“MARINE VIRTUAL PIPE LINE FOR
SMALL SCALE LNG LOGISTIC”
Optimum Solution for Gas Power Plant in Indonesian Central Region
By : Gembong Primadjaja
• PT. Pelindo Energi Logistik (PT. PEL) is an affiliation of PT. Pelindo III, which engaged in provision of energy , electricity and logistic.
• PT.PEL have been collaborated with PT. Indonesia Power in LNG Receiving Terminal Project, for supplying gas to the Dual Fuel Engine Power Plant in Pesanggaran, Bali. The natural gas is schedule to be delivered to the power plant on September 2015.
• 50 MMSCFD Regasification Unit is being built in Korea and will be operated September 2015 in Benoa Port, Bali.
• Procurement process of Storage & Shuttle Vessel is already started.
INTRODUCTION OF PT. PELINDO ENERGI LOGISTIK (PT.PEL)
• Prospected LNG Fields to supply the LNG demand from PT. PEL are Badak and Tangguh LNG Field taken from PLN allocation.
• PT. Pelindo Energi Logistik (PT. PEL) is projecting to have capabilities to supply LNG to Gas Power Plant with capacity of 650 MW in early 2018.
• With the additional LNG hub, the LNG Vessel Round Trip Day (RTD) will be shorter, therefore the capacity of LNG supply could be larger.
INTRODUCTION OF PT. PELINDO ENERGI LOGISTIK (PT.PEL)
ELECTRICITY OF
INDONESIAN CENTRAL REGION
Natural Gas is Potential Energy Fuel in Indonesia
Production of Natural Gas in Indonesia Source = SKK Migas – IPA Technical Division Presentation, 30 April 2014
• From 2002, energy production in Indonesia is dominated by gas and this trend will continue in the future
• Production of natural gas in 2015 is approximately 1240 MBOEPD
Increasing of Domestic Natural Gas Demand
Natural Gas Market Source = SKK Migas – IPA Technical Division Presentation, 30 April 2014
• Gas allocation policy prioritizes natural gas to supply domestic market
• The prioritized segments are oil lifting, fertilizer feedstock, power plant, and industry.
• However, there is limitations of natural gas infrastructure.
Limitations of Natural Gas Infrastructure
LNG Facility in Indonesia Source = Indonesian Gas Association Presentation
POWER PLANT DEVELOPMENT PLAN
Power Plant Development Plan in Indonesian Central Region
• The concept of power plant development is based on power plant data, power plant development plan, and infrastructure support.
• PT PLN has written data of power plant and power plant development plan as starting point of this project.
• PT PEL want to offer infrastructure support of those power plant
Power Plant Development in Central Indonesia Based on Gas Fuel
Infrastructure Support
Power Plant Development
Plan
Reference Data of Power
Plant
Existing Power Plant Capacities In Indonesian Central Region
(Source : RUPTL PLN 2014 – 2024)
Power Plant Development Plan
Electricity Transmission
• Transmission planning requires a longer preparation considering the needs of ground covers a wide area.
• Distribution system in Central Indonesia Region within the last 5 years show significant progress, especially in Kalimantan, Sulawesi, Lombok and NTT.
• During the period 2010-2014, the electrical transmission has increased 18% per year with a transmission length in 2010 about 4,522 kms increased to 8727 kms in 2014.
• The construction of substations increased by an average of 13.4% per year.
Electricity Transmission
Table 1 Length of Wire Transition in Central Indonesia
Table 2 Transformer Capacity in Central Indonesia
Electricity Transmission Development Plan in Kalimantan and Sulawesi
Electricity Transmission Development Plan in Lombok and Sumbawa
Electricity Transmission Development Plan in Flores and Timor
Potential LNG Source
• The LNG needs is supplied from PT Badak, Bontang and BP, Tangguh.
• PT Badak is produced LNG approximately 22.5 MTPA
• BP is produced LNG approximately 7.6 MTPA
• The composition of LNG from those two source is displayed in Table 3.
• Dock specification in BP can anchor ship with 85000 – 165000 m3.
