application and award proceduresenergymining.sa.gov.au/.../0019/342703/co2019_a-e_pel… · web...
TRANSCRIPT
![Page 1: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/1.jpg)
CO2019-A ACREAGE RELEASE To the Executive Director, Energy Resources Division, Department for Energy and Mining (as authorised delegate of the Minister for Energy and Mining).
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Name of participant who may be contacted about the application
We hereby make application for the grant of a petroleum exploration licence in respect of the area described hereunder and as shown on the attached map.
![Page 2: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/2.jpg)
CO2019-A
![Page 3: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/3.jpg)
In the case of an incorporated body applicant only – A copy of our most recent audited annual financial statement and our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
In the case of personal applicants only – A statement demonstrating my/our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
The proposed work program for each of the five years of the initial term of the licence, which includes specific reference to the ‘Criteria for assessment of applications’ listed above, and a technical report that assesses the prospectivity of the area and how the proposed work program relates to this prospectivity is attached.
The application fee/remittance advice for electronic funds transfer is enclosed. Please refer to the following web page from 1 July 2019 to determine the applicable application fee for FY 2018/2019, and for DEM banking details for payments made by electronic funds transfer. Alternatively, please call the Energy Resources Division on +61 8 8429 2443:
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#tenement_requirement_summary and
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#payment_of_regulated_fees
Signature of applicant(s):
Dated this Day of 2019
SEND APPLICATION MARKED ‘Confidential — contains PEL application’ to:
Executive Director, Energy Resources DivisionDepartment for Energy and MiningLevel 4, 11 Waymouth Street Adelaide SA 5000 AUSTRALIA
Closing date for CO2019-A applications – 4.00 pm Australian Central Standard Time
Friday 29 November 2019
CO2019-A YEAR 1 WORK PROGRAMNote: All work in Year 1 is guaranteed (Petroleum and Geothermal Energy Act 2000)
![Page 4: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/4.jpg)
EXPLORATION WELLS YEAR 1
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 1km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 1
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys
COMMENTS
*
![Page 5: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/5.jpg)
CO2019-A YEAR 2 WORK PROGRAM
Please tick a box to indicate whether the entire Year 2 program is guaranteed or not:
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 2
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 2km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 2
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 6: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/6.jpg)
CO2019-A YEAR 3 WORK PROGRAM
Please tick a box to indicate whether the entire Year 3 program is guaranteed or not. Please note that if Year 2 is not guaranteed, Year 3 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 3
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 3km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 3
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 7: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/7.jpg)
CO2019-A YEAR 4 WORK PROGRAM
Please tick a box to indicate whether the entire Year 4 program is guaranteed or not. Please note that if Year 3 is not guaranteed, Year 4 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 4
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 4km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 4
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 8: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/8.jpg)
CO2019-A YEAR 5 WORK PROGRAM
Please tick a box to indicate whether the entire Year 5 program is guaranteed or not. Please note that if Year 4 is not guaranteed, Year 5 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 5
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 5km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 5
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 9: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/9.jpg)
CO2019-B ACREAGE RELEASE To the Executive Director, Energy Resources Division, Department for Energy and Mining (as authorised delegate of the Minister for Energy and Mining).
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Name of participant who may be contacted about the application
We hereby make application for the grant of a petroleum exploration licence in respect of the area described hereunder and as shown on the attached map.
![Page 10: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/10.jpg)
CO2019-B
![Page 11: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/11.jpg)
In the case of an incorporated body applicant only – A copy of our most recent audited annual financial statement and our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
In the case of personal applicants only – A statement demonstrating my/our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
The proposed work program for each of the five years of the initial term of the licence, which includes specific reference to the ‘Criteria for assessment of applications’ listed above, and a technical report that assesses the prospectivity of the area and how the proposed work program relates to this prospectivity is attached.
The application fee/remittance advice for electronic funds transfer is enclosed. Please refer to the following web page from 1 July 2019 to determine the applicable application fee for FY 2018/2019, and for DEM banking details for payments made by electronic funds transfer. Alternatively, please call the Energy Resources Division on +61 8 8429 2443:
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#tenement_requirement_summary and
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#payment_of_regulated_fees
Signature of applicant(s):
Dated this Day of 2019
SEND APPLICATION MARKED ‘Confidential — contains PEL application’ to:
Executive Director, Energy Resources DivisionDepartment for Energy and MiningLevel 4, 11 Waymouth Street Adelaide SA 5000 AUSTRALIA
Closing date for CO2019-B applications – 4.00 pm Australian Central Standard Time
Friday 29 November 2019
CO2019-B YEAR 1 WORK PROGRAMNote: All work in Year 1 is guaranteed (Petroleum and Geothermal Energy Act 2000)
![Page 12: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/12.jpg)
EXPLORATION WELLS YEAR 1
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 1km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 1
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys
COMMENTS
*
![Page 13: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/13.jpg)
CO2019-B YEAR 2 WORK PROGRAM
Please tick a box to indicate whether the entire Year 2 program is guaranteed or not:
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 2
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 2km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 2
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 14: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/14.jpg)
CO2019-B YEAR 3 WORK PROGRAM
Please tick a box to indicate whether the entire Year 3 program is guaranteed or not. Please note that if Year 2 is not guaranteed, Year 3 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 3
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 3km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 3
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 15: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/15.jpg)
CO2019-B YEAR 4 WORK PROGRAM
Please tick a box to indicate whether the entire Year 4 program is guaranteed or not. Please note that if Year 3 is not guaranteed, Year 4 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 4
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 4km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 4
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 16: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/16.jpg)
CO2019-B YEAR 5 WORK PROGRAM
Please tick a box to indicate whether the entire Year 5 program is guaranteed or not. Please note that if Year 4 is not guaranteed, Year 5 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 5
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 5km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 5
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 17: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/17.jpg)
CO2019-C ACREAGE RELEASE To the Executive Director, Energy Resources Division, Department for Energy and Mining (as authorised delegate of the Minister for Energy and Mining).
