appendix a stormwater site plan report short form · the swmm for feasibility and design...

9
City of Tacoma 2016 SWMM Appendix A 1- 69 Volume 1 Appendix A Stormwater Site Plan Report Short Form The Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within or below the following thresholds: The project adds or replaces between 2,000 and 5,000 square feet of hard surface. The project disturbs between 7,000 square feet and 1 acre of land. If the project quantities exceed any of the above thresholds, prepare a formal Stormwater Site Plan Report per Volume 1, Chapter 4 of the City of Tacoma Stormwater Management Manual. Environmental Services may also require additional information if warranted by project parameters. Chapter 1 – Project Overview Work Order/Building Permit Number(s): ___________________________________________ Associated City of Tacoma Permit Number(s) (e.g. land use permits, work order permits): _____ ____________________________________________________________________________ Applicant Name: ______________________________________________________________ Applicant Address: ____________________________________________________________ Applicant Phone Number: ______________________________________________________ Applicant E-mail: _____________________________________________________________ Property Owner: ______________________________________________________________ Property Owner Address: _______________________________________________________ Property Owner Phone Number: __________________________________________________ Property Owner E-mail: _________________________________________________________ Project Address: ______________________________________________________________ Parcel Number: ______________________________________________________________ Size of Parcel (acres or square feet): _____________________________________________ Identify other agency permits required or associated with the subject parcel (e.g. hydraulic permits, Army Corps 404 permits). Provide Permit numbers if available: __________________ ____________________________________________________________________________ ____________________________________________________________________________ Watershed:___________________________________________________________________ Brief description of the project to include the following: Current site condition and/or use: ________________________________________________ ____________________________________________________________________________ ____________________________________________________________________________

Upload: others

Post on 30-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

City of Tacoma 2016 SWMM

Appendix A 1- 69 Volume 1

Appendix A Stormwater Site Plan Report Short FormThe Stormwater Site Plan Report Short Form may be used for projects that trigger only Minimum Requirements #1-#5. These projects typically fall within or below the following thresholds:

• The project adds or replaces between 2,000 and 5,000 square feet of hard surface.

• The project disturbs between 7,000 square feet and 1 acre of land.

If the project quantities exceed any of the above thresholds, prepare a formal Stormwater Site Plan Report per Volume 1, Chapter 4 of the City of Tacoma Stormwater Management Manual. Environmental Services may also require additional information if warranted by project parameters.

Chapter 1 – Project Overview

Work Order/Building Permit Number(s): ___________________________________________

Associated City of Tacoma Permit Number(s) (e.g. land use permits, work order permits): _____

____________________________________________________________________________

Applicant Name: ______________________________________________________________

Applicant Address: ____________________________________________________________

Applicant Phone Number: ______________________________________________________

Applicant E-mail: _____________________________________________________________

Property Owner: ______________________________________________________________

Property Owner Address: _______________________________________________________

Property Owner Phone Number: __________________________________________________

Property Owner E-mail: _________________________________________________________

Project Address: ______________________________________________________________

Parcel Number: ______________________________________________________________

Size of Parcel (acres or square feet): _____________________________________________

Identify other agency permits required or associated with the subject parcel (e.g. hydraulic permits, Army Corps 404 permits). Provide Permit numbers if available: __________________

____________________________________________________________________________

____________________________________________________________________________

Watershed:___________________________________________________________________

Brief description of the project to include the following:

Current site condition and/or use: ________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Page 2: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

2016 SWMM City of Tacoma

Volume 1 1- 70 Appendix A

____________________________________________________________________________

Proposed site condition and/or use: _______________________________________________

____________________________________________________________________________

____________________________________________________________________________

Have any other site improvements (include all new impervious surfaces and areas cleared) occurred on the site after January 1, 2003? List square footages and description: ___________

____________________________________________________________________________

____________________________________________________________________________

____________________________________________________________________________

Project impacts. Please fill in the following table (include onsite and offsite):

Table 1 - 4: Project Threshold Worksheet

Descriptiona

a.All terms are defined in the SWMM glossary.

Onsite Offsite Total

Existing Conditions

Total Project Areab (ft²)

b.The total project area in the existing condition should typically match the total project area in the proposed condition.

Existing hard surface (ft²)

Existing vegetation area (ft²)

Existing Conditions

Total Project Areab (ft²)

Amount of new hard surface (ft²)

Amount of new pollution generating hard surface

(PGHS)c (ft²)

c.The “amount of new PGHS” should be part of or all of “amount of new hard surfaces”.

