anpara d.t.p.s. schematics

Upload: ganesh-prasad-pandey

Post on 01-Nov-2015

60 views

Category:

Documents


32 download

DESCRIPTION

U.P.R.V.U.NL. owned, newly setup Unit No. 6 (500 MW) of Anpara Thermal Power Plant is erected and commissioned by B.H.E.L.

TRANSCRIPT

  • Project: 2X500 MW Anpara Thermal Power Station ( Stage-D) Reply to Customers comments on Plant Schematics Rev 04 vide letter ref AnparaD:1084:10095 dated 02.02.11 Ref Drg. No. PE-DG-298-145-I501 Rev04

    1. Comment on sheet 62: a)Suction header pressure has been indicated in the revised document b) Suction valves are already indicated in the drg. Status of these valves shall be displayed by changing color . Note has been added in the revised document. c) There is no flow measurement at CT pump common discharge header for remote indication as per approved PID. Hence the same is not indicated in the drg.

    2. Comment on sheet 71: a) Tag no of all the valves are indicated in the revised document. b) All manual valves are indicated in the revised document .

  • 3218Text BoxKKS code is not written as commented earlier

    3218Oval

    3218Line

  • 3218Text Boxflow also to be included

    3218Line

    3218Line

  • 12345678910111213141516171819202122232425262728293031323334353637383940414243444546474849505152535455565758596061626364656667686970717273

    2011-02-21T13:30:59+0530NTPCEOCCharanjeet SinghCAT I