Components PT Badak BP
% Mole % Mole
CH4 89,71 96,91
C2H6 5,43 2,37
C3H8 2,97 0,44
C4+ 1,39 0,15
N2 0,5 0,13
Total 100.00 100.00
Wobbe index
(MJ/Nm3)
55,7 54,20
Caloric value
(MJ/Nm3)
44,41 41
Relatif Density (kg/m³) 640 570
PE 7,71 10,6
Table 3. Composition OF LNG
Dock Specification in PT Badak LNG
Information Dock #1 Dock #2 Dock #3
Type T T T
Jetty Head Floor 36,25 m x 24 m 36,25 m x 24 m 36,25 m x 24 m
Mooring Dolphin 4 9 7
Breasthing Dolphin 4 4 4
Loading Arm 4 LNG 4 LNG
4 LPG
4 LNG
4 LPG
Fender Data
Tipe Super Cone Arch Fender Cell
Size 9,0 x 4,8 m2 6,8 x 3,8 m2 7,7 x 3,2 m2
Strength 378,6 ton m 285 ton m 285 ton m
Ship Data
Load Volume LNG Ship
18.000 – 135.000 m3
LNG Ship
18.000 – 135.000 m3
LPG Ship
5.000 – 75.000 m3
LNG Ship
18.000 – 145.000 m3
LPG Ship
15.000 – 100.000 m3
LOA 151 – 300 m 151 – 300 m 151 – 300 m
Draft full loaded 12,6 m 12,6 m 12,6 m
Pool
Depth 14 m ( SLW ) 14 ( SLW ) 14 m ( SLW )
Diameter 372 m 375 m 375 m
MARINE VIRTUAL PIPE LINE CONCEPT
Gas Fuel Power Plant - Infrastructure
LNG Terminal (LNG Supplier)
LNG Carrier (LNG Shuttle Vessel)
LNG Carrier Port / Jetty
LNG Unloading Facility
LNG Storage (Land Base / Floating Storage)
LNG Regasification Unit
BOG Facility Unit
Gas Metering Facility
Gas Piping System
HSE System
Land Base Logistic, buffer and Support
Marine Virtual Pipeline
LNG Carrier & Shuttle Vessel Route
Shuttle Vessel Service Group
Vessel 1
No Shuttel
Vessel No. Priority Provinsi Type Power Plant Name
Power
Capacity
NG
Consumtion
(mmscfd)
LNG Storage
Tank for 10
day (m3)
Total Vessel
Capacity
(MW) Unit Unit m3
1
SHUTTLE
VESSEL #1
1st Priority of
Vessel 1
Sulut PLTMG Tahuna 10 2 740.74
9,259.26
2 Gorontalo PLTG/MG Gorontalo Peaker 100 5 1,851.85
3 Sulut PLTG/MG Minahasa Peaker 150 7 2,592.59
4 Sulut PLTG/MG Mobile PP Sulbagut 100 6 2,222.22
5 Kaltara PLTMG Nunukan 2 10 2 740.74
6 Kaltara PLTMG Malinau 6 1 370.37
7 Kaltara PLTMG Tanjung Selor 15 2 740.74
Shuttle Vessel Service Group
Vessel 2
No Shuttel
Vessel No. Priority Provinsi Type Power Plant Name
Power
Capacity
NG
Consumtion
(mmscfd)
LNG Storage
Tank for 10
day (m3)
Total Vessel
Capacity
(MW) Unit Unit m3
18
SHUTTLE
VESSEL #2
1st Priority
of Vessel 2
Sultra PLTMG Mobile PP Kolaka Utara 5 1 370.37
5,925.93
19 Sultra PLTMG Mobile PP Bombana 10 2 740.74
20 Sultra PLTMG Bau-Bau 30 4 1,481.48
21 Sultra PLTG/MG Mobile PP Kendari 50 6 2,222.22
13 Sultra PLTMG Selayar 10 2 740.74
