105

£5

3. E-

FREQUENCY rMHz) 6 15

Hp

FRrouruCy rMHrl

Ilp:01:51

-a . MM L .0101L .0315

Page 64: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NRTIONRL TECHNICRL �Y6TEMS 5 May 1994 1?:36:2?

NATISONL TECHNIC RL SYSTEMSEMISSION LEVELE deuR3

145MIL-STD 491C PART 4 - CE-02WESTINGHOUSE MO 321590-5pMTVR WATTS BAR UNITI RUX ELECRPS I RACK NO- 1-R-4SUMP LVL CCONT.) TDC 1,2

125

105

B5

3,.

FREQUENCY tMHz3

I

6 1 6

tuf

5 May 1994 IP:36:2PPERK

Page 65: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC dSuR) PERK

5 May 1994 19:02:59v..v............-........... ... ... ..........:.........

---------- ! .. MIL-.sTDn si. PART4 t-... WESTINGH4OUSE MJO 21529-O5M M

. .. i TVA WATTS BAR UNITi 9UX ELEC RM.PS II RACK NO- 1-R-5TR-5X

........... ............ f. .... yvv.....v*....... .. .... ii.- ..........--

*0 HZ LIMIT i

* . 4.4 .. ..a...... .. .. ... ...... ...... .... 0...I.. ..........

,. ..

.. .. . .i . . . i . *

. ecc .meL . 015FREQUENCY tMHz)

hP NATIONAL TECHNICAL SYSTEMS 5 May 1994 18:56:00hp EMISSION LEVEL[ dlauR) PERKC

l S . --- @ -V V@ - V-- @ @ § -MIL-STD i1 PART 4 -

WESTINGHOUSE MJO 3j5LO-95M.............. ~.. . . . . ................................ '.''' '. . TVR WATTS DAR UNITI RUX ELEC RM.. . ** . . RPS Il RACK NO. 1-R-5

TD-5X S132... ..- . - - --.....1 3 i ....... ........ ..w......... ....... ...... .. .. .. .......

........ . ........... . ..................... . ... .. ... H2.L.M.-.-90HZ LIrMrT-

1.1.. . . ttt!@-b:.... ... ......... ....... ... S11 e.....l...e §eBe..s.....1

.I . .*..............I

9B~~~~~~~~~...... ....tt..VtV ..v.e .fi.. f

Be ...... . . i ... .. 4 --4 e. ..tt*t........ i7>,--.............. .......- ...............

............ .. -t e tt.. tt.

.................... ........... ........ i. i..... ...... i.............. ........... ....

3.E-5 .0001 .001 .015FREQUENCY (MHz3

hp150

130

lie

90

70

3. E

I

6 1 7

b

Page 66: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

145

125

1B5

e5

5 May 1994 19:12:BBhp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dluR) PERK

j .. MIL-STD 4iiC PART 4 - CE-3i iWESTINGHOUSE MJO 21590-95M

----------j .............. ...... ......... . -i TVR WATTS BAR UNITI AUX ELEC RM'RPS ri PACK NO. 1-R-5

j j jjjjj. j i jRCF TRD 1,2

........ .. ....... . ........... . -.... . ..-.. .......

........... .. ...................

i- ........... i...... ..... .... ... .- o .. i 4 . ...... i4 ... i .. i ..- _i* : ..................... ........ ............... .....,.... ... I . . . . **4....

j.E 88 iiiii ii-i s

:....... ... .. .... ... .... .................... .......

.. ......... ...... ..... j..ji..ii, j.jiji.i,.i..j i

... .. e e---+- ..... t -,*--.....i j

.5

VrbPI rmrv rMLa-.i.815

MIL-STD 41iC PART 4 -CE-'iWESTINGHOUSE MJO 31592-9SM

,i....... TVA WATTS PAR UNIT ARUX ELEC RMRPS II PACK NO. 1-P-5

.... WR PRESS. CCONT) TPC 1,2.ij''''j'''''Tt t'''ii .............. ........... ..... w .... .......

........... ...........

I..I.*.* ..g ...g.... 4. I .I.................. .... .................. ~ ........

L u ll .................... li . . . ........ ....i............I..... * ....

... ... .. . ...... ........... t..-... ...... ..4.......... ............ ?... .. ..... 4.. 44j

...... - - - - * a ..... - . j

hp NATIONAL TECHNICAL SYSTEMS -. ...... y..�............................ENMTIONAL TECHNICVL SYSTEMShp EMISSION LEVELC d~uR3

.015rprihrwrv rMw,1

125

185

B5

G5

3. E-

6 18

I

I - - -6

I IFIA.J LlN-

* .1 - - -5 -- W lo - -

I

3.E- , e L

5 May J994 IS: 19:26PERK

1 45

Page 67: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

125

105

NATIONAL TECHNICAL SYSTEMS 5 May 1994 19:26:38h MNATISONL TECHN ICRL PYSTEMShP EMISSION LEVEL[ dau R3

145

FREQUENCY CMHz2

55

Cs

PERK5 May J994hp NATIONAL TECHNICRL SYSTEMS

EMISSION LEVELE deuR]£ ¶t

125

105

B5

CS

MIL-STD 491C PART 4 - CE-RiWESTINGHOUSE MJO l5190-95M R

. .- ... ..-... , g-.i TVR WuTTS BAR UNIT AUX ELEC RMURPS II RACK NO. 1-R-*RTD (CONT) LOOP 4 TDE 1-4................................ .*.....g..*..... .............*..........f.. .... r . -... .. ! ... 9f......

........... .. .. ... ... ........... 3 ........................ . . .. .....

...... . .... t. . ..... ........ i.. i .. t- - . ... .......... 4 ..... ... t-4 4 - .......

,.. ... .. ...... . ..... . ...... . ........... ...... . . ....... ... ........... . i..... ... ..... ....... .... .......... .......................... ...... .... ........ . e . . -*.

... .. ....... ....... i ......... ... ...... . .....

........................... . ... .... .. J . ..e ass.EI .I-

FREQUENCY [MHz]6 1 9

I

5 May 1994- 19:26:36PERK

14.-STD 5iC PART 4 - CE-i1WESTINGHOUSE MJO 31592-95M

............ ....... ..... .... TVR WATTS M R UNITI R UX ELEC RM. , i ..... . *. .RPS II PACK NC). I-R-G

RTD CCONT) LOOP a TSP 1-4

..... .......... ................. ... *.,................

.... *. *. . . . ... '. '. '. . . . ......

. -........... ..... ................ . ............................... .............. ...... . ..... ...... .....

*, . .. , * . . ,, . .. t.T. . ......

.... . .. ...--------- ......----------------- -.... ...-- .... ....... -- i---- ...........................

..... ... .... . .... ......... e... . i 4..... ..... i-.4 . -4-4 .....

.. .. eii-;..... . .....

. ace LJ r--! I Do . els

19:32:49

-; . CIC14 L . Oa .015

Page 68: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hpJ45

NATIONAL TECHNICAL SYSTEMS P May J994 19:41:25EMISSION LEVELC dGuR) PERK

.................................................H ..- . . MIL-sT ..i .c PART 4 - CE-.I

* WESTINGHOUSE MDO 215g9-C-9g5 M

*RPS II RACK NO. I-R-G* . i RCS PRESS TBG 1e,11......... . ........ , ..... .. ...... ,,125

B5

95

,s l,

3. E-!

. . ...... .................... ..... . .. . ....-..- ..- ............ ......... .. .......... ... ... .. .... ...........

.......*..i .......... *.....S..... . .... ..

.. .. .. l .--...-. .. . ....... . ...........

a- I cml

J.. B15

I

So 20-

.. .� j

I

mrrEDirwrv rmu,.1, WM

Page 69: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS 5 May 1994 20:22:46EMISSION LEVELS dlauR) PERK

- ................. ... .... .... .IL-.TD M4T1i PART 4-CE-A.. * .. * .~WESTINGHOUSE MJO 21520-65M

* ------------ - -- -- TVA WATTS PAR UNITi AUX ELEC RM; RPS II RACK NO. 1-R-7FW FLOW LOOP 1 CAUX) TSR 1,2

.... . ......

L................... ........... ........ ................................

hp145

125

]55

55

rNcWLP6.I I LI lfl1 J

.815

RPFW

5 May 1994 26:3B03Bhp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dLuR) PERK14 5 . .. .......... ...... ....... .. .... ..... '...............L-STD 4S6C PART 4 - CE-Bi .STINGWOUSE MJO 2159-95M'A WATTS BAR UNITI AUX ELEC RM.S II RACK NO. 1-R-7FLOW LOOP a (AUX) The J12125 --

105 *.-

k..

B5 z

I....3. E-5

rm-grI-Lw4nL.1 LflflZJrmerl lrkur% ruu--

3

6 21

................ ...... . ......... .................... .....................

............ ..u ...... 4........

----i--Z-++-Z-Z--------+ ---j-----1-1--|+------......... ..................... ................. ,o

........... ....... ........ ......

.... ' -. I...''''--- ................... ' '

-- Z--|+. *- -.... ..... ........... ..................-

,........ ;..... .. .............. ........ ..... ... ......

. . ;a ig 7 i r r.r-.. ............ ....... . ........................................................... -- -............: : : :::: ; : :

I

::

II

3. E-' . JCWJL . 00FDFM LiF^vr r~u~j,

Page 70: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp145

125

105

B5

NATIONAL TECHNICAL SYSTEMS 5 May 1994 28:3?:28

NETIONAL TECHNICRL SYSTEMSEMISSION LEVELC d~uR3 'PERK

j . MIL-STl. 41C PART 4 - CE-BI .i jWESTINGHOUSE MJO 31590-RSM

.........-....-''-. .. .....''." ...... TVR WATTS BAR UNITI AUX ELEC RM:j PRPS II RACK NO. 1-R-7

VAULT STEAM PRESS. TPA 12,12

... .Z LIMj. :... .... ..........

*.........�... . . . ..... .................

i . .01,i,5 , ,i i i .

''''ij--ii---..----.. ........... ... :., .... .....--- . ................. .- ..... -.. ....

. . .. . .. . .. . ... . ... . . ... . .. . . .. . . ........... ....... .. . . . .

................ ....... ........... ...... . ..... .., i, i ij ...........

I..........i. i ........... ...... .... .. . .. j i j i 4 4 ......... j

.. ... .... ........ ... ...... .. .. .. - - .. ....

FREQUENCY (MHz]

PERK5 May 1994

............... ...... , , , . .MIL-STD 4ilC PART 4 - CE-0 jWESTINGHOUSE MJO 31590-RSM

i TVR WATTS BRR UNITI RUX ELEC RM Ij RPS II RACK NO. i-R-7

j VAULT STEAM FLOW TDA 4.5i........ i .i.i.i.T... . ....................... .......... . .. .......j

.-..- . . ..- ........... . .... . .....- -

j...... ; ...... .............. ... .. ....;... i

.... ..... .. ........... .. ............... . . .................... .... .... ........

............. I....... .. 1.3*. i............ i

l 3 3- 3 3U I. 3.03. 33j 31 33

.... - i--- - - ! .. ... ..... .. . .. ..................... - j ----------- --- - .- *-i

- --ij-f- 3-3- - .... ........ . ...... 44 41........... 3

20:44:01hp NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC dOauR]

dir

125

105

a5

35

FREQUENCY [MHz]a

I

6 22

tj

5 May J994- 20:3P:2B

d. L-t- -. ee0e L . aaL . e1s

I t

. suat L . EM .els

Page 71: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSp 4EMISSION LEVELE duRJ14 :.............. .!- ......... ....................

PERK 5 May 1994 20:59:3B........----. ......... ----- --.....................................................

FREQUENCY (MHz-6 2 3

(AF

hp NATIONAL TECHNICRL SYSTEMS 5 May 1994 20:53:8Bhp EMISSION LEVELE d~uR) PERK

14 . .... MIL-STD 46iC PART 4 - CE-Oi. . .WESTINGHOUSE MJO 31590-95M

..... . ... . .. .. TVA WRTTSERRUNITI RUX ELEC RM*. .. . . .FW FLOW LOOP 2 CRUX) TBR 1,2125 . ', .,.. ' , , ., * ... ......' . *. *. . '.'. *'. , * . '.

11 H.. .Z LIMt

105, -- e e-- -i w z s ........... ...... .................... ...... i....444... i....................

' . . . .'.'. ... .' ... .... .' ..... ...... '....'...............

... ...--@ -------- .......----------e ......-@-----§--- ................. , . ...... .............................. ..........

.. .. . ...... .. -- ----- - -

3' ' ...... U ...

FREQUENCY (MHz3

I

MfL-taL lUl PFRRT 4 - CE-01

WESTINGHOUSE MJO 31599-95MTVA WATTS BAR UNITI AUX ELEC RMRPS II RACK NO. 1-R-9STEAM PRESS. CCONT.) TDR 7,9

Page 72: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

105

B5

......... ..... ..9.o.e.4.9.9......... . ........... ........ 4 e ........ ........... ............ i....... ..

t- - '1--|---4 - 0-0--! !-- --- ----- 0 ------ i-------j-----i.........ej -.....--i-.-..... i-----i--.... i

* A- .---9......... ...... ......................... . .... .... ........... ..... .... ........... ....... ..... ....

... -+ . -.. .................... ........ .... i .. , 4 , 4 .. ....,..jj.;.... . .... --- --- --

rDrwI [rbrv rMu-, i.015

J

6 24

I

I

Ih Np ATIONAL TECHNICRL SYSTEMS 5 May 1994 212:2:19hp EMISSION LEVELC d~uR) PERK

45 . . T T T . . MIL-STfi4iCPRRT 4CE2.... . ~WESTINGHOUSE MJO 3159 0a- 9 s...................~ . ... S.NWOIE J 25-GM........... .......-....-.-.- T WRTTS BDR UNIT1 RUX ELEC RM.

. .. . .! .RPS II RACK NO. I-R-8** . * TURSINE IMP. PRESS TDB 7.?

.25. ....... i............ ........ .. ........ ................... ... .. -- - ...........

.. .. .. '...... ... .. ... .. . . . . ............ ....... ...... . .. . . . . . . .

. ,>-w- . ., d

3 .Er-5 . -JUV L

Page 73: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

125

105

25

NATIONAL TECHNICAL SYSTEMS 6 May 1994 28:23:55

hp EMISSION LEVEL[ dleuRJ PEM145

FREQUENCY fMHz -

NATIONAL TECHNICRL SYSTEMSEMISSION LEVEL[ dGuR3

FREQUENCY [MHz]

I

6 25

6 May 1994 0B:23:55PERK

* . MIL-STD 4ii .P RT E4 . C ..i. WESTINGROUSE MJO 31592-95M

------ ....... . . .. i TVA WATTS BRR UNIT1 AUX ELEC PM::RPS III PACK NO. j-R-9RCS FLOW TDR 7,0

......... ................... . i ....... ......... f...

. --- L .M .T

.. -.3 .. . .... . ...................UO i ....'.--.i-..... -i-. ..... 4ei..........i-----.-- - - .............. ............... .................... ........... ....... ..... ... .... ...........

............... '''.'''..........'''''-1 -- ----- ...... ...........|1 1+,

..... <....... ........ ................

a3.E-5- -

.laal , a13 .015

Page 74: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

125

105

NATIONAL TECHNICAL SYSTEMS S May 1994 28:36:11

hp NETIONAL TECHNICRL SYSTEMSPEMISSION LEVEL[ d~uR3 PERK

145MIL-*-T-- - PART 4 - CE-i R

WESTINGHOUSE MJO 21590-95M................... ........... TA WATTS BAR UNITI OUX ELEC PM

PPS III PACK NO. j-p-g

... ....-.... ........... i HLM-

.. f ,oo!llo .................... ....... .........

614 HZ LIMIT.

~~~~........ ,,.. .

- - -. -- - ......

.................... ................ .............................................

rMu- 1

85

GS

rwPri irwrv.015

S May 1994 25: 43 : 22hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR3

4e AJ IJ

125

105

e5

G5

3. E-.015

FREQUENCY [MHz]I UJw L

PERK

I

MIL-STD 41 c PART 4.. CE. . iWESTINGHOUSE MJO 31590-95M

*.... ..... ...... T........ . . W RPS TTS c NITI AUX ELEC RMRSIII RACKJ NO.I-U 1

*!.. RHR PUMP RTD TDD 9-11'.. .. ................ i....... .................... . ..... . . .

*. :.'*................. .............. ::.................. .... ... ......... ....... .........

.... ;--4-44 ................................ .. ..... ...........

*.2 . . . . . . . . .-. i.i. .- ..........

.... . .......

R.- .-.-.-.-.--. -----.e.--- ----. ----.--..... f- . '...-- .......... ....... ....... +..*.-..'/ ... fI1i.j;.l.............*.*.i.** mum -a - * - .Si- ***- *

6 26

, ,; - -- , - I o-ln J.-

6 May 1994 OB:36:11

-:33. E- I telu

6 May 1994 OB:43:00

-

Page 75: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ dluR3h p

145

125 :

105

B5

. G5

3.E-'

PERKS May 1994 2B:49:20

::j..13 -4* -..g C.. . ..2.-.-."

........ ......k 4.A.J....'. - ............................... - ...........

~~~~~~~~~~~~~~~~~~~. '..,''''t ----,-----------,------- ..... ..,

.. ...W J~ ...... .... ....

I U L .01L

FREQUENCY (MHz3

hp

- . . . ... . .. -. ------........ ......... I.

I

6 2 7

.. . .... I'l ...... .... I'l

. - - - ..........

... .. .. ... .. .. ..... ... .. .. ..... . . . . . . . . . ....... .. ~ . . . .. . . .

.MIL-STfl 481C PART 4 tC-21WESTINGHOUSE MJO 21590-9SM.TVR WATTS BAR UNIT1 RUX ELEC RMRPS III RACK NO. 1-R-10PREGSURIZER RTD TBD 1-4

I . a15

Page 76: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

125

]5O

NATIONAL TECHNICRL SYSTEMS S May 1994 29:55:09SCOLENIECRLL SRYSTEMS

PERK145)

FREQUENCY CMHz]

B5

I

6 2 8

J .. MIL-STD 4GIC PART 4 - CE-Gi

. ..WESTINGHOUSE MJO 31590-95M- . . TVA WATTS BAR UNITi AUX ELEC PM

. PRPS III PACK NO 1-R-11TPD-11X 5

... ... .. ... ...... ... ... ........ ...... ..... v.v.v......v

..... .. ... .. ...... 1 : ~h tf . ...........

... .. . 4..!.e--- ... ....... ........ s.. .44 !44.;i ji-e---iI -

. . . . .. ... ........ .... .. . . .. . .. . . . .

........ .... ..

. .................... . ... . .. . .. ........................ ........... .. ..............................................................................

6 May 1994- OB:56:09

I3.E-5- -

. 000 l . M L .015

h p EMI ssION

Page 77: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSP EMISSION LEVEL[ dfluR]145: !!YY!Y !-145 . . .. . .. . . .. . ...

............... .......- ........- .-r ............ .+! ...... .......