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Name of participant who may be contacted about the application
We hereby make application for the grant of a petroleum exploration licence in respect of the area described hereunder and as shown on the attached map.
![Page 18: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/18.jpg)
![Page 19: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/19.jpg)
CO2019-C
In the case of an incorporated body applicant only – A copy of our most recent audited annual financial statement and our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
In the case of personal applicants only – A statement demonstrating my/our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
The proposed work program for each of the five years of the initial term of the licence, which includes specific reference to the ‘Criteria for assessment of applications’ listed above, and a technical report that assesses the prospectivity of the area and how the proposed work program relates to this prospectivity is attached.
The application fee/remittance advice for electronic funds transfer is enclosed. Please refer to the following web page from 1 July 2019 to determine the applicable application fee for FY 2018/2019, and for DEM banking details for payments made by electronic funds transfer. Alternatively, please call the Energy Resources Division on +61 8 8429 2443:
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#tenement_requirement_summary and
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#payment_of_regulated_fees
Signature of applicant(s):
Dated this Day of 2019
SEND APPLICATION MARKED ‘Confidential — contains PEL application’ to:
Executive Director, Energy Resources DivisionDepartment for Energy and MiningLevel 4, 11 Waymouth Street Adelaide SA 5000 AUSTRALIA
Closing date for CO2019-C applications – 4.00 pm Australian Central Standard Time
Friday 29 November 2019
CO2019-C YEAR 1 WORK PROGRAMNote: All work in Year 1 is guaranteed (Petroleum and Geothermal Energy Act 2000)
![Page 20: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/20.jpg)
EXPLORATION WELLS YEAR 1
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 1km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 1
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys
COMMENTS
*
![Page 21: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/21.jpg)
CO2019-C YEAR 2 WORK PROGRAM
Please tick a box to indicate whether the entire Year 2 program is guaranteed or not:
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 2
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 2km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 2
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 22: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/22.jpg)
CO2019-C YEAR 3 WORK PROGRAM
Please tick a box to indicate whether the entire Year 3 program is guaranteed or not. Please note that if Year 2 is not guaranteed, Year 3 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 3
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 3km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 3
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 23: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/23.jpg)
CO2019-C YEAR 4 WORK PROGRAM
Please tick a box to indicate whether the entire Year 4 program is guaranteed or not. Please note that if Year 3 is not guaranteed, Year 4 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 4
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 4km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 4
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 24: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/24.jpg)
CO2019-C YEAR 5 WORK PROGRAM
Please tick a box to indicate whether the entire Year 5 program is guaranteed or not. Please note that if Year 4 is not guaranteed, Year 5 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 5
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 5km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 5
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 25: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/25.jpg)
CO2019-D ACREAGE RELEASE To the Executive Director, Energy Resources Division, Department for Energy and Mining (as authorised delegate of the Minister for Energy and Mining).
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Name of participant who may be contacted about the application
We hereby make application for the grant of a petroleum exploration licence in respect of the area described hereunder and as shown on the attached map.
![Page 26: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/26.jpg)
CO2019-D
![Page 27: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/27.jpg)
In the case of an incorporated body applicant only – A copy of our most recent audited annual financial statement and our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
In the case of personal applicants only – A statement demonstrating my/our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
The proposed work program for each of the five years of the initial term of the licence, which includes specific reference to the ‘Criteria for assessment of applications’ listed above, and a technical report that assesses the prospectivity of the area and how the proposed work program relates to this prospectivity is attached.
