ANALYSIS OF HEAT RECOVERY &STEAM GENERATOR MODULE WELDING. V.VINOTH(80105114057) Final- Mech AVCCE Internal Guide : Mr. S.Rajkumar , M.Tech Asst.Prof /AVCCE External Guide : Mr.R.Ragupathy Deputy Manager(BPN/RM) BHEL. ABOUT BHEL. INTRODUCTION BHEL-BHARAT HEAVY ELECTRICAL LIMITED - PowerPoint PPT PresentationTRANSCRIPT
ANALYSIS OF HEAT RECOVERY &STEAM GENERATOR MODULE WELDING
V.VINOTH(80105114057)Final- Mech
AVCCE
Internal Guide : Mr. S.Rajkumar , M.Tech
Asst.Prof /AVCCEExternal Guide: Mr.R.Ragupathy
Deputy Manager(BPN/RM)BHEL
ABOUT BHELINTRODUCTION
BHEL-BHARAT HEAVY ELECTRICAL LIMITEDBHEL established in 1955, BHEL( Trichi )
established in 1st May 1965It is largest engineering manufacturing
enterprise in India.It contain 14 manufacturing units, 15 regional
manufacturing division, 4 power sector, 8 service center & more than hundred ‘ service at site’.
It turnover of the company in 2007-2008 is Rs 21,401 corers.
BHEL havePower generation & TransmissionIndustryRenewable energyDefenseOil & gasTransportationTechnology up gradationR &DHRDC
CERTIFICATION• ISO-9001 for quality management
and all manufacturing unit/division.• ISO-9001:2000 for all up grade
major unit/division.• ISO-14001 for environmental
management system.• OHSAS-18001 for occupational
health & safety management system
dfdfdfddHEADHEADER
STRUBSPIRAL FINEDTUBE
WELDED AREA
HEADER AND SFT ASSEMBLY
STATEMENT ABOUT PROBLEMIf the module placed horizontally welding
operation done means penetration of weld is less between Header & SFT.
If pressure exceeds above the normal working condition the leakage or breakage may occur in the welded zone.
Weld quality-Porosity occurring at one layer can not be repaired in subsequent passes.
Reason for choosing More skilled labor.More time to take welding operation.More amount of filler rod to be used.Welder have more fatigue.Penetration of weld is less.Decrease productivity.
Scope & ObjectiveIncrease the penetration of weld.Less skilled labor is sufficient.Pressure withstand capacity is also
increased.Filler material is reduced.
METHODLOGYChange the position of the module in welding
period - horizontal to vertical position with the help of crane.
Fabrication of crane and pallet for suitable dimension.
welding involved in the module assembly.Shielded Metal Arc Welding(SMAW)
Gas Tungsten Arc Welding(GTAW) Flux Cored Arc Welding(FCAW)Resistance welding
Used for proper welding procedure like given below,
12
4312
3
6
9
GTAW
123
6
9
2
1
FCAW
clock clock
SUITABILITY OF WELDINGFCAW :-
Flux is not used, Slag inclusion are eliminatedExcellent production for the weld H2 is
achieved, Therefore no possibility for cracking in the weld.
Welding with CO2 shielding in low cost.Weld defects arises mostly due to faulty
welding procedure.
SMAW:-All position capability.Higher deposition rates .Less operator skilled.
FCAW:-All position capability.Good quality weld metal deposit.Metallurgical benefits that can be gained from flux.Less operator skilled.
RESISTANCE WELDING:-High speed.Easily automated.Suitable for high rate of production.Economical.
QUALITY CHECKS USED…NDT
Dry magnetic particle inspection Wet magnetic particle inspection (This test will
do for both before & after stress release condition).
Hydro pressure test