I 55

05 *.:

65 '

3.E-'

/

PERK 6 May 1994 09:21:4B, .. ... ... ... .... ... ... ... .... ... ... ... .... ... ... ... .... ... ... ... ... ................. IL-S1*f 4G iC PRRT 4 - CE-GI

WESTINGHOUSE MJO 31590-SSMTVR WATTS BAR UNIT1 AUX ELEC PMRPS III ARCK NO. 1-P-liTI-l1X 6

.,,,,e,,i---e,'' y ---. .......... .. ...... ......... I........... .......... ........ ...... - -*... -. -.

~~~~~~~..... --- i-1---..... ...

. . . . . . .. . . . . . ... . . . . . . ... . .. ... . ... .. .. .. .. ... ......... . . ... . . .

............... ...... ........... -.-.-.-.:.: ....-.- - - - - ...........

.00ll .00 e15

FREQUENCY EMHzJ

I

6 2 9

..... m............ -- --- ---------------- ---

4. I ~- 11

5

Page 78: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELS dluR) PERK

.. . . . . ........ .... . .. . .. .. .. .. . .. , - -,- -

6 May 1994 09:8B:13

MIL-STD 4GIC PART 4 - CE-2iWESTINGHOUSE MJO 215S0-9SMTVA WATTS BRR UNITI RUX ELEC RMRPS III RACK NO. 1-R-11STM.GEN.LVL LOOP 1 TRA 7,9

FREQUENCY [MHz]

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dl~uR) 6 May J994

PERK89:13:56

,......... .f.... ... *..ML-sTD G1c PART CE. 7

... ~ j . .*. WESTINGI4OUSE MJO 3159G -95Mi----j-------------------------------g----- TVA WATTS BAR UNIT1 RUX ELEC RM

.. RPS III RACK NO. 1-R-1lSTM.GEN.LVL LOOP 2 TDR 1911.

.. ..i. ............. .. . ...... i.. . . . ............. ....... ....-.---------------- .......... .. ........... ........... ........ ...... ... ... ...... ............ I ........ ........... ............................-

., . .... , , - ........ .......-

............. ..... .. ... ... .. ........ . ........... ....... .. . ... Z ........ i. . -...... . ...... . . ..... ...

.. ......... .............

... . ........ q........ ..... . .....- ..

.. .. . i...i...f ii - ................... ....... .. ..*~~~~~~. .......... ||b Z. s.,,.---m--t-m----\-l--- -I- l-- ----t----.---------------,'

.uIuJu L .U LrDrrM irwry rMu1..

.015

Ihp

145

125

815

95

3. E-

6 30Ir oueo . 1 LlfnZj

Page 79: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NRTIONRL TECHNICAL SYSTEMSEMISSION LEVEL[ d uR3 6 May 1994 09:20:30

PERKMIL-STD 461C PART 4 - CE-1 iWESTINGWOUSE MjO 215S9O-5MTVR WATTS BAR UNITI AUX ELEC RM:RPS III RACK NO. 1-R-11STM.GEN.LVL LOOP a TPA .2

.. - ., ,vv.. ... ...... .. ... . . *.. .. ...... ........

. . . .. . .......... .... ... .... . .... .. ........

FREQUENCY [MHz3

I

6 31

hp145

125

1B5

B5

3.E-5

Page 80: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMShip EMISSION LEVEL[ d~uR3145

I s CZJ L. '

105

B5

3. E-

PERK6 May 1994 09:26:J4

MIL-STD 4GlC PART 4 - CE-2...WESTINGHOUSE MJO 31590-95MTVR WATTS ERR UNITI RUX ELEC RMRPS III RACK NO. i-R-11STM.GEN.LVL LOOP 4 TER 4.5

...... I.... ........... -...... , , -.. -.. ...

..... .......----X--- ...o @- -- ...... - - - - 'i'. . ' .

- ........-....... ........ ........ -

.... i...i o - ....... ... .. ....... .... .. .- .. ...--- i-----------... i

..-- ...........

.015FREQUENCY [MHz]

6 32

wz

I

, 3L

, ... .............................-- .......................

.... . .. .. .. . ... ....................... .....................

: ww '''! ''' o- l---------

..................... .......................- --------,......................................................................................

: T ................... . ................................ ...

. T-

-a3

Page 81: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMS 6 May 1994 16:23:33

NETIONAL TECHNICRL SYSTEMSEMISSION LEVELC diguR3hp

245

125

1B5

B5

.001

Frprai irwCY Mmw&.015

............ .......... ........... .................... .... ............. . .. ...,IL-sTn 4i .c PART 4 - CE-2iiWESTINGWOUSE MJO 31590-95M............ ................... --. -- TVR WRTTS BAR UNITI AUX ELEC RM-RPS IV RACK NO. l-R-12TD- 12X C. ...... ........... ,...V†.....

. .... .... .. ........... i.... . 0i i... *-4 4 -- ...........

.. . . ... ... .... ... ji . .... . . j,,j.. . . . .. .... . . . . .

........ ,i --... iiiii. ... .. ............ i.. ... .... ............... ...........

.................. ,.: . . .. -..... ; ... .......... ' . .. 4.. ;....i....... 4..4.. i..

..... ...... . . ................................. . ................ ...... .... 1...........

6 May 1994hp NATIONAL TE CRL SYSTEMSEMSIN EEEd~uRJ ER]4D

125

105

B5

G5

FREQUENCY [MHz)

I................ .................... ................ ....... ................. MIL-ST i. 4i .c PART 4 -CE-2.iWESTINGHOUSE MJO 31590-955M.. .. ... . . .... . TVA WATTS RAR UNITI AUX ELEC RMRPS IV RACK NO. 1-R-12

I ...... ....................-.......... . .. -, .... .

....... ..... .. . ..... '''.....,.. , ' .' .M ............... . .... .......j.-..j . ........... .. ::::.:

....... ..... ... . .. ...... ..-, ........... ..-....... ¢' -+@&-- ----- ----.---- ol- .. ... .......... ---;.

............ ...... ........... ........ .. ...... 15 ......

.................. . .. .. . ........... ; ........................ ...... ... .. .. .......... ...... ......... .... ........... .. .... .........

I

6 33

.. .1 -,-- . .. ....

6 May 1994- 10: 23: 33PERK

. M

10:29:03PERK

. 9JJKJL . UfaL .015

Page 82: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 34

6(YEF

0

hip

145

125

185

B5

GS

u01, LroPw iIrkiy rmu-,i

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC duR. PERK

FREQUENCY [MHz]

.015

NATiONAL TECHNICAL SYSTEMS 6 May 1994- 10:35:59EMISSION LEVEL[ dl~uR) PERK

MIL-STD 46iC PART 4 - CE- iWESTINGHOUSE MJO 31590-95sK

.-.-- - TVR WATTS ARP UNITi AUX ELEC PMRPS IV PACK NO. 1-R-13PRESS.VPR.TEMP.RTD TBD 1-4

.... . .. .. ..... ..- .*** ..g . .. . . . .. . .. . . . . . .. .. . . ... . . . . . ...

*---i-------- HZ -- 11M it-'- ....... . ................ .

. . . . . . . . - ...... ....... '..... ,..... . ........ . ........ .. .................. ........

......... o- i- --- O............ ...........-i--i Y-*-Y---------- ........ ...... .. ......

i .... 4 -. ............ ., .... .. ,.T ', , , , ..... .. .... . ... . ?.~ .....

, yY l|A-sY|-||-Y+--@Y..... . -- e......... ...... ........ ..... .................... ............ ....... ie

.I* . . .... ... ......

.... .... .. .... ........... ........ 1........... ........... ....... ............ !- ------- -- -- - ---i ~~ 013a L

r mxurl ln4z J

Page 83: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShP EMISSION LEVEL[ d~uR) 6 May 1994 11:43:21PERK

145

00a

FREQUENCY EMHzJ.015

h p NATIONAL TECHNICAL SYSTEMSEMISSION LEVELt d.uR)

145........ T - ......... .........PERK 6 May 1994 11:49:52

.015FREQUENCY CMHzJ

I

6 3 5

MIL-STD 4GiC PART 4 - CE-2i. WESTINGHOUSE MJO 31590-95M

.------------- - --- ....... -----! TVA WATTS BAR UNITi RUX ELEC RMARP RACK NO. 1-P-2ft TD-2QX 5.... / ... .. . ............... ........ .... h.....L t M --. ' .'.-'............................. -.... ' .. T......

... . .... ..... ................................. ......... .. ........ /. .-.--e--zAP9'. 1 b hvZ LIMIT

.,... ..,.. , . , . .,.,.. . . .... .. ..-{...............

'. i--;--.e ...... .i . ...i -i.i.i.e.e..

... . . . . ...... ............... .........- - .......

. . . .. ........... ......... . . ... . ........... ....... ...... . . . ....

................... .................- -.--.:.i ............... ...... .. ....

125

105

e5

G5

.L-5- -

Page 84: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

h P -NATIONAL TECHNICALEMISSION LEVELE dBSYSTEMS 6 May 1994 11:55:5BuP) PERK!,.............................................. ........ ...... ....................................

MIL-STD 461C PART 4 - CE--IWESTINGHOUSE MJO 31590-RSM

-------- -----------------j TVR WATTS BAR UNIT1 AUX ELEC RMRPS IV RACK NO. 1-R-29BORIC ACID TANK TBP 7.5

.................................. .I . . ......

..... .......

.............. .4. ....... .~: .....

................ A . ........ ..... ......... ......................... ..................... ....... ........... i e.i.e.e. ...... ..... ........... ...........t

I. i 4 4 4 4 . . . . . . . . . . ........ . ... .. . . . .. . . . . .... ... .. . . .. . . . . .

...i...fi.. .... § .................t ..... t.t..t....

! ! -e- -I...... . ....... i .i- . ; ----- .: -

HJ4 :---- ... .,em

I I'IIL.UIr I eLffr r I rUn1I. J

............. - . - p -

i-i-o e-- i--e-----... ..

145

125

105

B5

iS

3. E-S ..... .;. ,0e10L

I

6 36

. ...................

j...................... ....................

:................... .... .. . .........................

I............... - A........ ... . i

.. *--,,----------

k.. & j A A:h

Page 85: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

* 6.0 TEST PROCEDURE (continued)

6.2 Conducted Emissions, Method CE03. Power and Signal Leads, 15 KHz to 50NI~z

Requirements

Conducted emission measurements, from 15 KHz to 50 MHz, will be made in

accordance with the applicable portions of Test Method CE03 of MIL-STD-462. Reference

Section 6.2, Test Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. An A. H. Systems Clamp-on Current Probe, Model

BCP-200/511, was connected to a Hewlett-Packard Automated Microwave Measurement

System, Model 8566S, through a 50' length of RG214/U coaxial cable. The current probe

was clamped around a selected power lead, within the RPS cabinet designated as "Phase",

and the analyzer swept over the frequency range from 15 KHz to 50 MHz, and plots were

generated for both Narrow and Broad Band measurements.

The preceding procedure was repeated with the current probe clamped around the

remaining leads designated as "Neutral", "Phase/Neutral Bundle" (including ground where

accessible), and the appropriate signal lead bundles (Reference Figure 4-2).

Sample Test Results

Test Results

CEO3 Conducted Emissions, 15KHz - 50 MHz Westinghouse ElectricCorporation will performanalysis for all tests.

Report No. 31590-95M

Page No. 6-37

Page 86: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

ISOLATTIMI TPAti'lFCIFOF&F

ONCODUCTED EMIS'SIINS METfHLO CF_ Q FF, l

TEST SET JPW o

Page 87: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELE d~uRJ

5 May J994 10:0?:5BNRRPPWDRNDhp

100

BO

50

40

22

rDrtI iru-v ruu-.1LO 50

t q.xvLIq IS LIrlLZ .

-- MIL-GTD 4G1CPART;4 - CE-03P

...i ...... -.... -. . R I C R

* --- .- - -................. . .......... . .:V ... .''''-.--.--.'. .......... ........ . ..... ... . ... ......... 'V ... V.V''''.'''.'

. *o. e .t -----........... ..... ..... .... ..... ----- .... --- ... . .............. ........ . ..... ............... ...

................... I...............e .- j . . ........

..... ..-...... . .... . .. ......... ........ . ....... .... :.: .. . ................ ....

.01

I

6 Qj

Ni

I l . I

Page 88: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 40

Page 89: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMShp EMISSION LEVELC duR3P

S0

22

5 May i994 i0:22:51NRR90WBRND

MIL-STD 4SiC PART 4 - CE-3CURY1 . . WESTINGHOUSE MJO 31590-95M

-.- .. ---.... -- TVR WATTS BRR UNIT1 AUX ELEC RM.PS I RACK NO. 1-R-1TR-IX 5.G* ...... ..e. -.... ..... ...... ........................... ....................... ......

........ ............ ...- ------- --- - - - -- - - - --. - -

I

rorh~oi irm rmu-1o

hp NRTIONRL TECHNICRL SYSTEMShp IIO LEVEL[C dFu RHz]4 Wr

5 May 1994 10N:22:51SROROSRNO

J Jig

1303

110

s0

72

MIL-STD 4 .. PAT . ......4 .tit ' '-.WIESTINGH4OUSE M.70 91590-95M

........ .. ....... T TV WATTS BAR UNITI AUX ELEC -M.RPS I RACK NO-. 1-R-1

I TR-IX 5vG

................ ... ..' ......

.. t. ...----......... ........ ................

. ............... ........ ' '.

... !J- ' - ! -...! ... 5; - ! - .....

FREQUENCY CMHz-6 41

I

11, -------- - ,-

.low

17.101 . A i 50

Page 90: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICRL SYSTEMS-EMISSION LEVELr d~uR/1NHz31 4

12 .

100

G0

.015

5 May 1994

FREQUENCY [MHzJ 6 42

6W

I99: 5P:23DRORDBRND

Page 91: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL LTECNICRL SYSTEMS4 A tEISO EE[du/lz

5 M�y 1994 09:53:1609 RORDR6

IEroAI irW&.v rhu, u-XJ.n~IL~fL.

I

6 4 3

NATIONRL TECHNICRL SYSTEMSEMISSION LEVEL[ douR3

FREQUENCY [MHz]

1-inzi

5 May 1 994

0

Page 92: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~uRA

S May 1994 09:48:10NARPOWEAND

hp

0B

BO

40

22

.e]

FPFRaIFrNCY rMw-1

hp ENATIONAL TECHNICAL SYSTEMShp EMISSION LEVELL d~uR/N~z3140 ... .. ..... .......

e00

Be

gO

.01

*- --. . .. . . .E-' .'. i

5 May 1994GROROARNO

MIL-STD 4f2fc PART 4 - CE-03WESTINGHOUSE M30 31590-95MTVR WATTS ARA UNITI AUX ELEC RMRP9 I RACK NO. 1-R-1CONT. PRESSURIZER SENS. TOR 1.2

.... *...... ..*............ . ..... . ... .'.'.. ' .-.......

........ .. ................ .................... .............................. ..... ............... . .................... ........... ....... ....................

...... ......... ..................... ........

............................ .... ....................

.. . i . i i i .... .i i i i .. i;; ................

.... .............. -

. . .. . ... . . . ............

j iii. . . . . . .j. . .,.,,,,,;.; .;.,

1i------.-..............i..;.-S......... ....... . .........-.-....--..... ...........- ....- .... . .. . . . . . . . . . . .

FREQUENCY [MHz]

I

so

T ---- T ..... f.... ............. ................................. ,. MIL-STD 4fiC PART 4 - CE-03

WESTINGHOUSE MJO 315912-95M....UR .....................i ........... .................. WSIGOEMO359-M'

* * .;TVA WATTS flAP UtNITI AUX ELEC PM. .. I PACK NO. 1-I-.i i CONT. PRESSURIZER SENS. TSR 1,2

............... ........ ............... .............................................

. , - . ........... ' .'...... ' ' . . ........

.. ........... ............. ...... '

........... ..... ...... . . ................ .......................

............ ... . .. ........................ . ...... .. .. . .....

.................. .................................

...............-................. ............. t.........-........-......... .....

. ................................ . . . . . .

........... .............

. . . . . . .... ............

1'5 '1 L s

6 44

Jew

.s . A I

............. . .......... . ...... . .. ................-----------I...

. ----- 1- ...-

I--... .! .......................... -- ------ -

4e : i

: - *:

I

Page 93: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC diuRP

5 Ma 1994 10:44:23NRRR WUAND

J--------- *I:.T.:.-..--T-T-T-'-'-----''''''''-''''---''--'''--..,.-MIL-STD 4StC PART 4 - CE-23

*. . .. .. WESTINGHOUSE MJO 315992-95M......- ---.......... -. .. -.... TVR WATTS BAR UNITI RUX ELEC RM

RPS I RACK NO. i-R-2LOOP 1 9TD TDD 1-4

......... . X.... w .e..|.... ........ ... o..... ' i'. i .-...-. j--.......... ........ - -w. v.....

----------------. .

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uR/NHz3

rorttrIry ru.il

5 May 1994

hp18l

B0

s0

45

22

.015

I18:44:235RORDARNO

hp150

138

110

90

72

.01

. f , v .................... -..MIL-STD 4G1C PART 4 ..CE- .2~WESTINGHOUSE M430 3159Q...B5M

.J --.... .............. T WATTS RAR UNITI AUX ELEC RMNRPS I RACK NO. 1-R-2LOOP I RTD TDD 1-4

.I.'.... ...... ... .. ...... . .' '''... . ' . . .... ' ' ' ' ..... ......

... ... .... .......... . .... .... ... . .. ... .............. ....... .......

.*.... ........ .... . .. ......... ...... ..... . . . ."...

............... .. , ......, .i

.*- - - . ..... ..... .*...* .... . ......... . ....... . . ......

.-. - : .-.-.- ... ;ii..... 4. ,,, . .,-. .....

U . ......

L% 5B 6 4S

e41

.......I........ .......................................................................................... ...........................................................

11 ---- o I - - if1

I I~vlw| ~n. Q . .

Page 94: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 6

Page 95: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

5 May 1994 10:3?:5BBRORDORND

FREQUENCY [MHz]

150

130

110

so

.015

I

0

(CtAp

hNATIONAL TECHNICAL SYSTEMShp-- EM ISS ION LEVEL C d Bu R/Nl9z3

Page 96: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dIluR)00s : .......-. ''''''Y''''-'''.. --- . ....- -. v.-

CURVE: :

........ ;.....-

~~~~................. .,. t

BO

so

40

22

.015

5 MaY 1994 25:41:13NRA RWDRND

MIL-SITU UIL PHRT 4 -

. WESTINGHOUSE MJO 21592-R5MTVA WATTS BAR UNITI AUX ELEC RM.RPS I RCK NO- i-R-3STEAM PRESS FLOW TDR 4,5

I- : ....- ........ ............ ...................... .-.----

FREQUENCY CMHzJ

hp gNATIONAL TECHNICRL SYSTEMShp-EMISSION LEVELE dguR/N~z3 5 May 1994 15:41:13oRlmnononi

145

125

105

B5

G6

.01

FREQUENCY rMHzo

. .. V........ ....... ... . ........ . 4.........E*WESTINGHOUSE MJOa a15aw-uan

.---.........-. ...... ........ TV WATTS BAR UNITI UX ELEC R -'RPS I RACK NO. 1-R2.STEAM PREae FLOW Tman4

.. .... ..... .T.. -. . -... , ---..----- .--- .-.. ..... ...........................

.... ..t..... ..... .-. - .. t..T.T.T i -.........-. .....-'--''........----' ......----'---. . ... ' . .. . .. . . .. -

- ------- 64 .. ..... ...... ....

......... . ...... .. .. .................... . . . . . . . ......

............................ .................. ...........

.. .............

........... . . .................

..... ''.'...i- . . -'-........ . ....... . .

n 1L1

I

---. S

. . J 5D

Page 97: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR]

5 Mar 1994. 15:35:32NARROWERND

MIL-STI 461C PART 4 - CE-03

WESTINGHOUSE MJO 315g2-95M'TUR WATTS BRR UNITi AUX ELEC RMRPS I RACK NO. i-R-2BORIC ACID TANK LVL TDC 1,2

............... .... ....... . ........ ....

:.::.. . :.:.:..... . .. . . .. . . . .. . .

IFRrogrFNry rmwu,1

h p NATIONAL TECHNICAL SYSTEMS._EMISSION LEVELE d~uR/N~z3J45

125

1B5

B5

.01

5 May 1994 15:35:32.RORD-RN'

.r.v. .. . . .................. gt....P~f... ..... ......MIL-STD 4 "titP... 4- .....WESTING1HOUSE MJO 21592-95M

........-... TVA WATTS BAR UNITi AUX ELEC RMRPS I RACK NO- 1---BORIC ACID TANK LUL TDC 2,2

........... - :... ,. ... . . : , .I......

... . .......... ........ .--- - .--- ---- .................. .... ........ - . ..........

......... . ... . . ..)..... ..... ,........ . ... . .... .'. .

.......... ...............

..., .. .. ..... . .. ..i 4 4 4 . ..... ... ... .. . . .... ..........,.....- . '. .......... ..... ....... . ... I, ,l,.,....4,S , 4...'

..... .. ... .......... ........ I..4..g.4.. 4............. ........ ......

........... .4

FREQUENCY [MHz3 6 49

hpl00

60

40

I

Page 98: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS 5 nMa 1994 15:32:02EMISSION LEVEL[ dGuPJ NA RWERND00 . . ............ .......... ..........................

12..... ...... ........ ..... M.L-ST.. 4 iC PRRT 4 - CE-...CURY I . WESTINGHOUSE MJO 235g9O-95M

- ....... ...- ..-- - -. ........ TVR WATTS BRR UNIT1 RUX ELEC PM.PPS I PACK NO. 1-P-3ANULUG-CONT. PRESG TDP B. .11

BO~ ........ . . .I..... y. ......... ..S... ..... 4...T ... T .*.. ... ...... ... S.........

.0 .......... - - ..... ............... ..... .e. ... .*

40--e ese++-~-*--* +-^- e +-' *-'............... ........ ..... .... .................... ........ ....'..-'

40 e! ........ !.ee! te---.....-.--!-e---N;-e eeie;e

.. . .. . .. . .. .. . .. . . ............................ ................ .. .... . . . .............. 4.4.4. ... .......... .... 5...........I. 4......4. . . .

.0 1 5 .. .. . ... . 1..

FREQUENCY (MHz)

S . Ihp NATIONAL TECHNICRL SYSTEMSEM ISS ION LEVEL I d 8uR/NWz 3

I45

125

0 e5

.015

5 May 1994 15:31:02GRORDBRND

FREQUENCY [MHz]

B5

% F 0

Page 99: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMShp EMISSION LEVELC diuR3I20.

