MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-4
SURVEY STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 143 of 246
From To
Main Carriage Way : Road Work
1 Centre Line & ROW -00+750 01+000 Km 1.75 MCW B/S Completed
01+000 02+200 Km 1.20 MCW B/S Completed
02+200 02+900 Km 0.70 MCW B/S Completed
02+900 04+600 Km 1.70 MCW B/S Completed
04+600 05+000 Km 0.40 MCW B/S Completed
05+000 06+700 Km 1.70 MCW B/S Completed
06+700 16+400 Km 9.70 MCW B/S Completed
16+400 17+165 Km 0.77 MCW B/S Completed
17+165 20+850 Km 3.69 MCW B/SCompleted (Junagadh Bypass
approach)
20+850 40+650 Km 19.80 MCW B/S Balance (Junagadh Bypass)
40+650 40+850 Km 0.20 MCW B/S Balance (Junagadh Bypass approach)
40+850 41+800 Km 0.95 MCW B/SCompleted (Junagadh Bypass
approach)
41+800 111+600 Km 69.80 MCW B/S Completed
111+600 112+800 Km 1.20 MCW B/S Completed
112+800 122+000 Km 9.20 MCW B/S Completed
122+000 122+704 Km 0.70 MCW B/S Balance (Somnath Trust stretch)
2 TBM Fixing -00+750 01+000 Km 1.75 MCW B/S Completed
01+000 02+200 Km 1.20 MCW B/S Completed
02+200 02+900 Km 0.70 MCW B/S Completed
02+900 04+600 Km 1.70 MCW B/S Completed
04+600 05+000 Km 0.40 MCW B/S Completed
05+000 06+700 Km 1.70 MCW B/S Completed
06+700 16+400 Km 9.70 MCW B/S Completed
16+400 17+165 Km 0.77 MCW B/S Completed
17+165 20+850 Km 3.69 MCW B/SCompleted (Junagadh Bypass
approach)
20+850 40+650 Km 19.80 MCW B/S Balance (Junagadh Bypass)
40+650 40+850 Km 0.20 MCW B/S Balance (Junagadh Bypass approach)
40+850 41+800 Km 0.95 MCW B/SCompleted (Junagadh Bypass
approach)
41+800 111+600 Km 69.80 MCW B/S Completed
111+600 112+800 Km 1.20 MCW B/S Completed
112+800 122+000 Km 9.20 MCW B/S Completed
122+000 122+704 Km 0.70 MCW B/S Balance (Somnath Trust stretch)
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
SURVEY WORK STATUS AS ON 30 JUNE '2014
S.No Description of WorksChainage
Unit Qty. Side Remarks
Page 144 of 246
3.
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-5
MANPOWER
MOBILIZATION STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 145 of 246
As on : 30-Jun-14
PKG-1 PKG-2 PKG-3 PKG-4 Total Available
1 Staff 136 76 53 125 390
2 Operator's & Drivers 116 121 25 50 312
3 Skilled Labour 60 54 94 135 343
4 Un-Skilled Labour 154 124 101 198 577
Total Available Manpower 466 375 273 508 1622
MANPOWER STATUS
Jetpur–Somnath Project (NH – 8D)
Four - Laning of Jetpur-Somanth Section(Km 0.000 to 127.000) of NH 8D in the State of Gujarat to be
executed as BOT(TOLL) Project on DBFO pattern under NHDP Phase III
S.No Description
Available nos
Page 146 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-6
PLANT & EQUIPMENT MOBILIZATION STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 147 of 246
PKG-1 PKG-2 PKG-3 PKG-4
1 WMM Plant 150,200 TPH 1 1 1 1 4
2 BP 20,25,30,45 Cum/Hr 1 3 0 2 6 Including PRW agencies
3 Crusher150, 250TPH (16hr considered) 1 1 1 1 4
4 HMP 124 TPH 1 1 3
5 Sand Screening Plant 0 1 0 0 1
6 Excavator 8 6 0 13 27 Including earth work dumping agencies
7 Motor Grader 4 3 0 6 13
8 Dozer 1 0 0 2 3
9 Tractor Dozer 0 1 0 0 1
10 Vibratory Roller (or) Soil Compactor 7 6 1 10 24
11 Tandem Roller 2 2 0 3 7
12 Pneumatic Tyre Roller 1 1 0 1 3
13 Baby Roller 2 0 0 1 3
14 Wheel Loader 2 2 1 4 9
15 Tractor Loader 1 1 0 2 4
16 JCB 3 3 1 6 13
17 Sensor Paver 2 4 0 4 10
18 Tippers / Dumpers - 8 Cum to16 Cum 32 22 0 73 127 Including earth work dumping agencies
19 Transit Mixers 6 Cum 4 6 0 10 20 Including PRW agencies
20 Water Tanker (12000/5000 Ltr) 7 9 1 14 31 Including PRW agencies @ 12 Nos
21 Diesel Tankar 2 1 0 2 5
22 Trailor 4 0 0 4 8
23 Transport Truck 0 2 0 6 8 Including PRW agencies @ 7 Nos
24 Tata 407 0 0 0 1 1
25 Mobile Service Van 0 1 0 1 2
26 Bitumen Distributor 4000 to 5000 Sqm 1 1 1 1 4
27 Boom Placer 2
28 Hydra Crane 5 0 0 4
29 DG Set (5 Kva to 625 Kva) 11 24 5 25 65 Including PRW agencies
30 Plate Compactor 1 0 1 0 2
31 Dewatering Pump 4 3 0 6 13 Including PRW agencies
32 Tower Light 4 4 1 4 13
33 Broomer 1 3 0 1 5
34 Compressor 1 2 0 1 4
35 Air Compressor (Workshop) 2 1 1 2 6
36 Tractor 4 6 0 10 20 Including PRW agencies
37 L M V 9 19 6 16 50
38 Staff Bus 1 1 0 2 4
39 Lathe Machine 0 0 1 0 1
40 Press Machine 0 0 0 1 1
41 Welding Machine 5 6 0 10 21
42 Drill Machine 1 1 0 1 3
43 Concrete Pump 0 1 0 0 1
44 Kerb Casting Machine 1
45 Kerb Cutting Machine 0 0 0 2 2
46 Breaker 1 1 0 4 6
47 Electronic Weigh Bridge 40MT 1 2 1 1 5
48 Bench Grinder 1 1 1 1 4
49 Steel / Bar Cutting Machine 11 3 0 13 27 Including PRW agencies
50 Steel / Bar Bending Machine 1 2 0 1 4 Including PRW agencies
1
Jetpur–Somnath Project (NH – 8D)
MAJOR PLANT & EQUIPMENT AS ON 30 JUNE ' 14
Available At SiteS No
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as BOT (TOLL) Project on
DBFO pattern under NHDP Phase III
DESCRPTIONS Total Available Remarks
1
9
1 1
Page 148 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-7
H.S.E. STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 149 of 246
Monthly HSE Report
June ’14 Page 1 of 8 Jetpur-Somnath Project
1.0 HEALTH, SAFETY & ENVIRONMENT
Project: Jetpur - Somnath Project, Gujarat Month: June Year: 2014
1.1 Executive Summary
Health & Safety
“ We have achieved above 7.12 million safe man hours without lost time injury”
The Jetpur - Somnath project has achieved Approx.7.12 million cumulative man-hours worked up to 30st June’14.
The project has accomplished Zero LTI free man-hours worked since last LTI on dt.1st July ‘12.
02 No. First Aid cases occurred during the month of June’14.
Total 163 nos. of Construction Vehicles (Like Hywa, Tipper, Roller, Paver, Hydra & DG Set) were
inspected and Stick Green Sticker after inspection during the month of June’14.
Total 40 Nos. of Safety trainings conducted at site and achieved 504 man months during the month of
June’14.
Total 14.Nos. Plants (like Batching Plants, Crusher Plants, and Hot Mix Plants etc.) have been inspected
during the month of June’14 by HSE team and, mechanical team.
Total 5413 man-month achieved from tool box talks such as Incident alerts, Hazard & Fire safety to site
etc. conducted at site.
Total 38 persons. Safety Induction Conducted during the month of June’14.
Total 2 nos Housekeeping Inspection conducted at site all during June’14.
06 Nos. Work Permit has been issued for excavation work during June’14.
Issued mandatory PPEs to the workers and ensure its proper use at site and PPEs stock list has been
attached with the monthly report as Appendix 1.
Page 150 of 246
Monthly HSE Report
June’14 Page 2 of 8 Jetpur-Somnath Project
PHOTOGRAPHS RELATED TO SAFETY MANAGEMENT SYSTEM & PROGRESS
Working at Height with PPE’s(Full Body Safety Harness) Workers working with proper PPE’s at RoB-1
at Flyover Ch. 00+718
Manual handling job doing with proper Water Sprinkling at for control Air- pollution
PPE’s at RoB-1
Page 151 of 246
Monthly HSE Report
June’14 Page 3 of 8 Jetpur-Somnath Project
WORLD ENVIRONMENT DAY CELEBRATING ON 5 JUNE 2014
Plantation By:Mr. B.S Kapur (Sr. Technical Advisor-JSTPL)
Plantation By:Mr. P K Pattnayak Plantation By:Mr. Manish Chitkara (JSTPL) (VP & Site Head-JSTPL)
Page 152 of 246
Monthly HSE Report
June’14 Page 4 of 8 Jetpur-Somnath Project
Speech given by Mr.P Pattnayak (JSTPL) on World Environment Day 05 June 2014 at Shapur Camp
1.3 Health, Safety & Environmental Objectives
Objectives Measures Progress
Health & Safety:
1 Eliminate Personal Damage
(PD) Class 1 incident
PD Class-1:- Damage which
permanently alters the future
of the individual.
Zero No of Personal Damage Accident until
completion at the Construction Site.
PD-1 Fatality - 0
PD-1 LTI - 0
No-Major Accidents
2 Reducing personal damage
Class 2 and Class 3 incident
systematically.
PD Class-2:- Damage which
temporarily alters a person’s
future e.g. broken arm or
muscle strain etc.
PD Class-3:- Damage which
inconveniences a person e.g.
first aid treatment for a cut
Achieve 7.12 million safe man-hours worked
since last LTI on 1st July’12
PD -2 (LTI) - 0
PD -3 - 01
LTIFR - 0
The project has
achieved
7.12 million safe
man-hours worked
since last LTI on 1st
July’12
Page 153 of 246
Monthly HSE Report
June’14 Page 5 of 8 Jetpur-Somnath Project
hand, dust in eyes etc.
Near Miss / Dangerous
Occurrence
3 Increase a level of safety and
health awareness among
employees and sub-
contractors.
Conduct Tool Box Talk before starting of work.
Site Inspection with Checklist.
Total man-month for Tool Box Talk achieved
5413 Nos.
Total 40 nos. of training programmes Conduct at
the site.
Total man-month for training achieved 504Nos.
Conducted monthly HSE Committee meeting at
site for review of HSE compliances and
performance.
Tool Box Talk
conducted before
starting of work by
HSE Team.
20th HSE
Committee meeting
held on dated 22nd
May’14.
4 To maximise sub-contractor
and supplier involvement in
improving Safety and health
performance.
Involve the sub-contractors and their employees
in all HSE training programmes.
Being Done
5 PUC, Driver licence & other
documents
PUC, Driver licence & other documents should
be available in construction vehicle.
PUC & fitness
certificate of all
required
construction vehicle
has been update as
on date.
6 EMP Documentation Environmental Performance Assessment checklist
had not been maintained.
It should be maintain on monthly basis.
Environmental
inspection has been
done and other
documents shall be
maintained as per
requirement.
7 HSE Training HSE Training Should be conducted as per training
plan.
Training conducted
as per scheduled of
monthly plan. Total
504 workers
participated during
this safety training
8 Excavated Material stacking at
working site.
Excavated Material should be stack up to 2m
height at working site.
