Standardised!Passivhaus!Schools
Elrond Burrell, Architype
![Page 2: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/2.jpg)
Be Social #Sustainability #Passivhaus #Timber @ElrondBurrell @TRADA_ @ArchitypeUK @Ecobuild_Now
![Page 3: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/3.jpg)
We design
Life Enhancing!Genuinely Sustainable Architecture
![Page 4: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/4.jpg)
Standardised to bring to or make of an established standard size, weight, quality, strength to compare with or test by a standard to chose or establish a standard for
![Page 5: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/5.jpg)
Why Standardise? To save money To save time To guarantee performance
![Page 6: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/6.jpg)
To Save Money
![Page 7: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/7.jpg)
To Save Money In austere economic times this is surely a good thing? With limited money available standardising means MORE schools can be built BUT…
![Page 8: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/8.jpg)
To Save Money Is reducing capital cost the only issue? Minimising construction cost now, may increase long term or future costs SURELY … we should be looking at whole life costs?
![Page 9: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/9.jpg)
To Save Time
![Page 10: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/10.jpg)
To Save Time To avoid wasting time is surely a good thing? Schools should focus on teaching, not designing new buildings BUT…
![Page 11: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/11.jpg)
To Save Time What about… The education value of pupil and teacher involvement in the design process? The importance of buildings meeting the practical needs and expressing the character of the individual school and community?
![Page 12: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/12.jpg)
To Guarantee Performance
![Page 13: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/13.jpg)
To Guarantee Performance Again – surely a good thing To guarantee energy consumption, internal comfort and user satisfaction BUT…
![Page 14: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/14.jpg)
To Guarantee Performance Do any of the standardised solutions achieve this? – are they even trying? What energy standards are being set? What comfort standards are being set? How are these being delivered? Can they be guaranteed?
![Page 15: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/15.jpg)
Why Standardise? To save money To save time To guarantee performance
![Page 16: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/16.jpg)
To Save Time
![Page 17: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/17.jpg)
To Save MAKE Time
![Page 18: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/18.jpg)
To MAKE Time “The community love their building, they feel it belongs to them, the respect it and care for it” “The layout really works for us, because the architects listened to our ideas and responded to our ethos and practical needs” “The building has helped us move from Satisfactory to Good in our latest Ofsted”
![Page 19: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/19.jpg)
To MAKE Time
2
Engagingly collaborative Elegantly simple Radically ecological Uplifting and enriching Robust and timeless
![Page 20: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/20.jpg)
![Page 21: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/21.jpg)
![Page 22: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/22.jpg)
![Page 23: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/23.jpg)
![Page 24: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/24.jpg)
![Page 25: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/25.jpg)
![Page 26: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/26.jpg)
![Page 27: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/27.jpg)
![Page 28: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/28.jpg)
![Page 29: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/29.jpg)
![Page 30: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/30.jpg)
![Page 31: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/31.jpg)
To Guarantee Performance
![Page 32: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/32.jpg)
To Guarantee Performance Most school buildings do not perform in terms of user comfort Most school buildings use 5+ times as much energy as predicted HOW do we change this?
![Page 33: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/33.jpg)
To Guarantee Performance Monitor buildings and learn from our mistakes Support users in occupying their buildings Avoid tick box compliance processes Set standards + Use techniques that will deliver them
![Page 34: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/34.jpg)
Occupied Days
Unoccupied Days
Baseload
A-Typical Summer Profile Shape
substantial energy use when building is or is nearly empty in
morning
Half-hourly Electrical Demand Profiles
Admin staff arrive at 7:30am, teaching staff arrive between 8 - 8:45
Major electrical use before building is occupied, in both summer and winter (6 cleaners arrive @ 5am)
![Page 35: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/35.jpg)
What is Passivhaus?
![Page 36: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/36.jpg)
What is Passivhaus? Rigorous energy standard Rigorous comfort standard Rigorous quality assurance standard
![Page 37: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/37.jpg)
photovoltaics
solar thermal
Biomass gs heat pump
Heating energy 120 kWh/m2 Primary energy 300+ kWh/m2
Consumption and carbon emissions offset by renewables
![Page 38: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/38.jpg)
0.6 ac @ 50 pascals
Heating energy 15 kWh/m2 Primary energy 120 kWh/m2 0.6 ac @ 50 pascals energy consumption and carbon emissions reduced simply by using less energy!