40

20

5 May 1994 15:25:42NRRRWARND

MIL-STD 4SiC PROT 4 -

WESTINGHOUSE MJO 31590-95MTVR WATTS ERR UNITi RUX ELEC RMRPS I RACK NO. I-R-3STEAM PREG.CVRULT) TPR 18eJ

,, .................................................. ------

.015 50FREQUENCY [MHz]

h p NATIONAL TECHNICRL SYSTEMSEMISSION LEVEL[ dl~uR/MI.z3

125

105

. , .MIL-STI) 41iC PART 4 - C

.WESTINGHOUSE MJO 31590-9SM......... ........... ---- ------..... TVA WATTS BAR UNITI RUX ELEC RM-

RPS I RACK NO. 1-R-3STEAM PRES.CVAULT) TDA 10,IJ

... - ...... .. ....... .... ... . .... ...... ......

..... -....... ...........

..... ... *, ........

. ................. ... ......... ................................. .......... ......... ............................. .......

.............. .....

. - - .. .... .......

I. .. . . . . . . . . . . . . .............

. t .@ -| . - . - ... ... ... ... ... ..- ..- . . . . . . . .- . t.... .-. . - ... ... ..~.; :... . . . . . . . . .. . . . . . . . . .. . . . . . . . . .

BRORDBRND

FREQUENCY CMHzJ

BS

6 -5 1

I

J4:

5 May 1994

.<.01 . A J

Page 100: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR/N~z3

5 May J994 15: 21J :25........ ~....... .... ... T . Tb................................

.wit ILST 461 PART 4 -t CE-O......................*.MiHWESTINGHOUSE MJO 21590-95M M

RPS I RACK NO. I-R-3* .wn FW FLOW (AUX) TDD 1.2

............. * .................... .. . . .f!.......... ...*T .........

. ......... ....... .... ..........

........ ,, .. . . . . . . ..... . . . . . . .. . . . .. . . ... ... , . . .. . . ..... . ,.,.,.I

..... ..4. ... 4..... .... ......... .... ,.....m ...g ....... .I..............

........ .... m....g.I............... .. ......

...................... v.... .... . . . . . ... ...... ...........

q ---- :.:..: :-..;:--i-;:

FREQUENCY [MHz]La 50

Ihp

145

125

105

B5

Ei5

.01

6 2

CA1

.s ., J

Page 101: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC dSuR3

S MaY 1994 15:16:12NARRRWDRND

FRErDurCy rMw~i

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC dSuAR/NHz

i4D

125

J05

B5

.01

5 May 1994 25:26:122BROADBAND

............ . ...........................................................

MIL-STD 4S1C PART 4 - CE-03g gWESTINGHOUSE MJO 31590-95M i

........... TVA WATTS BRR UNITi AUX ELEC RMi' RPS I RACK NO. 1-R-a

..... .... . .... .. .- . ....... ......

..... .......... ....... . ............... .- ... ....... ............................ ...... . . ....... ..........

....... ................... ...... . ......... ...

.-.---. . . . . . .- .- ...- .... -*..... - - .... ...... 4.. .

...-.......... - - - - .. ........................ .............. . .

................. ....... g . ....

............ ................... A................... . .. ........ .......

g. . . . . . . . . . . . ..t. . .e t t * v it ti t

. . . . . . . . . . . . . . . . .g i gi ig

e ::----:: . j . :. :-:::::::..: ..........

.I L

FREQUENCY (MHz)

hp1B8

50

40

22

.81

MIL-STD4 GIC PART 4 - CE-03CLJPYV i. WESTINGHOUSE MJO 31592-9SM

................ -.. .....----- .- -.. TVR WATTS B RA UNITi ARUX ELEC PMRPS I RACK NO- i-P-2

,*,'.,1.. .... '....... .........

............*+. .. . ............... ....... .............. ........ ........ - ... ..-.-. ........... -. ..

. . . .- .-.- ........ ......

.' , , , .' .' .,44 -....... '.. .'..... N.. ,'...... ... .. . i

- -- - j- - --. u~ .... ------

5E

I

50

6 '3

iDV; . 1

.: i

Page 102: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL T CREHIL SYSTEMS 1 Mr J994 JB:0?:4500 .. ..... .. ...... ....... T i N RC WP RT1B0

-. NIL STIN 1P~T~........ W HINOOUSE MIO 31590-95M'i- :- -- --------TS BAR UNITi AUX ELEC RM

RPS I RACK~ NO. 1-R-4SUMP LVL (CONT.) TDC 1,2

...... ,, ... i,, i... ...........''.......''''........ ..... .............. ........ .................... ............ ... .......... ....... ......... ........

ji . . .. j. j -.......... ..... ............. ., .

.... i..... ... i ii.............. . ............... i..,ii.. i .i .. ,ii.,

......... ...... , j .............iseesseo. ........ > @ ............... ........ ..,..,..,

2 1 ... ..... i.iiii,,, ............... ........ ...... ... ........

1.. . ..... . ..................

FREQUENCY EMHz]

6 -

-

Page 103: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

5 Maj 1994 1B:203:25N WRAHDND

MIL-STD 46iC PART 4 - CE-03WESTINGHOUSE MJO 31590-95MTVR WATTS BRA UNIT1 AUX ELEC RMRPS I PACK NO. 1-R-4TURBINE IMP PRESS TDD 7.9

rorei rury rmu-,1

h p.2

. . . LT- - c. 5 M a y 1 9 4 - B

3 .3..3 3 33.MIL-STh4 iC PART CE 3

, .... ---.-----T-R WATTSECR

............... . ..... . ..................................-....

............. . ... .... ...

.I..*.... 4 .N.O..... . ...... . .-........ .. .- ........... ............. ....... f.... r... ............... ......-.-

.. ...... . .... . ......... g.......g.....

, ........ ,........ ... . ... ................ ........ ......... X...-

.... -----------'------*'----*- - ' *L. . ..... . .. . ; -

. I.... ... I.*4*i.. 5. . )* . ........)....

5 ..... ...

J ]i)

125

155

B5

95

.01!50

-- -l~ L r%, sI LIEIL. JreraiFrur-v ruu.-

I

6 55

J Bo0R3:2R5

hp N ATIONAL TECHNICRL SYSTEMSEMISSION LEVELS d~uR)1 0 0 ...... ........ '.....'.'............... . ........

j j j CURVE i i i i i

31 ........ . ........ .... ..

98 **... ....... ...

5. .. 4 .,. . .....

2 10 ... .. - i+; j........i....e.+. e. -

40 . ...... ................... i.

it.|

. - 11 .� J

5 May j 994

. .

hP rEMI55iIoN LEVELE d~uR/N~z3

Page 104: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC d~uR/NHz3 5 May 1994

FREQUENCY [MHz] 6 5 6

I1?: 59:24GRORD8RND

hpJ45

125

105,

B5

.01i

Page 105: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NRATIONL TECHNICRL BSYSTEMShp EMISSION LEVEL[ d~guR3JOBB

60

40

5 MaY 1994 1?:55:32NRRROWERNn

MIL-STf 46IC PART 4 - CE-23WESTINGHOUSE MJO 31592-95MTVS WATTS BAR UNITI RUX ELEC RM:RPS I PRCK NO. 1-R-4FW FLOW CRUX) TDD 1.2

FREQUENCY flHz350

I

6 57i

Page 106: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Ih NTIONL TECHNICAL SYSTEMS 5 May 1994 ]P:5 1 11hp - EMISSION LEVELE d~uR/H~z3 n>nmrlmnnsn

MiL-STDi 4GfC PART 4 -CE-83WESTINGI4OUSE MJO 21592-aSmTVR WATTS BRR UNITI RUX ELEC RMRPS I RACK NO. 1-R-4STEAM PRESS TBA 7,Q

EbEI.%I FiP ML *IJL.QI~ I ULIln .1

6

J45

C'Orrilfreki- rul- I

Page 107: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 59

Page 108: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 6 0

Page 109: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC dEuRJ

5 May 1994 1B:15:1BNRRROWDRND

hp

B0

S0

. 1 I LOFREQUENCY EMHzJ

hp NATIONAL TECHNICAL SYSTEMS

...............

:~YWESTINGHOUSE M-302159e-GSM

.rPS II RACK NO. 1-R-5TD-5X 5

B .. ....... . ... * ....... .......- - .- . ....'. .-

..a. . -- I 4 .*.-9. ........ .-.-. 4... 4...- -- - --------..-............................

.. 4. 4...9. . :.*.9 . * .. . . .*.....*.*... ----44 .------ ..*. * ....... 4.... .. -------- -------

. 4 .O ... . ... ............ . ............

..... ............ *....... .. .- ............ . - ...-. .. . ........5 .

J13

131

712

.8

FREQUENCY CMHzJJ 13

6 61

(le

I:. ..... f -- v--vv.....- ... f.. ........ ....... ....... ............. .......................................................... v....

* I * ...r . MIL-SmTD 46IC PART 4 - CE-03

.* ... WESTINGHOUSE MJO 31 5 913-9 ECM

t. - ..- --.------------ .--.,TVR WRTTS BAR UNIT1 RUX ELEC RMPPS II PRCK NO. 1-R-5

............... ........ .... *... .... --.-, ............... ........ ..... .....-..... .....................

. .. ......... ....... '........ ..... .. . ...... *. .. ......... ...... ....

''t ..... - .... et - 4 -4 . - - e ----- ,- , t .. j. t ... .. . .. . .. ;.. .. .. .

' ,'' ''''-'-. -. ''''- . -, .-.-. ,' .'..'............ ........ .......

....... . . . j. ..,. .h. .-"-- . . .. . . .....' .. .. .... , . . ., .. , , ...

j...... ,,',. .' .... ... ..... . .'....... ..... &''

i. t. t++ +4-F+ts............. ............... ... ........... .........1

2B

.11

I

1B: 15: 1B

Z> 50

5 May 1994

. . bil

Page 110: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp EMI5NAL TECHNICRL SYSTEMS 5 May 1994 1B:19:10hp EMISSION LEVELE dGuR/N~z3 GROROORNDIst O..-T. T r MIL-STff i 461 PRT 4 *-.--E0-------

.... .... ............-... .... ... ...CE9.....- ....

.... .. ..... .I.J. .... . *.... .. .NESTINGI.OUSE MJ 3159-95n R

RPS II RACK NO. -RSTB-5 X 61 30 ...- - -.. I...... e -------------e-------- - ............................................. ---., .... .... . . ...,.....138 . . ...... -. . . . .. .- ...- ! . .... ..1

0 ' ........... . ....... . ..------... ...... ...... .................

. . ................. ..................... .... ........ . ....-.

......----....... L.........1........ -..... .. ...... ....--- '--'- .--- -- @ -- ,-............ ---- ,--------......-----'-..........

. -.. . . . . . . . . . . . . . . . -.-.- . . . . . . .. . . . . . -. . - . . . .i-j-. . .:.::

- . ...........8015 1IL

FREQUENCY CMHzJ

6 62

Page 111: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NAIiONRL TEC NICRLSYSTEMS150

130

]10

9B

.01

5 May 1994UNUHUWHN4U...................................... ..........

.~~MZL- FD4i6 C1PR~T i-~CE~WESTI GROUSE MJo 31520-95m. i ........ ........... i U LC RM

.PS RACK NO. I-Q-5TP-5 5.6. ..... .... - - -- ------------ -------- -............... ........ ... .........f...... ... !........ .4 ... s........

..... ..... .... . .. .......- .-....... - ........ ............... ..w., .,..,. .,,vvv., .... . ..... . ...... . .

.......... N...... ......... ...i.-.'.-.j;.' ........ ' '......

.............. ...... . -...- ..... ................ i

......... .... .... ... ----- -... ..... iis .. . .. ... ''|!

...............-. ,.- .-.... j--. .....-... ........ ** i-............... ;..... ............... ...

I

6 3. .

.M .,A

Fr2rim ikNiy rmu- 1

* 1r* & 4,r..s-,, ^- ,LAtF te -v n 3 t 0- l

CYPpt -1lt lA .56in "3'/ iA ^^ M%-4c-- flA4

clA 4 f. A . ow Sia a4 C, k,9vaI

MLZI Agi.1-

Page 112: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSh p EMISSION LEVELE dLuR)1 0 0 ......... ''- ........... -- j'... .................. '---'...... Y''

,188-.-.. -.......

B o ........................

. . .. . . ...... ... . .....0 , ...............

0 .... ........... ........

2 2 i ... .... ................... ........-- ..... . ...

.. ..... .........29''''~~ W L

5 Ma 1994 1B:45:54NRRR WBRND

.. .. . ... . . . . . . . . . .. . . . .. . . ............................................ .MIL-STD 4GiC PART 4 -- -33......WESTINGHOUSE MJO 2159Q-9sM

,: TVR WATTS BAR UNITi RUX ELEC RM!RPS II RACK NO. 1-R-5WR PRESS TDC 1.2

.......... .. ... .-...... ...... .. ..... i

rrl.LWULnQL, LMrIZJ

Ihp NATIONAL TECHNICAL SYSTEMS Mty 1994 J:45:54

6 . . ...... ...... ........ - -..- ..... Ali.. ... ... . ... .1. ........

.. .. . . ... ........ ... - TYR WATTS BRUNITI AUXELCRPI1 RC NO.1-5

.i!WR PRESS TDC 1,2

138........................ . ...... ........... .... ..... .... .. ., .... ....... . ... . . . . . .....

iI0...44..*.......... ................... . .

55 ... ..... '............... ......

..... .... .. ...... 4....., ..... ...... 9........I.... .......... . .

"I..T.....

.... . ........... . .. .**. ..4 ........ ...

............. . ........ .... .... ..015 .1 L

FREQUENCY CMHz-

6 64

Page 113: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NMISONL TESYNICSL STEMS 5 May 1994 18:40:01156.......----.--- .-..-. -- BR------ADBAN-.--D TifC R......... .... . ............... N IE E R

......... ............ ....... . * ..-. RT §i5... ... ...........

1'......i-.--11-

.... . ...............

: RPS II PAC NO. 1-R-5139 .. +~............., ... j n RCF CCONT.) TDID 1.2

2130 ......... j ................. .... ..... . . .4... .. 4f..........* . . .g ......................

.. 4.....*.. ....... ........ .. .....

* ... g***......g. . . . .**S .4.U*. ......

I. 4.....4.,-.~. ............

*,--- !4-- - - -- - - - -.. 7-+ - -..... ............... ........ ... 4.4 4 4 ...... . ..... ..... ....

5015.i - f

--FREQNCY CMHzJ

6 3S5

hp NATIONAL TECHNICAL SYSTEMS 5 Mar 1994 1B:40:01EMISSION LEVEL[ d~uR3 N~RRRCWRND00 ........... .. . M.L-ST -IC PRT .. CE-.

.CR .*. .WESTINGHOUSE MJO 31522-BSMi -.-.-.-- .. ..... .-. .i TVR WATTS BAR UNITi AUX ELEC RM.

RPS II RACK NO. 1-R-5RCF CCONT.) TPD 1.288 @. R 6++ * ................... V.. V.|w-- V x -... .v@w@.|6 .

BO............. .... ,.... ...... ........ .. .j... ...

.................-....... . ..... -' . '...... ...

so...................... . . . .

40 .... ........ .. .. *.. ..*.*.. ......i-... -:............N ........ ............... ........ ... L.. -...-....

,. ................. .'..

2. 7 *

.01t''La' BeFREQUENCY [MHz]

Page 114: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Lp NNATIONAL TECHNICAL SYSTEMSh w P EMISSION LEVELC d SuR3................. !......

B............... ......

BO . . .. ......

.0............................ ....... . ...

40 .4 ...I.. t4 i .. i..

..... ... * .....

20 ..., .. ..... * ..... ......... ....... ....

...... ....... 4 . ,4-

ii..i. i .......... ...... x.... ..... .....

81 .1....

R;W1994 1B:5?:26NA UAND

MIL-STD 4GiC PART 4 - CE---WESTINGHOUSE MJO 3159g-95MTVA WATTS RAR UNITS AUX ELEC RH

.RPS II RACK NO- 1-R-GRCS PRESS TDG 18X11

...........,......... . .... .. ........................... .......... .

FREQUENCY (MHz)

Ihp NTION42h TECHNICRLSYSTEMS 5 May 1994 19:57:26145 . .V . . ....... . .:. !. -----. *- PT - .. § .- -if-' ' Rf.-......... t ... ' ..............

.......... ... TAWTSRP.NT U LCR :

. ~RCS PRESS TDG se,1X.. 125 . ....

.......... ......................

....... .. ~. ; EGWOUSE....... MJO . .........-.....

....... .W...... .. R .. . U ..A . .. . R. ..-. . ' I RAC NO '1-R'

....... ............ . .... i . ........ ....... ..............

.2...... . ...... . , . . . . . .. ..5 ........ .4..g... . . ...... .......... .. . . .

-.. .... . . . .. .........

BS. ..*.*.*........... . .*.....* .** .. .. ... .. '......*.*

..... ..-.. I.. .... I . ......... .. .................

FREQUENCY (MHz)

666

Page 115: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

Ihp NTISONoRL TECHNICRL uYoT"Es ORSNh CRXSN4MJS 5 May 1994 195329

J45:...... ......... .. r-............ .... ......*f... .Y.... .WE... 9f5..-f . NT4......ti.. w........-......

WESTINGHOUSE MJO 215969-BSM...... . .. ..... . T. T. T T T, M- T i f R T i - C -

: ...... ... ....... ........... . TVA WRTTS PRA UNITI RUX ELEC RMRPS II RACK NO. 1-R-gRTD CCONT) LOOP 4 TBE 1-4

125 ................. ..............- ...........

. .... . .- ...................

15 *I.....*............ . ........* . . ... 4.I. i 4-44 . ........... ....... ...*g . ......... ..........

.....5.. .. ..... .. .a. ...............*.... ...g * .g ............ ... . .... s.,....,.a

' .... .-- - - .... ... ................ ...........I .

................................ ............ ......

. -.......... ... . . .. . .... . ... . . -

.015~ 1 1 ~ ~ -i

FREQUENCY rMHz3

6 - '7

Page 116: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp TONR TECHNICAL SYSTEMS 5 May 1994 J:9Bh p EMISSONo LTEVELEtR~ dSuY^TEz BRORDIaRND145 ...... ..... .................... ...... ........ . . . .. .. - '

IL . ............ ..... .... isgot ... .. ......... d TV 0 ....I.......* * WESTINGHOUSE MJO 215929-Q5M-wn......-- TVR WATTS BAR UNITI AUX ELEC RN4* * RS IIRACK NO. 1-R-G

1 . ....... RTD CCONT) LOOP a TD 1-4.125 ....... ........ .. . .... . .. . ............. ......... ..........

.................. ..... ... . ...... .. .......................

5..5 . ...... . . .*..*.*.* .I . .............. ............... ........ ... ..

.. . ... ..... .... . .... . ...... . .. . . . ...- ,. .. .. ,' . . ' .. .. . .. . . ... .. ... .

..*.*. ... ...-. -. ...... . -.. ........ ..... . g........ ........

95i

B5. m --X - + .......... ... ............... .... .... ............... ... .. ...... ... . ..

* 4.' ....* ..* ............ ..... ,............. . . ........

.815 1i ..FREQUENCY [MHz]

6 88

Page 117: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hlp NATIONAL TECHNICRL BYBTEMSEMISSION LEVELC douR/fl z34 i rA I.ti

125

105

B5

9a5

.01

5 May 1994 20:15:53GRORDORND

.... ....... ........ ..... ... v. ....... . .- ........... .--- --.-.-----.-.*[email protected] -4C1C PART 4- -2WESTINGHOUSE MJO 31590-GEM

*.............-.-i TAR WATTS MR UNITi RUX ELEC RM .RPS II RACK NO. 1-R-7VAULT STEAM FLOW TMR 4,5

.........-... ............ ............. ...... ..... . .... ... ............... . ... .........-

. . ... i...... .. .. ... 1.......''

.. . ...........

... . ... . ................................. ¢

. ...-.-....... .... .. . ........

--------- - . -.. ....- ...... -...... . ..-........... ....

.......... . .... ..........

...*. .. *4..* I.. I.. .

.*.*.. ...* ; -4 .*.*.. ..... i*4i. .... i ...9..... *'*****t,..... ..* ....... . .......

,.. . .. ., ....... -.- . . ., .. , . ............... ........ ..m,.

C L I. .

FREQUENCY [MHz]LU

I

50

6 69~.w 3

Page 118: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE d~uR31n a vv.vv............................ .. ... .. . . .-.. . . .. *......... . . . . .. . ....... . .. -------

- --- TU--------

..... ..... ..... ..... .... ... . ..... .... ..... .

s0

40

29

.01e

5 Mag 1994 28:1:j11NRRROWDRND

MIL-STD 4G1C PART 4 - CE-923WESTINGHOUSE MJO 2159B-95M

- a TVA WRTTS BRA UNITI AUX ELECRPS II RACK NO. 1-R-7VAULT STEAM PRESS. TPA ID,11

a *1 .. ... . , . .. ... . .. . .

