architect demolition and success asbestos removal
TRANSCRIPT
CLIENT TESTIMONIAL
¨Our Bobcats and small loaders are completely replaced by our 25.6
and 32.6 Merlos, with large buckets, high speed and a good reach, it
doubles productivity at the very least. Our Merlos have no problem working
underground. They lower the need for manual labour. Our Merlos position
our 8x15 containers that we change often and empty the second floor. Our Rotos are better than cranes and boom trucks, both of which are quite
cumbersome and not very efficient or versatile. They also need a worker at all times to attach the cables while the Roto does not. Gains are not only
anticipated, they are expected. We haven’t even mentioned the high capacity
basket and remote control yet. For asbestos removal and cleaning in confined spaces, our Merlos are twice as fast as other methods.¨
- DELSAN-AIM, LATCON LTD
KEY CLIENTS
QUEBEC / MARITIME
Delsan-AIM
Demo Spec
René St-Pierre
ONTARIO
Tri-Phase Environmental Inc
Latcon
Priestly Demolition
ALBERTA, BRITISH COLUMBIA
Quantum Murray
Dewar Pacific Projects
DEMOLITION AND ASBESTOS REMOVAL
CAPACITY
FROM5500TO 26000POUNDS
REACH20 FEET TO
120 FEETHIGH
ARCHITECT OF YOUR SUCCESS
QUEBEC100, d’Anvers StreetSt-Augustin-de-Desmaures (Quebec) G3A 1S4
MONTREAL606, Lionel-Boulet BLVD Varennes (Quebec) J3X 1P7
TORONTO3079, Harrison Court Burlington (Ontario) L7M 0W4
CALGARY111, Centre Street SW Langdon (Alberta) T0J 1X2
ROTATION
3600
3 STEERING MODES
CRAB4 WHEELS2 WHEELS
•20% more compact
•20% faster (40km/h vs 25 km/h)
•Boom up to 30% faster
•20% more precise when it comes to final positioning •20% more towing power
•20% more visibility
1,5’ 1,5’
INTEGRATEDSIDE SHIFT IN AVERAGE*
$,43 750 FUELECONOMY OVER5 YEARS
MERLO :
20% MORE COMPACT
MERLOIT IS MINIMUM 5%
OF OPERATIONAL GAINS DUE TO:*May vary depending on models
THE BEST
COST OFOWNERSHIPIN THE INDUSTRY