gas boiler
![Page 39: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/39.jpg)
Passivhaus Standard
120 kWh
310 kWh
189 kWh
120 kWh
15 kWh
105 kWh
Primary energy Thermal Heating
![Page 40: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/40.jpg)
Passivhaus Standard
120 kWh
310 kWh
189 kWh
120 kWh
15 kWh
105 kWh
Passivhaus buildings are performing BETTER than predicted
58 kWh
15 kWh
43 kWh
Primary energy Thermal Heating
![Page 41: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/41.jpg)
Passivhaus Standard
120 kWh
189 kWh
120 kWh
15 kWh
105 kWh
Passivhaus buildings are performing BETTER than predicted
58 kWh
15 kWh
43 kWh
310 kWh
Primary energy Thermal Heating
![Page 42: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/42.jpg)
Achieving Passivhaus? Meet a series of technical standards
o fabric U-values of 0.15 and windows/doors of 0.8 o airtightness of 0.6 @50 pascals o elimination of thermal bridging
Model the building using PHPP o optimise the orientation, form and fabric o prove within thermal energy limit of 15 kWh/m2.a o prove within primary energy limit of 120 kWh/m2.a o confirm within limits of overheating
Undergo the rigorous certification process
![Page 43: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/43.jpg)
Adopting Passivhaus? It’s based on sound building physics and evidence It’s based on reducing energy by design, instead of offsetting carbon with add-ons It encourages integrated design thinking + rigorous discipline It drives simplicity of form, detailing and construction It works!
![Page 44: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/44.jpg)
Achieving PH Schools
Oakmeadow Primary School Bushbury Hills Primary School
![Page 45: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/45.jpg)
Optimising the Form
Single storey Two storey
14m deep
18m deep
22m deep
22m
dee
p fa
ce E
/W
14m deep
18m deep
22m deep
22m
dee
p fa
ce E
/W
![Page 46: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/46.jpg)
Optimising the Form
Ground floor plan: Oakmeadow Primary School
![Page 47: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/47.jpg)
Optimising the Form
Section: Oakmeadow Primary
![Page 48: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/48.jpg)
Design Out Thermal Bridging
Structural slab Lo
ad
Insulation
Insu
latio
n
Structural slab Lo
ad
Insulation
Insu
latio
n
Model & Test every detail
![Page 49: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/49.jpg)
Design Out Thermal Bridging
Structural slab Lo
ad
Insulation
Insu
latio
n
Structural slab Lo
ad
Insulation
Insu
latio
n
Model & Test every detail
![Page 50: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/50.jpg)
Design Out Thermal Bridging
Keep structure within the thermal envelope
![Page 51: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/51.jpg)
Design Out Thermal Bridging
OR Keep structure outside the thermal envelope
![Page 52: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/52.jpg)
Design In Airtightness
By simplifying every detail
![Page 53: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/53.jpg)
Optimise SG & Ventilation
Simple efficient window arrangement Simple secure night ventilation grilles
![Page 54: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/54.jpg)
Optimise MVHR & Ducts
Fresh air supplied to all main rooms
MVHR
![Page 55: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/55.jpg)
Collaborate
Across the whole team - consultants, specialists, client, contractor, and supply chain
![Page 56: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/56.jpg)
Delivering Design Quality
No compromise of brief, client aspiration, architectural quality or sustainable materials palette
![Page 57: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/57.jpg)
![Page 58: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/58.jpg)
![Page 59: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/59.jpg)
![Page 60: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/60.jpg)
![Page 61: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/61.jpg)
![Page 62: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/62.jpg)
Conclusion
![Page 63: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/63.jpg)
![Page 64: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/64.jpg)
![Page 65: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/65.jpg)
![Page 66: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/66.jpg)
DatePassed by
For the original drawing size
17.06.10Checked by
Scale
Drawn by
N
CheckedByMark
Drawing Originator
Drawing Title
Check this drawing is the latest revision.Do not scale from this drawing.Do not use the information on this drawing without checking all dimensions on site.Do not use any areas indicated for either valuation, purchase, sale or any other form of legally binding contract.Do not reproduce any part of this drawing without prior written consent.
Job No
Notes
6225Drawing No
PL 100Revision
-
Ground & First Floor Plans
Drawing StatusPLANNING SUBMISSION
SC MP -
1:100 A1
Key Plan
Project Title
Swillington Primary School
Contractor Client
Employer
REVISIONS
Date Details
Interserve Project Services Ltd1 Thunderhead Ridge, Glasshoughton, Castleford,West Yorkshire, WF10 4UATel: 01977 522300 Fax: 01977 522301
Architype, Upper Twyford, Hereford, HR2 8ADt 01981 542111 f 01981 542112 e [email protected]
GROUND FLOOR
Total Gross Internal Area
1427.6 Sq m
CANOPY CANOPY
CANOPY CANOPY
NURSERY
TOILETS���
RECEPTION
TOILETS���
B
SHOWER TROLLEY Nom. 1950 x 750mm
A B
C
A
C
KEY
TEACHING AREAS
STAFF AREAS
AUXILLARY AREAS
STORAGE
MULTI-USE AREAS
COMMUNITY FACILITIES
CIRCULATION
NURSERY79.3m!