RM.

FREQUENCY [MHz]

I

6 7

.....................................................- ---........ . ......... I....................... .. . . ,. .

Page 119: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIOoNA TECNCRdL. SYSTEMSta

125

105

Os

.01

5 May 1994 29: 66:49GRORDARNO3

. ,....*............WESTINGM4OUSE M3O 91590-95m

,. . ., . ..X. ., . ...,.,. .... ..............

........... . ........... ....... ............... ......... ...... r.... f ....... .................. f ......

......-... - ........-.F... -.. '..... ..... . ..........................

............... .... .. ...... . . .

'-.- - ........ - -. ..... ... ....... .....*... .. . ..... ......... .

,.-.. ......... . .. .......................

.............. ..... . ..... ... -- ;........... . ..... . ... - -:..... ............ ...... ..... .... ...... .... 1-;. . . ....... ..... .... . ........

..... ........ ...... . .....

............... ..............

.... *.............

.........1..........

FREQUENCY [MHz]

I

50

6 71

I

.- .,

Page 120: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~guR)288........ ......

C33 URV1 I

B O .... . - .. .. . . ....... ..... ... ...

9 . . . ..... 4 . ... . ........

4B....i-° . ....... + .............. ... ......*

210 ........... . ..-.....

5 May 1994 20:02:35NARROWDAND

MIL-STf 4G1C PART 4 - CE-23WESTINGHOUSE MJO 21590-95MTVA WATTS DRA UNITI AUX ELEC RMRPS II RACK NO. 1-R-7FW FLOW LOOP 1CAUX.) TSR 1.2

FREQUENCY EMHzJ

125

105

J........................................ .......

A-WESTINGH OUSE MJ30215909-91 TVA WATTRW BATT SDAR1UXN IAUX EL

ERP HA SI RACK NO..1R-RFN- .FLO FLOWP LOOUXCA UX.D T

. ..... ........... .......... . ...... . ................... ................. ...................... ... .

................ ...... ..... . ........

. . . ................

.......... ... .... .......... ..... ............ ..... .....

.3 3 333333............. . ........ s....- .. .................

.................. ..............................

...... ................... ... ..... .... . ......... .4 ........ .............. .............----

......... .............................................. i ... ...... ...

........ ..... ........... ........ ...... ......... ...... .......................... ........ . . . . . . .. . . . . . . . .. . . . . . . . .. . . . . . . .

h p NATIONAL TECHNICAL SYSTEMSII EM ISS ION LEVELEC d OuR/NHz]3

50FREQUENCY (MHz)

e5

S5

I

6 72

w

J43

5 Mlay 1 994

.-.01 . s

L ra

213:E2.:35GROROORNO

Page 121: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

h P NATIONAL TECHNICRL SYSTEMSEMISSION LEVEL[ dnuR) 5 Ma 1994 21:25:1?

NARPQWERNDi lt

BO

FREQUENCY EMHz]

3....... ...... ... MIL-STD 4SiC. PA RT 4 - CE.CURVE1 . . . . WESTINGHOUSE MJO 31592-95M

TVA WATTS BRR UNIT1 RUX ELEC RMRPS II PACK NO. I-R-9TURBINE IMP. PRESS TED 7.9

......... *4..... .*...4. ....... .. .. . .. ... . ....................

,-.--....... --...... .... ... ................... . ............... ..... .... . .. -... . ............... ......... ............

............. . ............ .. '.. ... .'.. .-..' ..... ..'... ....

, ' - ' - -. -.j. -... ... .-; .'. .'..

'.5.'......... ''...'. .. ..... , ..' .. .' .....v W

40

22

I

6 '73

v.e: . . i 1 503

Page 122: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uR/Nl~z3 5 May 2994 2J:20:46

SROROSRNL- ... . ...-.. ... MIL-STD 491C PAT 4. CE.

-............. 5 - .WTTS R NI ELEC R

.S......... ...-.- ..- --.-1.

... ... .. ... i. . .... . ....... .......... . ..... I..... ..............

.. ,...... . .... .:..... ...................

..-g......... ., ...' . .... 'T .4 4 4 [email protected].+.-^-'*-----............ ...... ...... ............... -.- ---------- .-...... - --. -- -...- -- ... .4 4 ............... ........ ...... -

5 ''... I - ; ..- -. .-- , .- I.-.

........ ... ...... ............. ...

3

FREQUENCY EMHz-ea

I

50

6 74

C-A

hp NATIONAL TECHNICAL SYSTEMS 5 May 2994 2J:20:46EMISSION LEVELE duR) NNRRRWRNf

10 ..... .... MIL S TD i.. PRt................... WESTINGHOUSE MJO 3i592-95M

... .. ... ...... . .......... ............jRPIIR9KN.l-9.............. TVA WATTS BAR UNITI AUX ELECF

BS N , +, ++, ., .STERM PRESS (CONT.) TBR 7,9... . V ... ......... . .......................................

.......... ....... ................. .......... . ...... .... ...... ........

.. . ....*I............. ....... .. . ... ........

45 ~ *4~~I 4 .... i ....i ...*.i...i.. . .

2 4...g..4 .3 4 4 -4-- ........ .. .. ... .. ....-.. *-*- . 4..219

Hphp

145

125

105

B5

C5

.el

........ !

.w .,A

Page 123: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NRTIONRL TECHNICRL SYSTEMSEMISSION LEVELE d~uR/HHz3 5 May 1994 21 : J4: 0

RRonnoomn,............... ....C A T - ...CE-.

'. ........... RTVA WATTS BAR UNITI AUX ELEC RM

i'........... F FLOW LOOP 2 TPA 1,2\ . *.--.-+-~~~~~~. !---- ---.. @ . ; *;... , . ......,, ,, . ..,..m,... ....... ............. .........................

A . ..... .. ...

.....................

. .... .... . ......... ..... . ..... . ..... ....................

.................

........ ..... ... ...'

.................. . .. .

. . . . ......................... .........

..... . ... ... ...... .. .....

.... .... . ................................ ....... . .... .. ...... A.. ...

ror!Ftrulrly ruu-I I .Ind.

hp145

125

]B5

95

.81

I

6 75

- - - - - - -

., . , -

Page 124: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

'IONAL TECHNICRL SYSTEMSI SS I ON LEVEL E d Eu RP/Hz 3

r . I U- Lr- J

I

6 76

hp145

125

I55

B5

.015

- ---- -

Page 125: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSNRTIONRL TECHNICAL SYSTEMS

P EMISSION LEVELE dEuR)----.--- --........... ........................-

CL RYE.. -.-

B * .**.......... .. .

B O ..... t I ... .. .... ...!-4 4 .. ...... .. ... ...

.. W). . . ............. ....... .... .. ...... . .... ..i4 4 ;........

.. .............................. .... ...... ..... ..... . . . ............... ......... ................ ........ .... i..

.... i4 4 4 - ...... 4.......... ........ i... ..... !

.............. e--*i----- .>- - .......... * - --- ^ ..

.................... ......... ......... . . .. . . .................. ........... ........ . .... ............. . .....

. i .... - j-

rII iurv rLul- J

5 May 1994 21:3B:1?NARA0WDRND

. Y,,MIL-STDl 46iC PART 4 - CE-23..WESTINGOUSE MO 31592-95mTVA WATTS ERR UNITi RUX ELECRPS III RACK NO. 1-R-9 .. T.-.X 6

......... ..... .......''''!''.Y''Y '' '..'..Y! .'.. ''' -

..........

125

1B5

h p NATIONAL TECHNICRL SYSTEMSdflXISIO LEVELE d~uA/NHZ3

J ¶- ....................... ........ .................-. . . . .. P O......"tit... -..............

~~~~~.... ,MIL' .''-ST 'G PAT!' 4 - C- ' '-

NETIND-9X MO 15-a9

i.-. -.......... .i'......... .............. ........ .......-..A..T.B............ ...... ..... . . ............ ..........2...........

.. .... . 4........ 2% ............... .. *..... ....4....

. ~ ....... . * 2 .2..................... ...... ...

. ..............-------- .... ... .... ... .A.. .. ....

................. . ........ --.

.......... ..... ..: ...............

FREQUENCY I MH 3 L

B5

5S

hi

B0

40

22

.01II

I

.6 77

r~uu-,

14D Z

.......... I................ ----------------

; ~~~5 May 1994 U.......2:33:17?Ro~ncomn

FPFDlIIFm.-Pl

Page 126: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMS145 ......... f.... ... -r..--..... y..-

125 ..̂ .. ...

5 .......................... * . . ........... ... . -.-.-.

.015

5 May 1994 21:42:32BROROARND

FIMLCULtlj LrlrIZJ

hp NTIONAL TECHNICRL SYSTEMS 5 Mak 1994- 21:42:32P EMISSION LEVEL[ d~uR3 NRRROWPRNM

M IDB......... ..... .............]00' . g ,g g g g , g, g,.MIL-STD 46iC PRRT 4 - CE-O2L' WESTINGHOUSE MJO 3159C-95M! .. -........... ---. -. . ... TVR WATTS DRR UNITI RUX ELEC RM

RPS III RRCK NO. i-R-9TP-QX 5S,GB O .... . . ........ ........ ... 56...........

e. ,.. ..... ......... . .. .

................................ . ........ ............... ........ ..... .... .... ................ ........ ......... ..... ....... .............------ .-------- -. .... ... ........ ............... ........ ......

4 .i .---. ........ o . o ~ ..v. ... ................. +.t,....... .. ....

.. -. . .-.- --+ -.-.. ...L .

.. , ......... .... . .... . ...

. ----- °-°........ ?+. .o----....... ........ .... ........... ........ .......

.e15 1 -. i ---- i----i

FREQUENCY [MHz]

I

S 7 8

Page 127: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELS dSuR] 6 May 1994 OP:41:53NARROWERNI)

MIL-STD 461C PART 4 - CE-03WESTINGHOUSE MJO 31590-95MTVA WATTS PAR UNIT1 RUX ELECRPS III RACK NO. I-R-9RCG FLOW TPA 7,9

S 17

I

Page 128: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 80

Page 129: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d~uR/NHz3 6 May 1994 2?:53: 12

BROROSRNO.... .......... .... . ..... ..-.. ... .. f. . .. ......................................................MIL-STD 4G1C PART 4 -CE2

WESTINGHOUSE MJO 21590-5VM- TSA WATTS BAR UNITi AUX ELEC RM

RPS III RACK NO- 1-p-1. PRESSURIZER TUDD 1-4

44 X ............... ...i ..........-.-..--- ... ..................... ....................*

....... ..- .'-.-.-.' ...... -e.* ... .. . 1 .@. s- ... ... -.'.*@e .............. .*.@- ........ *.-..-.. -...-.................. ................

. . ...... ......... .............. '

<.............---'-. ......- .. '.-.... .. '. ... '

....... ...... .... ......................... ........ "'!l-

.. . i .-.-........ ......-........ . ........ .- ...-..

................. ....... g. . ..... .' -.' .. . ' ''........

.. l.l.......... . ..... . l ... ...... ... ...... . .....

FREQUENCY [MHz]

hp145

125

105

a5

95

I

50

6 1

.M. 0: . A J t U

Page 130: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE dRuR3OBD

BO

6B

.015

6 May 1994 09:34:3BNARRoWDRND

MIL-STD 461C PRRT 4 - CE--

WESTINGHOUSE MJO 31590-95M 'TVAR WATTS ERR UNITI RUX ELECRPS III RACK NO. i-P-1iTP-l1X 5

6 82

(A'3J

I

F;2FDIFNCYrMSII r ----- - Ia L-n

y

Page 131: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dluR)

1j009 9 ........ .... T. r''''''! ......... . ..'....''''''........

FrpUirwry rvmw,

6 May 1994 09:3B:35NRRRWAND

-50

NHTIONAL TECHNICAL SYSTEMS'EMISSION LEVEL[ d~uR/NHz3 6 May 1994 09:3B:35

SRORO"RNDV..v.V................................ ...........

j \j jj jj jj j .j jYjjMfL -STD 461iC PART 4 - CE-03.............. iso ..4 ................i i ii:j i WESTINGHOUSE MJO 21590-R51M

.. ...... ........... TVA WATTS BAR UNITi AUX ELEC RMjRPS IIIRRACKCNO. I-R-1lTB-l1X 6

...... N.-j-.n.j ..--j-j'..j.. ' ! .'.j.j.ij.j

* .* .............. ............4........... ..... . ... ...... ... ........

.I . 4....5--.*.---§- - ------- ' .- ..................

i .. 4-444-i .. L ....... ................. ............... .......4 .:... ..... ........ ..... .... .; ...: . . . : ... .:.::::::.:.:. :. :

................ .............. .............. ....g..... ........

..... ................. ' j ' l ' .... .

FREQUENCY EMHzJ

B0

S0

40

29

.015

hp145

125

105

5

S5

.01

I

6 &3

UP

* .1 --- - I - In£-

I -

.< .. A J L 0 51

Page 132: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICRL SYSTEMSEMISSION LEVEL[ d~uR/NHz3I

125

205

B5

.01

6 May 1994 09:43:18SROROGRND

........ ! .... ..... .. .... . . . . ...... .. . . MIL-STD 46 fc PART4-CE9

.T .... ... .'.'-'. ..... ---- ...... ........................

,.... ..... I...... .... I... , , ,

... ..... :.,..

§---~~~ --. e. -| 4G E

: : : ........ ... .............:.:.. ..... ...............: :.. .......: ......: : .: .....: ..: : : : -. :.. ..:.. ..: :.. .. ......... . ...... ----- *----- - .-............... ...... ...... . ... . .. ........ .,. .... .... ... .-- ......... ... . .. ....

...... ... , .- - . .. ,............ .i...

... ........... ......

i:-:-.:i.-.i.3.; --ii-- i- ---------i- - i i i n.. -. .i.......-.i... i ...... i i.

. A

FREQUENCY CMHz36 8 4

I

5B,g

Page 133: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE d~uR2

.I............ . ........ .-,.

BO

s0

40

6 Ma 1994 28:00:19NRRR0WBRND

.015

FREQUENCY [MHz]

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d uR/Nlz3

J q;)

125

105

B5

GS

.01

6 May 1994 10:00:19GRORDGRND

....... MIL-ST 461C PART 4 - CE-

.............. WESTINGH4OUSE MJ'O 21599-95M4... i.ff....... - ...... ...... TVA WATTS BAR UNITI AUX ELEC RM

RPS III RACK NO. 1-R-11STM.GEN.LVL. LOOP 4 TBD 4.5

............-e -4e-- -----@--- --T........- i.T..Tj.T;7 ........................ ...... ................. ................

.... ... .......... ..... .... ...... ......... ..... ...... ... ................ ...... j

...... ...... . ......... .. . .. . ........ ..... .... ......... i..iii...ii.ij ij.. .................... ... j. j

.............. ..... ..... . .. ..... ....... ........ ......

......... . , ........... ...............*

............ ... *I. . .. .. . ..........................

................ ...... .... ..-.-. : .. . ......... - ... L..i.-; .......................... ............

. I

FREQUENCY [MHz]LU 50

I

6 8 5

1BBIC

LU ]

Page 134: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uR/NHz3 6 May 1994 09:5B: lB

SRORnOSRNC.IL-STD 46iC PRRT .4 CE-0 i

i WESTINGHOUSE MJO 21590-95M....... ... . ............... ...... TVA WATTS BAR UNITI RUX ELEC RM

...... RPS III RACK NO. 1-R-11.STM.GEN.LVL. LOOP a TBD D 2

.................

.... .. .. ...... . ....-.-.... .... .... ......

.-....... .... ----- .......-.-.-......... .....-... ...................... ...... ..... .............. .

... ..... . .-----,-,-,-, ...........

.. ... . ..... ... . . . . . . . . .... ...... ...... '. -

.................15. .......... ........ ......

........I...*.... 4.. . .I.,.. . .......... ........ I........... . . .. * .

... ... g... . . *........I.* ..I.I.........S .......

.......... . .. . . ..* ... ..... *.*. 4.*.I *.g) .

. .......... ... ........*S..I. ..*4. ..g .... ........ I... I........ .

FREQUENCY [MHz]

hp145

125

]05

B5

.e1

I

50

6 86

.s .,A

Page 135: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ diuR]

6 May 1994 09:52:09NARP0WUANDhp

122

B2

50

40

22

. 1

FREQUENCY [MHz]

I

MIL-STfl 4C1C PART 4 - CE-03CuRVl/m *. . ...- WESTINGHOUSE MJO 21590-95M'

i.. . . - --............... ... . ... .-. TVR WATTS SAR UNITi AUX ELEC RMRPS III RACK NO. 1-R-11

* .STM.GEN.LVL. LOOP 2 TPA 10.1I. , \ . ........................... . . . . ......................... ......-............... ..............

@ . ...---.. ..... ... .... . . .. .................. . ............. ..... .. . . ..... 4 4 4 ... ... ......... ........ ............ .... ........ ......

........ .... ..... ... .. . ... . .., ...... ..... j*........... ... .. .....

.......... 44 ......... ,,,,...... ........ ..',...... '.w.....'

*- 4 - - ........ ..... .... .. .. ...... ..... ........ * .......

' ' ! -d * .............................. ........... ., ..... .

; -4. .. ...-.-- .... .... .- ... ...... ..... .... ..... i-4-4..-. .............. ...... - ............ .......... i. ...

* ,....... ., .... ... .........

6 87

LZ.al I eL1 so

Page 136: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC d~uR/NHz3

6 May 1994 09:4B:63GRORDORNO

.. MIL-STD 4GIC PART 4 - CE-02..WESTINGHOUSE MJO 31592-O5M

.. TVA WATTS BAR UNITI RUX ELEC RPMj .. :. 3RPS III RACK NO. l-R-11

..GTM.GEN.LVL. LOOP 1 TRA 7,9

.................... ...........

---....... .... .............. ............. . -. ..... ...... ... ............... ...............

................. .... ... . ......

.. i - .. . ..... . . . . 3 . . . . . . ......................... ................. ..... ..3..

3 ......... ... .. i .. 3

3 -- -. . . ..... .4 ... ..........................-.. i

. .. . . . . -. . ... .. . . - .j .i

. j . . . . . . .i . i. . i i i

,~. .i ,........,, Y>i j,

; : : : .:.:.:.I....e....-i - .. i .,.-; .. ,- - ,i . . .i ,

. I

FREQUENCY EMHzJ

Ihp

145

125

105

B5

9i5

.01 50

6 88

,;9 i

Page 137: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 89

Page 138: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 90

Page 139: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELE dRuR3

.1

6 May 1994 10:]?:02NARRR WDAND

FREQUENCY EMHz]

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uR/MHz3

145 : ...... '........ .................'' .'.....''" ...I...

6 May 1994 JB: 1?:02SROROLRND

FREQUENCY EMHz3 6 91

�2

hphp

BO

40

.01

MIL-STD 4SfC PART 4 -CEOiURYC. WESTINGHOUSE MJO 1590-95M

.............. . ........- ..... - -. i TVR WATTS DAR UNIT1 AUX ELEC PM. . . ... R I RCK NO. i-P-12

< . . ,, . ..,TD-12X 5,6...... s. .. ......... ...... io4oi.. .. . ........ ..... ... ....v .... ........ !.Y..!............

. .. ..... .. ..... ......... ..... ......... ... ../ ..... . . .. . . .....

.C, 5 ,~~.s,................ ......... ....... ..

. ! I .. x........ ...........

. - --.- .. F- -- --- ....- .. ..............

................ ........ ..... ......... ......... ..... .. ......

50

I

, i

Page 140: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

.8

Kl-N

. ....... .. . .

NATIONAL TECHNICAL SYSTEMS GMaaf 2884 21:32:DBENMTIONAL TECHNICEL SYSTEMShp EMISSION LEVELE d~uR3 6 May 1994 N J:32:1D

NRQROWRRND55 1IL-STfl 4G1fc PART 4 - E2

WESTINGHOUSE MDO 21599-95MTVA WATTS BRR UNIT1 RUX ELEC RMRPS IV PACK NO. i-R-19PRESS.VRPOR TEMP. RTD TOD 1-4

........................ ......... ... . . ....B0

6B

40

22

50rcrFiirur'v rMu.,

,-. ..- .-..-... ..............-- . ..... ...... .........

L. ,. e ........ ........ ..... ..... ,... ....... , ..'...... ......

........ z00z|9¢weoolw0s@ z @ @wo@@si@no@6oc§@B ........ ..... .............. ........ .............

.... ... . . 1. . . .... -. ....5.5 .55.5--5.55.

.. ..... ... .. ... .- 4 -........

6 92

Cv

I

!.. :..... ...-.. ..... --. . . .................. ......... ;..... ... -..

''.... ........ .''''* .. 1-- . . . +. ................. .......... .. , e ,,,,,,,,,;,O

~~~ - I xu - - I Lrmz -J

.