Excavated material
removed from the
edge of excavated
pits
Objectives Measures Progress
Environmental:
Implementation of EMP Plan for Jetpur-
Somnath Project
Environmental mitigation
measures has been
implemented at site Complied
Qtr. Environmental Monitoring Qtr. Environmental
Monitoring has been Complied
Page 154 of 246
Monthly HSE Report
June’14 Page 6 of 8 Jetpur-Somnath Project
conducted on 14.05.2014
Six Monthly MoEF Report (January –
June’14)
6 Monthly MoEF Report from
January’2014 to June ’2014 to
be submitted
Under preparation; will be submitted
in July ‘14
1.4 Ongoing Key Health, Safety & Environmental Initiatives: -
No. of Workplaces or PKG. 02 Packages
No. of Health and Safety Plans in Place: 02
No. of Environmental Plans in Place: 02
System Measurements This month
(nos.)
Up to Previous
Month
(Nos.)
Total to Date
(nos.)
No of Inductions and Attendees 38 2060 2098
No of Toolbox Talks Attendees 5413 81440 86853
No of HSE Inspections 2 65 67
New Procedures Performa (List and attach any new procedures/ forms introduced on the
project) Health, Hygiene and safety Inspection Check list
00 05 05
1.4.1 Training
In-House Health, Safety & Environmental Training:
Total 40 Nos. Safety training conducted at site
Over 5413 Nos. Worker participated in this training including Site engineers of EPC Contractor and
sub-contractors have successfully attended the above training programme.
The site training is a step towards our awareness programmes conducted on monthly basis on HSE
aspects among all workman and supervisory staff to create awareness among project staff for safe,
secure and healthy environment at work site.
Every day tool box talks conducted at site, before starting of work at each working location.
1.4.2 Key Action for June’14:
Status of Key Actions from previous month:
Health & Safety:
World Environment Day has been conducted at Shapur and JSP Site on 05 June 2014.
Specific HSE – Training programs has been conduct during the month covering welding, cutting, rigging, material
handling, hot work, asphalt works etc.
Specific training for Electrical shock has been conducted.
Spreading of bleaching powder at Labour Camp and Plant area.
Electrical Audit has been conducted at package 1 & 2 before Monsoon.
Page 155 of 246
Monthly HSE Report
June’14 Page 7 of 8 Jetpur-Somnath Project
Maintenance of all Diversion boards has been done for increasing visibility during nights.
All water purifier and RO’s has been checked all are in working condition.
Environment:
Ensured dust sprinkling system (water tankers) at construction site for dust pollution control.
Environmental Monitoring along the Project road and plant site has been conducted on 14th May
2014.
Green belt developed near all Plants (like Batching Plants, Crusher Plants, Hot Mix Plants etc.
Installed water sprinkling system in all the crusher plants
Rehabilitation of Borrow area and Quarry sites to be initiated after completion of project.
1.4.3 Key Actions planned for July ’ 14:
Health & Safety:
First Aid Training should be conduct at all packages.
Carbolic Acid should be placed near office Area, Labour Camp and Plant area.
Specific HSE – Training programs to be conduct during the month covering welding, cutting, rigging, material
handling, hot work, asphalt works etc.
Specific HSE training for Inspection of crane for girder launching and work at Height.
Proper Housekeeping at ROB-1befoer girder launching activities.
Environmental Issue:
Environmental Monitoring to be done
Implementation of Environmental Management Plan
Ensure monthly reporting system at site.
Review of environmental checklist and its implementation at site
Review/Monitoring of Applicable permits and clearances.
1.5 Environmental Monitoring Program: Air:
Oct.13
Water:
Oct.13
Noise/Vibration:
Oct.13
Waste/Recycling:
Nil
Flora/Fauna:
Conservation of Flora and Fauna have been taken care on top priority during the widening of 2-lane to
4-lane road project.
Page 156 of 246
Monthly HSE Report
June’14 Page 8 of 8 Jetpur-Somnath Project
1.6 Health, Safety & Environmental Inspection:
Level 1 HSE Inspection has been conducted during this month
Level Type Project/Location Inspected by
Level-1 Internal PKG A & B Safety Officer
1.7Monthly Health, Safety & Environmental/Breaches/Complaints/Non-Conformance/ Awards/penalized:
Awards issued to: Nil
Penalized/Warning:
0 Nos. Staff and workers Penalized for safety violation.
Public Complaints: - (If any - provide details)- NIL
Safety Non-Conformance: - (If any - provide details)- NIL
Breaches by EPC Contractor (M/s Backbone Enterprises): - (If any - provide details)- NIL
Definition of Breaches – Number of breaches of statutory health, safety & environmental requirements. This includes
Fines, Improvement Notice, Prohibition Notice, Penalty Notice or Prosecutions, or Non Compliance with Legal and Other
Requirements.
1.8 Analysis of HSE Incidents for the Month of June’14: Nil
Sl.
No.
Incident Description
*Identify Body Part
Injured
Date/
Time of
Incident
Injured Person(s)
(include details of any
Medical Treatment)
Damage to property or
the Environment
Location
Head of
Department
Comments
Classes
(PD1,
PD2,
PD3)
1st Day
Absent
1st Day
Return to
Work
1st Day
Return to
Normal
Duties
No. of LTD
This
Month
Cum Yr
to Date
1.9 Health, Safety & Environmental Committee Meetings:
Project Date Held Next Due Actions
Closed Out
Actions in
Progress
Action
Outstanding
HSE Committee Meeting has been conducted on 22nd May’ 2014
Page 157 of 246
JAN FEB MAR APR MAY JUN JUL AUG SEP OCT NOV DEC
1 965 1494 1603 1670 1794 1794 1608 1432 1545
2 69504 11956 12824 13356 14352 14352 12870 11456 160670
3 1725088 3633072 397760 320016 344448 377152 345864 286400 7429800
4 1418912 3633072 397760 320016 344448 377152 345864 286400 7123624
5 32 63 1 1 1 1 2 2 103
6 0 0 0 0 0 0 0 0 0
7 0 0 0 0 0 0 0 0 0
8 1 0 0 0 0 0 0 0 1
9 1.78 0 0 0 0 0 0 0 1.78
10 0 0 0 0 0 0 0 0 0
11 0 0 0 0 0 0 0 0 0
12 0 0 0 0 0 0 0 0 0
13 2 1 0 0 0 0 0 0 3
14 1 0 0 0 0 0 0 0 1
15 0 0 0 0 0 0 0 0 0
16 0 0 0 0 0 0 0 0
17 0 0 0 0 0 0 0 0 0
18 0 2 0 1 0 0 0 0 3
Lost Work Days
Frequency Rate -( No. of lost time injury x 106 /
Total man hours worked )
Severity Rate- (No. of man days lost x 106
/ Total man hours worked )
Lost Time Injury Cases (Absent due to injury over 48 hours)
SAFETY MANAGEMENT SYSTEM
MONTHLY HSE STATISTICS REPORT
Report for the Month of :- June '14
Sr.No Required Data DETAILS OF CURRENT YEAR 2014
Average No. of Employees / Day
Man-hours worked / Day
Man-hours worked during this month
Total safe man hours achieved since inception
First Aid Incidence rate
Note : Manpower details are to be based on the record of Personnel Department which includes all the workers at site including PRW workers, Sub-Contract workers and departmental Workers. Man-hours worked details may not be 100% not accurate but
should be near to 90-95% accuracy .
: Highlighted parts such as Sr.no 9, 11, 12 and Column 'Total/Average' are protected.
TOTAL / AVERAGE
Previous
Year
2012
Previous
Year
2013
4-LANING OF JETPUR-SOMNATH SECTION OF NH-8D PROJECT START DATE: 31.03.2012
Number of Near misses(including Property damage)
Number of dangerous occurrences(including Property damage)
Number of Fire Incident
Environmental Incidents
Percentage of compliance to unsafe acts & unsafe conditions
Number of Mock drill conducted
Restricted work medical cases
Fatalities
Incident Rate - (No. of lost time injury x 1000 /
Total No. of Persons)
Page 158 of 246
Stretch: Jetpur - Somnath
Stretch Chainage: 0+000 to 127+600
State: Gujarat
District: Rajkot & Junagadh
Police Station: Jetpur, Junagadh, Vanthali, Keshod, Maliya, Mangrol, Patan &Veraval
Date LocationTime of
AccidentA* B* C* D* E* F* G* H*
Vehicle
Registration No.Vehicle Type
1 5-Jun-14 Ch.40+00 7:30 PM Moti Palace Minor MinorHit from back
sidePaved Good - Clear GJ 11A/2774
Motor Cycle
& Pedestrian0 0 1 1 0
2 26-Jun-14 Ch. 39+400 7:00AM Trilok Nagar Minor MinorHit from back
sidePaved Good - Clear -
ST Bus &
Cyclist0 0 1 1 0
3 27-Jun-14 Ch 39+00 10:30 PM Near Wadla fhatak Major MajorHead on
CollisionPaved Good - Clear GJ 11Z/9482
Charge
Rickshaw1 0 0 0 1
108
Ambulance
4 29-Jun-14 Ch.109+750 6:00PM Chatgora Minor Minor Overtaking Paved Good - Clear GJ3FA/5564
Motor Cycle
& Motor
Cycle
0 0 1 1 0
S.No.