RECEPTION�����
PE. STORE���
STAGE/
SPECIAL
STORE9.8�
CENTRAL
STOCK
ROOM���
ACC.
TOILET���
ACC.
TOILET��� REPRO.
����
COMMU.
STORE���
SPEC.
STORE4.5�
COMMUNITY
ROOM����� YEAR 3
���� YEAR 4�����
YEAR 5�����
YEAR 6�����
KITCHEN
����� SERVERY/
CHAIR
STORE��
INTERVIEW
ROOM8.3�
GROUP ROOM
SENco��� HYGIENE
ROOM
�����
MAIN
HALL���
YEAR 1����
YEAR 2����
KS2
BOYS
TOILETS9.1�
KS2
GIRLS
TOILETS9.1�
SPECIAL
STORE12.5�
GROUP
ROOM�����
KS1
BOYS
TOILETS����
KS1
GIRLS
TOILETS����
SOFT
READING
AREA
LIBRARY
AREA
ICT
AREAPRACTICAL
AREA
FOOD
TECHNOLOGY
READING
AREA
OFFICE
DRY
STORE
TOILET
LOBBY
LOCKERS LOCKERS LOCKERS LOCKERS
LOCKERS LOCKERS
LO
CK
ERS
STAFFROOM�����
FOOD PREP
STO.
1.1�
GENERAL
OFFICE�����
SEN
THERAPY/
MI ROOM�����
HEAD
OFFICE/
MEETING
ROOM���
MAIN
RECEPTION/
WAITING AREA18.1�
Poss
ible
futu
re f
old
ing p
art
itio
n
LOBBY6.7�
OPENING
ROOF LIGHT
BARRIER
MATTING
WET
AREA
BARRIER
MATTING
WET
AREABARRIER
MATTINGWET
AREA
BARRIER
MATTINGWET
AREA
BARRIER
MATTINGWET
AREA
BARRIER
MATTINGWET
AREA
BARRIER
MATTING
WET
AREA
BARRIER
MATTING
WET
AREA
CANOPY
LOW LEVEL PARTITION
LO
W L
EV
EL P
ARTIT
ION
2.2
m F
OLD
ING
PA
RTIT
ION
2.2
m F
OLD
ING
PA
RTIT
ION
BARRIER MATTING
BARRIER MATTING BARRIER MATTING
SERVER
LOCATION
(TBC)
CARETAKER/
CLEANER
STORE�
LOCKERS
CLO
AK
S
CLO
AK
S
2.2
m F
OLD
ING
PA
RTIT
ION
CIRCULATION32.6�
CIRCULATION10.2�
CIRCULATION11.6�
KEY STAGE 2
HUB SPACE152.8�
KEY STAGE 1
HUB SPACE78.6�
MAIN HALL
Possible Access Hatch
PLANT
ROOM26.8�
void
CIRCULATION16.7�
FIRST FLOOR
Total Gross Internal Area
44.3 Sq m
![Page 67: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/67.jpg)
![Page 68: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/68.jpg)
![Page 69: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/69.jpg)
To Guarantee Performance “We feel that our children are more alert and attentive in lessons due to the amount of daylight in classrooms and the fresh air throughout the school. The fact that the new school is built to passivhaus standards means that learning has been enhanced. Our pupils are comfortable, secure and stimulated by their new environment; hence they learn very well!” Sara Morris: Head Teacher, Oak Meadow Primary School
![Page 70: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/70.jpg)
To Guarantee Performance
“Our gas bill was 90% less in the first year of occupying our new building, compared to the old one”
Sara Morris: Head Teacher, Oak Meadow Primary School
![Page 71: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/71.jpg)
To Save Money Capita Symonds ‘typical sustainable school’
£2,151/sqm (M&E £454/sqm) St Luke’s 2009 BREEAM Excellent
£2,080/sqm (M&E £357/sqm) Oakmeadow Passivhaus School
£1,780/sqm (M&E £323/sqm) Standardised Passivhaus School <£1,550/sqm (M&E <£300/sqm)
![Page 72: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/72.jpg)
Why Standardise Schools? To save money?
ü YES, but focus on SIMPLICITY to achieve better value not just CHEAP
To save time? Ø NO, if this means negating the value of engagement in
the process
To guarantee performance? ü YES, by setting PASSIVHAUS as the only evidence
based standard that works
![Page 73: Architype - Standardised Passivhaus Schools, Ecobuild UK 2014](https://reader033.vdocuments.net/reader033/viewer/2022052903/5578e9f9d8b42a5c5c8b4ca6/html5/thumbnails/73.jpg)
Standardised Passivhaus Basing design on the evidence of what actually works
Striving for simplicity of design to deliver more for less
Image: Albert, Righter and Tittman Architects