... .. .. ;

. Vib, .I La

Page 141: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hpJ45

125

B05

55

.015

NATIONRL TECHNICRL SYSTEMSEMISSION LEVELC d uR/H.z3

6 May 1994 1 1:3?:24GRORDRRNO

I

FREQUENCY EMHz9

I

6 9 3

Page 142: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMS 6 May 1994 11:13:54EMISSION LEVEL- dGuR/NYz3 GRORDORND14 ! ..... il..........=............. ! ----..................................................I

I

6 94FREQUENCY [MHz]

Page 143: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMTQIT S ION L-VEL r d .o.JMU 6 May 1994, . -. . ----- ... L..T. . . .. P RT . UKU

*........... . ... . . . .TI3....... j -~~~~A--.----.--------------------lT9WTTS BAR UNIT1 RUX ELEC RM:* R.P.9SS IV PA6 CK NO . 1-R-2 8

'* .-.-.g .. ................ . .. . . .............. .. ... ......... ..... .... ........ ......... ..........--------------. ...............

.. .... . . . . .1. . . ... .

........ ........ ..... ....... .... .. ...... ..... 3*---- - ---- ..........--.. ...

.. . .. ....... * e 44 .... I.. . ... . . ...... I. ..... .. I

. 4444 . 4 3 . ....... ....4.4.. ................ ------ -.+.e... ...... ................ ........ ......

........... . ....... . ..... . ...... ........-...... ..-.-.-.- ......

L U

FREQUJENCY [MHz]

I

145

125

105

B5

,;.e1 . L J 50

6 9 5

I 1:69: J?

Page 144: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC dBuR3

.1

6Ma&Y 1994 11:21:35NR R RWN3ND

FREQUENCY rMHz]

hp NATIONAL TECHNICRL SYSTEMS" - EMISSION LEVELC dDuR/NHz314D

125

105

B5

.81

6 May 1994 11:21:35GRORDORNO

......................................................................................

.MIL -STI I 461C PART 4 - CE-23. ~WESTINGH4OUSE MJO 21592-gSM R..... . .-.......... -.

-*........T -- TVR WAtTS BAR UNITI RUX ELEC RM.RPS IV RACK NO. 1-R-29

............TD-2QX S-G

.... ....... ....... ... .I. . ~.... ........ .........i...... ...... .............. ...... ....

.......... .... .... , .1 .. * ... ....... .... ... ........ ............. 0 . ....

, .. ....... . . ...... ...

............. ... ........ *S. . ... ......i...g . ... .......

. ........ .. .. - ---- -- i --- -*- -*-- - -

i---*--- ......i.-.-.-.-.... ......... --------- --- ..... ------ i.-.............. ...... i..e.;.; ;.j.j ;

,, .-.e.--i--------- ....................-.....---- ............... ......................... .................- ........ .-+----.....------i---i

FREQUENCY (MHz)

7hpI09

B0

40

22

. e15

......... .... .... . . v.v.v. ................. ................. .................. .... ....

MIL-STD. 4GC PART 4 - CE-03.CUR 1 . ... WESTINGHOUSE MJO 31590-95M

............. .----.---.- -------....-..-.. TVA WRTTS BAR UNITI RUX ELEC RM< - . RPS IV 5RACK NO- I-R-29

: TID-29X 5-G. ............ e....... i ..V..

... .. ... . ... .......*.. . ....

.. . . . .. ................. ...... *..

............... ..... .... ......... .....-...

'...... ........ .) .... ..! ........ ............ .. . ................

50

I

6 9 6;w . I i 51

I

Page 145: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONRL TECHNICRL SYSTEMSP- EMISSION LEVEL[ d~uR)I LiB

BO

5B

40

22

6 May 1994NAPR WDRND

11:28:1]

Fa 55FREQUENCY EMHz)

I

6 97

MIL-STD4 ifiC PART 4 - CE-02* CLJPSjW : . . -.. WESTINGHOUSE M-O 31590-l95M P

..!.-..! -. !--.-..! ! . .... TVA WATTS BAR UNIT1 AUX ELEC RMRPS IV PACK NO. 1-R-20BORIC ACID TANK TBA 7.,.... .... .... *. ' .I 4j '.. . . ...... .' .

......... ..... .... .......... ........ .... ..... .. '''' '' ..... ....

X. . . . ........... ............... . . .... .....

..... . ... ...... ... - .-.-.. :...... ........ .... .. .:. : ........ ........

*----i-----o- --- i-o-~ei..........-------- .... ......... ... eS o4 * 4 * ............... ........ ...... i ... i

!!!!.* ................. ><. .......

.......... .... * ... .......... .... i

...................... .....

. 1

Page 146: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A76.0 TEST PROCEDURE (continued)

6.3 Conducted Emissions. Method CE07, Switching Transients. Time Domain

Requirements

Conducted emissions switching transients, time domain, will be measured in

accordance with the applicable portions of Test Method CE07 of MIL-STD-462, Reference

Section 6.3, Test Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. A Tektronix oscilloscope, Model TDS 520, and a

Stoddart Model 91550-1 current probe was connected to a selected power lead, designated

as "Phase". The time domain current measurement results were printed and stored on

electronic media.

The preceding procedure was repeated with the current probe connected to theremaining lead designated as "Neutral". (Reference Figure 4-2).

Report No. 31590-95M

Page No. 6-98

Page 147: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.3 Conducted Emissions. Method CE07. Switchin2 Transients. Time Domain(continued)

Sample Test Results

Test Results

CEO7 Conducted Emissions, Switching Transients,Time Domain

Westinghouse ElectricCorporation will performanalysis for all tests.

Report No. 31590-95M

Page No. 6-99

Page 148: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

l A

CONDUCTED EMISSIONS) METHOD CE07

TEST SETUP

TYPICALTo0

:az0

fLA

\0tA

Page 149: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

0 S

.... .... ...... ... ............ ..-.......... l .-.--.. .. ... ............. . -. .. ... .. ..... ....... ... .... .... ...... .. ...... . ..... .. .......... .. ................. ....... ..... ..... .. ... .. ...... .... ... ...... . . .-. ..-. ....

A: TUA WATTS BAR UNITI RACK 1-R-1 TB-1X 5 STEADY STATE

................... ..... .... .... .... - --- -- - - ----------------- -.- .--. -- - -- -- - -- -- - --..- -- -- - --.- - -- -- - -- -- --.-------------..................................... . . . . . . . .. . . 1----------L

-----------

! d- ----------- I--- --- -- --- -........... ..! -- --------------- L

-------.----------- .............------------'----------- ------------ -----------' - ---------------- ------------ -'----------- i rs'S i t z

, ,, .. ,, ,function keqjl::::::::for no re

'''~~~~~~~~~~~~'~~ ....~ ~- ~~'~-~~ - -~-' -- --- ------ ---- -- ... ....... ...... ........ ... ..-.... ....... .. .......

C'

Page 150: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95K UNITI 1-B-i TB-1X 6 STEADY STATE

.......... . . . ... .. -- -- S-- --

...... ................-- ---- -- ---- - - ----- ---- -- - I--- --- I------ S

-t ---- -----S ----S - - - - -

. .......... . . . . S.S..

-2 ------- - - -I

A

-j- - - - - ------------ ----------- -----------

* - . ......S - - - - - - -S - --- i-I. .----I .I -S S--- S S- -- S ---- - - - - - -S

lOOnUfdhiu-A 2nSfdiP,

IPress Shiftt1Ifunction keyizZfor moreinfornat ion.

0)rNt I"

C-)

1�:

a

Page 151: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

.. .......... ..........-............... ........ . .... ............. ............ ..... ......-..... ..... .0...... ............

A: TUA WATTS BAR 31950-9511 UNITI 1-R-3 TB-3X 5 STEAD STATE

. . . . . .. . . . . . . . . . . . . . . . . .. .. . . . . . . .. . .. . . ... .. . .. . . . . . . . .. . .. .. . . .. .. . . . . . .. . . . .. . * . . . . . . . . . . . . . . . .

- - - -- - - - - - - - - - - - - - - - - - . . . . . . - - - - - - - - - - - - - - - - - - - - I - - - - - -I - - - - - - - - - - - -

- - -- -- -- -- - -

.. ...-- ---- .. .... -- - -- -- - - ----- - -- ---

* - - - -- - - - - - - - - - -

- ----- .. .. - ------ -- --- ----- --- ----- --- ----

- - - - -- - - - - - - - - - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - - --* - - - - - - - - -

.........A............. ..... .. .......... ........ I ------ ...... ... ..... ... ..... -..... ...................... . ............ ......... .... ....... .. ......

1press Shift+:function keuzzIfor umorezinforuiat ion.I

0�z

C-)w

lOOnU/div-A 2nS/div

Page 152: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95K UNITI 1-R-3 TB-3X 6

: ... .... .... . .... ... ... .. ....

: . .L.- --. . .1 L

A -. -.------- ---------------- ------------------------ I----------- ---------- ,-----

.- -- -- -- ---- - -- -- -- ----- --- -- -.-- ---.------ '-------- - ---------- ------------ .---------- '.---- -'.u1-- --+- ----- ------------ - - - - - - -f - - - - - - - - - - ..................................... . .. . .. . . .. -f - - - - - - - - - - - - - - - - - -

----- -|-- ---~~--!.- ----------- ------ 1----- ------- ------ -------- -- -- <. .1 . m. a . .1.* . a a . .

......... - .- L- - 4. .

-.. . a a .

.; ...... . ... 9 .... .. ........ ....... . .. .- ., -. .. . ......- , .. .- .. ..... ........... ......... I . . . .. .. . . .. .. .. . .... ... . . . . . ... - .... . .......... .................... ... . ... ... . ...- .......

lOOrnUfd iv-P 2nS/fdi v

Press Shift+sfunction keyi

.for noreinfornat ion. .

4. -..... .. . ... ... ... ...... .. -............... ,

C)

-IC14-

Izi

Page 153: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUl WATTS BAR 31590-951M UNITI 1-R-5 TB-SX 5 STEADY STATE

..@ . .....;----- ; ..... ....-- ..... ..... .. ........... .................. ... . . ... .... .... .......... ...... .......... .. V-

...........------------------t- - ---------- A-- - ------- 0- -- I

Ai

l OOnUt'diu-A 2nSfdiu

P Press Shift-1Ffunction keyl

tfor More. informat ion.'

cryIz

Page 154: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

* 0

A: TUA WATTS BAR 31590-95N UNITI 1-R-5 TB-SX 6 STEADY STATE

. ..... ..... . .......... . . .. . . ....... . . .. . .

i. . . . . ... .@ @. . . . . . . . . . . . . . . . . . . . . . - - - - - - - - - - - - - - - - - - - - - - - - - - - : . . . .

i----------- ----------- ..... -i--------------------------------'-----'-- ----

!---------- -------------------------- -------------------

*---------<--------s--------e--------s---------|--------------------r----------- ---------- |-----s e s Shifts

A

g ,, , , , , . ,.function keyI : ::::.for nore| i inforuat

O dd

C-

. -------- -------- - ----

Page 155: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

0

A: TUA W4ATTS BAR 31590-S5M UMITI 1-R--7 TB-7X S

. . . .. .... ... ...... ........ .

.. . .. . ... .. ......... . .-- -- -- -- -- -- -- -- -- - - - - - - -- - - - - - -- - - - - - - -- - - - - - - -

-- - -- - - ------------------------- - - -- -- .. .. . . S -

- ---- ------- ---- - - --- --- - -- - - - - I- - - - - -I- - - - - -

- - - - - - -- - - - - - - -

- -- -- -- -- -- -- --

.. .. .. .. .. . . . . .. . .. . . -- - - - - -- - - - - - - -- - - - -- - - - - --- - - - - - -- - - - - - - - - - - -

--- --- -- -- - - - - -- - - - - - -- - -- - - -- - - - - -- - -- - - -- - - - - - - -- - - - - - - -

-----------

.. .... . ... ..... .... . ..... . . ..... .. ...... ... ....- ... .. ... .. ........ .. ..... .. .... .... ..... .. . . ... ... ...... . ... ...

OODMU/d iv-A 2uiS/d i"

Press Shift+'!function keu':Zfor mior-einformiat ion..

C,

Page 156: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TVA WATTS BAR 31590-95M 1-R-7 TB-7X 6

f - - -------... , ,..i.

!- ---------6- --- ----- ---*- ----- -----@- ------- ---i- ---------- -|- ---------- -X- -b --- -- - - -- - - - - - - - - - - - - - - - - -- - - - - - - - -

-- - -- - -- - -- - - ; .. . . . . -- - -------------r----- X----------- - - -------- --- s------------ r----------- s * -- - - - -

| ------------- --.-.......------------r----------- ------------ ----------- ------------ ----------- ----------- ------ , Pr s h f F

.A

* *Press Shift-i-I ** function key'

I - -Afor no relOOnU/d iu-A 2nSfdiqifra o

Cr

Page 157: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95K UNITI 1-R-9 TB-9X 5 STEADY STATE

. . ..... .. . . . . . . * . .... .

------------- - - - ---- - - ---- - -

1 - ... . . . -- - - - - - - -- - - - . . .. . . - - - -- - - - - -- - - - - - --'- - - - - -- - - - - - -

-----------

- - - - - - - - - - - - - . . . . . . - -- - - - - - - - - - - - - - - - - - -- - - - - - - - - - - - - - - - - - -

lO~n~d iuA 2nfd i

I Press Shift+~z: function key~z! for norezinfornat ion.!

Cs)

I

Page 158: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95M UNITI 1-R-9 TB-9X 6 STEADY STATE

........... ................... . .... ..... . ....i i i i - i -------- - - - - , ------------ , - - --- ----.-. -.-.-.-.-.-..-.-.-.-. -.-.-.-.-..-.-.-.-.-.-. -.-.-.- -.-.-.-.-.-.-. -.-.- -.-.-.-.-.-.-.-.-. -..-.-.-.-.-.-.-.-.-.a-.-.-.-.-.-.-.-.-. . .. -. -. .

- ----- - --- -- -- --- -- -- --- -- -- --

A

.3 P. t! .

.--- ----- A---- ---------- ---------------'----------- ------------

----..-. ------ -.----- --..-- -----.. ------ - --.-- ------ ------------................ . ..... ........ . . ..... ..... ..... . ....... ............. , .... .......

.. ....... .... -.- .... - -... ........... ... .... . ... ... .. . ... . ..... . ...... . ......... ..... .. .. .. ....... .... ... .....-.....

S0nU/d i v -A PM'-ZZiv

:Press Shift+function keyfor nore.infornat ion.

Page 159: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-9511 UNITI 1-R-11 TB-11X 5 STEADY STATE

... ... ... ....

. . ., - . . . . . ,. . .. . .. . .,............ -

:** a a a a .

A

.: .....: ----. -----. -----. - -----. --- --. ----. -- ---.

--- -- --- -- ... .. ... - --- -- --- -- -- --- - --- -- --- - --- -- --- -- - P re s s S h if t.-

I * aaaafunction keyzi .. Udv .i ....................... ..... ....... ..... ....... .

l!nfi- !2, |fd.iuI-,.....,..,.. .......,

r¼C)~h A

Page 160: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95511 UNITI 1-n-li TB-11X 6 STEADY STATE

Al

lOOnW'dhiw-A 2nSt'div

Pressr Shift+!zf unc t ion k eyzIfor nore jtinfornat ion.i

j-"

Page 161: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-BEM UNIT 11-R-12 TB-12X 5 STEADY STATE

..... ... ....... - -- ..... ..... ........ .. ....... ... ............... . .......... .. ................... ........... .. .... .....

i:::::::....... -------...... ..... -------

A------------ --------- . ----------t.- ------ J----.- . ....-----.J...- -- --.t.....---- -- -----z--- --------- -- -------

..------ ..-- ------, ------------------------------------- ---------- 1-- ----------------- --- ---

........-.... .......... . ...... - . ..... .... . . . ... ..... . ... .... ..... .. . ....- ... .-.. ............. ........ ... .... ......... ..... ....... . ......

50rmU/d is- 2vof -A

i .

... .. .. .. .. .-.

* Press Shift+.ifunct ion keyZtfor moreI infornat ion. '

A

-A.- ., a

901i

C11-1)

Page 162: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

A: TUA WATTS BAR 31590-95M UNITI 1-R-12 TB-12X 6 STEADY STATE

.......................................................... ..... ........................... .... ; ............ ........... ....... .... ................ . . . ..

* . . . . . 1

----------- ------------------------ ------------ ----------- A------------ ---- ------- ------ --------

.lb .114: i 111 l. 1 1..Iu . k .- -11- . il

1I'' lillf"hI'"'- I

I---- --- T, -- -r -

................................................- ........... --------- ------------ ---------------------------------- :------------ -----------...

- ------------------- - -- ---- -- -- -- - -- -- -

: . p . p.5 . * . p * . p . .n - ........d .. .... ....... i................ .......... .... .................... ......... .- .. ......... . ....... ...........-.. ......... . 2 S... ..... ...... .. ... .. . .S0nU/div- a Sdi

>.Press Shift'-,function key~.for nroreinfornation.

i , - - - --I

iti------------iit!. . . . . . . . . . . .

izIj

it . . . . . . .iz 1-1

A

tNt

C.

Page 163: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

1'

0

A: TUA WATTS BAR 31590-9SE UNITI 1-R-28 TB-28X 5 STEADY STATE

v. .... ... ........ .... ..... ... .............. ...... ... . ..... . ..... . .. . . ... ....... .. .............. ...... ...... .. ..... ........... .......

' ----'------------------------''--'------- ------- Ir----------- I------------- ----- j-------

----- -- --- .- '-' ------------------J----------------

:-----,,--- ---- ,----------- --.... ----------- ------------- --------- ----------- -------- ......--- *

* ' * ' ' ' S

~* :

i ., , ... ,,. . ,..L .;, ,.,,, ... . -- --------------------- ---------- -L. - j----- ,,,, ,,; -, ,, I- , , -, ,- -, - -.. -,,- .. - -.,- - -.. . -. ; ...... .. .; - - -.. -. -'' ----- - --- ----- L

SOnUfdiau A 2.aV 1.44.

Press Shift+sfunction key:for nore

, infornat ion..

A'~:

CD

j A.4

c-re

W'w o s vr

Page 164: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

0 0

A: TVA WATTS BAR 31590-9511 UNITI 1-R1-28 TB-28X 6 STEADY STATE

- - -99 - - . . . . .9.1

A

:function keylzIfor more

SOnUfdiu v A 2nSfdiu ...... . ....

Cr3

3%

Page 165: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.4 Radiated Emissions. Method REXX. DC Magnetic Field

Requirements

Radiated emissions, DC Magnetic Field, will be measured in accordance with the

applicable portions of MIL-STD-1399, Section 070, Part 1. Reference Section 6.4, Test

Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. A Magnetic Instrumentation Gaussmeter, Model 912,

was set up with its measurement probe located in the "X axis" location of the units' probe

fixture. The measurement probe orientation was then changed through multiple axes until

a worst case level was detected. Measurements of the DC magnetic field were taken and

recorded on data sheets.

The remaining mapping locations were measured following the preceding procedure.

(Reference Figure 4-2).

Sample Test Results

Test Results

REXX Radiated Emissions, DC Magnetic Field Westinghouse ElectricCorporation will performanalysis for all tests.

Report No. 31590-95M

Page No. 6-117

Page 166: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

POWRF ' I]UPCE

LIX \0 \fIW-ff . - --- Ih

TE STPROBE

GAUSSMETER

RADIATED EMISSIONS , METHID RE'/'SSFT IJP

0

-N

s Pdco

z p

-

- 000

(-

- ..

T'i I 1`---PI 1

Page 167: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NationalTechnicalSystems

JobNumber _ _ 5 _ _ _ _5___N

Customer I -V f)1Th'S S VLA f

Test Sample uNI1 AuYI LLFCTJC- £X&'

Test REXX-DC Magnetic Field Emissions

Purchase Order P° 2

Remarks Drop-off C.5= distance i

ATA SHEET

Date _ _ _ _ _ _ _ _ _ Page o of _

Specification NTS TP No. 3vSQOi- £.eso; 0

Model/Serial Number see below

Mode of Operation FKl Yh ciZ4 (

in inches to where source guass level is less

than 0.5 guass.

Location Level(guass Drop-off &.5 Remarks

/ - ^ - ____._____C . ____/__. _,__ _____

i- R-1.3 Rt 0.5 , c>.

/~I~M~ .______CS__/ '.b^i.6

-57 F OA M3 /,o<@ e

-aS /, ,,C AQ)INk:,

C-N

/ - -9: S ~. 7 fgr

/ - e- ,,n S.7 4;C i-Q, I

/Z - / S1 . Ii Z 9' /-6)ft( Z

k2A vZi kj-Y

_ _ _ _ _ _ _ _ _..:"

/29- . -- ._v- I ,_, J. . .

i~1 ')6vot

Test Technician

Test Engineer-

N/A

U- ArS-~ 6 1.1 J Form 20.1

Acton Division533 Main StreetActon, MA 01720

M

- .