(DD/MM/YY) Chainage/Km AM/PM Accident Location Fatal
No. of Effected Persons
Grievous
Injury
Minor
Injury
Net
Injury
Nature of
Accident
Classification of
AccidentCauses Road Feature
Road
Condition
Intersecti
on Type
No. of
Animals
Killed If
any
Help Provided
by the
Ambulance/Patr
ol Vehicle
Remarks
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as BOT(TOLL) Project on DBFO pattern under NHDP Phase III
ACCIDENT REPORT FOR THE MONTH OF JUNE' 2014
Weather
Condition
Vehicle Type /Pedestrian Involved
I*
Page 159 of 246
RECEIPT
THIS
MONTH
ISSUE THIS
MONTH
1 Ear Plug Nos 99 150 101 148
2 Fire Extinguisher 2Kg+5Kg (CO2) Nos 10 73 64 19
3 Fire Extinguisher 50LTR Nos 2 1 0 3
4 Firstaid Box Nos 20 36 26 30
5 Hand Gloves Nos 178 859 793 244
6 Nose Mask Nos 501 962 720 743
7 Reflective Tape Rd/Wh/Yel Nos 63 422 377 108
8 Safety Cone Nos 18 166 135 49
9 Safety D Ring & Chest Belt Nos 24 110 98 36
10 Safety Fire Bucket Nos 6 22 19 9
11 Safety Helmet BLUE/GREEN Nos 15 154 152 17
12 Safety Helmet ORANGE/RED Nos 34 44 27 51
13 Safety Helmet WHITE Nos 120 415 359 176
14 Safety Helmet YELLOW Nos 95 2304 2262 137
15 Safety Jacket GREEN/YELLOW Nos 270 885 760 395
16 Safety Jacket ORANGE Nos 211 3394 3312 293
17 Safety Ribbon Nos 18 316 286 48
18 Safety Shoes + Gum Boot Nos 238 1883 1778 343
19 Cat Eyes(3M BRAND) Nos 126 100 37 189
20 Safety Delinator 750MM Nos 30 62 35 57
21 Hand Blinker Nos 10 24 19 15
22 Signal Light Blinker Nos 0 7 7 0
23 Safety Solar Blinker Nos 4 12 10 6
24 Water Fillable Barricade Nos 32 98 78 52
Appendix-l
Stock details of Safety Equipments
Sr. No. Item Description Unit
Opening
stock on
01.06.2014
RECEIPT ISSUE
Closing Balance
as on 30.06.2014
Page 160 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-8
Q.A. & Q.C. STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 161 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
1.0 Tests on Borrow areas for Embankment and Subgrade 37905 37769 136 1363 1352 11 39268 39121 147
1.1 FSI 1 test /1500 m3 Mutually Agreed Cum 3284 3270 14 42 42 0 3326 3312 14
1.2 Grain Size Analysis 1 test /1500 m3 Mutually agreed Cum 3279 3271 8 42 42 0 3321 3313 8
1.3 LL / PL / PI 1 test /1500 m3 Table no. 2 of IS 73 and Cl. 7 Cum 3255 3255 0 42 42 0 3297 3297 0
1.4 MDD / OMC 1 test /1500 m3 MORT&H Clause 903.2.1 Cum 3301 3301 0 42 42 0 3343 3343 0
1.5 CBR Test 1 test /3000 m3 MORT&H Clause 903.2.1 Cum 1455 1445 10 10 10 0 1465 1455 10
1.6 Field Density (Emb. Layer) 1 test /1000 m2 MORT&H Clause 903.2.2 12797399.71 532177.6 13329577.31 Sqm 12338 12276 62 631 623 8 12969 12899 70
1.7 Field Density (Sub. Layer) 1 test /500 m2 MORT&H Clause 903.2.3 4881348.24 274014.40 5155362.64 Sqm 10993 10951 42 554 551 3 11547 11502 45
2.0 Tests on OGL Samples(MCW & SR) 5544 5535 9 82 82 0 5626 5617 9
2.1 FSI 1 test /250 m Mutually agreed Km 662 655 7 0 0 0 662 655 7
2.2 Grain Size Analysis 1 test /250 m Mutually agreed Km 658 658 0 0 0 0 658 658 0
2.3 LL / PL / PI 1 test /250 m Mutually agreed Km 663 663 0 0 0 0 663 663 0
2.4 MDD / OMC 1 test /250 m Mutually agreed Km 663 663 0 0 0 0 663 663 0
2.5 CBR Test As required Mutually Agreed Km 148 148 0 0 0 0 148 148 0
2.6 Field Density (Emb. Layer) 1 test /1000 m2 MORT&H Clause 903.2.2 2260366.82 41980 2302346.82 Sqm 2750 2748 2 82 82 0 2832 2830 2
3.0 Backfilling Structure Work 5617 5611 6 607 607 0 6224 6218 6
3.1 FSI 1 test /1500 m3 Mutually Agreed Cum 124 124 0 15 15 0 139 139 0
3.2 Grain Size Analysis 1 test /1500 m3 Mutually agreed Cum 286 286 0 15 15 0 301 301 0
3.3 LL / PL / PI 1 test /1500 m3 MORT&H Clause 903.2.1 Cum 133 133 0 15 15 0 148 148 0
3.4 MDD / OMC 1 test /1500 m3 MORT&H Clause 903.2.1 Cum 120 120 0 15 15 0 135 135 0
3.5 Field Density (Emb. Layer) 1 test /1000 m2 MORT&H Clause 903.2.2 857566.49 158091.0 1015657.5 Sqm 4954 4948 6 547 547 0 5501 5495 6
Quantity
during
Month
Upto Date
quantity
Unit of
Quantity
169840.550 31590.60 201431.15
Remarks
2957921.40 146514.98 3104436.38
140.966 3.072 144.038
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
Page 162 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
4.0 Tests on Granular Sub - Base Course(GSB) 8497 8467 30 383 382 1 8880 8849 31
4.1 Gradation 1 test /200 m3 MORT&H Cl. 903.3.3.1 cum 2116 2110 6 95 95 0 2211 2205 6
4.2 LL / PL / PI 1 test /200 m3 MORT&H Cl. 903.3.3.1 cum 2104 2089 15 95 95 0 2199 2184 15
4.3 MDD/OMC As required Mutually Agreed cum 37 37 0 0 0 0 37 37 0
4.4 CBR test As required MORT&H Cl. 903.3.3.1 cum 29 29 0 0 0 0 29 29 0
4.5 10 Percent fine value 1 per Batch Mutually Agreed cum 14 14 0 0 0 0 14 14 0
4.6 Field Density 1 test /500 m2 MORT&H Cl. 903.3.3.1 1599871.56 84104.8 1683976.4 cum 4197 4188 9 193 192 1 4390 4380 10
5.0 Tests on Aggregate Base Course(WMM) 17935 17926 9 712 710 2 18647 18636 11
5.1 Mix aggregate Gradation 1 test /100 m3MORT&H Cl. 903.3.1 (Table
900-3)Cum 3995 3995 0 164 164 0 4159 4159 0
5.2 Plasticity Index 1 test /100 m3MORT&H Cl. 903.3.1 (Table
900-3)Cum 3922 3922 0 164 164 0 4086 4086 0
5.3 Aggregate Impact Value 1 test /200 m3MORT&H Cl. 903.3.1 (Table
900-3)Cum 2371 2371 0 91 91 0 2462 2462 0
5.4 Flakiness & Elongation Test 1 test /200 m3MORT&H Cl. 903.3.1 (Table
900-3)Cum 2344 2344 0 91 91 0 2435 2435 0
5.5 Water Absorption As required Mutually Agreed Cum 58 58 0 0 0 0 58 58 0
5.6 Proctor Test As required Mutually Agreed Cum 15 15 0 0 0 0 15 15 0
5.7 Field Density 1 test /500 m2 MORT&H Table No. 900-3 2318918.3 96469.2 2415387.5 Sqm 5230 5221 9 202 200 2 5432 5421 11
6.0 Bitumen 2608 2608 0 54 54 0 2662 2662 0
6.1 Specific Gravity 1 test per lot/Batch IS 73-Table 2 MT 147 147 0 0 0 0 147 147 0
6.2 Penetration @ 25 degree 1 test per sample Table no. 2 of IS 73 and Cl. 7 MT 979 979 0 27 27 0 1006 1006 0
6.3 Softening point (R & B) 1 test per sample Table no. 2 of IS 73 and Cl. 7 MT 979 979 0 27 27 0 1006 1006 0
6.4Absolute viscosity @ 60
degree 1 test per Sample Table no. 2 of IS 73 and Cl. 7 MT 63 63 0 0 0 0 63 63 0
6.5Kinematic Viscosity @ 135
degree1 test per Sample Table no. 2 of IS 73 and Cl. 7 MT 440 440 0 0 0 0 440 440 0
7.0 Prime Coat (SS-1) and Tack Coat (RS-I) 13140 13140 0 320 320 0 13460 13460 0
(A) Prime Coat
7.1Spreading Rate of Prime Coat
(Emulsion SS-I)
1test per 500 sqm or
two test per day
MORT&H Cl. 903.4.2 Table-
900-41214121.874 48031 1262152.874 Sqm 4009 4009 0 120 120 0 4129 4129 0
(B) Tack Coat
7.2Spreading Rate of Tack Coat
(Emulsion RS-1)
1test per 500 sqm or
two test per day
MORT&H Cl. 903.4.2 Table-
900-42367151.293 95519 2462670.293 Sqm 9131 9131 0 200 200 0 9331 9331 0
18892.840 705.936 19598.776
336387.01 16993.2 353380.21
349077.31 15765.40 364842.71
Page 163 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
8.0 Bitumenous Macadam (Grade-1) 1133 1133 0 0 0 0 1133 1133 0
8.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
8.2 Individual Aggregate Gradation2 test per day per
plant MORT&H Cl. 903.4 MT 148 148 0 0 0 0 148 148 0
8.3 Mix aggregate Gradation2 test per day per
plant MORT&H Cl. 903.4 MT 154 154 0 0 0 0 154 154 0
8.4
Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 222 222 0 0 0 0 222 222 0
8.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
8.6 Coating and StrippingAs required and each
source changeMORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
8.7Binder content and extration
test
2 test per day per
plantMORT&H Cl. 903.4 MT 153 153 0 0 0 0 153 153 0
8.8 Density of compacted layer 1 test per 250 sqm MORT&H Cl. 903.4 34239.50 0.00 34239.50 Sqm 456 456 0 0 0 0 456 456 0
9.0 Bitumenous Macadam (Grade-2) 116 116 0 0 0 0 116 116 0
9.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
9.2 Individual Aggregate Gradation2 test per day per
plant MORT&H Cl. 903.4 MT 26 26 0 0 0 0 26 26 0
9.3 Mix aggregate Gradation2 test per day per
plant MORT&H Cl. 903.4 MT 31 31 0 0 0 0 31 31 0
9.4Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 21 21 0 0 0 0 21 21 0
9.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 3 3 0 0 0 0 3 3 0
9.6
Coating and StrippingAs required and each
source changeMORT&H Cl. 903.4 MT 1 1 0 0 0 0 1 1 0
9.7Binder content and extration
test
2 test per day per
plantMORT&H Cl. 903.4 MT 28 28 0 0 0 0 28 28 0
9.8 Density of compacted layer 1 test per 250 sqm MORT&H Cl. 903.4 7699.45 0.00 7699.45 6 6 0 0 0 0 6 6 0
4949.98 0 4949.98
41419.78 0 41419.78
Page 164 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
10.0 Dense Graded Bitumenous Macadam (Grade-1) 13146 13146 0 547 547 0 13693 13693 0
10.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 12 12 0 0 0 0 12 12 0
10.2
Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 1870 1870 0 73 73 0 1943 1943 0
10.3Plasticity Index of fine
aggregateAs required Mutually agreed MT 28 28 0 0 0 0 28 28 0
10.4Flakiness Index and Elongation
Index (combined)1 per 50cum MORT&H Cl. 903.4 MT 1892 1892 0 73 73 0 1965 1965 0
10.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 13 13 0 0 0 0 13 13 0
10.6 Coating and Stripping 3 per Source MORT&H Cl. 903.4 MT 5 5 0 0 0 0 5 5 0
10.7Individual Aggregates
Gradation
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 1690 1690 0 112 112 0 1802 1802 0
10.8 Dry Mix aggregates gradation1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 1026 1026 0 32 32 0 1058 1058 0
10.9Binder content and extraction
test
1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 954 954 0 32 32 0 986 986 0
10.10Marshall stability flow test and
density void analysis
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 913 913 0 32 32 0 945 945 0
10.11 Density of compacted layer 1 test per 250 sqm MORT&H Cl. 903.4 1066129.28 46070.00 1112199.28 Sqm 4743 4743 0 193 193 0 4936 4936 0
11.0 Dense Graded Bitumenous Macadam (Grade-2) 1993 1993 0 101 101 0 2094 2094 0
11.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 4 4 0 0 0 0 4 4 0
11.2
Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 241 241 0 11 11 0 252 252 0
11.3Plasticity Index of fine
aggregateAs required Mutually agreed MT 2 2 0 0 0 0 2 2 0
11.4Flakiness Index and Elongation
Index (combined)1 per 50cum MORT&H Cl. 903.4 MT 251 251 0 11 11 0 262 262 0
11.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 6 6 0 0 0 0 6 6 0
11.6 Coating and Stripping 3 per Source MORT&H Cl. 903.4 MT 1 1 0 0 0 0 1 1 0
11.7Individual Aggregates
Gradation
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 259 259 0 27 27 0 286 286 0
11.8 Dry Mix aggregates gradation1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 191 191 0 9 9 0 200 200 0
11.9Binder content and extration
test
1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 196 196 0 9 9 0 205 205 0
11.10Marshall stability flow test and
density void analysis
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 185 185 0 2 2 0 187 187 0
11.11 Density of compacted layer 1 test per 250 sqm MORT&H Cl. 903.4 145822.41 7665.00 153487.41 Sqm 657 657 0 32 32 0 689 689 0
31005.59 1242.98 32248.57
234449.369 9348.25 243797.623
Page 165 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
12.0 Bituminous Concrete(Grade-2) 6709 6709 0 331 331 0 7040 7040 0
12.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 37 37 0 0 0 0 37 37 0
12.2
Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 945 945 0 28 28 0 973 973 0
12.3Plasticity Index of fine
aggregateAs required Mutually agreed MT 37 37 0 0 0 0 37 37 0
12.4Flakiness Index and Elongation
Index (combined)1 per 50cum MORT&H Cl. 903.4 MT 945 945 0 28 28 0 973 973 0
12.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