22 Sultra PLTMG Mobile PP Wangi-Wangi 5 1 370.37
Shuttle Vessel Service Group
Vessel 3
No Shuttel
Vessel No. Priority Provinsi Type Power Plant Name
Power
Capacity
NG
Consumtion
(mmscfd)
LNG Storage
Tank for 10
day (m3)
Total Vessel
Capacity
(MW) Unit Unit m3
8
SHUTTLE
VESSEL #3
1st Priority of
Vessel 3 & 2nd
Priority of
Vessel 1
Kaltim PLTG/MG Kaltim Peaker 2 100 10 3,703.70
37,407.41
9 Kaltim PLTG/MG Mobile PP Kaltim 30 5 1,851.85
10 Kalsel PLTGU/MGU Kalsel Peaker 1 200 4 1,481.48
11 Kalsel PLTG/MG Mobile PP Kalselteng 1 100 12 4,444.44
12 Kalsel PLTG/MG Mobile PP Kalselteng 2 100 12 4,444.44
14
1st Priority of
Vessel 3 & 2nd
Priority of
Vessel 2
Sulsel PLTG/MG Mobile PP Sulsel 1 100 12 4,444.44
15 Sulsel PLTG/MG Mobile PP Sulsel 2 50 6 2,222.22
16 Sulsel PLTGU Makassar Peaker 450 20 7,407.41
17 Sulsel PLTGU Sulsel Peaker 450 20 7,407.41
Shuttle Vessel Service Group
Vessel 4
No Shuttel
Vessel No. Priority Provinsi Type Power Plant Name
Power
Capacity
NG
Consumtion
(mmscfd)
LNG Storage
Tank for 10
day (m3)
Total Vessel
Capacity
(MW) Unit Unit m3
23
SHUTTLE
VESSEL #4
1st Priority
of Vessel 4
NTB PLTGU Lombok Peaker 150 5 1,851.85
15,185.19
24 NTB PLTG/MG Mobile PP Lombok 50 6 2,222.22
25 NTB PLTMG Bima 50 6 2,222.22
26 NTB PLTMG Sumbawa 50 6 2,222.22
27 NTT PLTMG Kupang Peaker 40 2 740.74
28 NTT PLTG/MG Mobile PP Kupang 30 4 1,481.48
29 NTT PLTMG Mobile PP Flores 20 3 1,111.11
30 NTT PLTMG Maumere 40 5 1,851.85
31 NTT PLTMG Alor 10 2 740.74
32 NTT PLTMG Waingapu 10 2 740.74
OUR FIRST PROJECT PESANGGARAN PTDG
50 mmscfd supply
LETTER THE MINISTRY ENERGY AND MINERAL RESOURSES (ESDM)
OF NATURAL GAS ALLOCATION FOR POWER PLANT IN BALI
PT PELINDO ENERGI LOGISTIK
LETTER THE MINISTRY ENERGY AND MINERAL RESOURSES (ESDM)
OF NATURAL GAS ALLOCATION FOR POWER PLANT IN BALI
PT PELINDO ENERGI LOGISTIK
Recommendation Letter to South Port and Ex #03 Warehouse
for LNG Receiving Facility in Benoa Sea Port issued by KSOP Benoa
PT PELINDO ENERGI LOGISTIK
Recommendation Letter to South Port and Ex #03 Warehouse
for LNG Receiving Facility in Benoa Sea Port issued by KSOP Benoa
PT PELINDO ENERGI LOGISTIK
Existing Land Use Rights (Hak Penggunaan Lahan / HPL)
Pelindo Branch Benoa 2013
PT PELINDO ENERGI LOGISTIK
LNG DISTRIBUTION CONCEPT FOR GREEN BALI
PT PELINDO ENERGI LOGISTIK
PT. INDONESIA POWER - PESANGGARAN POWER PLANT Natural Gas Fuel Power Plant of PT. Indonesia Power. Target COD on July 2015
Capacity = 200 MW.