4'02I , 0 -.< /--

Page 168: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NationalTechnicalSystems

Job Number \ 5 5 15,

Customer XV - A fZ NUC(CLEAZ

TestSample U)M:T -I o, EzLpTrJC eap.

REXX-DC Magnetic Field EmissionsTest

Purchase OrderPA P I\I

Acton Uivision533 Main StreetActon, MA 01720

fkTA SHEET

Date SA01 2 Y Page 2_ of

Specification NTS TP No. 3'5qO45+ - e3 s'o" 0

Model/Serial Number see below

Modeof Operation PIC Jct , -EIcWc,-\. tLS Op64 c; X l

Drop-off 4.5= distance in inches to where source guass level is lessF-emarKs

than 0.5 guass.

Location Level(guass Drop-off d.5 Remarks

-cA 'i N L-/

P-R- 1--e. ei. < 44

/ - k - 7ti_. b .cIAV / r -

I IR-' ? R 4 f I - -' I I , - I I r .L- r- I

e- ''(- 1

-- C AR ' t,/ Q- g t 2_ _ _ _ _ _ _ _ _ _ __C_ A i ~ v =

!~~~ ~ ~ ~ - I .7 -ji r

A, ftC--

1- i?-S R /.l 7; 4) __A_/- R-L 3L2 u ; w4

/ _ _ _ _ _ _ _ _ _ _ _ _ _ - C

_ _ _ _ _ _ _ _ _ _ _ _ _ _A__ _ _ _ _ _C T

Al /A

Test Technician

Test Enqineer-

N/A

6 1 2 0 Form 20.1( -

-�7��A

Ak 65 , AJ % I

FeCAm e-I- P-9 q S

Page 169: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.5 Radiated Emissions. Method REOI, AC Magnetic Field, 30 Hz to 50 KHz

Requirements

Radiated emissions, magnetic field, from 30 Hz to 50 KHz will be measured in

accordance with the applicable portions of Test Method RE01 of MIL-STD-462. Reference

Section 6.5, Test Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. An A. H. Systems Loop Sensor Antenna, Model

SAS-200/560, was placed in the "X axis" location of its antenna fixture. The output of the

loop antenna was connected to an HP Model 8566S, Automated Microwave Measurement

System, through a 50-foot length of RG214/U coaxial cable. The antenna orientation was

then changed through multiple axes until a worst case level was detected.

The spectrum analyzer swept over the frequency range from 30 Hz to 50 KHz and

plots were generated for the frequencies of maximum radiation.

The remaining mapping locations were measured following the preceding procedure.

(Reference Figure 4-2).

Sample Test Results

Test Results

REOI Radiated Emissions, AC Magnetic Field, Westinghouse Electric30 Hz - 50 KHz Corporation will perform

analysis for all tests.

Report No. 31590-95M

Page No. 6-121

Page 170: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

0

a -- \ Pr tv'EP ?F prl i F[1\ I\

TE'ST AHT1TE'NIA

EMi METER

RADIATED EIK1ISSII \IS) iEI T-IC Ii EL0tl 'iT'(-g .-SFT JP

PO010~1

z0w(AsoCo

\6LA

4:

Page 171: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC diapT3 PERK

3 May 1984 10:11:5B

MIL-STD 461C PART 4 - RE-2;

. .. WESTINGHOUSE MJO 31590-95M.TVA WATTS BAR UNrTi AUX ELEC

REACTOR PROTECTION SET IRACK NO. 1R--1 PANEL SIDE

FREQUENCY [MHz3

.V... rf................ ...... ATC... :5... . . . . .: ' . TT . .MIL-ST. 1C PRT 4 REs;; * . . . . . .WEST ING14OUSE MiO 3 t 5980-9 SM........................... RECO MJ 25G-:TVA WATTS BAR UNITI AUX ELEC PM

'RECTOR PROTECTION SET I* ... ..I~ EAGLE 21 MMI CART CRT FRONT

i ', .'.- . ................ ............. . .. .... .... . ......... . . . .. . .. . . .... . . ... ......

.. . .........

... .RZ ......... .. .... ......... ... .

....,.........

...... ,,,.. . e.... , ......... ..................... .......... ... TI -V . .... .... .... .... ..

.... ' ,.. LL ,,','., . .... . .'., : , , . . .. L. . '................

...........V...... L... ..................!....

h p NATIONAL TECHNICAL SYSTEMS.EMISSION LEVEL[ drn~T1130

116

50

59

rorwl Inary ruu-.1r% sWLIl I LI J

.01

Ct lrJoc-&i<

6 1 23

hp

I

I

3 May 1994 10:34:06PERKo

Q3. E- . rjluv .05

Page 172: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

130

110

NATIONAL TECHNICAL SYSTEMS 3 May 1994 29:IB:35hp ENTIONRL TECHNIC L SYSTEMShP EMISSION LEVELE deDoT3

....... ....... ..... ...................... ................. ................................................ .MILST) 41CPART 4 - E0* . . . WESTINGHOUSE MJO 315 R-95M.... ... ... ....... ..... . .. ,.: TVA WATTS BAR UNIT1 AUX ELEC RM

i * .>is . . . .. i.RERCTOR PROTECTION SET I.. . .RACK NO. 1-R-1 PANEL REAR

......o...... ......................................... .... . ... . ..... . . ........ -. ......... i. .

i .-..-.......--.. :.. ......... : : ... . ... - .-..-...... ...................

....... .... ......... . ......... . .. .. ......... .........

oj..ooo- ---------............... ...... o .... 8 .2............

.......... ........ ......- --................ ....... ........... *. ... . .. .. . *. .

o i .. i.o 4 . . i o . i o.o i.. i i .. i o o.o..i i.i

..... . ................l . .1 . .; ........................... .- O-a .............. o .. . ...... o.o--,,,,,,,,,,,.,,,,,,j------j,----;

s0

FREQUENCY [MHz]

6 194

I

FREQUENCY [MHz]

3 May 1994 09: 16:35PERK

53. E- . lovi i .ee1 .es

Page 173: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

112

B0

70

52

NATIONAL TECHNICAL SYSTEMS 3 May 1894 11:23:54hp p EMISSOL LTECHICAL SYSTEMS PERK

i 01

. vvv J

roDri irm.rv ruu-i

130

120

Y0

70

52

[ hp NATIONAL TECHNICAL SYSTEMS

5...5.5.5 If5..... . 555 I - TI) 4GIC PIR 4 - RE-0iEMISS.I .LEVEL ,.*pT .PER ... ......... . ...... .. ...............WESTINGH4OUSE MJO 2159B0-5M

i............. I -. g.... TVR WATTS BRA UNITI AUX ELEC RMREACTOR PROTECTION SET JRACK NO.1-R-2 PANEL FRONT

.. .I .4............ .... ..........................................-....-....... I

..--44 ............... I...4...4 ....I.

.......................... ......

............:......... ......*

5~~~~~.. ... ...- +-- ............. .........--i----------1 .... ti?-tt----------- ..... -......f::: :V i j i A' ' '.I....4..b..t.. ..t.......I. ......

.... i..q . . 4 ......... . - - - ..... .m m ..... i...

. -

FREQUENCY EMHzJ 6 125

I

- - ll�WLJL.Ml I L -IrIlL i

J . . .. MIL-STL 4iGiC PART 4 - RE-3i

WESTINGHOUSE MJO 31592-95M! ........ !-.--.--.--.... TVA WATTS DAR UNITI AUX ELEC PM

. .j REACTOR PROTECTION SET I...... jI..RCK NO.1-R-i PANEL FRONT(MMI)

I e---|i-+e........ ......... 4 -ie i ......... ........ |V-V,....... .V..... ......

............... ..... ......... .... ... . .......... ...... ........................... ........... .........

............ ...... ........... ............

................... .................. ) . . .............. 4..g......

5 5 5 5.... ..... '.. . t .... 5 55 .. 5.......... ... . . .. . . . ........ ..... .....

5........ ................... ................. ... ....l.................. ....... ......5

3 May 1994 11:03:54

.05.01

3 May J 994 11:19: 12PERK

. vvvJ * VVI .e1

Page 174: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~pT3 PERK 3 May 1994 11:2P:14

MIL-STD 4GiC PART 4 - RE-BiWESTINGHOUSE MJO 31590-95MTVA WATTS BAR UNITI AUX ELECREACTOR PROTECTION SET IRACK NO.1-R-2 PANEL FRONT

FREQUENCY [MHz]

h F EMINSION LEVEL[ d~pT3 PERK --- ----- --------.30.~............... ........ .... ...................... . . .*.- . MIL-STD 41iC PART 4 - RE-0i

.............. ....... WESTINGHOUSE MJO 31590-95Mi -. ... - ..-.... i TJ WRTTS BAR UNITI AUX ELEC RMO

....-.. '..REACTOR PROTECTION SET I1RACK NO. 1.-R-2,4 DOOR GERM FRONT

.......................... ..... .......... ................

9....8 * . . .....................................................................................-- .

.........g... i . i... gi..... , .j', ...... i........... .. . .

70i*iil+-Jlli+i.......... .......... .... .. . .... .. ....... ............

.... i. .. 1.. ..... . .i............ i. .i70 -.... ..... ......- i... i ....i ..* --? -- t .......... ..... -t----. - i ......... ...... gi-i.----

.,......1......I.....,. .. ...... ... ... .; . .

.... i -- ... -...i.. ?-44 -; ..............i.........i. .- ... *i-ti---i-4-i- -------. i---........ i --t-i ........... ---.-- * ----, ---.................I........ . . ... .. . .5.. ............... *. . . . r .

I.E- .0001 .0l 81 85rorti irijry rmu-i

I

6 126

Ct

r 1L1U~a - -ll - -{.i . J

3 Mav 1994 I I:6 !RR 3-h n YPTIONRL TECHNICAL SYSTEMS

Page 175: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELE diepT)

3 May 1994 09:4?:23

MIL-STf 4G6C PART 4 - RE-2iWESTINGHOUSE MJO 31590-95MTVA WATTS BAR UNITI AUX ELEC RM.REACTOR PROTECTION SET IRACK NO. 1-R-a PANEL REAR

................. ............. .......... f..... r... ................ T......... ................

FREQUENCY EMHz)

MIL-STD 46iC PART 4 - RE-0iWESTINGHOUSE MJO 21590-gsMTVR WATTS BAR UNITI AUX ELECREACTOR PROTECTION SET IRACK NO. 1-R-4 PANEL REAR

hp NATIONAL TECHNICAL SYSTEMS 3 May 1994 09:56:161 EMISSION LEVEL[ dYpT ! PERK May 299429:58:16.. ..... ..........!. .................................................................................

118 V

9B

70 .--

5a 8*

:..

3. E-5

Ior Irburv 1 ruu .

I

6 1C7.ee1

rDr?%i irm.- ru~u- i

Page 176: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS S May 1994 14:26:21

NETIONAL TECHNICE L SYSTEMSEMISSION LEVEL[ dap T3hp

130

110

70

59

rorNi ic-urv.0001

rM-, 1

NATIONAL TECHNICAL SYSTEMS S May 1994 15:66:18

NETIONRL TECHNICE L SYSTEMSEMISSION LEVELC d~pT3 PERK

3. E-S .001FRprtMrNrY rMfbl

NOTE: THE ABOVE AND FOLLOWING PLOTS FOR REO1 SHOW

TRANSIENT EMISSIONS OCCURING EVERY 26 SECONDS. THE

SOURCE OF THESE EMISSIONS UNKNOWN, BUT ARE NOT NOTED DURING

6C 1 1ETS

CE01 TESTS.

..... -MIL-STI 4GSC PART 4 - RE-21

WESTINGHOUSE MJO 31590-95M- - - ,TVR WATTS BAR UNITI AUX ELEC PM

REACTOR PROTECTION SET 11.. .. .. . . *. -. . RACK NO.1-R-5 PANEL REAR

.. . .. . .. . ... ... ... ... ... .. . ... .. . .. . . .. ... . .. . . .. . . .

I...... ... . .. .................. ... ..... ...... e.......... ...... ......-'

.......... ...4 .'- - ......

* . c.i . . . ...,,, , , . . . .. . . .V 6o----i----M- ---4----j-.h............... ................ iii. l.-i.i..i..i.. ...... 3

....... ............... .. . .............. . ......... ... ................. ..... ..... ,........

Ihp

130

110

90

70

5s

- ----w~l I 1 - ... lJ

3 May 1994 14:26:21PERK

3.E-S- -

.es.01

3 May 19B4 15:06: 1B

3. E-5

Page 177: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NRTIONAL TECHNICRL SYSTEMS- EMISSION LEVELt d epT

I.- t .... - .'.- -.

PERK

;.,

3 May 1994 15:14:20

MIL-STfl 4~1C PRRPT 4 -Rt2WESTINGHOUSE MJO 31592-95MTVR WRTTS BRR UNIT1 RUX ELEC RMRERCTOR PROTECTION SET 11RACK NO.1-R-7 PRNEL REAR

..............

...................................... ................. .........

I I D

B0

70

52 .

.001 .esFREQUENCY rMHzJ

J .51

................. e....i. . .

... e. .. ..... . ........ . .. . ..

.o. . .............. . ..... .

I

6 12i)&43

FREQUENCY EMHz3

.~ ~ ~ -... .......... "'''Y'.v B . ...................-----........... I

... . ......... . .. .. .............. k......... ..... I..... j .. , +,;, ; ..

j::

3

.............. ,...i..

. 10191 ]

'....

Page 178: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS 3 May 1994 15:36:33hp EMISSION LEVEL[ d~pT3 PERK130 ... - v................ .. ............ ...............MIL-STD 41TC PART 4 - RE-2i

. . ~s .. . . . ..i WESTINGHOUSE MJO 31590-95M.......... ! .............- -... !TVR WATTS BAR UNIT1 AUX ELEC PM112 .. REACTOR PROTECTION SET 11

.. .- \ . . . . ....RACK NO.1t-P-5 PANEL SIDE.. .. . ..... .' ,. .. ....... ...... . . , . .' ... .. .. .. , .. .. . ... ..

............ .I.. ... ....... ...... --

FREQUENCY [MHz]

hp NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC dprpT3130 . ..........................

.... .. .. .

1123-4-@¢ --- +e-----N.................. -,---

so

70

3. E-5

PERK 3 May 1994 15:45:2?

rmr-LWUrNL1t LMMZJ

I

6 1 30t Z R

. IUFJ L

rlrsrly Ir-II.w ru- -

Page 179: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMS 3 May 19B4 15:5?:28

NATIONAL TECHNICEL SYSTEMSEMISSION LEVELr diapT3h

FREQUENCY EMHz3

MIL-STD 4lGC PRRT 4 -. E-22WESTINGHOUSE MJO 31590-95MTAR WATTS BRR UNITI RUX ELEC RMREACTOR PROTECTION SET IIRACK NO.1-R-G PANEL FRONT............ ......... ....... f.... y... ........ ,...-.. -...y......... -.v.--.

.................................. .. ..................- - .-.--.-- - -

hp130

lio1

FREQUENCY [MHz]

I

.o 10 31I

3 May 1994 15:5?:2B

Page 180: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 1 32

NATIONAL TECHNICAL SYSTEMS 3 May 1B94 I4:�B:32NATIONAL TECHNICL SYSTEMSEMISSION LEVEL[ d~pT3

MIL-STD 4G1C PART 4 - RE-2iWESTINGHOUSE MJO 31590-95MTVA WATTS DAR UNITI AUX ELECREACTOR PROTECTION SET IIIRACK NO.1-R-11 PANEL FRONT

.............. .......... ,....... f .....,..,. . , ..- , T ... ................. y.........

............. ......... ....... ... . ... ... ............ -.-..-....

FREQUENCY [MHz]

hp130

I 0

s0

s5

3.E-5

FREQUENCY EMHz]

3 May 1994 14:00:32

Page 181: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONRL TECHNICRL SYSTEMShp EMISSION LEVELE d~pT3

90

5B

PERK

PERK

3 May 1994 13:42:13

MIL-TTD 4GiC PRRT 4 - .....WESTINGHOUSE MJO 31590-95MTVR WATTS BAR UNITi AUX ELECREACTOR PROTECTION SET II1RACK NO.1-R-11 PRNEL RERR

FREQUENCY [MHz]

3 May 1994 13:51:19

hp NATIONAL TECHNICAL SYSTEMSf EMISSIO . d'pT3

110

90

so '

tarIe

FREQUENCY EMHz]

MIL-STD 461C PRRT 4 - RE-OlWESTINGHOUSE MIO 21590-RSMTVA WATTS DAR UNIT1 AUX ELEC RMREACTOR PROTECTION SET IIIRACK NO.1-R-l1 PANEL SIDE

*.. . ........... ......... ................. -

..................... ,......... .... '

...... ....... ;. ....---------......

. ......I...... \'........,.,., ,.............. ..... .... ...... . ............... . .......

..... .. .. 4.i e ...... + - ; .... @n .....-- ......... ....... ................ . 4 e-e.i i -ioe-4i .-.+rxni4¢@[email protected]@.......

i 44 ............... , ..., ,:,..... ... . . ....... ............... ..ii

. .......................... ................. ... ..................................... ...... ... ... ........

I

o%1 -w*:3o '

.......................... I......I......... '' --'Y ........!'': .... ';''' .. --.. ..... @.............................................................

..... . .... ;.... ;...... j,-- ................ ;..........L ...... :..... :....L ... L..: ..... :i

1.110

3. E-5

3 May 1994 1 3 :5 1: j9

3 . 000

.l W-- ... ...!.!

Page 182: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d SpTJ

3 May 1994 13:IB:3B

MIL-STD 461C PRRT 4 - RE-2iWESTINGHOUSE MJO 31592-95MTVA WATTS RAP UNITI AUX ELEC PMREACTOR PROTECTION SET IIIRACK NO.1-R-s PANEL REAR

FREQUENCY EMHz]

hp NATIONAL TECHNICAL SYSTEMS"P. .EMISSION LEVEL. d.pT.130 ,v: ... f.............-'!' ' - ............... I......... ........... I...--!-- -

PERK 3 May 1994 13:32:5?

FREQUENCY EMHz]

I

6 1,3 4

MIL-STD 4GIC PART 4 - RE-i1WESTINGHOUSE MJO 31598-95MTVR WATTS DRR UNITI RUX ELEC RMREACTOR PROTECTION SET IIIRACK NO.1-R-10 PRNEL RERR

Page 183: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I I

90

3 May 1994 16:13:35NATIONAL TECHNICAL SYSTEMSP EMISSION LEVEL[ d~pT) PERKI13B

3. E-

FREQUEJNCY rMwzl

SZ

FREQUENCY EMHzJ 6 135

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELC dlpT3

I

MIL-.ST) A61iC PART 4 - RE-Bi

-- WESTINGHOUSE MJO215SG-R5M P... ........ ...... ........... . .......... T AW ATTI G OS E BAR UNIT AU EL C R* -' ---- 'REACTOR SPROTECTION SET 11

........ ....*.. RACK NO.1-R-8 PANEL FRONT

..... .. .. . . .. . . . . .. . . . . . . . ..... . . .. . . . . . . ..