12.6 Coating and Stripping 3 per Source MORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
12.7Individual Aggregates
Gradation
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 788 788 0 44 44 0 832 832 0
12.8 Dry Mix aggregates gradation1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 416 416 0 12 12 0 428 428 0
12.9Binder content and extration
test
1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 363 363 0 12 12 0 375 375 0
12.10Marshall stability flow test and
density void analysis
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 366 366 0 12 12 0 378 378 0
12.11 Density of compacted layer 1 test per 750 sqm MORT&H Cl. 903.4 889875.5 41076.0 930951.5 MT 2812 2812 0 195 195 0 3007 3007 0
13.0 Semi Dense Bituminous Concrete(Grade-2) 110 110 0 0 0 0 110 110 0
13.1 Cleanliness (dust) 1 per 50cum MORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
13.2
Los Angeles
Abrasion/Aggregate Impact
Value
1 per 50cum MORT&H Cl. 903.4 MT 15 15 0 0 0 0 15 15 0
13.3Plasticity Index of fine
aggregateAs required Mutually agreed MT 0 0 0 0 0 0 0 0 0
13.4Flakiness Index and Elongation
Index (combined)1 per 50cum MORT&H Cl. 903.4 MT 17 17 0 0 0 0 17 17 0
13.5 Water absorption As required and each
source changeMORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
13.6 Coating and Stripping 3 per Source MORT&H Cl. 903.4 MT 0 0 0 0 0 0 0 0 0
13.7Individual Aggregates
Gradation
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 17 17 0 0 0 0 17 17 0
13.8 Dry Mix aggregates gradation1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 23 23 0 0 0 0 23 23 0
13.9Binder content and extration
test
1 test per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 22 22 0 0 0 0 22 22 0
13.10Marshall stability flow test and
density void analysis
1 set per 400 MT or
2 tests per DayMORT&H Cl. 903.4 MT 16 16 0 0 0 0 16 16 0
13.11 Density of compacted layer 1 test per 750 sqm MORT&H Cl. 903.4 0.00 0.00 0.00 MT 0 0 0 0 0 0 0 0 0
3485.96 0 3485.96
110138.259 4981.56 115119.819
Page 166 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
14.0 Fine Aggregate(Sand for Concrete) 6174 6174 0 172 172 0 6346 6346 0
13.1 Sieve Analysis (Gradation)1 test per sublot
dividedIS 2340 Cl.4 MT 3425 3425 0 103 103 0 3528 3528 0
13.2Material passing 75 micron
(Silt Content)
1 test per sublot
dividedIS 2340 Cl.4 MT 2459 2459 0 69 69 0 2528 2528 0
13.3 Water absorption1 test per sublot
dividedIS 2340 Cl.4 MT 159 159 0 0 0 0 159 159 0
13.4 Specific gravity (SSD)1 test per sublot
dividedIS 2340 Cl.4 MT 131 131 0 0 0 0 131 131 0
15.0 Coarse Aggregate(For Concrete) 14454 14454 0 416 416 0 14870 14870 0
15.1 Sieve Analysis (Gradation)1 test per sublot
dividedIS 2340 Cl.4 MT 7793 7793 0 234 234 0 8027 8027 0
15.2 Aggregate Impact Value1 test per sublot
dividedIS 2340 Cl.4 MT 2941 2941 0 91 91 0 3032 3032 0
15.3 Flakiness Index.1 test per sublot
dividedIS 2340 Cl.4 MT 3151 3151 0 91 91 0 3242 3242 0
15.4 Specific gravity (SSD)1 test per sublot
dividedIS 2340 Cl.4 MT 166 166 0 0 0 0 166 166 0
15.5 Water absorption1 test per sublot
dividedIS 2340 Cl.4 MT 148 148 0 0 0 0 148 148 0
15.6 Los Angeles Abrasion Value1 test per sublot
dividedIS 2340 Cl.4 MT 0 0 0 0 0 0 0 0 0
15.7 Material passing 75 micron1 test per sublot
dividedIS 2340 Cl.4 MT 255 255 0 0 0 0 255 255 0
16.0 Cement 2028 2028 0 57 57 0 2085 2085 0
Physical Tests 0 0 0 0 0 0 0 0 0
16.1 Standard Consistancy Test 1 test per lot IS 3535 Cl. 5.5.2 & 5.6.1 MT 328 328 0 8 8 0 336 336 0
16.2 Soundness Test 1 test per lot IS 3535 Cl. 5.5.2 & 5.6.1 MT 298 298 0 8 8 0 306 306 0
Setting time Test MT 0 0 0 0 0 0 0 0 0
(a) Initial Setting time MT 327 327 0 8 8 0 335 335 0
(b) Final Setting Time MT 326 326 0 8 8 0 334 334 0
Compressive Strength Test MT 0 0 0 0 0 0 0 0 0
(A) 72+ 1 Hr. strength MT 249 249 0 8 8 0 257 257 0
(b) 168 + 2 Hr. strength MT 258 258 0 9 9 0 267 267 0
(c) 672 + 4 Hr. strength MT 242 242 0 8 8 0 250 250 0
16.3 1 test per lot IS 3535 Cl. 5.5.2 & 5.6.1
16.4 1 test per lot IS 3535 Cl. 5.5.2 & 5.6.1
176338.710 5891.960 182230.670
55022.542 1974.630 56997.172
117296.171 5208.65 122504.82
Page 167 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
17.0 Site Concrete 39142 39140 2 1524 1524 0 40666 40664 2
M 10 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 94 94 0 0 0 0 94 94 0
28 days compressive strength Cum 30 30 0 0 0 0 30 30 0
M 15 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 2497 2497 0 104 104 0 2601 2601 0
28 days compressive strength Cum 2427 2427 0 82 82 0 2509 2509 0
M 20 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 2832 2832 0 167 167 0 2999 2999 0
28 days compressive strength Cum 2537 2535 2 167 167 0 2704 2702 2
M 25 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 77 77 0 18 18 0 95 95 0
28 days compressive strength Cum 62 62 0 22 22 0 84 84 0
M 30 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 7981 7981 0 287 287 0 8268 8268 0
28 days compressive strength Cum 7926 7926 0 267 267 0 8193 8193 0
M 35 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 4544 4544 0 90 90 0 4634 4634 0
28 days compressive strength Cum 4317 4317 0 117 117 0 4434 4434 0
M 40 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 774 774 0 45 45 0 819 819 0
28 days compressive strength Cum 708 708 0 69 69 0 777 777 0
M 45 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 235 235 0 10 10 0 245 245 0
28 days compressive strength Cum 233 233 0 7 7 0 240 240 0
M 50 Grade Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 570 570 0 7 7 0 577 577 0
28 days compressive strength Cum 715 715 0 6 6 0 721 721 0
17.9Frequency according
to table 1700-8As per MORT&H 1716.2.4 2943.65 133.50 3077.15
17.8Frequency according
to table 1700-8As per MORT&H 1716.2.4 2399.35 14.00 2413.35
17.7Frequency according
to table 1700-8As per MORT&H 1716.2.4 3174.69 229.45 3404.14
17.6Frequency according
to table 1700-8As per MORT&H 1716.2.4 39646.50 766.30 40412.80
17.5Frequency according
to table 1700-8As per MORT&H 1716.2.4 63955.49 2142.05 66097.54
17.4Frequency according
to table 1700-8As per MORT&H 1716.2.4 426.62 42.71 469.33
17.3Frequency according
to table 1700-8As per MORT&H 1716.2.4 19577.90 1058.15 20636.06
17.2Frequency according
to table 1700-8As per MORT&H 1716.2.4 11877.41 486.94 12364.35
17.1Frequency according
to table 1700-8As per MORT&H 1716.2.4 721.15 0.00 721.15
Page 168 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
DLC Concrete Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 123 123 0 6 6 0 129 129 0
Insitu Density3 density holes per
2000 sqmAs per MORT&H 903.5.1.2 22684.30 600.00 23284.30 Cum 60 60 0 3 3 0 63 63 0
PQC Grade Concrete Cum 0 0 0 0 0 0 0 0 0
7 days compressive strength Cum 141 141 0 24 24 0 165 165 0
28 days compressive strength Cum 100 100 0 26 26 0 126 126 0
7 days flexural strength Cum 85 85 0 0 0 0 85 85 0
28 days fexural strength Cum 74 74 0 0 0 0 74 74 0
18.0 Slump Test 55786 55786 0 2719 2719 0 58505 58505 0
M 10 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 173 173 0 0 0 0 173 173 0
Slump test at Plant Cum 169 169 0 0 0 0 169 169 0
M 15 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 2402 2402 0 114 114 0 2516 2516 0
Slump test at Plant Cum 2378 2378 0 114 114 0 2492 2492 0
M 20 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 3553 3553 0 237 237 0 3790 3790 0
Slump test at Plant Cum 3580 3580 0 237 237 0 3817 3817 0
M 25 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 86 86 0 11 11 0 97 97 0
Slump test at Plant Cum 85 85 0 11 11 0 96 96 0
M 30 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 11892 11892 0 464 464 0 12356 12356 0
Slump test at Plant Cum 11886 11886 0 461 461 0 12347 12347 0
M 35 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 7303 7303 0 189 189 0 7492 7492 0
Slump test at Plant Cum 7306 7306 0 189 189 0 7495 7495 0
M 40 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 702 702 0 73 73 0 775 775 0
Slump test at Plant Cum 681 681 0 73 73 0 754 754 0
18.7
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 3157.59 229.45 3387.04
18.6
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 39243.85 766.30 40010.15
18.5
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 63804.27 2142.05 65946.32
18.4
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 427.12 42.71 469.83
18.3
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 19480.65 1058.15 20538.81
301.15 0.00 301.15
18.2
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 11723.91 486.94 12210.85
17.12 2 cubes and 2 beams
per 150 cum or Min
6 cubes or 6 beams
per day
As per MORT&H 1716.2.4
17.13
18.1
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3
17.11
3 samples per 1000
sqmAs per MORT&H 903.5.1.1 2718.00 47.00 2765.00
3585.10 628.75 4213.85
Page 169 of 246
Tested Passed Failed Tested Passed Failed Tested Passed Failed
Quantity
during
Month
Upto Date
quantity
Unit of
QuantityRemarks
MONTHLY QUALITY CONTROL AND ASSURANCE STATEMENT UPTO 30th June 2014
( ROUTINE QUALITY CONTROLL TEST IN ALL PACKAGE LABORATORY )
S. No. DescriptionFrequency of
Tests
Reference clause of test
frequency
Quantity upto
previous
month
Total No of tests upto
previous month
No. of tests during the
monthTotal No of upto date test
M 45 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 491 491 0 3 3 0 494 494 0
Slump test at Plant Cum 477 477 0 3 3 0 480 480 0
M 50 Grade Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 534 534 0 22 22 0 556 556 0
Slump test at Plant Cum 530 530 0 22 22 0 552 552 0
PQC Grade Concrete Cum 0 0 0 0 0 0 0 0 0
Slump test at Site Cum 779 779 0 248 248 0 1027 1027 0
Slump test at Plant Cum 779 779 0 248 248 0 1027 1027 0
18.11 Texture Depth TestPer day 5
Measurements
As per MORT&H Cl. 602.9.8.4
(Table-600-2)- 75 75 0 5 5 0 80 80 0
232037 231845 192 9388 9374 14 241425 241219 206
113840 113778 62 3712 3712 0 117552 117490 62
118197 118067 130 5676 5662 14 123873 123729 144
Total Tests
Total Laboratory tests
Total Field Tests
18.101 test per per each
dumper
As per MORT&H Cl. 904.5.2.4
(Table-900-6)3585.10 628.75 4213.9
18.9
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 3108.40 133.50 3241.90
18.8
1 test( on composite
samples) per each
mixture unit
As per IS 1199 cl. 3.2 and 3.3 2465.85 14.00 2479.85
Page 170 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-09
EXISTING ROAD MAINTENANCE
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 171 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n
t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
EXISTING ROAD MAINTENANCE
Clause 6.2 of the Concession Agreement states that “ During the development
period, the Authority shall maintain the Project Highway, as its own cost and
expense, so that its traffic worthiness and safety are at no time materially inferior as
compared to its condition 7 (Seven) days prior to the last date of submission of bid,
and in the event of any material deterioration or damage other than normal wear
and tear, undertake repair thereof, or pay to the Concessionaire the cost and
expense, as determined by the Independent Engineer, for undertaking such repair
after the appointed date”
As the existing project highway has deteriorated to such an extent where its traffic
worthiness and the safety of the road users are at grave risk during the development
period, repair and maintenance was taken up with duly submitted representations to
the Authority.
