arsalan curriculum vitae

5
Sub: Application for the post of Plant Operator To, Human Resources Dept. Enclosed here is my resume for your consideration for a skilled and qualified Power Plant Operator with experience in Power Plant Operation as well as Preventive Maintenance. My most recent experience is in M/s LUCKY CEMENT LTD ‘110 MW’ (POWER GENERATION) in operation Department currently assigned with Distributed Control Systems. Operation having gone through, I request you to kindly consider me with my overall qualification and experience. With eagerness I shall satisfy the expectations of your organization with the best of my ability and Skills with operation and trouble shooting of, turbine, boilers, generator as well as pressure, temperature, flow, level & Differential pressure gauges. I have 05 year experience. I worked for (2) ARTISTIC FABRIC MILL Ltd. Thermal POWER PROJECT. STG (13 MW) (3) Gatron Industries Limited. CCPP & Gas and Furnace Plant (55MW-Thermal Power Plant) Hub Baluchistan I have drawn together experience in operation and trouble shooting in Power Plant, boilers, gas turbines, compressors, generators, pumps and engines. I have good knowledge regarding operation& maintenance of pumps, turbines, generators & compressors. Professional Computer literacy and strong communication skills motivated me to indulge with diverse group of people to work as a team player with leadership capabilities. The attached CV will help you assess my strengths and diverse skill set in greater detail. I would eagerly welcome the opportunity of discussing the prospects further, and can be reached at the above mentioned phone number and e-mail for setting up a convenient appointment. Looking forward to hearing from you soon. Yours truly, ARSALAN ALI

Upload: arsalan-ali

Post on 09-Feb-2017

18 views

Category:

Technology


0 download

TRANSCRIPT

Page 1: Arsalan curriculum vitae

Sub: Application for the post of Plant Operator To, Human Resources Dept. Enclosed here is my resume for your consideration for a skilled and qualified Power Plant Operator with experience in Power Plant Operation as well as Preventive Maintenance. My most recent experience is in M/s LUCKY CEMENT LTD ‘110 MW’ (POWER GENERATION) in operation Department currently assigned with Distributed Control Systems. Operation having gone through, I request you to kindly consider me with my overall qualification and experience. With eagerness I shall satisfy the expectations of your organization with the best of my ability and Skills with operation and trouble shooting of, turbine, boilers, generator as well as pressure, temperature, flow, level & Differential pressure gauges. I have 05 year experience. I worked for (2) ARTISTIC FABRIC MILL Ltd. Thermal POWER PROJECT. STG (13 MW) (3) Gatron Industries Limited. CCPP & Gas and Furnace Plant (55MW-Thermal Power Plant) Hub Baluchistan I have drawn together experience in operation and trouble shooting in Power Plant, boilers, gas turbines, compressors, generators, pumps and engines. I have good knowledge regarding operation& maintenance of pumps, turbines, generators & compressors. Professional Computer literacy and strong communication skills motivated me to indulge with diverse group of people to work as a team player with leadership capabilities. The attached CV will help you assess my strengths and diverse skill set in greater detail. I would eagerly welcome the opportunity of discussing the prospects further, and can be reached at the above mentioned phone number and e-mail for setting up a convenient appointment. Looking forward to hearing from you soon. Yours truly,

ARSALAN ALI

Page 2: Arsalan curriculum vitae

CURRICULUM V ITAE

OBJECTIVE

I am looking for a job in a good position in this field where I can use my skills and capabilities to the best effect. I possess effective organizational skills & the ability to work together with other fellow people and produce the final output effectively.

PERSONAL INFORMATION Name : Arsalan Ali

Father’s Name : Asif Iqbal

Date of birth : 09 - 11 - 1991

Mobile No. : +92-346-2879820 / +92-300-3395271

E-mail address : [email protected]

C.N.I.C. No. : 42501 -6988530 - 1

Marital status : Single

Current location : KARACHI

Postal address : House No.R187 Block ’A’ P.T.V Housing Society near Ahsanabad super highway Karachi

COMPETENCY CERTIFICATE

Certified “C” CLASS BOILER ENGINEER. From PUNJAB BOILER ENGINEER Examining Board PAKISTAN. JULY 2016

WORK AND EXPERIENCE POWER PLANT OPERATION KEY RESPONSIBILITY

PERFORM DUTY IN CONTROL ROOM

Monitored all parameter in control room and take complete reading set.

Acknowledge alarms and take corrective action accordingly.

Check and review the operating conditions and records.

Feed all control room logs and technical data and take print out.

Entering, transcribing, recording, storing, or maintaining information in written and electronic form.

EDUCATION

QUALIFICATION INSTITUTE YEAR DIV.

Diploma Of Associate Engineering (3 year Program)

(In Power) Government College Of Technology 2013 1st

Intermediate (Pre Engineering) Government Islamia Science College 2010 2nd

Matriculation (Science) The Graceful Grammar High School 2007 1st

Page 3: Arsalan curriculum vitae

RESPONSIBILITIES IN THERMAL POWER PLANT OPERATE AND MONITOR ALL AUXILIARY AND CONVENTIONAL SYSTEMS

Operate and monitoring all auxiliaries system of during startup and shutdown of Plant.

Monitor all parameter; take complete reading set and corrective action accordingly.

Watching gauges, dials, or other indicators to make sure a machine is working properly.

Maintained the operating equipment’s and facilities in sound and clean condition.

Maintaining and Computerizing of Shift Log.

Starting, Synchronizing, Loading, Un-Loading and Stopping Of Generators & Turbine.

High pressure Boiler Feed Water Pumps.