Amount of replaced hard surface (ft²)

Amount of replaced PGHSd (ft²)

d.The “amount of replaced PGHS” should be part of or all of “amount of replaced hard surfaces”

Amount of new plus replaced hard surface (ft²)

Amount of new + replaced PGHS (ft²)

Amount of existing hard surfaces converted to vegetation (ft²)

Amount of Land Disturbed (ft²)

Vegetation to Lawn/Landscaped (acres)

Native Vegetation to Pasture (acres)

Existing hard surface to remain unaltered (ft²)

Existing vegetation area to remain (ft²)

Page 3: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

City of Tacoma 2016 SWMM

Appendix A 1- 71 Volume 1

Chapter 2 – Existing Condition Summary

Existing Site Conditions (Check all that apply)

1. Describe the existing site conditions. (Check all that apply)

Forest Pasture/prairie grass Pavement Landscaping Brush

Trees Other

2. Describe how surface water (stormwater) drainage flows across/from the site. (Check all that apply)

Sheet Flow Gutter Catch Basin Ditch/Swale Storm sewer pipes

Stream/Creek Other

3. Describe, discuss and identify the following for the project site:

a. Topography – is the site: Flat Rolling Steep

b. Natural and man-made drainage patterns (which direction does stormwater flow and how): ______________________________________________________________ ___________________________________________________________________ ___________________________________________________________________ ___________________________________________________________________

c. Are there any known historical drainage problems such as flooding, erosion, etc. ___________________________________________________________________ ___________________________________________________________________ ___________________________________________________________________

d. Existing utilities (Check all that are on the site and show on site map with legend)

Storm Water Sewer Other __________________________

e. Are sensitive and critical areas present on or near the site (i.e. vegetative buffers, wetlands, steep slopes, floodplains, geologic hazard areas, streams, creeks, ponds, ravines, springs, etc.)?

Yes (show on site map) No

f. Are existing fuel tanks present on the site?

Yes (show on site map) No

g. Is this site within the South Tacoma Groundwater Protection District (on GovME or SWMM Volume 1, Chapter 2, Figure 1 - 2)?

Yes No

Page 4: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

2016 SWMM City of Tacoma

Volume 1 1- 72 Appendix A

h. Is the site within the aquifer recharge area (on GovME under Building and Land Use/Critical Areas)?

Yes No

i. Are groundwater wells present onsite and/or within 100 feet of the site?

Yes (show on site map) No

j. Are septic systems present onsite and/or within 100 feet of the site?

Yes (show on site map) No

k. Are there existing public and/or private easements on the project site?

Yes (show on site map & provide recording numbers) No

4. Provide a soils report to identify the following (attach soils report as Appendix to Stormwater Site Plan):

a. Date of soil investigation: ______________________________________________

b. Soil type and/or infiltration rate: _________________________________________

NOTE: See Volume 3, Appendix B to determine when soils report is needed for a project.

c. Groundwater elevation: _______________________________________________

d. Location of test pits (show on site map).

e. Attach the soils report (with soil log) to this document.

Adjacent Areas

1. Check any adjacent areas that may be affected by site disturbance and describe in item 2 below (check all that apply):

Streams* Lakes* Wetlands* Steep Slopes*

Residential Areas Roads Ditches, pipes, culverts

Other ______________________________________________________________

* If site is on or adjacent to a critical area, the City of Tacoma may require additional information, engineering, and other permits to be submitted with this short-form.

2. Describe how and where surface water enters the site from upstream properties:

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

Describe how and where surface water exits the site: ______________________________________________________________________

______________________________________________________________________

Page 5: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

City of Tacoma 2016 SWMM

Appendix A 1- 73 Volume 1

______________________________________________________________________

Chapter 3 – Offsite Analysis (Qualitative)

1. Describe the downstream drainage path leading from the site to the receiving body of water. (Minimum distance of ¼-mile (1320 feet)) {e.g. water flows from site, into curb-line to catch basin at intersection of X and Y streets. A 12-inch pipe system conveys water another 1000 feet to a ravine/wetland.}

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

2. Investigate the drainage system ¼ mile downstream from the project by site visit, including the following items:

a. Problems reported or observed during the site visit:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

b. Existing/potential constrictions or capacity deficiencies in the drainage system:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

c. Existing/potential flooding problems:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

d. Existing/potential overtopping, scouring, bank sloughing, or sedimentation:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

Page 6: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

2016 SWMM City of Tacoma

Volume 1 1- 74 Appendix A

e. Qualitative data on features such as land use, hard surface, topography, soils, presence of streams, and wetlands:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

f. Information on pipe sizes, channel characteristics and drainage structures:

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

g. Date and weather at the time of the inspection (was it raining during site visit?):

___________________________________________________________________

___________________________________________________________________

___________________________________________________________________

Chapter 4 – Low Impact Development Principles

Where feasible, sites shall use the following low impact development site design principles.

Check those principles that will be used onsite. The applicant is not required to revise their proposed design in order to accommodate these principles but shall use the principles when feasible.