Estimates for maintenance of existing road repair and maintenance has been
submitted to NHAI and it was reviewed by IE and forwarded to NHAI thru letter
No. ICT: 655: NCS: 7683 dated 25.06.12.
As the overlay works on existing road in more than 80 km length could not be taken
up till the availability of hindrance free land including Junagadh and Keshod Bypass,
Concessionaire had again requested NHAI for approval of the estimate for Repair &
Rehabilitation work submitted earlier. After review by Independent Engineer a
revised proposal Rs. 4.26 crore was recommended by the office of RO, Gandhinagar
for necessary approval vide their letter NHAI/12013//2/2010-RO-GNR/Tech/Jet-
Som/Vol-10/3439/2013 dated 28.03.2013 for taking up bare minimum repair &
rehabilitation works on the balance length of existing road to be overlaid after
handing over of hindrance free land by Authority.
However, Concessionaire will be undertaking the repair of existing road by laying
overlay wherever required, to bring the highway condition to satisfactory condition
and avoid criticism from the public and local administration, as instructed by IE and
the Authority. Aprpox. 6.52 km length of overlay works and 66 km of pot hole
repairing completed during Dec ’13 & Jan ’14. Concessionaire’ representative has
carried out maintenance of existing road in the month of May ’14 between Ch.
Page 172 of 246
MONTHLY PROGRESS REPORT – JUNE ’14 Jetpur - Somnath Section of NH-8D
4 L a n i n g o f J e t p u r - S o m n a t h S e c t i o n ( K m . 0 . 0 0 0 t o 1 2 7 . 6 0 0 ) o f N H - 8 D i n t h e S t a t e o f G u j a r a t o n D B F O P a t t e r n u n d e r N H D P P h a s e I I I
99+100 to 121+111 (Gadu – Somnath Section) and also on portion of existing
Junagadh Bypass.
Further, several communications have been exchanged between JSPTL, IE & NHAI
on this context along with relevant cost estimates which were scrutinized by IE for
approval under clause 6.2 of CA. JSTPL has submitted revised estimate or Rs. 13.97
Cr. Vide letter No. JSPTL/2014/320 dated 02nd January 2014 taking in to
consideration that the damages have enhanced during monsoon due to insufficient
maintenance in absence of approval of estimate. The estimate submitted by JSTPL
was reviewed by IE and optimized to Rs. 7.79 Cr. Vide letter No.:
ICT:655:NCS:1571 dt 7th January, 2014. Further, PD, NHAI has recommended for
approval from Authority to cost estimate R. 6.52 Cr. towards Repair &
Rehabilitation work of existing road through letter No. NHAI/PIU/RJK/Jet-
Som/2013/D-962 dt 18th March’2014 and enlightened the same further through letter
No. NHAI/PIU/RJK/Jet-Som/2013/D-1369 dt 29th April’2014
Meanwhile, the existing bypass is currently being maintained by JSTPL by repairing of
pot holes including overlay in severely damaged sections, however these short term
measures cannot withstand the anticipated traffic for additional 2.5 to 3 years due to
delays in starting of proposed Junagadh Bypass considering the uncertainty involved
in possession of land. Existing Bypass needs immediate strengthening in order to
meet the demand of traffic for coming 2.5 to 3 years. Accordingly, JSTPL submitted
the proposal for major maintenance / strengthening of existing Junagadh Bypass
through letter No. JSTPL/2014/365 dated 10.03.14 and requested the Authority to
accord approval, under change of scope, for carrying out major maintenance prior to
monsoon period, so that excessive deterioration during monsoon can be avoided
and the existing bypass can be maintained in traffic worthy condition for the benefit
of road users.
As concessionaire has not received any concurrence / approval from the Authority
till now, again requested for in principle approval for the proposal submitted for
carrying out major maintenance to the existing Junagadh bypass prior to monsoon
period through letter No. JSTPL/2014/403 dt 02.06.14
Page 173 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
ANNEXURE-10
ISSUES AFFECTING
CONSTRUCTION
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 174 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
A. ISSUES REQUIRING URGENT
ACTION FROM NHAI
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO
Pattern under NHDP Phase III
Page 175 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Key issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAI Annexure-10AAnnexure-10AAnnexure-10AAnnexure-10A
Sr. No.Sr. No.Sr. No.Sr. No. IssueIssueIssueIssue Current StatusCurrent StatusCurrent StatusCurrent Status ImpactImpactImpactImpact Action required from NHAIAction required from NHAIAction required from NHAIAction required from NHAI
LandLandLandLand AcquisitionAcquisitionAcquisitionAcquisition –––– JunagadhJunagadhJunagadhJunagadh BypassBypassBypassBypass andandandand itsitsitsits approachesapproachesapproachesapproaches
(Design Ch.17+165 to Ch.41+800)(Design Ch.17+165 to Ch.41+800)(Design Ch.17+165 to Ch.41+800)(Design Ch.17+165 to Ch.41+800)
3D Published in Gazette on 06 Aug 2013 and in local
newspapers on 17 Aug 2013.
3G Hearing commenced on 5 Oct’13 & completed till date
for 6 villages (Out of 10) of Vadal, Sukhpur, Virpur,
Taliyadhar, Nadarkhi & Shapur villages. Further 3G Hearing
for balance 4 villages of Saragvada, Galiyavada, Vadhavi and
Koyali planned on 30.10.13, 27.11.13, 29.11.13 and 22.11.13
respectively was boycotted by villagers except at Saragvada
village where a few villagers attended the hearing.
Further villagers of Junagadh have filed a PIL (283 of 2013) in
High Court against proposed alignment and have also
accused LAO of bypassing certain procedures during the 3D
hearing. Due to this LAO (Junagadh), is hesitant to proceed
further till the Court gives further orders. He has also
sought legal advice and further LA process is held up as on
date.
3G approved for approach portions of Junagadh
Bypass (Existing road sections of Vadal & Shapur
Villages) and Payment disbursement carried out for
Vadal on 21 & 26 Mar14 and for Shapur on 26
Mar14.
During the Hearing on 26 June14, Govt. lawyer
informed to Court that 3G Hearing for 2 villages i.e.
Vadal and Shapur is fixed on 11 July14 and within
acceptable time frame the award will be completed.
The Court also instructed to carryout 3G hearing
for balance villages also. Next hearing is on 11
July14.
Complete works of Junagadh Bypass remains
suspended due to non-availability of the land.
1. Construction work cannot be
commenced in (approx.) 19.8019.8019.8019.80 KmKmKmKm lengthlengthlengthlength
ofofofof bypassbypassbypassbypass along with another 0.100.100.100.10 KmKmKmKm
held up in its approaches on both ends
totaling to 19.90 Km.19.90 Km.19.90 Km.19.90 Km.
2. The resources mobilized for Package-1
and part of Package-2 continue to remain
grossly underutilized.
3. The commencement of works in this
section is delayed by 731 days against the
provisions of clause 10.3.4 of CA.
The process of Land Acquisition (3G to
3H) for the Junagadh Bypass of 19.80
kms needs to be expedited as these
delays would affect CoD and further
delay Project completion schedule.
1
Page 176 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Key issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAI Annexure-10AAnnexure-10AAnnexure-10AAnnexure-10A
Sr. No.Sr. No.Sr. No.Sr. No. IssueIssueIssueIssue Current StatusCurrent StatusCurrent StatusCurrent Status ImpactImpactImpactImpact Action required from NHAIAction required from NHAIAction required from NHAIAction required from NHAI
Non-PossessionNon-PossessionNon-PossessionNon-Possession ofofofof completecompletecompletecomplete landlandlandland inininin no.no.no.no. ofofofof villagesvillagesvillagesvillages duedueduedue totototo
paymentpaymentpaymentpayment disputedisputedisputedispute inininin 3H3H3H3H ProcessProcessProcessProcess andandandand FreshFreshFreshFresh 3G3G3G3G (Part-2(Part-2(Part-2(Part-2
awards) for Patan & Supasi villagesawards) for Patan & Supasi villagesawards) for Patan & Supasi villagesawards) for Patan & Supasi villages
Possession is still pending due to payment dispute in 3H
process. The prominent villages, where possession is
pending are: Supasi, Veraval and Patan
§ SupasiSupasiSupasiSupasi – Out of 2.33 Km LA process completed
for 1.24 Kms only i.e. 53% (Balance 1.09 km – 47%)1.09 km – 47%)1.09 km – 47%)1.09 km – 47%)
§ § § § PatanPatanPatanPatan –––– Out of 4.71 Km LA process completed
for 3.11 Kms only i.e. 66% (balance 1.60 kms- 34 %)
§ § § § VeravalVeravalVeravalVeraval –––– Out of 2.05 Km LA process completed
for 1.97 Kms i.e. 96% (balance 0.08 kms – 4 %)
§ The majority of non-availability of land is at Supasi
& Patan villages where the 3G for Part-2 of LA
process is underway.
1. Construction work cannot be
commenced in (approx.) 2.772.772.772.77 KmKmKmKm lengthlengthlengthlength
and there are 6 gaps in length because of
the same which are causing delays in
works and gross underutilization of
mobilized resources.
2. The commencement of works in this
section is delayed by 731 days against the
provisions of clause 10.3.4 of CA.
To expedite further process of balance
payment disbursement and deliver the
balance land for 3 villages. We request
your intervention for speedy process of
Part-2 3D approvals & further process of
3G & 3H (Payment disbursement) in
these two villages to mitigate further
delays in completion of Project.
2
Page 177 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Key issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAI Annexure-10AAnnexure-10AAnnexure-10AAnnexure-10A
Sr. No.Sr. No.Sr. No.Sr. No. IssueIssueIssueIssue Current StatusCurrent StatusCurrent StatusCurrent Status ImpactImpactImpactImpact Action required from NHAIAction required from NHAIAction required from NHAIAction required from NHAI
LandLandLandLand AcquisitionAcquisitionAcquisitionAcquisition –––– 3333 VillagesVillagesVillagesVillages (Keshod(Keshod(Keshod(Keshod Bypass-Movana,Bypass-Movana,Bypass-Movana,Bypass-Movana,
Keshod and Kevadra villages)Keshod and Kevadra villages)Keshod and Kevadra villages)Keshod and Kevadra villages)
Land acquisition proceedings have been stalled on account
of public resistance to proposed alignment.
A revised alignment prepared by DPR Consultant and
consented by IE has been recommended by PD to NHAI on
29 August 2012. The revised alignment has been approved
by PD, NHAI and the intimated to us on 01 Feb 13.
This revision in alignment has necessitated fresh land
acquisition proceedings.
Part of the main Carriageway has been constructed within
30 m available ROW. However, other works like service
roads, lined drains etc. are pending for completion of land
acquisition for the complete ROW of 60m.
1.001.001.001.00 KmKmKmKm length of highway (approx.) is affected for
carriageway works
11.411.411.411.4 kmkmkmkm length of highway is affected for completion
works including slope protection, drainage works
etc.