Condensate water pump.

Pump house operation and equipment.

Heat Exchangers and Condenser operation.

Carry out the isolation of equipment’s for planned and emergency maintenance and Normalized of the plant thereafter.

WATER TREATMENT PLANT OPERATION (RO) KEY RESPONSIBILITY

RESPONSIBILITIES THE PRODUCTION OF 500M³/DAY (DEIONIZATION PLANT)

Taken into service and out of service of the Plant.

Perform duty on desalination Plant.

Flow Station Routine checks on instrument connection, Pumps. Valves, Meter etc.

Monitored tripping condition of equipment’s, process parameters and control within Defined limits.

Ensure conductivity, TDS & pH of the distillate within required range.

Take necessary corrective action in case of emergency or equipment breakdown to Ensure the uninterrupted service.

Troubleshooting of Measurement and Control Loops.

Maintained the operating equipment’s and keep clean condition.

RESPONSIBILITIES OF 260,000 GALLON/DAY REVERSE OSMOSIS (RO) WATER TREATMENT PLANT

Performed duty on Reverse Osmosis Water Treatment Plant.

Operate daily routines and call up card.

Taken Plant into service and out of service.

Monitored all parameters, complete reading set & take corrective action Plant operation.

Maintained the operating equipment and facilities in sound and clean condition.

Page 4: Arsalan curriculum vitae

I am working as “Control Room Operator” in Power Plant.

110 MW POWER PLANT OPERATE AND MONITOR ALL AUXILIARY AND CONVENTIONAL SYSTEMS

At present working on 110MW Power Plant with 132 kV Grid Station 20~25 MW dispatch to WAPDA (HESCO). Plant consists on 13 (Gas and HFO) generators & 2 Steam Turbines.

Working on Siemens ( Berghof & ABB) PLC Systems.

Parameters monitoring on SCADA.

Steam Turbine 15 MW * 1

Steam Turbine 6 MW *1

WHR Boiler for STG

CAT MAK GAS (G16CM34) 5.9 MW * 5

CAT MAK HFO (16CM32) 7.4 MW * 2

Roll Royce GAS (V16AG) 6.8MW * 3

Roll Royce GAS (V20AG) 8.5MW * 1

Wärtsilä GAS (20V34 SG) 8.3MW *1

Wärtsilä HFO (18V32) 5.5 MW * 1

I worked as “Central Control Room Operator” in Thermal Power Project & Water Treatment Plant (RO) since April 2014 to November 2014.

13 MW THERMAL POWER PLANT OPERATE AND MONITOR ALL AUXILIARY AND

CONVENTIONAL SYSTEMS

Single Cycle Power Plant (Steam Turbines) capacity 13 MW. 1. Steam turbine (Siemens GK 26/40 10 MW *1) 2. Steam turbine (Siemens Back Pressure turbine 3 MW *1)

Solid Fuel (wood ships) fired Boiler 70 ton/hr. capacity and 30 bar pressure. (Water tube Boiler) for Steam Turbines.

Reverse Osmosis (RO1) water treatment plant 625m3 /day.

Reverse Osmosis (RO2) water treatment plant 380m3 /day.

Deionization (DI) plant mix bed polisher 500 m3 /day

LUCKY CEMENT LIMITED CONTROL ROOM OPERATOR SINCE DECEMBER 2014 – PRESENT

ARTISTIC FABRIC MILLS PRIVATE LIMITED C.C.R OPERATOR SINCE APRIL 2014 – NOVEMBER 2014

Page 5: Arsalan curriculum vitae

I worked as “Assistant Operator” in 55MW Power Plant since 2011 - 2014 and Plant Specification is.

55 MW POWER PLANT OPERATE AND MONITOR ALL AUXILIARY AND CONVENTIONAL SYSTEMS

Combine Cycle Power Plant 8.5 MW Gas turbine (Turbo Mach TAURUS 60 5.5*1) Steam turbine (Tut hill Nadrowski 3.0*1)

HRSG 16 ton/hr. capacity 42 bars pressure. (Single Pass Water tube Boiler) for Steam

Turbine.

Dual Fuel boiler (GAS and Furnas) 12ton/hr. capacity and 10 bar pressure fire tube boiler for stem chillers.

Waste Heat Recovery Boiler (WHRB) 1.5 ton/hr. capacity and 0.75 ton/hr. (Smoke tube Boilers) operating on Gen set exhaust.

Water Treatment Plant (DI plant and Soft water treatment plant), Economizer, Condenser, Super Heater, Gas Compressor, Air Compressor, Cooling towers, etc.

Gas Generator JENBACHER (JGS 420 1.4*3),(JGS 620 3.0*3),(JMS 620 3.0*2)

HFO Generators DUETZ (TBD 645 L8 3.1*2)

HFO Generators DUETZ (BV 8M 628 1.5 *7)

HFO separators’ (MFPX 307), Lube oil Purifiers’ (MMPX 404 & LOPX 705) and HFO Booster module system.

SAFETY AWARENESS Handsome Safety awareness against personal safety as well as plant safety.

Safe working procedures (According to work permits).

Use of Personal Protective Equipment’s (PPEs).

Attend One Day Fire Fighting Training Program from LUCKY CEMENT LTD.

AWARD Pakistan RED Crescent Society

RED Crescent services crops (volunteers’ auxiliary force) participated certificate.

Participated in earth quake relief camp victims at P.T.V station Karachi on 2005.

GATRON (INDUSTRIES) LIMITED POWER AND UTILITY ASSISTANT OPERATOR SINCE JUNE 2011 – APRIL 2014