application of geological data for geotechnical work (clean version) · 2018-03-21 · application...

18
Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng Arup Director, Leader of Arup’s Infrastructure design group in London Geotechnical engineer [email protected]

Upload: others

Post on 13-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Application of geological data for geotechnical work

Tim Chapman  BE MSc DIC CEng FICE FIEI FREngArupDirector, Leader of Arup’s Infrastructure design group in London Geotechnical [email protected]

Page 2: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Large project next to Waterloo station

Plan showing a site with dense network of tunnels, shafts and escalators under one end of the building

Page 3: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

The solution that received planning permission

Photos showing that viewing corridors are a more significant constraint as they preclude the granting of Planning Permission – hence the foundation solution has to cope with extreme geotechnical constraints

Page 4: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

The geotechnical engineer struggles with….

• 19 different consultants all clamouring for client attention

• Many project constraints and drivers in addition to the ground

• We don’t generate enough crises!    (fortunately…)

• Urban planning- Viewing corridors, transport access, section 106 payments

• Building planning- Fire, M&E plant space, letting configurations

Page 5: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

How is geological data used?

Design – standard processesStratigraphy

Characterisation of strata

Water pressure distribution

Parameters for design

Risk mitigation – “drama”!Topography

Man‐made- Archaeology ‐ protect- Contamination- Tunnels ‐ protect- Obstructions – avoid?

Geology and hydrogeology- Faults- “Scour hollows”- Changes in stratigraphy- Unexpected clay swell !- Water flow

Page 6: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Conundrum

• Cost of investigating ground is shockingly low

• Yet ground risks are one of main causes of 

project delay (50%), and of• Insurance claims on completed projects – eg NHBC

• Serious for buildings – 0,1% of project budget spent on SI

• Can be catastrophic for major infrastructure eg tunnelling

• Challenge to the industry is for even greater efficiencies 

• 33% cut in project costs sought by government

Page 7: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

“… as we know, there are known knowns; there are things we know we know. We also know there are known unknowns; that is to say we know there are some things we do not know. But there are also unknown unknowns— the ones we don't know we don't know.”

Expect the Unexpected

Former U.S. Secretary of Defense Donald Rumsfeld explained a state of intelligence at a US Defense Department Briefing on 12 February 2002

Page 8: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Data flows – geological data at the macro level

Enable much better appreciation of geological hazards – desk study

Turn “unknown unknowns” into “known unknowns” 

Reduce ignorance!

“If you do not know what you should looking for in a site investigation, you are not likely to find much of value” 

– Rudolph Glossop (1968 Rankine Lecture)

Industryshares data

Body gathers data

Synthesise data Disseminate

Page 9: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Big data! First of the 8 great technologies

The future!

“The Government Construction Strategy was published by the Cabinet office on 31 May 2011. The report announced the Government’s intention to require: collaborative 3D BIM (with all project and asset information, documentation and data being electronic) on its projects by 2016”

Page 10: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

10

Information Management

Information Modelling

BIM maturity level

0

1

2

3             ‘holy grail’

No project wide common standard for flow and 

production of information

A project wide consistent approach to flow and 

production of information

As BIM level 2

2D CAD and paper issue

2D/3D CAD produced independently by team 

members

3D models produced by all team members to common level of detail using common tools

Single project model

BIM maturity level definitions

A project wide consistent approach to flow of 

information

Page 11: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

11

HS2 catalyst for change….

Page 12: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

12

Potential of BIM to transformgeological data flows at the project level

• GI data and our interpretation

• All reports will be completely public, all interpretation will be open to scrutiny

• Collaboration through the design process – real or formal?!

GI Data Piling contractorConsultant

Drawings

Site tablet

Piling

RecordsSetting out

Other site opsMaterial properties

Page 13: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

13

BIM attributes for a geotechnical element

Design of the elementLevels of Development LODs Attributes

Ground investigationChoice of GI techniques and locations

Desk studyUnderstanding all of the issues

ART ART

Page 14: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

14

Great new geological data… developed knowledge!

Page 15: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

15

Insatiable demand for data processing

But is it wise?

How to feed the beast while maintaining quality

Geological risks are wildly random and so not directly amenable to statistical reduction

John Burland’s “well winnowed experience” 

Page 16: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

16

The “Second machine age”a new dawnPower of machines to replace manual tasks• now mastering complex tasks like driving• autonomous vehicles now on our roads

Future opportunities to exploit power is exponential ‐ thanks to Moore's law

Far more agile data collection and handling, Automation of on‐site processes, Instrumentation much cleverer• How far will this intrude into geotechnical data collection and design?• How can better geological data systems be most useful?

People• Shortage of skilled people• What happens to the people without skills?  Can they find other jobs?!

Page 17: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

17

A better future?

Process and efficiency versus wisdom and reliability

Let us master the copious data, improve our processes but not neglect wisdom, or we lose the reliability that we need

Page 18: Application of geological data for geotechnical work (clean version) · 2018-03-21 · Application of geological data for geotechnical work Tim Chapman BE MSc DIC CEng FICE FIEI FREng

Thank you

[email protected]