. 4- -,.-. . ' -.. . .... ......J.'.....'. ' - -. '

.\ ...... ......... . ..... ......

~~~................ ,2 li. ......... ,,...,.

................. ......... -4 .... ;- - 4 .... ...... ....

.esa . u=01 1 .01

Page 184: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

h 3 Ma>, 1994 IS:3B:1?

I

V 1 a 6

MIL-STD 4GiC PART 4 -

WESTINGHOUSE MJO 31590-95M'TVA WATTS BAR UNIT1 AUX ELEC PM::REACTOR PROTECTION SET VI,ARCK NO.1-R-la PANEL RERR

... .. .. ,....,:................... ........ ... ...

FREQUENCY [MHz]

3 May 1994 1B:44:2B

FREQUENCY [MHz3

h 3 May 1994 16:36:JP?

Page 185: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NMTIONRL TECHNICRL SYSTEMSEMISSION LEVELE d~nTI

* ., .....I ...† , - - i

PERK3 May 1994 1I:03: 25

MIL-STD 46-1C PART 4 - RE-0iWESTINGHOUSE MNO 31590-GSMTVA WATTS BAR UNITI AUX ELEC RNREACTOR PROTECTION SET IVRACK NO.1-R-2G PANEL FRONT

........... - ..... . ............. . . ....... .... .- - ......................

|---.-..... i-.i ......... .4...i.4..;.*.' ...... j .... ....................... ...... I ... . .......

........... ....... ................

....... +--i-.j~.e. - -.; ..... ... . . ........... . . ....

.. ,---e-....,i., ,,,v............ 1 |1*8---- -i---................ ................. e

................ ............

.... .........

................ !.I*.. . ... .. .. g ... . . . . . . . .. . . . . . . . .. . . . . . . . ...... g.. g..~...............$ , , , ,.. . . * . . . . *. . * . . . . . .

. OLPLL J .w1rcralirusrv rMuL

.01 .0!IMflL.*ILYlL I LU~flL .8

h 3 May 1994 1Sz54:SR

PERK I IC- . '-'- -..... ......... .... ..... ..................................................................MIL-STD 4G1C PART 4 - RE-21WESTINGHOUSE MJO 31592-RSM

:!TWR WATTS BAR UNITI AUX ELEC RMREACTOR PROTECTION SET IVRACK NO.1-R-ag PANEL SIDE

.. ...................................................... .. .... ..-.--.--

rPrwirvU r rmuil

hp130 ...... - . -;----

I. .. . .....

5 i0

70 :

sm' i:

52 9

3.E-'

I

5

6 13 7

Nt2Y

I --

I X-x-, . Ll 11 -

- ---- -- --

......... .: ........ .- - ...... . . . .................................................. ------

hl 3 May 1994 19!54!5R

i

I

Page 186: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELt d~pT) PERK

3 May 2994 1?: 2?:22

.IMIL-STD G 1C PART 4 - RE-2i. iWESTINGHOUSE MfO 31590-95M

.TVR WATTS BAR UNITI AUX ELECREACTOR PROTECTION SET IVRACK NO.1-R-12 PANEL FRONT

PM R:

. ... . ..... *. ... I..j........... ........................ .

.. .... .. ..j....... ............. .. -..-j.------------i-i--iii-------.----------. ...........

....... ...... .e.e ................. .................

....... . ... .... .. ... :. : .. . .. ......... ..... ....... i

5 . a01 .0 l sFREQUENCY [MHzJ

Hp NATIONAL TECHNICAL SYSTEMS a May 1994 1?:16:65

EMISSION LEVELE d~pTJ PERK

MIL-STD 4GiC PART 4 - RE-rn........ .. WESTINGHOUSE MJO 21590-95Mi... ............. ................. ......... .. ... TVR WATTS BAR UNITI AUX ELEC RM:........ ..........REACTOR PROTECTION SET IV........... .......RACK NO. 1-R-12 PANEL FRONT

2 ..i.............. *.... .. ... . ............ ......................

.X .............. ................. . .... . ......... . .... . ......

so .... ,,., ... ...... -.-.,.-.... '....... ..'- .

59 - - f

J ... ....... ...... *. . ... ....

5 .. . .1 . . .....

.B ..... - .... e ++ 1 ..................... .............. ........ ".... ......---- ---- >- -- --

.5............... t ... . ..... ...

3 .E . ..... .. .e.------ee. . ..... ... . ......... .......... ...... ......... ... . ............. 0 .. .i ww M i .@

FREQUENCY [MHz]

hp4 noa

216

so

70

52

3. E-

I

o 13 6

ow ........ . .- ......................... ................. . ..--......................................................................................... . @so* ... sP .o @

.... . ..... .:. ............-..... ..

J

. . .'4: : : : . . .. . .: : : : . . . ___ :

Page 187: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.6 Radiated Emissions, Method RE02. Electric Field. 14 KHz to I GHz

Requirements

Radiated emissions, from 14 KHz to 1 GHz, will be measured in accordance with

the applicable portions of Test Method RE02 of MIL-STD-462. Reference Section 6.6, Test

Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. The antennas used during the performance of this

test were as follows:

Frequency Antenna Coaxial Cable Polarization

.014-30 MHz Active Rod 25' of RG214/U Omni-Directional30 - 300 MHz Biconical 25' of RG214/U Vertical/Horiz.300 - 1000 MHz Log Periodic 25' of RG214/U Vertical/Horiz.

Measurements from 14 KHz to 1.0 GHz were performed using the appropriate

antenna with the corresponding coaxial cable connected to a Hewlett Packard Automated

Microwave Measurement System, Model 8566S. The antenna axis orientation was changed

until a worst case level was detected. Plots were generated for both narrow and broad band

measurements.

The remaining mapping locations were measured following the preceding procedure.

(Reference Figure 4-2).

Sample Test Results

Test Results

RE02 Radiated Emissions, 14KHz - 1 GHz Westinghouse ElectricCorporation will performanalysis for all tests.

Report No. 31590-95M

Page No. 6-139

Page 188: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

POD\1ER SOU'RE

\ ''

TES T ANT E N N A

EMI METER

Z ,I //I

7 / ,

RA4DIATED EMISSIONS) METHOD REO3,) TYPICALSlI ET [ J

Pd

CD

go

l) t

It 0

alUo

CD Z

Z 0

F E : :

Page 189: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONRL TECHNICRL SYSTEMSEMISSION LEVELC dBuV/nu/MWz

4 May 1994 JJ:30:09BRORDORND

.................................... . . .......................... ..

FREQUENCY EMHz)

6 14~1

I

Page 190: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp1408.

IN128:..

1 00,

50

:....

.8014

NATIONAL TECHNICRL SYSTEMSEMISSION LEVELE dBuV/n/MWz3 4 May 1994 10:52:29

DROROGRND

FREQUENCY EMHzJ

I

u 1 42

h NATIONAL TECHNICAL SYSTEMS 4 May 1994 10:52:29P EMISSION LEVELE d~uV/oJ NRRROWARND98............. . ... .. . . r y ...... .. ~ .... . . . . . . . .90 . . .. MIL-STD iGC PART i RE-2

WESTINGHOUSE MJO 3159 -95M.......... .................. ...... TVA WATTS BAR UNIT RA X ELEC RMREACTOR PROTECTION SE IRACK NO. 1-R-1*2 PANE FRONT

.. ......... ... . ........... ....... ........... ........ ... .. .. . . . . . .

........ . .... ........ ...... ......... ....... ......

.......... ...... ...........

*................. ............................

, ......... . .. ,................. .... ,...... ......... .. .......... ee.e. ,eeee... . . .........

.. ........ . ... . ...........

.. ......... .... .... . .......

................. .............................. ............................................................................ . ..1314 .1 I 101 I Im 112r>

FRErrEi IFNf rMwH1

I

I

I

I

I

Page 191: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

h p NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE d-uV/m/MWz3

21408 ... ... !.... -.......... b.y..!Yf........!

rFrhi irurv ruu-,

4 May 1994 11:03:58SRORDDRNO

r IM ht 1 LnfJ - -

I

o 143

hp NATIONAL TECHNICAL SYSTEMS 4 ;May 1994 ]i:03:5BEMISSION LEVEL[ dfluV/o)3 NARPRORND98....... .. ...... y..-. ... v .....................................

MIL-STD 4G1ifC PART... RE- .... *.......... .WESTINGHOUSE MO 315gO-9s sM

--- - ---.---.....!. TVP WRTTS DAR UNIT1 ALJX ELEC RM.RECTOR PROTECTION SET I..RACK NO. -R-,4 PANEL FRONT?. ...... ......... .......... ....... - .. ........... .....,. .-.-... ..

.. ...... ........... ........

. . . . . . . . . . . . . . . ......

. . . . . .......... .. i-44 1......I...... . . ... ~44 4 ........ 4....--4;

i...... .. . . . . . . ..... . . . . . . . . . .

. . . . . . . . . . . . . . . . . . . . ... .. . .... ..... ........

..... . . . . . . . . . . . . . . . .......... .......................... ....... . . . ..................... . . .

.......... .......... i....... ........... ........ ...'.'. ........ ........ .........

.............. .......-.- ........... i.i.i ......i . ii.514 IIC -. . . .. .

FREQUENCY [MHzJ

I

Page 192: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

EMISSION LEVELE d~uV/n34 May 1994 OB:4B:42

NRRRoWIRRND... .. ... .. ... .. ... .. .. ... .. ... .. ... .. .. ... .. ... .. ... .. ....... ............

MIL-STD 4G1C PART 4 - RE-22WESTINGHOUSE MJO 31590.-95MTVA WATTS BAR UNITI AUX ELEC RMREACTOR PROTECTION SET IRACK NO.1-R-i.2 PANEL RERR

..-,, -, --.,- -, ------------------.. .. .

ssION LEVEL[ d~uV/n/MHz34 May 1994 BB :4B:42

URORDBRND. . . f f .... ..... .... .......

...... T-... . .PA.T .4 . RE

................. TVRAWRTTS BAR UNIT1 RUX ELEC RM.s6. .. . .. ** 3 .RERCOIR PROTECTION SET I

RACK NO.1-R-1.2 PANEL RERR............ , ..................... ........ ......................

.......... 4 ................ .............. ...... . . ......... . . .

. . . . .......... ..............

.................... ............ .....

............ . . . . . . . . .

........... ............... ...... .....

. . . . . . . . . . . . . . . . . . . . . .

................ .....

, ....... i i ......... I.

........................... ..

* -. '....'.........--t-- .--------- e@-t"@-----.. ........ ... 1 1I... . . . ..----.. . ..... ''''1.N ' -.-..-.- ,.. -.

i.. ttttt X1.................. e..i. . e++~~e

...... i--- - o ..- ~e....... ..*-uj- . i.L. .....i . ... j!i-j..j.. i I - ......................................... --.

. . . . . . . . . . . ..jii----------- - * is i i............ .3 . . . .

I....I..ii iili.l. '.i .1. . .i..i i i iii 4... i . w .i..- .. i. . .. i

FREQUENCY CMHz-l00 1008

6 144

EMI

Ihp

140

120

.81

w Wux~a - .WI L-mFrErw irwy rmu-i

B0

.. I . J J i l

Page 193: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp EMISSION LEVEL[ dI~uV/m39 0 .. !................... .....- . . .

4 Mav 1994 09:20:21NARRO'WER NI

MIL-TU 61CPRRT 4 - RE-02WETINGH-OUSE MJO 21592-95MTVR WATTS BAR UNITI AUX ELEC PM:REACTOR PROTECTION SET IRACK NO. 1-P-2.4 PANEL =004-TfEAg-

FREQUENCY [MHz]

EMISSION LEVELE d RuV/m/MHz3Jhp 4 May 1994 99:28:21

GRORDORANOJ49MIL-STD 4GIC PART 4 ---- RE-G2f----- !WESTINGH4OUSE MJO 31592-95M MTVA WATTS PAR UNIT1 RUX ELEC RM:REACTOR PROTECTION SET 3RACK NO. 1-R-2,.4 PANEL ERONTk%¶l

i CI

00e

Be

.0]

FREQUENCY EMHzJ

.......................................... . .. .. . .......... . ...... r .... r"! ... fT Tlf!

...... . ... ........... . . .......... ..... . ... . .. .. . ...

... . .... ..... ...... . ... ........... ............... ...........

.......... ........... . .......... ......

.......... ...... .... .. ..........

.... . ..... .......... 44i

.......... . ................. . . .

..... ...... ... ... . ... ..... .... .................

. . . . . . . . . . . . .. . . . .. . . . . . . . .. . . . . . . . .i ...................................... ....... . . . . . . . . . .. . . . . . . . . . . .. . ........... ......

1 4 I a M

L :

I

6 145o

.: ....r.. . . . . . . . . ................. !.ft--; ...... .... ;......... :.:.: ............. z.....

:11111111111! ............................... ........................................................................................................ -----------

4 May J994

Page 194: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEUELE dauV/nrMHz3 4 May 1994 11:16:56

GRORDSRNO*........ ................... v .- . .*............ . ..... .......... ........,MIL-STD 41iC PART 4 - RE-B2 .

WESTINGHOUSE MJO 21590-Q5M. . --i-.... TVR WATTS BAR UNITI RUX ELEC RM

REACTOR PROTECTION SET 11......... RACK NO. 1-R-5 PANEL SIDE

.I-,.. .. ...... ............. . . . f .. y

. ....... .. ... .............. . ... .. ... . i.i. 1 1..

i .......... ....... ...... . . ..........

....... ............. ...........

.......... .i....... .i. .......... .... .j . .....

....... ...... ...... j. ... ...... ..

i,,,,,,;,,,,,;..... ...... .. ;.;,,+....... ....... . . ......-.e-- i^ *- -.e.i-. ....... ............ ..'

,. . ........ -...........

...... .......... . ...... ...... .. . . . *. l ' ' ......... - - '.'.-..L4 .1 I 1 I0 Wee

rorai IrL- rsu-

6 44,6

Ihp

140

128

]B0

Be

GIB

.01

- rL.sPF-u4L, Lnnrz J

I

I

I

I

Page 195: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp -ATIONRL TECHNICRL SYSTEMSJ 41

J20

200

Be

.01

4 May J994 16:23:3?Rmonomonkm

1-L-T 411 PART 4 - R---,--2......... . . . . . ... .........

............ TVR WATTS BAR UINITI AUEX ELEC RNERECTOR PROTECTION SET E1

i RACK NO. i-R-5,6 FRONT

A................ ........ .- . .......... .... -.'.'.' .- ' .'-.- ..' .'

........ ............ ....... .. .. . . . . . .

*.....,................. ......... ........... ............... .......-

4 . ... .*..........I. ........ .**...4 .......

; ; ;E i j -i ..... , L ;L.... ......-.. .........

4 Me 0 0 18

FREQUENCY rMHz]

I

6 1 47

I

I

I

I

I

Page 196: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICRL SYSTEMSEMISSION LEVEL[ d~uV/rn

4 May 1994 16:35:34NRPOWRANDhp

90

FPEGoJNCY rMHzl

INRTIONRL TECHNICRL SYSTEMSEMISSION LEVELE d~uV/m/MHz3 4 May 1994 16:35:34

BRORDORND.'.,.........................-,MIL-STD 461C PART 4 - RE-92

WESTINGHOUSE MJO 31599-95M......... V. ... r ................ .................a TVA WATTS BAR UNITI AUX ELEC RMREACTOR PROTECTION SET IlRACK NO. 1-R-71G FRONT

120 ...,j.j4..,..*..4 . ... '

KNL'". : :::::: URQRVWIILr~j

. .. , , . . . . .j..... ....... '

, ,, ,, ,, ,, , ........ '.'. 'M'1 .'. ' .'..'

.I ..... ....... ......... ... .'''''',-''''..........'T'.''

.--............................ ..... ..

14 .1 1 10 100 1i00r-rr iirFy ruumW-

I. XLh. * LI II I~ J

rp ' 'u -18

50

30

12l

hp4A f

as

Go

. .. 0

...... ..... , , .,..,.,.,.. ...... - . .................................................

....* . . .. . MIL-STI 461C PART 4 - RE-2WESTINGHOUSE MCO 31590-95M

.-.... ..........- ..-.. TVR WATTS BAR UNITi AUX ELEC RMREACTOR PROTECTION SET 11ARCK NO. 1-R-71Q FRONT

.......... ' ' . '-.' ..-....'-'.-., ..-,'... . '

. ..... . . .........* . .. I... .*.*.. ........... .4.*. .*.i . ...........

...................

...... .... .... ..

. . .......... .......... ..... ....... .......... 4.

4......... ...... ......... ...... ..... .i... ................ 5

........ ........... ...... .... i.5.- ......................................................... ... ......... .. ............ ........... ........... ..14 I la 3 0100 1800. 0,

I

, -- .

lBO21

a ; m ; ;;;;

Page 197: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELE dEuV/foJ

4 Mav 2994 2?:13:25NRRROWDAND

MIL-STU 4GIC PART 4 - RE-22WESTINGHOUSE MIO 31590-95MTVR WATTS BAR UNITi AUX ELECREACTOR PROTECTION SET II1RACK NO. 1-R-1e REAR

rorfai irwcv rmw,.,

h p NATIONAL TECHNICAL SYSTEMS-EMISSION LEVELE d~uV/m/M~z3

120

100

s0

sa

4 May 1994 I?: 13:25SBROR13OR4NO

MIL-STD 461C PART 4. R- .2WESTINGHOUSE MJO 21590-95M.........--- . .- i TVR WATTS PRR UNITI AUX ELEC RM ZREACTOR PROTECTION SET IIIRACK NO. 1-R-lB REAR

... .. .. ;4444..... 4 .* .. *.*.** ................................. .............. . ... -.. . .. .

... * Z Z ZZZ ZiZi . .Z.Z ... . . . .... .. .... .! .. . .

. .Z. I ZZZZII .. Z g. . ..... 4 .. *...........*j

i . .Z ............. T..................... .

.. . Z . Z.......... .. .. . . ........ Z.

Z Z i ZZZZ ZZ ZZZZ .. Ti I Z ....... ZZZ Z i XZ~.......... ZiiiZZ ... Z... - ii - i i ii~ii ii L . ..... . . .i . j

, . .. Z |. .... ....... Z . ..... .... . j.. 4# t

--------- ---- ...... ...Z.Z. Z ...Z.|. Z ..Z.Z.

. 014 .1 10 3]0

-FREQUENCY tMHzJ18080

hp90

PO

50

i la i:.

;...

.014 188-

I

6 14 9

eV

.1 ---- 1-

14B6

-.

I

Page 198: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 15 ~i0

NATIONAL TECHNICAL SYSTEMS 4 May 1994 16:59:21hp EMISSION LEVELE d~uV/ru NARROWDANIDg .................................. . . . . . . . .

MIL-STD 4GiC PART 4 - RE-02WESTINGHOUSE MJO 31590-95M

....... i . ..... . ..-..... .. TVA WATTS DAR UNITi AUX ELEC PM:REACTOR PROTECTION SET IIIRACK NO. 1-R-li SIDE

...... . ...... .... .. . ;.;; ....... ..... ......... ........ ......, . .. .... j . .. . ..,,.......

.......... j .i .......... .. iiii.io.i... , ........... ,..... ......... I .... i.,i,..

... i. ... .......... ... ;.*. i .. . ....... ........... I .. .; ..i ii i.. ii i ; ; ; . i;.I..,.,..4.. . . . . . ...

50

.... .i...... .... ... .. .. .

FREQUENCY (MHz3

Page 199: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC dSuV/ri3

4 May 1994 16:48:04NRR90hlAND

FREQUENCY EMHzJ

hp NATIONAL TECHNICAL SYSTEMSP EMISSION LEVELE dBuV/inMHz3140

120

]00

B0

G2

.014

4 May 1994 16:4B:04GRORDAtRNO

... ........... T T . .f .. i . i cR...TWESTINGHOUSE MJO 21599-GEM

...... ..... *14........ TVR WATTS BAR UNITI RUX ELEC RMHREACTOR PROTECTION SET IIIRACK NO. 1-R-16 FRONT.,............. .-. .. ............ ......................... -.

..... ........g..g... i ...........--.-...... ..--. .. 4..... ......

...... I .. ...... g. ........4444 ... 4..4 ,., ........ .4.........

......................... . . .... . .. . ....* . ......... ... .., ,,,,,,, .,,............ . .......... .

i ...i. 4 .... ...... ... .4... . .......... .. ......... *......* . 4....... ....

........... ........... .. .. . ............ ...... .

;;i .. ...... i i.i.i.. i-4 -4 i .......... i..... i .i.i. ii -w- ...-.-.- . ... ......

.I I 0 100 lau

FREQUENCY EMHz-

I

6 I11

I-.

Page 200: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSh NRTIONRL TECHNI CAL SYSTEMShp EMISSION LEVELC d~uV/n390 , .......... .. .....

4 May 1994 1?:49:04NARROWERND

MIL-STD 4GiC PART 4 - RE-02WESTINGHOUSE MJO 21590-9EMTVA WATTS BAR UNITI AUX ELECREACTOR PROTECTION SET IVRACK NO. i-R-la REAR

....................... ...... . ............. .... .. . . ...

I 10

FrpFm irtiry rMF,1

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uV/m/MHz314D

125

105

5

.03

4 May 1994 IP:49:64SRORD.RNO

*. . . . . w ..................................................... ..tMIL-STD 4i1C PART 4 - RE- .WESTINGHOUSE MJO 31590-9GM

....... ........ L-....... ........... TVA WATTS BAR UNrTl AUX ELEC RNMREACTOR PROTECTION SET IVRACK NO. 1-R-1a REAR

I.. .. I .i . ...... I *~*. .* ...... ......................... y. . ......... ...... f.. Tlf!!y

.. ... .. . ...... g . ...... .... .''' ''--- ......... ....''''''--'' '''''-'' - '''''- XV.. .. . .......

....... .. -.-

LA ........; ...... . > ... ............. .... g .. .-.... LgA ..... .. ..... gL ... 6.g

.e........ ................

.I. . . . .. . . . ... -4 4 .... ..

. ...... . . . .i ..I..iIiI .i .i ... . ....... II .

* ffi .' t4.t. ....... .......... ....... ... -4 4 4 4 ..... .. w. ...I......I

.; .:..:... - :-.---- .:-:'!i- -- --- .... -.....i 3 10

FREQUENCY CMHzJ100 1000

I

6 15 2

I

I

I

I

L It

Page 201: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp90

NATIONAL TECHNICAL SYSTEMSEMISSION LEVEL[ d~uV/m3

........ . . . . . . .,..,..... ..v, ............ ,............................... ........................... . . .. . . MIL-STI 4GiC PART 4 RE-22

WESTINGROUSE MJO 3159 -95M.... ...... .......... .......... ... .... -TVA WATTS 3AR UNITI A X ELEC RMREACTOR PROTECTION SE IVRACK NO. I-P-2g SIDE

I...,. ,., . , , , ,* ** ..

... . . ............ .. .. .I . ..i. . . ............- .......... .......... .... .... ....... ....

^ . .. . . . . ............... . .! , ,,. ................ !...

.. .... ..... i .e...... ................. .. .. ......50

..... ... ... ......... .......I. I..I.9..5*g* . ,**. ~ . ... ,.. , ,u , . , . 4.,

| ........... .......... ................................. ..... . ....

. . . . . . ................. t

, ...............................

1-4 .1 I 1E 100 1000rDEbi ibir£v ruu-tL

Ila

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC d~uV/m/MWlz

145 ...............

4 May 1994 ]?: 39 33BROROORND

1 10rorEi irwy rM4,1

6 1 53

I

- , , ,I ,,- ,, , .f , % 1.4 tq .I i30

rn~nblLI-nzJ~

I ouqxvowaw -1 J -,

. 0:

4 MV 1994 IP 39:33NRR wigaidn

Page 202: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSEMISSION LEVELC deuV/u/MHz3 4 May 1994 I P:2B: 03

GRORDORND

FREQUENCY EMHz]

I

6 15 4

hp NHMISSNL TECHLNICAdL SYSTzEMS 4RRMay 19N94 J?:2B:03

-M L- T i TWESTINGHOUSE MO0 31590-S5M

<'V WRTT -R RUNINi RUX ELEAP?...,\j..i.|II------........ ' .+.v'--.......'. . --....------.- --.- -- .......... .... tV.VV------ -----.-- V'A WRECTR OTECTION SET IVRACK< NO. 1-R-1a FRONT

50.......... ............

... ...... .... ....... ....

...... .... ..... ... . ..... ........ . ........ .....

........................ . . . . . . .

. . . . . ........ ...... .' -.

.......... ...... ........ ....... ... ... ... .............. .......... . ... . . .......... ...... . ......... ............... ..... ....

...... ............ ..... ..... ........... .. . .

...... ....... ...... . . . . . . . . . .@3 1§0 1 VI-++' ''''' v '.4...............--.................

FREQiUNCY rMw-y

hp145

125

105

B5

.014

-- - - ----- --- - -

Page 203: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

EMISSION LEVELS dRuV/mn 4 Mav 1994 a9:1J:19NRRROWDRND

MIL-STf 4GiC PART 4 -RE.. ... WESTINGHOUSE MJO 31590-95M......... .... .......... ......- - TVR WATTS hRR UNITI RUX ELEC RM

REACTOR PROTECTION SET IEAGLE 21 MMI CART FRONT

...... t. .!. .. .. . .... -t---- . -...- -...- ......... ,.... ...................

I J0

rvrcI iruriv ru. 1I

EMISSION LEVELE14: ........

.. '

122

100

B0

£2

.01

d-uV/m/MHz3'~ ~ ~~~~~~~~~~~~... -@ -9! -¢----6!@Y---YY-- @*o:---:t.es... . . . . . . . ... -

4 May 1994 09:12:19Rmo~nRRmn

MIL-STD 41 fc PART 4 - RE-02 .WESTINGHOUSEMJO 31592-95M