The application fee/remittance advice for electronic funds transfer is enclosed. Please refer to the following web page from 1 July 2019 to determine the applicable application fee for FY 2018/2019, and for DEM banking details for payments made by electronic funds transfer. Alternatively, please call the Energy Resources Division on +61 8 8429 2443:
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#tenement_requirement_summary and
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#payment_of_regulated_fees
Signature of applicant(s):
Dated this Day of 2019
SEND APPLICATION MARKED ‘Confidential — contains PEL application’ to:
Executive Director, Energy Resources DivisionDepartment for Energy and MiningLevel 4, 11 Waymouth Street Adelaide SA 5000 AUSTRALIA
Closing date for CO2019-D applications – 4.00 pm Australian Central Standard Time
Friday 29 November 2019
CO2019-D YEAR 1 WORK PROGRAMNote: All work in Year 1 is guaranteed (Petroleum and Geothermal Energy Act 2000)
![Page 28: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/28.jpg)
EXPLORATION WELLS YEAR 1
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 1km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 1
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys
COMMENTS
![Page 29: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/29.jpg)
CO2019-D YEAR 2 WORK PROGRAM
Please tick a box to indicate whether the entire Year 2 program is guaranteed or not:
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 2
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 2km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 2
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 30: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/30.jpg)
CO2019-D YEAR 3 WORK PROGRAM
Please tick a box to indicate whether the entire Year 3 program is guaranteed or not. Please note that if Year 2 is not guaranteed, Year 3 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 3
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 3km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 3
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 31: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/31.jpg)
CO2019-D YEAR 4 WORK PROGRAM
Please tick a box to indicate whether the entire Year 4 program is guaranteed or not. Please note that if Year 3 is not guaranteed, Year 4 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 4
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 4km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 4
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 32: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/32.jpg)
CO2019-D YEAR 5 WORK PROGRAM
Please tick a box to indicate whether the entire Year 5 program is guaranteed or not. Please note that if Year 4 is not guaranteed, Year 5 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 5
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 5km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 5
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 33: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/33.jpg)
CO2019-E ACREAGE RELEASE To the Executive Director, Energy Resources Division, Department for Energy and Mining (as authorised delegate of the Minister for Energy and Mining).
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Full Name(s) Participating interest (%) Business Address Telephone Facsimile Email
Name of participant who may be contacted about the application
We hereby make application for the grant of a petroleum exploration licence in respect of the area described hereunder and as shown on the attached map.
![Page 34: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/34.jpg)
CO2019-E
![Page 35: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/35.jpg)
In the case of an incorporated body applicant only – A copy of our most recent audited annual financial statement and our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
In the case of personal applicants only – A statement demonstrating my/our expected financial position over the anticipated term of the licence is attached. (Include statements for each participant.)
The proposed work program for each of the five years of the initial term of the licence, which includes specific reference to the ‘Criteria for assessment of applications’ listed above, and a technical report that assesses the prospectivity of the area and how the proposed work program relates to this prospectivity is attached.
The application fee/remittance advice for electronic funds transfer is enclosed. Please refer to the following web page from 1 July 2019 to determine the applicable application fee for FY 2018/2019, and for DEM banking details for payments made by electronic funds transfer. Alternatively, please call the Energy Resources Division on +61 8 8429 2443:
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#tenement_requirement_summary and
http://www.energymining.sa.gov.au/petroleum/licensing_and_land_access/applications#payment_of_regulated_fees
Signature of applicant(s):
Dated this Day of 2019
SEND APPLICATION MARKED ‘Confidential — contains PEL application’ to:
Executive Director, Energy Resources DivisionDepartment for Energy and MiningLevel 4, 11 Waymouth Street Adelaide SA 5000 AUSTRALIA
Closing date for CO2019-E applications – 4.00 pm Australian Central Standard Time
Friday 29 November 2019
CO2019-E YEAR 1 WORK PROGRAMNote: All work in Year 1 is guaranteed (Petroleum and Geothermal Energy Act 2000)
![Page 36: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/36.jpg)
EXPLORATION WELLS YEAR 1
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 1km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 1
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys
COMMENTS
*
![Page 37: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/37.jpg)
CO2019-E YEAR 2 WORK PROGRAM
Please tick a box to indicate whether the entire Year 2 program is guaranteed or not:
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 2
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 2km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 2
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 38: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/38.jpg)
CO2019-E YEAR 3 WORK PROGRAM
Please tick a box to indicate whether the entire Year 3 program is guaranteed or not. Please note that if Year 2 is not guaranteed, Year 3 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 3
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 3km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 3
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 39: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/39.jpg)
CO2019-E YEAR 4 WORK PROGRAM
Please tick a box to indicate whether the entire Year 4 program is guaranteed or not. Please note that if Year 3 is not guaranteed, Year 4 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 4
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 4km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 4
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS
![Page 40: APPLICATION AND AWARD PROCEDURESenergymining.sa.gov.au/.../0019/342703/CO2019_A-E_PEL… · Web viewName of participant who may be contacted about the application . We hereby make](https://reader035.vdocuments.net/reader035/viewer/2022070808/5f06cbe77e708231d419c784/html5/thumbnails/40.jpg)
CO2019-E YEAR 5 WORK PROGRAM
Please tick a box to indicate whether the entire Year 5 program is guaranteed or not. Please note that if Year 4 is not guaranteed, Year 5 cannot be guaranteed.
Guaranteed Non-guaranteed (Tick only ONE box)
EXPLORATION WELLS YEAR 5
Well 1 Well 2 Well 3 Well 4 Well 5
Cost (A$’000)
SEISMIC YEAR 5km/km2
length/area must be specified
Cost (A$’000)
2D Seismic
3D Seismic
Seismic reprocessing
OTHER STUDIES YEAR 5
Cost (A$’000) Description
Gravity surveys
Aeromagnetic surveys
Other (e.g. geochemical surveys)
COMMENTS