Minimization of land disturbance by fitting development to the natural terrain. Minimization of land disturbance by confining construction to the smallest area feasible

and away from critical areas. Preservation of natural vegetation. Locating impervious surfaces over less permeable soils. Clustering Buildings Minimizing Impervious Surfaces

Chapter 5 – Discussion of Minimum Requirements

The following elements are required for the Stormwater Site Plan Report. Describe how each of the Minimum Requirements will be satisfied. The applicant can check the boxes that apply or describe the alternate means used to comply with the Minimum Requirements. Review Volume 1 of the SWMM to determine which Minimum Requirements apply to a project.

Minimum Requirement #1 – Preparation of a Stormwater Site Plan

This stormwater site plan short form report satisfies this requirement. Other__________________________________________________________________

Page 7: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

City of Tacoma 2016 SWMM

Appendix A 1- 75 Volume 1

Minimum Requirement #2 – Construction Stormwater Pollution Prevention

The Construction Stormwater Pollution Prevention Plan Short Form and TESC Plan Drawing(s) satisfy this requirement.

Other:__________________________________________________________________

Minimum Requirement #3 – Source Control of Pollution

For a single family residence, the homeowner shall comply with all Best Management Practices (as applicable) contained in Volume 4, Chapter 3 of the 2016 City of Tacoma Stormwater Management Manual.

For commercial or industrial facilities, complete the, “Worksheet for Commercial and Industrial Activities” contained in Volume 3, Chapter 2 of the 2016 City of Tacoma Stormwater Management Manual. Attach the worksheet to the Stormwater Site Plan Report. The owner or operator shall comply with all BMPs checked.

Other:__________________________________________________________________

Minimum Requirement #4 – Preservation of Natural Drainage Systems and Outfalls

All boxes (except Other) should be checked for this Minimum Requirement.

The natural drainage patterns have been maintained to the maximum extent feasible. Discharges from the project site occur at the natural location to the maximum extent

feasible. Discharge from the project site will not cause a significant adverse impact to downstream

receiving waters and downgradient properties. Other:__________________________________________________________________

Minimum Requirement #5 – Onsite Stormwater Management

The following BMPs are proposed for meeting this requirement. See Volume 3 and Volume 6 of the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types (more than one roof), ensure the means of onsite management is described for each.

Roofs:

Downspout Infiltration Trench Downspout Dry Well Rain Garden Bioretention Facility Dispersion Trench Splashblocks Perforated Stubout Collect and Convey

Other Hard Surfaces:

Concentrated Flow Dispersion Permeable Pavement Rain Garden Bioretention Facility Sheet Flow Dispersion

Page 8: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

2016 SWMM City of Tacoma

Volume 1 1- 76 Appendix A

Concentrated Flow Dispersion Collect and Convey

Lawn and Landscaped Areas:

Post Construction Soil Quality and Depth Other:__________________________________________________________________

Minimum Requirement #9 – Operation and Maintenance

See Chapter 6 of this Stormwater Site Plan Short Form Report. Other: _________________________________________________________________

Maintenance Requirement #10 – Offsite Analysis and Mitigation

See Chapter 3 of this Stormwater Site Plan Short Form Report. Other:__________________________________________________________________

NOTE: If Minimum Requirements #6, #7, or, #8 apply to a project this short form cannot be used.

Chapter 6 – Operation and Maintenance Manual

1. Describe the onsite storm system. Include each type of facility, including its function and operation. Include any manufacturer’s documentation.

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

2. Indicate the person or organization responsible for maintenance of the onsite storm system, including phone number, address and email.

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

3. Indicate where the Operation and Maintenance manual is to be kept. Note that it must be made available to the City for inspection.

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

______________________________________________________________________

4. Attach the maintenance schedules from Volume 1, Appendix C for all facilities used on the site, or create maintenance schedules.

Page 9: Appendix A Stormwater Site Plan Report Short Form · the SWMM for feasibility and design requirements for onsite stormwater management techniques. If there are multiple surface types

City of Tacoma 2016 SWMM

Appendix A 1- 77 Volume 1

5. Provide a sample maintenance activity log indicating emergency and routine actions to be taken. Attach to this document.

6. Provide an estimated operation and maintenance cost for each component of the proposed system:_________________

Chapter 7 – Construction Stormwater Pollution Prevention Plan

The Construction Stormwater Pollution Prevention Plan Short-Form may be used – Please refer to the SWMM Volume 2, Appendix C.

Drawings Required

• Vicinity Map – GovME map may be used to provide the nearest cross-streets on the site plan with a North arrow.

• Site Map showing new and existing improvements and Grading Plan (this may be on a 8 ½ “ x 11” or 11” x 17” sheet). Include as much detail as possible, including:

◦ Elevation contours

◦ All existing improvements (including utilities)

◦ All proposed improvements

• Include pipe types and slopes for all proposed stormwater and wastewater lines.

• Include details for any proposed stormwater system (infiltration trench, rain garden, etc.)

• If dispersion is proposed show the location of the flowpath and include type of vegetation.

• Provide a proposed landscape plan.

__________________________________ _____________________________

Prepared By: Date Prepared: