Annexure No. 2
ENERGY CONSERVATION MEASURES
The following energy conservat ion measures would be adopted in the
proposed hotel project.
� Solar water heating system for the hot water requirement.
� Use of LED l ights in place of convention light ing system.
� Water cooled chil lers in place of air cooled chil lers which are energy
intensive & the treated water available from STP would be used as make-
up water attached to the water cooled chil lers.
1. Solar water heating system for hotel project
� Hot water requirement = 2,500 ltrs.
� No. of solar panels = 25 nos.
� Electricity saving = 25 x 1,500 units / annum
= 13687.5 MWh/annum
2. LED lights in place of convention lighting system.
Particulars Qty. Energy Requirement as per Conventional l ight ing (100 watt)
Energy Requirement as per LED l ighting
(5 watt)
Total Energy Savings
Lighting
Points 1224 536112 MWh / annum
25776.3 MWh /
annum
510335.7
MWh /
annum
3. Solar Energy operated Photovoltaic lighting for partial external areas lighting.
Particulars Qty. Energy Requirement as per Conventional Systems (10 nos.)
Energy Requirement after Solar Lighting
(10 nos.)
Total Energy Savings
Total no. of
l ight ing
points
10
8760 MWh/ annum
(@ 200 Watts, 12 hrs.
operation)
NIL
8760
MWh/annum
2
4. Water cooled chillers in place of air cooled chillers which are
energy intensive & the treated water available from STP would be
used as make-up water attached to the water cooled chillers.
Energy consumption with air cooled chil lers
Energy consumption with high eff iciency water cooled
centrifugal chi l lers with VFD
Saving in Units
7199 MWh / annum 4500 MWh/annum 2699
MWh/annum
5. Further, the following additional measures will reduce heat gain to
the building, thereby there is reduction in electricity consumption.
� Use of double / trip le glass to reduce heat gain to the building.
� Use of terrace garden to reduce heat gain to the building.
Total energy saving is expected to be of about 31.33%
Annexure No. 3
PARKING DETAILS The parking detai ls proposed for the hotel project are given below :-
PARKING REQUIREMENT Vs PARKING PROVIDED
Details Parking required as per Kerala Municipality Building Rules (KMBR)
Parking required as per MoEF
guidelines*
Parking Provided
Restaurant (50 seats)
5 3 5
Mult i cuisine Restaurant (40 seats)
4 2 4
Dining area (70 seats)
7 4 7
Hotel rooms (42 nos.)
18 11 35
Parking required for Disabled person
1 2 1
TOTAL 35 Cars 22 Cars 52 Cars
*Based on the population of the nearest town as per the Census 2011 viz. Alapuzha town is having population of 2,40,991 ( i.e. between 2 Lakhs to 10 Lakhs ). Therefore, the parking provision is made taken into the consideration of population between 2 Lakhs to 10 Lakhs as per the guidel ines of MoEF. PARKING PROVIDED IN THE PROPOSED HOTEL :-
Lower Ground level 5 Cars
Parking at Upper Ground level 20 Cars (Open level)
Parking at Upper Ground level
(Multi Level Car Parking)
27 Cars (9 nos. x 3 level)
TOTAL 52 Cars
ADDITIONAL PARKING AREA PROVIDED :- Addit ional bus parking - 1 bus Two wheeler parking proposed - 35 nos.
**********************