Service road of 1.691.691.691.69 kmskmskmskms is affected due to non-
availability of ROW.
Any delay in completion of LA process will severely
jeopardize the exceptional efforts taken by JSTPL
and will delay the works as above within 60M ROW.
1. 1.00 Km length of highway (approx.) is
affected for carriageway works and 11.4
km length of highway is affected.
2. The commencement of works in this
section is delayed by 731 days against the
provisions of clause 10.3.4 of CA.
Re-commencement of LA process as per
revised alignment and delivery of
complete land for Keshod Bypass as per
revised alignment without any further
delay.
3
Page 178 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Key issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAI Annexure-10AAnnexure-10AAnnexure-10AAnnexure-10A
Sr. No.Sr. No.Sr. No.Sr. No. IssueIssueIssueIssue Current StatusCurrent StatusCurrent StatusCurrent Status ImpactImpactImpactImpact Action required from NHAIAction required from NHAIAction required from NHAIAction required from NHAI
LandLandLandLand AcquisitionAcquisitionAcquisitionAcquisition –––– TollTollTollToll PlazaPlazaPlazaPlaza (including(including(including(including TrafficTrafficTrafficTraffic AidAidAidAid PostPostPostPost &&&&
Medical Aid Posts)Medical Aid Posts)Medical Aid Posts)Medical Aid Posts)
As per 'Schedule B' 16,000 sqm of additional land is
required at Toll plaza (Total 32,000 sqm)
As per design carried out based on reference layout given
in IRC 84: Manual for Four laning, 1,08,000 sqm of land is
required. But we have optimized the land to only 10,000
sqm at each Toll Plaza (Total 20,000 sqm for 2 Toll Plazas).
TollTollTollToll plazaplazaplazaplaza (TP)-1:(TP)-1:(TP)-1:(TP)-1: The work was stopped due to heavy
resistance from locals who wanted to shift the location of
Toll plaza by1 km in Govt. land. 3C hearing completed on
23 Dec’2013.
TollTollTollToll plazaplazaplazaplaza (TP)-2:(TP)-2:(TP)-2:(TP)-2: 3C hearing completed on 21 Dec’2013.
3D documents approved by MoRT&H, Gazette publication
done on 7 Mar 14 followed by publication in local
newspapers on 28 Mar14.
TollTollTollToll plazaplazaplazaplaza (TP)-1:(TP)-1:(TP)-1:(TP)-1: 3D documents were pending at
LAO for about 3 months and now forwarded to
NHAI HQ from NHAI RO office for approval and
further process of Gazette publication.
TollTollTollToll plazaplazaplazaplaza (TP)-2:(TP)-2:(TP)-2:(TP)-2: 3D documents approved by
MoRT&H, Gazette publication done on 7 Mar 14
followed by publication in local newspapers on 28
Mar14.
Further process of Land Acquisition (3D/3G to 3H)
for the Toll Plazas land needs to be expedited as this
activity is on Critical path and further delay would
affect CoD and Project completion schedule.
1. Construction works cannot be
commenced for Toll Plaza-1(51+250) and
Toll Plaza-2(108+900) in absence of land
for the facilities of Toll Plaza.
2. The commencement of works in this
section is delayed by 731 days against the
provisions of clause 10.3.4 of CA.
To deliver the land for TP-I (51+250)
and TP-2(108+900) without any further
delay.
Utility Shifting – PGVCL:Utility Shifting – PGVCL:Utility Shifting – PGVCL:Utility Shifting – PGVCL:
Delay in shifting of utilities (underground crossings) which
has severely affected the commencement of works due to
non-availability of RoW in the stretches of Land affected by
such utilities.
The shifting of electrical lines (in crossing locations) was
started only in the month of Dec13.
The shifting of electrical lines was started in Dec13
and is completed in a length of 4 km (approx.) since
31 Jan14 and the RoW for this land is now available
for working.
However, process of shifting the balance 245
crossings shall take duration of 3 months but works
held up due to payment issues with NHAI.
RoW for 2.56 km (approx.) of land is still
not available due to presence of electrical
utilities
Apart from the above, the works
especially in raised carriageway are
affected due to pending crossings of
underground utilities.
Shifting works for both electrical lines
and underground crossings for HT lines
need to be expedited to give possession
of RoW for land affected by the above
utilities.
4
5
Page 179 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Key issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAIKey issues requiring urgent action from NHAI Annexure-10AAnnexure-10AAnnexure-10AAnnexure-10A
Sr. No.Sr. No.Sr. No.Sr. No. IssueIssueIssueIssue Current StatusCurrent StatusCurrent StatusCurrent Status ImpactImpactImpactImpact Action required from NHAIAction required from NHAIAction required from NHAIAction required from NHAI
Impediments in construction of ROB-1 at Km 2+800:Impediments in construction of ROB-1 at Km 2+800:Impediments in construction of ROB-1 at Km 2+800:Impediments in construction of ROB-1 at Km 2+800:
A1 side RE wall works has been hampered due to non-
availability of the land in the approach land from Km 2+200
to Km 2+350. This has been cleared only in the month of
March 2014.
Further, locals has stopped the work of ROB demanding for
2 no’s PUP on both sides along with the service road. This
issue has been brought to the notice of PIU NHAI and a
joint site inspection has been conducted at site but locals
have persisted their demand for construction of 2 no’s PUP.
Detailed proposal for construction of 2 no’s PUP
under “Article-16 - Change of Scope ” has been
submitted by JSTPL.
IE reviewed the recommended the same to NHAI.
PIU has recommended the case to CGM-NHAI
In Principle accorded by NHAI HQ on 16 June 14.
RE wall & embankment works were
hampered near the Abutments A1 & A2
since last 5 months due to non approval of
'In-Principle approval' and now the
construction works are being taken up.
6
Page 180 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
B.LAND ACQUISITION STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 181 of 246
Jetpur Somnath Toll ways Pvt. Ltd [JSTPL]
Details of land-availability for main carriageway work - Status as on 30 June 2014 Annexure-10B
From To Length Electrical Utilities (in
possessed land)
Water Pipe line utilities (in possessed
land)
Other Constraints
1 Navagadh -0.754 1.400 2.154 2.154 0.085 2.0691. Payment Disbursed - 12/14 = 86%. (One Time)
2. 85 mtrs stretch affected due to non-shifting of electric lines utility
2 Pedhla 1.400 2.314 0.914 0.914 0.050 0.8641. Payment Disbursed - 13/18 = 72%. (One Time)
2. 50 mtrs stretch affected due to non-shifting of electric lines utility
3 Jetalsar 2.314 7.340 5.026 5.026 5.0261. Payment Disbursed - 71/73 = 97%. (3 times)
2. 200 mtrs stretch affected due to non-shifting of electric lines utility
4 Navi Sakli 7.340 10.150 2.810 2.810 2.810 1. Payment Disbursed - 31/46 = 67% (5 times)
5 Juni Sakli 10.150 11.160 1.010 1.010 1.010 1. Payment Disbursed - 12/13 = 92% (5 times)
6 Choki 11.160 15.740 4.580 4.580 0.070 4.5101. Payment Disbursed - 49/53 = 92% (5 times)
2. 100 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipeline needs to be shifted
7 Kathrota 15.740 15.900 0.160 0.160 0.160 1. Payment Disbursed - 9/11 = 82% (2 times)
8 Bhiyal 15.900 17.165 1.265 1.265 1.265 1. Payment Disbursed - 12/13 = 92% (5 times)
9 Vadal (Ex.Road) 17.165 20.850 3.685 3.685 0.300 0.400 2.985 1. Payment Disbursed - 92/99 = 93% (5 times)
10 Sukhpur 0.000
11 Saragvada 0.000
12 Virpur 0.000
13 Galiyavada 0.000
14 Vadhavi 0.000
15 Taliyadhar 0.000
16 Nadarkhi 0.000
17 Koyali 0.000
18 Shapur (Ex.Road) 40.650 41.800 1.150 1.150 1.150 1. Payment Disbursed - 15/18 = 83% (2 times)
19 Vanthali 41.800 47.590 5.790 5.790 0.080 5.710
1. Payment disbursed, 94/103 = 91%. (5 times)
2. 80 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipeline to be shifted;
4. Railway boundary issue affecting 80 mtrs of stretch
20 Kanza 47.590 49.950 2.360 2.360 2.360 1. Payment disbursed, 15/16 = 94%. (5 times)
21 Khokharda 49.950 50.625 0.675 0.675 0.675 1. Payment disbursed, 2/2 = 100% (One Time)
22 Gadoi 50.625 53.430 2.805 2.805 2.8051. Payment disbursed, 32/36 = 89% (5 times)
2. Toll Plaza land acquisition pending (100 m RoW)
23 Tinmash 53.430 53.670 0.240 0.240 0.240 1. Payment disbursed, 3/4 = 75% (4 times)
24 Manekvada 53.670 58.080 4.410 4.410 4.410 1. Payment disbursed, 42/44 = 95% (5 times)
25 Agatrai 58.080 62.620 4.540 4.540 4.540 1. Payment disbursed, 80/86 = 93%. (6 times)
26 Movana 0.980 0.980
S.No.
Village
Design Chainage Length where payment process
under section 3H is under progress
Non-availability of RoW due to various factors Length of Land Possession (Clear front available for
Construction)
Status as on 30 June' 2014
0.000
* Ministry has signed the 3A notification on 24 August 2012
* Re-publication of 3A in local newspaper achieved on 24 February 2013
* JMS completed for all 10 villages of Junagadh Bypass from 25-29th June
2013 with the help of District administration and police force.
* 3D published in local news papers on 17 Aug 2013
* Payment disbursement started at approaches of Junagadh Bypass (Vadal
& Shapur villages).
* Further process of 3G to 3H needs to be completed and land to be
delivered with desired urgency.
1. Possession of Existing ROW is in progress.
20.850 40.650 19.800
Page 182 of 246
Jetpur Somnath Toll ways Pvt. Ltd [JSTPL]
Details of land-availability for main carriageway work - Status as on 30 June 2014 Annexure-10B
From To Length Electrical Utilities (in
possessed land)
Water Pipe line utilities (in possessed
land)
Other Constraints
S.No.
Village
Design Chainage Length where payment process
under section 3H is under progress
Non-availability of RoW due to various factors Length of Land Possession (Clear front available for
Construction)
Status as on 30 June' 2014
27 Keshod 10.120 10.120
28 Kevadra
29 Sondarda 75.000 76.225 1.225 1.225 1.225 1. Payment disbursed, 41/42 = 98% (3 times)
30 Koylana 76.225 79.740 3.515 3.515 3.515 1. Payment disbursed, 71/72 = 99% (7 times)
31 Revadra 79.740 80.100 0.360 0.360 0.360 1. Payment disbursed, 3/3 = 100% (1 Time)
32 Panidhra 80.100 82.275 2.175 2.175 2.175 1. Payment disbursed, 19/20 = 95% (5 times)
33 Juthal 82.275 84.730 2.455 2.455 2.455 1. Payment disbursed, 21/22 = 95% (3 times)
34 Galodar 84.730 88.885 4.155 4.155 4.155 1. Payment disbursed, 38/38 = 100% (4 times)
35 Bhanduri 88.885 93.840 4.955 4.955 0.300 0.100 4.5551. Payment disbursed, 68/68 = 100% (4 times)
2. 300 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipe line needs to be shifted
36 Jadka 93.840 95.180 1.340 1.340 0.050 1.2901. Payment disbursed, 13/14 = 93% (4 times)
2. 50 mtrs stretch affected due to electric lines utility
37 Gadu 95.180 99.100 3.920 3.920 0.220 3.7001. Payment disbursed, 26/26 = 100% (5 times)
2. 220 mtrs stretch affected due to non-shifting of electric lines utility
38 Vishanvel 99.100 99.580 0.480 0.480 0.050 0.4301. Payment disbursed, 3/4 = 75% (3 times)
2. 50 mtrs stretch affected due to non-shifting of electric lines utility
39 Sukhpur 99.580 101.160 1.580 1.580 0.100 0.080 1.4001. Payment disbursed, 24/24 = 100% (5 times)
2. 100 mtrs stretch affected due to electric lines utility
40Shantipura /
Mohabatpura101.160 102.190 1.030 1.030 1.030 1. Payment disbursed, 13/15 = 87%. (5 times)
41 Simar 102.190 103.080 0.890 0.890 0.890 1. Payment disbursed, 13/13 = 100% (3 times)
42 Kindarva 103.080 104.580 1.500 1.500 1.500 1. Payment disbursed, 16/18 = 89% (4 times)
43 Sidokar 104.580 104.860 0.280 0.280 0.280 1. Payment disbursed, 2/2 = 100% (3 times)
44 Supasi 104.860 107.190 2.330 1.240 0.200 1.040
1. Payment disbursed, 14/17 = 82% (4 times)
2. Part-2 awards case
3. 200 mtrs stretch affected due to non-shifting of electric lines utility in
available land
45 Chanduvav 107.190 108.900 1.710 1.710 1.710 1. Payment disbursed, 22/22 = 100% (3 times)
46 Dari 108.900 110.500 1.600 1.600 0.100 0.120 1.3801. Payment disbursed, 51/65 = 78% (4 times)
2. 100 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipe lines shifting under progress
47 Chhatroda 110.500 111.100 0.600 0.600 0.130 0.4701. Payment disbursed, 5/6 = 83% (3 times)
2. 100 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipe lines shifting under progress
62.620 75.000 12.380
2. Revised alignment has been approved in the Executive Committee
meeting, NHAI held on 2 January 2013 & further process of Land
Acquisition as per approved revised alignment has to be initiated by
NHAI.
Page 183 of 246
Jetpur Somnath Toll ways Pvt. Ltd [JSTPL]
Details of land-availability for main carriageway work - Status as on 30 June 2014 Annexure-10B
From To Length Electrical Utilities (in
possessed land)
Water Pipe line utilities (in possessed
land)
Other Constraints
S.No.
Village
Design Chainage Length where payment process
under section 3H is under progress
Non-availability of RoW due to various factors Length of Land Possession (Clear front available for
Construction)
Status as on 30 June' 2014
48 Veraval 111.100 113.150 2.050 1.970 0.120 1.850
1. Payment disbursed, 20/29 = 69% (4 times)
2. Partial Land possession due to missing land parcels (Missing 3D),
Corrigendum and Remeasurement of survey numbers in about 67 villages.
3. Water pipe lines shifting under progress
49 Dabhor 113.150 114.420 1.270 1.270 1.2701. Payment disbursed, 8/9 = 89% (5 times)
2. 75 mtrs stretch affected due to non-shifting of electric lines utility
3. Water pipe lines shifting under progress
50 Tantivela 114.420 116.200 1.780 1.780 1.780 1. Payment Disbursed - 75/81 = 93% (5 times)
51 Bhalpara 116.200 117.990 1.790 1.790 1.790 1. Payment disbursed, 19/21 = 90% (5 times)
52 Patan 117.990 122.700 4.710 3.110 1.100 2.010
1. Payment disbursed, 37/56 = 66% (4 times)
2. Part-2 case of LA
3. 1200 mtrs stretch affected due to non-shifting of electric and also
water pipe line utilities
4. Approx. 900 mtrs is under Somnath Trust.
123.45 99.60 2.56 1.02 0.08 95.95
80.68% 2.07% 0.83% 0.06% 77.72%
Land in (Km)
Land in (%)
Page 184 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
C. SHIFTING OF UTILITIES TREES,GETCO
& PGVCL AND ITS
STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 185 of 246
Jetpur Somnath Toll ways Pvt. Ltd [JSTPL]
Status of Tree Cutting & Utility Shifting - PGVCL Annexure-10C
Sl. Description UnitTotal
(Affected) length
Cleared length
Balance%age
completionRemarks/Status as on 30 June '2014
1 Tree Cutting
a Protected Forest - Notified Km. 63.9 63.9 0 100% Tree cutting in protected Forest completed
b Protected Forest - Non-notified Km. 20.6 20.6 0 100% Tree cutting in protected Forest completed
c Non Protected Forest Km. 40.3 20.5 19.8 51% Balance at Junagadh bypass section
2 Utility Shifting
a HT line shifting - GETCO Nos. 18 14 4 78% Balance at Junagadh bypass section
bElectric line shifting (parallel electric
lines to the main carriage way)Km. 246.9 185.4 61.5 75%
Shifting of electric lines/poles parallel to highway
alignment is under progress.
cElectric line shifting (Under ground
crossing / overhead line crossing)
Locations
(Nos)288 49 239 17%
Balance locations the Shifting works are under
progress (at 26 locations Boring completed)
(35 Locations are at Junagadh Bypass section)
Shifting work is affected due to delay in payment of
RA Bills by NHAI.
Page 186 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
D. SHIFTING OF GWSSB
WATERPIPE LINE & ITS
STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 187 of 246
Jetpur Somnath Toll ways Pvt. Ltd [JSTPL]
Status of Utility Shifting - Water Pipe Line Annexure-10D
From To Length
250mm Dia PVC pipe (Jetpur Emergency pipe line network)
5.990 6.340 0.350 0.35
140mm Dia PVC pipe (Jetpur Emergency pipe line network)
5.645 6.510 0.865 0.87
90mm & 110mm Dia PVC pipe 5.610 6.250 0.640 0.64
2 Near Village Choki 140mm dia PVC pipe 10 Kg./Cm2 line 13.625 13.825 0.200 0.20
3 Near Village Vadal Shifting of 110mm dia PVC 10 Kg/Cm2 19.200 19.900 0.700 0.23
4 Near JMC Chungi Naka at ch 24.350 Crossing of 273mm dia MS Line 24.350 0.050 -
5 Near Village Virpur at Ch. 24.800 Crossing of 90mm dia PVC line 24.800 0.050 -
6 Near Village Vadhavi at Ch. 32.800 Crossing of 140mm dia PVC pipe line 32.800 0.050 -
7 After Village Nandarkhi at Ch. 35.450 Crossing of 250mm dia PVC Line 35.450 0.050 -
8On JND-VTL Highway Opp. To Vill Shapur at Ch. 40.800
Crossing of 711mm dia MS Line 40.800 0.050 -
9 From Vanthali Village to Ozat RiverShifting of 315mm Dia HDEP, 6Kg/Cm2 line (Run parallel and crossing at Ch. 44+850)
44.850 46.280 1.430 1.43 Completed
10Near Khokharda Fatak towards Gadoi-Tinmash- Sondarda under Ozat-II Regional W.S.S
Shifting of 140mm Dia PVC, 6Kg/Cm2 line (Run parallel 100 meter and crossing)
Shifting of 140mm Dia PVC, 6Kg/Cm2 line Run parallel 200 meter
56.200 58.200 2.000 2.00 Completed
Crossing of 610mm dia MS Line 65.050 65.100 0.050 0.05 NHAI yet to deposit supervision charges to GWSSB.
Crossing of 110mm dia PVC, 6Kg/Cm2 line 77.550 77.600 0.050 0.05 NHAI yet to deposit supervision charges to GWSSB.
Shifting of 500mm dia D.I pipe line(run parallel 6180 meter)
Shifting of 450mm dia D.I pipe line(run parallel 7420 meter & crossing)
13 From Sukhpur to Bhalpara Section of NH-8D Water line of 110mm dia PVC, 6Kg/Cm2 line 105.000 116.500 11.500 9.50 Further work not taken up due to non availability of land (Supasi Village).
14 From Sukhpur to Bhalpara Section of NH-8D Crossing of 110mm dia PVC, 6Kg/Cm2 line 105.000 116.500 0.400 Estimate are under approval by NHAI
15 From Talala Chokdi to BhalparaShifting of 140mm Dia PVC, 6Kg/Cm2 line Run parallel 565 meter and crossing.
116.200 116.765 0.565 0.565 Shifting Completed
Total Affected Length (in Km) 19.400 15.880 81.86%
Status as on 30 June '2014S
NoLocation
Chainage (present scope as per present status) Length
AvailableDescription
Near Village Jetalsar1
Near village: Sondarda, Manekvad, and village: Revandra, Ta: Keshod Junagadh Bypass (Realignment) of NH-8D
11
Payment deposited by NHAI. Tender awarded by GWSSB Department. Work shall be taken up.
-
Revised estimate under approval by NHAI.
NHAI is yet to deposit supervision charges with GWSSB.
From Galodhar to Gadu Section of NH-8D(Mangrol Emergency line - Between Ch. 86 to 96)
12 86.000 96.300 0.400
Page 188 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
E. OBSTRUCTION STATUS
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 189 of 246
LHS RHS LHS RHS
1 Encroachments 0 1000 1000 2 5 2 5
2 Encroachments 1000 2000 1000 - 4 - 4
3 Encroachments 2000 3000 1000 4 6 4 6
4 Encroachments 3000 4000 1000 6 4 6 4
5 Encroachments 4000 5000 1000 18 17 18 17
6 Encroachments 5000 6000 1000 39 56 39 30
7 Encroachments 6000 7000 1000 14 41 14 26
8 Encroachments 7000 8000 1000 8 9 8 9
9 Encroachments 8000 9000 1000 12 5 12 5
10 Encroachments 9000 10000 1000 6 3 6 3
11 Encroachments 10000 11000 1000 4 8 4 8
12 Encroachments 11000 12000 1000 17 6 17 6
13 Encroachments 12000 13000 1000 8 8 8 8
14 Encroachments 13000 14000 1000 25 17 20 17
15 Encroachments 14000 15000 1000 3 9 3 9
16 Encroachments 15000 16000 1000 - 7 - 7
17 Encroachments 16000 17000 1000 2 9 2 9
18 Encroachments 17000 18000 1000 5 16 1 9
19 Encroachments 18000 19000 1000 3 8 3 8
20 Encroachments 19000 20000 1000 21 32 5 28
21 Encroachments 20000 20900 900 7 11
22 Encroachments 40900 41000 100 - - - -
23 Encroachments 41000 42000 1000 9 2 9
24 Encroachments 42000 43000 1000 17 42 17 42
25 Encroachments 43000 44000 1000 11 3 11 3
26 Encroachments 44000 45000 1000 4 4 4 4
27 Encroachments 45000 46000 1000 4 6 4 6
28 Encroachments 46000 47000 1000 4 6 4 6
29 Encroachments 47000 48000 1000 2 3 2 3
30 Encroachments 48000 49000 1000 6 16 6 16
31 Encroachments 49000 50000 1000 1 1 1 1
32 Encroachments 50000 51000 1000 6 2 6 2
33 Encroachments 51000 52000 1000 - 6 - 6
34 Encroachments 52000 53000 1000 - 1 - 1
35 Encroachments 53000 54000 1000 - 1 - 1
36 Encroachments 54000 55000 1000 5 2 5 2
37 Encroachments 55000 56000 1000 10 5 4
38 Encroachments 56000 57000 1000 9 1 9 1
39 Encroachments 57000 58000 1000 2 4 2 4
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
Page 190 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
40 Encroachments 58000 59000 1000 - 1 - 1
41 Encroachments 59000 60000 1000 - 1 - 1
42 Encroachments 60000 61000 1000 3 2 3 2
43 Encroachments 61000 62000 1000 2 10 2 10
44 Encroachments 62000 63000 1000 2 9 2 9
45 Encroachments 63000 63900 900 2 12 1
46 Encroachments 75900 76900 1000 2 1 2 1
47 Encroachments 76900 77900 1000 4 5 4 5
48 Encroachments 77900 78900 1000 1 1 1 1
49 Encroachments 78900 79900 1000 1 7 1 7
50 Encroachments 79900 80900 1000 - 2 - 2
51 Encroachments 80900 81900 1000 1 3 1 3
52 Encroachments 81900 82900 1000 - 6 - 6
53 Encroachments 82900 83900 1000 3 3 3 3
54 Encroachments 83900 84900 1000 2 2 2 2
55 Encroachments 84900 85900 1000 6 6 6 6
56 Encroachments 85900 86900 1000 - 5 - 5
57 Encroachments 86900 87900 1000 3 8 3 8
58 Encroachments 87900 88900 1000 4 5 4 5
59 Encroachments 88900 89900 1000 - 6 - 6
60 Encroachments 89900 90900 1000 2 3 2 3
61 Encroachments 90900 91900 1000 3 1 3 1
62 Encroachments 91900 92900 1000 12 11 12 11
63 Encroachments 92900 93900 1000 4 - 4 -
64 Encroachments 93000 94000 1000 3 7 3 7
65 Encroachments 93900 94900 1000 1 1
66 Encroachments 94000 95000 1000 3 7 3 7
67 Encroachments 95000 96000 1000 7 16 7 16
68 Encroachments 96000 97000 1000 1 17 1 17
69 Encroachments 97000 98000 1000 20 20 18 18
70 Encroachments 98000 99000 1000 8 18 8 18
71 Encroachments 99000 100000 1000 4 12 4 12
72 Encroachments 100000 101000 1000 10 10 10 10
73 Encroachments 101000 102000 1000 16 24 16 24
74 Encroachments 102000 103000 1000 5 23 5 23
75 Encroachments 103000 104000 1000 7 21 7 21
76 Encroachments 104000 105000 1000 8 7 8 7
77 Encroachments 105000 106000 1000 18 15 9
78 Encroachments 106000 107000 1000 12 12
Page 191 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
79 Encroachments 107000 108000 1000 1 9
80 Encroachments 108000 109000 1000 10 3 10 3
81 Encroachments 109000 110000 1000 3 5 3 5
82 Encroachments 110000 111000 1000 16 17 16 17
83 Encroachments 111000 112000 1000 13 11 13 11
84 Encroachments 112000 113000 1000 2 4 2 4
85 Encroachments 113000 114000 1000 8 12 8 12
86 Encroachments 114000 115000 1000 12 7 12 7
87 Encroachments 115000 116000 1000 9 12 6
88 Encroachments 116000 117000 1000 4 13 2
89 Encroachments 117000 118000 1000 6 12 6
90 Encroachments 118000 119000 1000 7 10 3 2
91 Encroachments 119000 120000 1000 6 14 2 4
92 Encroachments 120000 121000 1000 8 8
93 Encroachments 121000 122000 1000 19 16
94 Encroachments 122000 123000 1000 17 18
95 Encroachments 123000 123454 454 10 13
Total 625 890 477 676
Page 192 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
1 Trees 0 1000 1000 7 3 7 3
2 Trees 1000 2000 1000 4 2 4 2
3 Trees 2000 3000 1000 24 29 24 29
4 Trees 3000 4000 1000 14 10 14 10
5 Trees 4000 5000 1000 53 28 53 28
6 Trees 5000 6000 1000 61 86 61 86
7 Trees 6000 7000 1000 65 20 65 20
8 Trees 7000 8000 1000 57 18 57 18
9 Trees 8000 9000 1000 52 88 52 88
10 Trees 9000 10000 1000 83 85 83 85
11 Trees 10000 11000 1000 93 119 93 119
12 Trees 11000 12000 1000 119 76 119 76
13 Trees 12000 13000 1000 97 81 97 81
14 Trees 13000 14000 1000 165 128 165 128
15 Trees 14000 15000 1000 128 106 128 106
16 Trees 15000 16000 1000 170 209 170 209
17 Trees 16000 17000 1000 199 225 199 225
18 Trees 17000 18000 1000 125 199 125 199
19 Trees 18000 19000 1000 255 298 255 298
20 Trees 19000 20000 1000 45 65 45 65
21 Trees 20000 20900 900 209 137 209 137
22 Trees 40900 41000 100 4 6 4 6
23 Trees 41000 42000 1000 46 55 46 55
24 Trees 42000 43000 1000 76 83 76 83
25 Trees 43000 44000 1000 50 15 50 15 Vanthli Realignment
26 Trees 44000 45000 1000 125 21 125 21
27 Trees 45000 46000 1000 65 85 65 85
28 Trees 46000 47000 1000 138 173 138 173
29 Trees 47000 48000 1000 - 34 - 34
30 Trees 48000 49000 1000 45 40 45 40
31 Trees 49000 50000 1000 150 141 150 141
32 Trees 50000 51000 1000 286 218 286 218
33 Trees 51000 52000 1000 106 99 106 99
34 Trees 52000 53000 1000 50 127 50 127
35 Trees 53000 54000 1000 93 124 93 124
36 Trees 54000 55000 1000 110 98 110 98
37 Trees 55000 56000 1000 35 41 35 41
38 Trees 56000 57000 1000 124 70 124 70
Page 193 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
39 Trees 57000 58000 1000 32 118 32 118
40 Trees 58000 59000 1000 26 43 26 43
41 Trees 59000 60000 1000 16 13 16 13
42 Trees 60000 61000 1000 76 147 76 147
43 Trees 61000 62000 1000 99 126 99 126
44 Trees 62000 63000 1000 59 52 59 52
45 Trees 63000 63900 900 97 111 97 111
46 Trees 75900 76900 1000 47 61 47 61
47 Trees 76900 77900 1000 65 82 65 82
48 Trees 77900 78900 1000 46 67 46 67
49 Trees 78900 79900 1000 78 56 78 56
50 Trees 79900 80900 1000 51 73 51 73
51 Trees 80900 81900 1000 74 173 74 173
52 Trees 81900 82900 1000 133 151 133 151
53 Trees 82900 83900 1000 42 38 42 38
54 Trees 83900 84900 1000 8 34 8 34
55 Trees 84900 85900 1000 61 114 61 114
56 Trees 85900 86900 1000 13 96 13 96
57 Trees 86900 87900 1000 10 37 10 37
58 Trees 87900 88900 1000 54 40 54 40
59 Trees 88900 89900 1000 80 16 80 16
60 Trees 89900 90900 1000 116 84 116 84
61 Trees 90900 91900 1000 111 59 111 59
62 Trees 91900 92900 1000 67 72 67 72
63 Trees 92900 93900 1000 86 10 86 10
64 Trees 93000 94000 1000 15 25 15 25
65 Trees 93900 94900 1000 58 9 58 9
66 Trees 94000 95000 1000 18 20 18 20
67 Trees 95000 96000 1000 3 5 3 5
68 Trees 96000 97000 1000 - 10 - 10
69 Trees 97000 98000 1000 24 42 24 42
70 Trees 98000 99000 1000 29 40 29 40
71 Trees 99000 100000 1000 45 41 45 41
72 Trees 100000 101000 1000 116 148 116 148
73 Trees 101000 102000 1000 60 18 60 18
74 Trees 102000 103000 1000 50 69 50 69
75 Trees 103000 104000 1000 93 69 93 69
76 Trees 104000 105000 1000 92 100 92 100
77 Trees 105000 106000 1000 34 83 34 83
Page 194 of 246
LHS RHS LHS RHS
Description RemarksS.
No
OBSRTUCTIONS LIST
Jetpur–Somnath Project (NH – 8D)
4 - Laning of Jetpur-Somanth Section(Km 0.000 to 127.600) of NH 8D in the State of Gujarat to be executed as
BOT(TOLL) Project on DBFO pattern under NHDP Phase III
Nos of Obstruction
Removed
Nos of Obstruction
TotalFrom To Length
78 Trees 106000 107000 1000 29 155 29 155
79 Trees 107000 108000 1000 36 180 36 180
80 Trees 108000 109000 1000 35 119 35 119
81 Trees 109000 110000 1000 50 32 50 32
82 Trees 110000 111000 1000 106 72 106 72
83 Trees 111000 112000 1000 19 197 19 197
84 Trees 112000 113000 1000 69 81 69 81
85 Trees 113000 114000 1000 32 57 32 57
86 Trees 114000 115000 1000 390 529 390 529
87 Trees 115000 116000 1000 335 294 335 294
88 Trees 116000 117000 1000 272 214 272 214
89 Trees 117000 118000 1000 53 134 53 134
90 Trees 118000 119000 1000 46 91 46 91
91 Trees 119000 120000 1000 3 9 3 9
92 Trees 120000 121000 1000 9 32 9 32
93 Trees 121000 122000 1000 15 2 15 2
94 Trees 122000 123000 1000 67 31 67 31
95 Trees 123000 123454 454 46 9 46 9
Total 7,324 8,232 7,324 8,232
Page 195 of 246
MONTHLY PROGRESS REPORT – JUNE ’2014 Jetpur - Somnath Section of NH-8D
F. DETAILS OF HINDRANCES
AFFECEING THE WORK
4 Laning of Jetpur - Somnath Section (Km.0.000 to 127.600) of NH-8D in the State of Gujarat on DBFO Pattern under NHDP Phase III
Page 196 of 246
Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]Jetpur Somnath Tollways Pvt. Ltd [JSTPL]
Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014Details of hindrances / obstacles affecting four laning - Status as on 30 June 2014 Annexure-10FAnnexure-10FAnnexure-10FAnnexure-10F
FromFromFromFrom ToToToToLength in Length in Length in Length in
MtrsMtrsMtrsMtrsLHSLHSLHSLHS RHSRHSRHSRHS
BOTH BOTH BOTH BOTH
SIDESIDESIDESIDE
46200 46550 350 350 350.0Existing Major Bridge (Ozat river) @ 46+375 proposed for
re-construction (CoS)- In principle approval pending
Gap in 4 lane traffic and structure work along with
approaches of Highway on LHS Side
48450 48520 70 70 70.0 Service Road end & tapering portion at Kanza village Service road, tapering portion to MCW & lined drain
50900 51500 600 600 1,200.0 100m RoW land for Toll Plaza (1)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all
Toll Plaza allied works, Bus Shelter after Toll Plaza
56700 57100 400 400 400.0 CoS - Re-construction of MJB @ 56+769 delayed approvalsMajor Bridge construction, Highway works & protection
works
63600 75000 11400 11,400 22,800.060m RoW not available (work carried out in available RoW
of 30 m @ Keshod Bypass with restricted EMB slope)
Service Road works (2.60 Km), Shoulder slopes, unlined
drain, Lined drain at Service Road, Major and Minor
Junction, Bus shelter, Embankment protection, Turfing
91300 91500 200 200 Underground electric line crossing issues at Service Road
Tapering portion (Somnath side)Service Road construction at MCW merging point
96700 96800 100 100 100.0 Land issues at Service Road Tapering portion Service Road construction at MCW merging point
110980 111110 130 130 Payment for property is pending (Universal Construction
Office)All highway works.
111840 111920 80 80 160.0 Matter for acquisition of land is in High Court (PIL 13477)All Highway works and also the connectivity in the
Veraval realignment (1.1 Km length).
108680 109280 600 600 1,200.0 100m RoW land for Toll Plaza (2)Toll Plaza DLC, PQC, Admin Buildings, Toll Booth, all
Toll Plaza allied works, Bus Shelter after Toll Plaza
26.326.326.326.3
13.113.113.113.1
Affected WorksAffected WorksAffected WorksAffected Works
Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected Cumulative Two-lane length affected
(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):(in 2L-Kms):
Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected Cumulative Four-lane length affected
(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):(in 4L-Kms):
ChainageChainageChainageChainage Hindrances inHindrances inHindrances inHindrances in
2 Lane Affected 2 Lane Affected 2 Lane Affected 2 Lane Affected
length in Mtrslength in Mtrslength in Mtrslength in MtrsDetail of HindrancesDetail of HindrancesDetail of HindrancesDetail of Hindrances
Page 197 of 246