........... TH WHITTS EAR UNITI AUX ELEC PM I........ - 'REACTOR PROTECTION SET I

. EAGLE 21 MMI CART FRONT

.I........ .g..I .................... I............... . .....

.......1~* . 4.. .. .44.............4..4.I*g4

................... ...... ... I..I....~ .4 .. *..4.. I4.. I

.................. . . . . .. . . . . . . .. . . . . . . .......

.... ..... ...... . . . . . . . . .

........ ,- .-----....... ...........-.-.

£ ....... .,... .. -............ . --. --

JRFrI J-.jrv rMu.1I00

hpon

50

30

J12

.014

hpI

1000

6 155

(VA

.............. .. , ---------- -

-IF14 J

::::

-~~~~ 1 "A.l^ Ln J

.s

Page 204: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

EMISSION LEVELC dGuV //MHz]4 May 1994 09:32:30

GRORD1RND

FREQUENCY [MHz]

I

6 156

Page 205: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.7 Radiated Emissions, Method RE02.1. Electric Field. Hand-held Radio Profile

Requirements

Radiated emissions, from 162.025 to 173.7625 MHz, will be measured in accordance

with the applicable portions of Test Method RE02 of MIL-STD-462. Reference Section 6.6,

Test Setup.

Procedures

The Auxiliary Electric Equipment Room Environment was set up and operated as

specified in Section 4.0 of this report. The radios were tested outside the Auxiliary Electric

Equipment room, at each of their operating frequencies, in a continuous communication and

keying communication mode of operation. The antennas used during the performance of this

test were as follows:

Frequency Antenna Coaxial Cable

30 - 300 MHz Biconical 25' of RG214/U

Measurements from 162.025 to 173.7625 MHz, were performed using the

appropriate antenna with the corresponding coaxial cable connected to a Hewlett Packard

Automated Microwave Measurement System, Model 8566S. The transmitting antenna axis

orientation (hand-held radio) was changed through multiple axes with the radio outside the

equipment room until a worst case level was detected. Other site specific radios and known

sources of noise were "keyed" or activated as much as feasible. Plots were generated for

narrow band measurements.

During testing for Protection Set III, the hand held radios were keyed from the

opposite side of the closed double doors.

Report No. 31590-95M

Page No. 6-157

Page 206: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

6.0 TEST PROCEDURE (continued)

6.7 Radiated Emissions, Method RE02.1. Electric Field. Hand-held Radio Profile

Requirements (continued)

During testing for Protection Set IV, the hand held radios were keyed from the

opposite side of the stairwell door.

Sample Test Results

Test Results

RE02.l Radiated Emissions. Hand-Held Radio Profile Wie--tin vhna, cE I e c t r i cCorporation willperform analysisfor all tests.

Report No. 31590-95M

Page No. 6-158

Page 207: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE d~uV/WoJ130

PERK

... I......

jigl

4 May 1994 13:3?:JB

.MIL-StD 49G PART 4 - PE-22iWESTINGHOUSE MJO 31590-95MTVR WATTS BAR UNITI AUX ELEC PMMIDLAND 70-15D HANDHELD FlPROT. SET III, PACK 1-P-li L PR

.............................................................................................................................. ................................................................................................................................

..................... ..............................................

,.. ................. ..............................................................................

................................................................................................. . . . . . . . . ......... - -- - - --

leeFREQUENCY [MHz]

I

6 1 59

eAc2

90

70

59

160

,................ ............... ...................................................... - - - - - - - - --....................-

I.................. ......................................................................................................................................................................... -..v

Page 208: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 16 0

hp NATIONAL TECHNICRL SYSTEMS 4 May 1994 13:15:29EMISSION LEVEL[ d~uV/o)3 PERK

MIL-STD 4G1C PART 4 - RE-22.1WESTINGHOUSE MJO 21590-95M

....................... --... TVR WATTS BRA UNITi RUX ELEC RMMIDLAND 70-1502 HRNDHELD Fr.PROT. GET III, RACK 1-R-1l L RRP

JI::........................................................................................... ............................................................................................................................................................................................... ..............................

go ...... . . . . . ..... ....................................

7 0....... ....... .... ... ....... .....................

............................................................................... .............................................................. .....

, ......................................... ............................................................- ............................................

FREQUENCY [MHz]

Page 209: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMS 4 May 1994 15:30:53EMISSION LEVELE d~uV/ru) PERK130. -

. MIL-STD 4GIC PART 4 - RE-02.1

.. WESTINGHOUSE Mio 31590-G5M'i---..--- ..--.-.-.- ..-- .-. TVR WATTS ARA UNIT1 AUX ELEC PM

. MIDLAND 70-1502 WANDHELD FlJPROT. GET IV, RACK 1-R-29 P FRT.

j )........ .... ............................................................................. .................... ............

,..................................................................................................................... ........................................................................ .

112:...................................................................

.. r ......................................................................... .......... . ...........................................

................... ............................. ....

.................... .............................................................................. . ..................................... .................. ...............j

...... ...................................... . ......

.................... . ............................................................................... . ............................... ..................... .................. j

LFR...EQUENCY ...

FREQUENCY EMHzJ

I]

6 161

Page 210: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp NATIONAL TECHNICAL SYSTEMSEMISSION LEVELS dguV/nj

I12 .................................................................................PERK

4 May 1994 15:34:05

MIL-STD.4s1C PART i - RE-D22i

WESTINGHOUSE MJO 31590-95MTVA WATTS BAR UNITi RUX ELEC RMMIDLAND 70-150B WANDHELD F2PROT. GET IV, RRCK 1-R-29 R FRT;

1 1 2 .............................................

90

70

52

15TV,

, ..................................... ....................................................................................................................................

......................................................................................................................... ........ ..................................

, .................... .............................................................................................................. .............................................................................. .............................................................. ....................................

,.......................................... .......................................................... ... ............................................ .................,........................ ....................................... ............. .................. ... . .............................................................

.''.................................... .................................. ... ...... ........................ ....... .......... ................ ..- - -

tDI -1-lee

FREQUENCY [MHzJ

I

f%o 1 624,

... ----- -

Page 211: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 1 630Ut,

h NATIONAL TECHNICAL SYSTEMS 4 May 1994 15:44:58p EMISSION LEVELE d~uV/mJ PERK

. MIL-STD 4G1C PART 4 - RE-02-1WESTINGHOUSE MJO 21590-95M

, ................... ........... TVA WATTS EAR UNITI AUX ELEC RMHMIDLAND 712-iSD WANDHELD F2PICON Im FROM STAIRWAY DOOR

J I : ......................................................................................................................................................................................................... ................................................... ...........................

7 290 .-----------. ------........... ................................................................................................................... .................................

7 0 .......................................... ................................. .......................... .............. ...................................................... ..................

......................................... . ......... ........................................................................ .................. ...................................................................

.0 . . ........ ............................................................

.................. C ..Y 1 -........................... .. -. -

t Lo,

FREQUENCY [MHz]

Page 212: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hp130

210

90

52

NATIONAL TECHNICAL SYSTEMS A May 1994 13:49:01

NEISTIONL TECEN I uCRL SYSTEMSEMISSION LEVEL[ dguV/fv3

MIL-STL 4GiC PART 4 - RE-02-1WESTINGHOUSE MJO 31590-GSM

- ..-..--. . TVA WATTS BAR UNITI RUX ELEC RN.MOTOROLA WT 1222 WRNDHEL.D FJPROT. SET III, RACK i-R-2J L RR

........................................................................................... ....................................................................................................

................................................................................ ..............

.......................................... ................................................................................................................................................

, .. .................................................................................................................................................

......................................... ...... ...............................................................................................................................................

.......................... ............... ........ .. .............................................................................. .................. ..................................................... ...... ? e

' , , . ............................................... ................... ..............................................................

.................................... .......... .......... ............................................................. ...................................

6 164 0

... ......... ................... ..... ... ............................................................................

FREQUENCY [MHz]

4 May 1994 13:49:0,PERK

]Be lee

I

Page 213: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

I

6 .16 5

e'0

NATIONAL TECHNICAL SYSTEMS May 1994 13:54:13hp NTIONAL TECHNICRL SYSTEMS

P EM ISS ION LEVELE d gu /n u

- MIL-STD 4GIC PRTWESTINGHOUSE MJO 31590-95M,.............................................. TW R WATTS BAR UNIT1 AUX ELEC RM

. MOTOROLA ST 1000 HANDHELD F2PROT. GET III, RACK 1-R-11 L R:

.t12.1 JH11L

..................................................................................................................... ............................ ..........................................................

.9

YB --- ---- - - ---...............---.---- .-.--............................................ ... ................................................... .................

1 ....1

7 0 .. ........................ ............... ................................ .............................. ..... .. ................... ................

.......................................... ...... .................................................................. ... .........................................

5a,' .................. ........................................................................ . .. ............................................................. .. '''......................................... ...................... ........ ...... ... ................................. . .. .......................... ..... .. ..............

]50 lee

FREQUENCY EMHz]

PERK 4 May 1994 13:54:13

Page 214: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

hNATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE dBu V/r13 . ...............................

I I

90

70

50

i DO

PERK4 May 1994 14:52:02

leeFREQUENCY (MHz]

0I

6 166Ca

. MIL-STD 4GiC PART 4 - RE-.2.iWESTINGHOUSE MJO 21590-95M -....- --------- ----------------------.-.............. TVA WATTS BAR UNITi AUX ELEC RM

. MOTOROLA HT 1000 HANDHELO FJPROT. SET IV. RACK 1-R-29 R FRT

..............................................................................................................................................................................................

...................... ...................................................................................................................................................

El.

......................................... ... ......................................................................... ........ ........................................................................................................... ..... ............................................................................. ..........................................................................

,..... .................................... ..... ......................... ............................... ...................................................................

......................................... ........ ... .............................................................

............................. .................................................. .. .............................................................

......................................... ..... .. ........................................................................ . ......... . ............................................................. ......

.--................ - A

....................................................................................................

3

7

Page 215: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

4 May 1994 14:39:19hp NATIONAL TECHNICAL SYSTEMShp EMISSION LEVELE dauV/ru

. MIL-STD AG1C PART 4 - RE-22-JWESTINGHOUSE MJO 31590-95M

.......... .......... ......... TVR WATTS BAR UNITi AUX ELEC RMMOTOROLA HT 1000 HANDHELD F2PROT. SET IVY RACK l-R-29 R FRT

1 10 ................................................................................................ ..............................................................................................

.............................................................................. . .....................................................

..................................................................................................................... ....................................................................... 1

..*'............... .. ........ . .....................................

.................................................................................................................... . . ..........

A........................................

FrprywNry rMwH,1

SI

'K'

I

46 167

lee

PE'RK

- . I.",

15E

Page 216: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

SI

6 168

hp NATIONAL TECHNICRL SYSTEMS 4 May 1994 15:54:2?EMISSION LEVELC dlRuV/o) PERK10 .MIL-STD 4GIC PART 4 - RE-2-.

WESTINGHOUSE MJO 21590-95M............................. TVA WATTS BAR UNITi AUX ELEC PM:

MOTOROLA WT 1002 WHANUELD F2DICON Im FROM STAIRWAY DOOR

120 . .............................................................................................

3 0 0 : ................................................... ............. ............................................, ..........................................................................

.--- . .. .. . -------................................. .. ........................................................................

.......................................................................................

BB,''.................................................................... ....... ',',ii . __ _ __ _

150 - ----FREQUENCY EMHzJ

Page 217: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

7.0 TEST EQUIPMENT LIST

The test equipment listed in Section 7.0 of this test report is the actual test equipment that

was used during this test program. All test equipment was checked prior to testing to assure that

it is within calibration, and it was allowed sufficient warm-up time to guarantee measurement

accuracy.

Calibration is performed and checked on a routine basis in accordance with MIL-STD-

45662A, using standards traceable to the National Institute of Standards and Technology (NIST).

Report No. 31590-95M

Page No. 7-1

Page 218: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

LIST GENERATED ON : 05/31/94

INV # DESCRIPTION MANUFACTURER MODEL #

NTS Equipment ListFOR MJO # 31590 -95M

SERIAL # RANGE ACCURACY CAL FREQ CAL DUE CAL(months) DATE STATUS

ML371 DIGITAL MULTIMETER

ML390 GAUSSMETER

ML565 AC-DC CURRENT PROBE

MW397 ATTENUATOR SET

WA331 CURRENT PROBE

WA453 CURRENT PROBE

WA454 CURRENT PROBE

RENTAL EQUIPMENT USED

RENTAL S/A, E/R INV #400723A

RENTAL RF P/S, E/R INV #502843D

RENTAL DSO, GE INV. #01617794

RENTAL BICONICAL ANTENNA

RENTAL LOG PERIODIC ANTENNA

FLUKE 75

MAGNETIC INST. 912

FLUKE Y8100

WEINSCHEL AS-6

STODDARD AIRCRAF 91550-1

ELECTROMETRICS PCL-30

ELECTROMETRICS PCL-11

TEK

A.H. SYSTEMS

A.H. SYSTEMS

34851569

24525

4165116

4975

785-103

1460

1123

HP8566B

HP85685A

TDS 520

0-1000VDC,0-750VAC,0-10A,

10 mG TO 100 KG

0-200 AMP

DC to 18 GHZ, 3,6,10,20,

10 KHZ TO 100 MHZ

9KHZ TO 110MHZ

20HZ TO 50KHZ

DCV:+/-(.5%RDG+

DC:+/-(.4%RDG+

0-200 Hz:+/-2%

3,6DB:+/- .3DB

N/A

N/A

N/A

500 MHZ

456

380

CALIBRATION ABBREVIATIONS

UWCE - USE WITH CALIBRATED EQUIPMENTCBU - CALIBRATE BEFORE USENOM - NOT USED FOR QUANTITATIVE MEASUREMENTSCAL - CALIBRATED

12

12

1 2

6

1 2

12

1 2

10/08/94

£08/25/94

09/23/94

08/25/94

06/17/94

11/30/94

11/30/94

02/10/95

01/05/95

03/29/95

CAL

CAL

CAL

CAL

CAL

CAL

CAL

CAL

CAL

CAL

PAGE NO. 7-2

Page 219: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

8.0 ANTENNA/PROBE CORRECTION FACTORS

Report No. 31590-95M

Page No. 8-1

Z2�z��F

Page 220: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSTRANSDUCER TABLETransducer Title : EMC PCL-11 SN 1123/DUE 11/30/94Sign of Trans. : PLUS. Freq Interpolat. : LOG

- Number of Points : 9

Frequency (MHz) Trans Factor

123456789

NATIONAL TECHNICALTRANSDUCER TABLETransducer Title :Sign of Trans.Freq Interpolat. :Number of Points :

2.E-5.0001.0005. 001.005.01.02.035.05SYSTEMS

EMC PCL-30 SNPLUSLOG13

5543.232.52713.88.54.32.31.5

1460/DUE 11/30/94

Frequency (MHz) Trans Factor

12345678

.9

10111213

NATIONAL TECHNICALTRANSDUCER TABLETransducer Title :Sign of Trans.Freq Interpolat. :Number of Points :

.01

.05

.1

.2

.3

.4

.613102050100SYSTEMS

23.19.12.7-2.7-5.3-7-9 . 2-10 .9-12.4-12.9-13.7-6.5-5. 6

STODDARD 91550-1 DUEPLUSLOG11

Frequency (MHz)

.01

.05

.1

.2

.3

.4

.61310100

Trans Factor

173.4-2 . 6-7.6-10.2-11.6-13-14-14.9-15.9-11.6

Point

Point

6/21/94

Point

123456789

1011

L

3 1 5 9 0

8 2

Page 221: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

NATIONAL TECHNICAL SYSTEMSTRANSDUCER TABLETransducer Title : RENTAL LOOP ANTSign of Trans. ; PLUSO Freq Interpolat. :LOG

9 Number of Points : 12

Frequency (MHz) Trans Factor

123456789

101112

NATIONAL TECHNICALTRANSDUCER TABLETransducer Title :Sign of Trans.Freq Interpolat. :Number of Points :

2.E-55.E-5.0001.0002.0005.001.002.005.01.02.05.1SYSTEMS

RENTAL ACTIVEPLUSLOG8

------------

78.971.966.661.954.549.443.836.631.626.723.322.9

ROD S/N 610

Frequency (MHz)---------------

.01

.02

.05

.530405060

Trans Factor

-.7-1 .9-2.2-2.4-2.3-1.8-1.2-.6

3 1 5 9 0:

8 3

S/N 587

Point

Point

12345678

Page 222: Analysis for EMI/RFI Mapping of Auxiliary Electric ...EQUIPMENT ROOM EMI/RFI MAPPING OVERVIEW 3.0 EMI/RFI MAPPING OVERVIEW The Eagle-21 Process Protection System is located within

t

NATIONAL TECHNICAL SYSTEMSTRANSDUCER TABLETransducer Title : BICONICAL S/N 463

* Sign of Trans. : PLUS& Freq Interpolat. : LOG

Number of Points : 35

Point-----

123456789

1011121314151617181920212223242526272829303132333435

Frequency (MHz) Trans Factor--------------- ------------

20 13.625 1430 13.935 14.440 13.745 13.650 12.960 10.770 10.180 9.890 10.3100 10.2110 10.9120 11.4130 11.5140 12.1150 12.5160 12.9170 13.7180 14.2190 15.2200 15.8210 17220 17.7230 18.4240 19.2250 19.6260 19.5270 20280 20.8290 20.6300 22310 22.6320 23.5330 25.2

3 1.5 9 0

8 4