PT PELINDO ENERGI LOGISTIK
By Courtesy Indonesia Power:
TUKS Pertamina
South Terminal 206 m
SOUTH TERMINAL OF BENOA SEA PORT
Indonesia Power
South Terminal
PT PELINDO ENERGI LOGISTIK
PULAU SERANGAN
DE
SA
IN K
ER
UK
- 1
2 M
LW
S
BOUY 2
KONDISI EKSISTING S/D TAHUN 2012
Bouy 10
SUAR 9
ISLAND EXPLORER
ISLAND EXPLORER
ISLAND EXPLORER
BENOA SEAPORT LAYOUT
TURNING BASSIN DIAMETER 425 M
PT PELINDO ENERGI LOGISTIK
SHIP POSITION OF TURNING BASSIN
PT PELINDO ENERGI LOGISTIK
ARRANGEMENT OF LNG VESSEL & FSU
KAPAL PERTAMINA
FASILITASREGASIFIKASI
PT PELINDO ENERGI LOGISTIK
LNG HANDLING ILLUSTATION
Regasification Facility
Floating Storage Unit
LNG Vessel
PT PELINDO ENERGI LOGISTIK
PT PELINDO ENERGI LOGISTIK
FLOATING REGASIFICATION UNIT (FRU)
Natural Gas Pipeline System from
Regasification Unit located in Jl Raya Pelabuhan
Benoa till the end of embankment, then turn
West to Pesanggaran Power Plant. There all in
DLKR of Benoa Sea Port. Total Length is 3,6
KM.
Pipa diatas tanah
Pipa dibawah tanah
NATURAL GAS PIPE LINE ROUTE PLAN
PT PELINDO ENERGI LOGISTIK
THANK YOU
Attachment (1)
There are rules in Indonesia
•Undang-Undang No. 1 Tahun 1970 tentang Keselamatan Kerja.
•Peraturan Pemerintah No. 19 Tahun 1973 tentang Pengaturan dan Pengawasan Keselamatan Kerja di Bidang Pertambangan.
•Peraturan Pemerintah No. 11 Tahun 1979 tentang Keselamatan Kerja Pada Pemurnian dan Pengolahan Minyak dan Gas Bumi.
•Peraturan Menteri Tenaga Kerja Nomor PER.05/MEN/1996 Tahun 1996 tentang Sistem Manajemen Keselamatan dan Kesehatan Kerja.
•Peraturan Menteri Tenaga Kerja dan Transmigrasi Nomor PER.08/MEN/VII/2010 Tahun 2010 tentang Alat Pelindung Diri.
•Keputusan Menteri Tenaga Kerja dan Transmigrasi Nomor: KEP.234 /MEN/2003 tentang Waktu Kerja Dan Istirahat Pada Sektor Usaha Energi Dan Sumber Daya Mineral Pada Daerah Tertentu.
•Peraturan Menteri Tenaga Kerja dan Transmigrasi Nomor PER.15/MEN/VII/2005 Tahun 2005 tentang Waktu Kerja dan Istirahat Pada Sektor Usaha Pertambangan Umum Pada Daerah Operasi Tertentu.
•Keputusan Menteri Keuangan Nomor 433/KMK.04/1994 Tahun 1994 tentang Norma Penghitungan Khusus Penghasilan Kena Pajak Atas Penghasilan Dari Pekerjaan yang Diterima Tenaga Asing yang Bekerja Pada Wajib Pajak Badan di Bidang Pengeboran Minyak dan Gas Bumi di Indonesia.
•Surat Keputusan Badan Pelaksana Kegiatan Usaha Hulu Minyak dan Gas Bumi (BPMIGAS) No. KEP-0051/BP00000/2008/S8 tentang Revisi Pedoman Pengelolaan Sumber Daya Manusia Kontraktor Kerjasama.
•Peraturan Menteri Tenaga Kerja dan Transmigrasi Republik Indonesia, Nomor 4 tahun 2014 tentang Waktu Kerja dan Waktu Istirahat Kegiatan Usaha Hulu Minyak dan Gas Bumi.
Attachment (2)
• Undang-Undang No. 21 Tahun 2000 tentang Serikat Pekerja/Serikat Buruh
• Undang-Undang Nomor 13 Tahun 2003 tentang Ketenagakerjaan,
• Undang–Undang No. 2 Tahun 2004 tentang Penyelesaian Perselisihan Hubungan Industrial
• Peraturan Pemerintah No. 8 Tahun 1981 tentang Perlindungan Upah