anatoli romaniouk, trt ib meeting october 30 th 2013 trt meetings quite many constrains! 1

5
Anatoli Romaniouk, TRT IB meeting October 30 th 2013 TRT meetings Quite many constrains! 1

Upload: cameron-pope

Post on 14-Dec-2015

213 views

Category:

Documents


0 download

TRANSCRIPT

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

TRT meetingsQuite many constrains!

1

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 2

Preliminary plan for TRT/ID Meetings in 2014.Preliminary plan for TRT/ID Meetings in 2014.February

TRT meeting 3-5th February

TRT institute We. 5thID

ID combined 7th February

ATLAS week 10-14 February

May-June

ID commissioning WS May 19th

ATLAS 16-20 June (outside)

TRT meeting (outside?), 3 days 26-28 June?

October

ATLAS  6-10 October (CERN)

TRT meetings 14-16 October

TRT institute  15th October.I

ID commissioning 13 October

2014 Milestone runs:

•M1: Feb 17-21

•M2: March 31-April 4

•M3: May 19-23

•M4: July 7-11

•M5: Sept 8-12

•M6: Oct 13-17

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

2014 M-Runs:

21 Oc 2013 S. Zimmermann, LS1-Weekly 3

M1 M2 M3 M4 M5 M6

PIX X1 X2 1 ready using events simulated at ROD2detector cold

IBL X1 X2 1 ready using events simulated at ROD2detector cold

SCT X1 1detector cold

TRT X

LAR X

TIL X

L1Calo X1 (X1) X2 (X2) 1 Readout only. 2 Trigger part once LAR/TIL available

CSC X1 X2 1 Old RODs, side A only 2 New ROD

MDT X

RPC X X provide trigger for M2 or latest M3

TGC X X2 2operating gas, trigger

BCM X

ALFA -- -- -- -- X --

LUCID -- -- -- -- -- X

TRT starts 31 March-4 April

Anatoli Romaniouk, TRT IB meeting October 30 th 2013

2014 Weeks

9 Oct 2013 S. Zimmermann, ATLAS Week, Marrakech 4

ATLAS outATLAS out

M1-6M1-6

ATLASATLAS

UpGradeUpGradeP & PP & P

TRTTRTIDID

TRT+IDTRT+ID

ID-WS ID-WS

TRT outTRT out

TRT+IDTRT+ID

ATLAS outside

?

Anatoli Romaniouk, TRT IB meeting October 30 th 2013 5

Outside TRT WSOutside TRT WS• 19th – 23rd May– ID Commissioning Workshop on Monday 19th May– ID Week 19-23rd May• Uncoupled with ATLAS or upgrade weeks. Chosen becausethe pixel/IBL installation should be completed andcommissioning is underway• 13th – 17th October– ID Week, with commissioning workshop on Monday– Directly after ATLAS week at CERN

1.Do we want to have it?

2.When: 26-28 of June? Other time?

3.Where?

4.3 possible places